Estudio_asada_la_arena - V7.0.pdf

  • Uploaded by: Alejandro Gonzalez
  • 0
  • 0
  • June 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Estudio_asada_la_arena - V7.0.pdf as PDF for free.

More details

  • Words: 19,741
  • Pages: 87
21 de marzo de 2019

ESTUDIO HÍDRICO E HIDRÁULICO ASADA LA ARENA, GRECIA, ALAJUELA.

ING. ALEJANDRO GONZÁLEZ BOLAÑOS IC-24424

PROFESIONAL RESPONSABLE La redacción, estimaciones y diseños presentados en este documento fueron realizadas por el ingeniero Alejandro González Bolaños, inscrito bajo los códigos IC-24424 e CI-337-16 en el Colegio Federado de Ingenieros y Arquitectos de Costa Rica (CFIA) y Secretaría Técnica Nacional Ambiental (SETENA), respectivamente.

____________________________ Ing. Alejandro González Bolaños Cédula 1-1354-0240 CFIA: IC-24424 SETENA: CI-337-16 Correo electrónico: [email protected]

i

ÍNDICE DE CONTENIDOS I.

Introducción ....................................................................................................................................................... 1

II.

Ubicación y extensión del acueducto ............................................................................................................... 2

III.

Infraestructura actual del acueducto ................................................................................................................ 4 III.1. Fuentes de abastecimiento ........................................................................................................................... 4 III.1.1. Cantidad de agua ................................................................................................................................... 4 III.1.2. Calidad de agua ..................................................................................................................................... 4 III.2. Tuberías ......................................................................................................................................................... 5 III.2.1. Tuberías de impulsión ........................................................................................................................... 5 III.2.2. Tuberías de conducción/distribución .................................................................................................... 5 III.2.3. Tuberías de distribución ........................................................................................................................ 6 III.2.4. Tuberías de conducción ........................................................................................................................ 6 III.3. Tanques de almacenamiento ........................................................................................................................ 6 III.4. Equipo de bombeo en Caseta de Bombeo .................................................................................................. 6

IV.

Balance hídrico para el escenario actual ......................................................................................................... 7 IV.1. Demanda actual del sistema ........................................................................................................................ 7 IV.1.1. Servicios atendidos ............................................................................................................................... 7 IV.1.2. Densidad poblacional ............................................................................................................................ 7 IV.1.3. Consumo promedio por habitante ........................................................................................................ 7 IV.1.4. Agua no contabilizada ........................................................................................................................... 7 IV.1.5. Demanda promedio del sistema .........................................................................................................10 IV.1.6. Demanda máxima diaria del sistema .................................................................................................10 IV.1.7. Demanda máxima horaria del sistema ...............................................................................................11 IV.2. Producción del sistema ...............................................................................................................................11 IV.3. Balance hídrico ............................................................................................................................................12 IV.4. Análisis volumétrico.....................................................................................................................................12 IV.4.1. Volumen requerido para combatir incendios .....................................................................................12 IV.4.2. Volumen requerido para regulación diaria .........................................................................................12 IV.4.3. Volumen requerido para abastecer el sistema durante interrupciones ............................................12 IV.4.4. Volumen total requerido ......................................................................................................................13

V.

Análisis hidráulico para el escenario actual – sin proyecto ..........................................................................13 V.1. Metodología ..................................................................................................................................................13 V.2. Criterios de aceptación ................................................................................................................................14

ii

V.3. Modelo ..........................................................................................................................................................14 V.4. Resultados ....................................................................................................................................................15 V.4.1. Escenario estático – caso actual, sin proyecto ...................................................................................16 V.4.2. Escenario máximo horario – caso actual, sin proyecto ......................................................................17 VI.

Proyecto por desarrollar ..................................................................................................................................18 VI.1. Tipo de proyecto ..........................................................................................................................................18 VI.2. Ubicación de proyecto.................................................................................................................................18 VI.3. Diseño de sitio de proyecto ........................................................................................................................18 VI.4. Demanda de agua potable asociada a proyecto .......................................................................................19 VI.5. Análisis hidráulico para escenario actual – con proyecto .........................................................................20 VI.5.1. Escenario estático – caso actual, con proyecto. ..............................................................................20 VI.5.2. Escenario máximo horario – caso actual, con proyecto...................................................................22

VII.

Mejoras propuestas ....................................................................................................................................23

VIII.

Balance hídrico para el escenario futuro ...................................................................................................24

VIII.1. Demanda futura del sistema .....................................................................................................................24 VIII.1.1. Servicios por atender ........................................................................................................................24 VIII.1.2. Densidad poblacional ........................................................................................................................25 VIII.1.3. Consumo promedio por habitante ....................................................................................................25 VIII.1.4. Agua no contabilizada .......................................................................................................................25 VIII.1.5. Demanda promedio del sistema .......................................................................................................25 VIII.1.6. Demanda máxima diaria del sistema ...............................................................................................25 VIII.1.7. Demanda máxima horaria del sistema .............................................................................................26 VIII.2. Producción del sistema .............................................................................................................................26 VIII.3. Balance hídrico ..........................................................................................................................................26 VIII.4. Análisis volumétrico ..................................................................................................................................26 IX.

Análisis hidráulico para el escenario futuro ...................................................................................................28 IX.1. Modelo .........................................................................................................................................................28 IX.2. Resultados ...................................................................................................................................................28 IX.2.1. Escenario estático ...............................................................................................................................28 IX.2.2. Escenario máximo horario ..................................................................................................................30

X.

Presupuesto de obras .....................................................................................................................................31

XI.

Conclusiones ...................................................................................................................................................32 XI.1. Conclusión principal ....................................................................................................................................32 XI.2. Conclusiones secundarias ..........................................................................................................................32

XII.

Bibliografía...................................................................................................................................................33

iii

XIII.

Anexos .........................................................................................................................................................34

iv

ÍNDICE DE CUADROS Cuadro 1. Cantidad de agua según estudio. ............................................................................................................ 4 Cuadro 2. Calidad de agua. ....................................................................................................................................... 5 Cuadro 3. Desglose de la producción de agua potable en un acueducto. ............................................................. 8 Cuadro 4. Consumo promedio de la ASADA, escenario actual. ...........................................................................10 Cuadro 5. Demanda promedio de la ASADA, escenario actual. ...........................................................................10 Cuadro 6. Demanda máxima diaria de la ASADA, escenario actual. ...................................................................11 Cuadro 7. Demanda máxima horaria de la ASADA, escenario actual. .................................................................11 Cuadro 8. Consumo promedio para proyecto residencial por desarrollar. ...........................................................19 Cuadro 9. Demanda promedio para proyecto residencial por desarrollar. ...........................................................20 Cuadro 10. Demanda máxima diaria para proyecto residencial por desarrollar. .................................................20 Cuadro 11. Demanda máxima horaria para proyecto residencial por desarrollar. ...............................................20 Cuadro 12. Servicios por atender - año 2038, ASADA La Arena. .........................................................................24 Cuadro 13. Consumo promedio de la ASADA, escenario futuro (sin incluir Proyecto La Arena). ......................25 Cuadro 14. Demanda promedio de la ASADA, escenario futuro (sin incluir Proyecto La Arena). ......................25 Cuadro 15. Demanda máxima diaria de la ASADA, escenario futuro (sin incluir Proyecto La Arena). ..............25 Cuadro 16. Demanda máxima horaria de la ASADA, escenario futuro (sin incluir Proyecto La Arena). ............26 Cuadro 17. Presupuesto de obras...........................................................................................................................31 Cuadro 18. Resumen de resultados - nodos de la red - caso actual – escenario estático, sin proyecto. ..........34 Cuadro 19. Resumen de resultados - tuberías de la red - caso actual – escenario estático, sin proyecto. .......37 Cuadro 20. Resumen de resultados - nodos de la red - caso actual – consumo máximo horario, sin proyecto. ...................................................................................................................................................................................40 Cuadro 21. Resumen de resultados - tuberías de la red - caso actual – escenario estático, sin proyecto. .......43 Cuadro 22. Resumen de resultados - nodos de la red - caso actual - escenario estático, con proyecto. ..........46 Cuadro 23. Resumen de resultados - tuberías de la red - caso actual - escenario estático, con proyecto........49 Cuadro 24. Resumen de resultados - nodos de la red - caso actual – consumo máximo horario, con proyecto. ...................................................................................................................................................................................52 Cuadro 25. Resumen de resultados - tuberías de la red - caso actual – consumo máximo horario, con proyecto. ...................................................................................................................................................................................55 Cuadro 26. Resumen de resultados - nodos de la red - caso futuro – escenario estático, con proyecto...........58 Cuadro 27. Resumen de resultados - tuberías de la red - caso futuro – escenario estático, con proyecto. ......61 Cuadro 28. Resumen de resultados - nodos de la red - caso futuro – consumo máximo horario, con proyecto. ...................................................................................................................................................................................64 Cuadro 29. Resumen de resultados - tuberías de la red - caso futuro – consumo máximo horario, con proyecto. ...................................................................................................................................................................................68

v

ÍNDICE DE FIGURAS Figura 1. Ubicación de ASADA y proyecto La Arena sobre imagen satelital Google Earth. ................................. 2 Figura 2. Ubicación del Proyecto La Arena en hoja cartográfica Naranjo 1:50,000............................................... 3 Figura 3. ANC en Costa Rica para Acueductos Operados por AyA. ...................................................................... 9 Figura 4. Modelo del acueducto - caso actual. .......................................................................................................15 Figura 5. Modelo de caso estático, caso actual......................................................................................................16 Figura 6. Modelo de consumo máximo horario, caso actual, sin proyecto. ..........................................................17 Figura 7. Diseño de sitio – Proyecto La Arena. ......................................................................................................19 Figura 8. Salida gráfica - caso actual, escenario estático, con proyecto. .............................................................21 Figura 9. Salida gráfica - caso actual, escenario máximo horario, con proyecto. ................................................22 Figura 10. Mejoras propuestas. ...............................................................................................................................23 Figura 11. Modelo de escenario estático, caso futuro............................................................................................29 Figura 12. Modelo de consumo máximo horario, caso futuro. ...............................................................................30

vi

I.

INTRODUCCIÓN En el presente estudio, se realiza un análisis de las condiciones hídricas e hidráulicas del cantón de Grecia, específicamente del acueducto La Arena, administrado por la ASADA La Arena. El objetivo de este análisis es determinar si el nuevo proyecto residencial, denominado “Proyecto La Arena”, se puede abastecer satisfactoriamente de este acueducto. El trabajo desarrollado tiene cuatro aristas principales: el componente topográfico, utilizado para realizar el análisis hidráulico, el análisis de campo realizado para ubicar, identificar y caracterizar los elementos existentes del acueducto, la revisión de información técnica y normativa de apoyo y los análisis hídricos e hidráulicos correspondientes. Como insumos básicos para este trabajo, se utilizan los informes realizados por Geotec (2014), ICEA (2011), UCR (2017) y UNA (2009), reportes de aforos y pruebas de calidad de agua de las fuentes de abastecimiento, características básicas del acueducto existente e información general sobre el proyecto residencial por desarrollar, así como el levantamiento topográfico aportado por el desarrollador.

1

II.

UBICACIÓN Y EXTENSIÓN DEL ACUEDUCTO El acueducto se ubica en los distritos de Tacares y San José, cantón de Grecia, provincia de Alajuela. El acueducto se extiende a lo largo de 5.0km sobre vías públicas nacionales y municipales, además de 1.65km a través de propiedades privadas. Los elementos indicados en la Figura 1 fueron levantados en campo y georreferenciados por parte del desarrollador.

Figura 1. Ubicación de ASADA y proyecto La Arena sobre imagen satelital Google Earth.

En la Figura 2, se muestra la ubicación del Proyecto La Arena sobre la hoja cartográfica Naranjo 1:50,000 del Instituto Geográfico Nacional (IGN). De acuerdo con esta figura, el proyecto se ubica en las coordenadas [504600 – 227150] de la hoja cartográfica.

2

Figura 2. Ubicación del Proyecto La Arena en hoja cartográfica Naranjo 1:50,000.

3

III.

INFRAESTRUCTURA ACTUAL DEL ACUEDUCTO A continuación, se discuten las características de las fuentes de abastecimiento del acueducto, de sus tuberías, tanques y sistemas de bombeo. III.1. Fuentes de abastecimiento El acueducto cuenta con tres fuentes de abastecimiento: Naciente Oviedo, Naciente Rodríguez y el manantial conocido como “Ojo de Agua”.

III.1.1. Cantidad de agua La información sobre la producción de agua del sistema (cantidad de agua), se obtiene a partir de los cuatro informes anteriores elaborados por Geotec (2014), ICEA (2011), UCR (2017) y UNA (2009). Esta información se resume en el Cuadro 1. Cuadro 1. Cantidad de agua según estudio.

UCR (2009) No indica.

ICEA (2011) Único aforo en la entrada a un tanque de almacenamiento: 7.93 lps. Corresponde a la naciente Ojo de Agua.

GEOTEC (2014) ASADA suministra información del 2013. Resultados: Oviedo 1 – desde 10.60 lps hasta 20.79 lps, Oviedo 2 – desde 10.0 lps hasta 39.83 lps, Rodríguez desde 5.93 lps hasta 17.99 lps, Ojo de Agua – 16.0 lps.

UCR (2017) Realiza aforos en las nacientes Los Oviedo 1, Los Oviedo 2, Los Rodríguez 1, Los Rodríguez 2, Ojo de Agua y en la entrada del tanque que capta las nacientes Los Oviedo y Los Rodríguez. Resultados: Oviedo 1 4.73 lps, Oviedo 2 – N/A, Rodríguez 1 – 5.33 lps, Rodríguez 2 – 1.57 lps, Ojo de Agua – N/A.

Con base en la información del cuadro anterior, se asignan las siguientes producciones a cada una de las fuentes del sistema analizado, utilizando las menores mediciones disponibles:    

Naciente Oviedo: 14.73 lps. Naciente Rodríguez: 5.93 lps. Manantial Ojo de Agua: 7.93 lps Total disponible: 28.56 lps

Considerando la información disponible, se desestima la necesidad de realizar nuevos aforos en el sistema

III.1.2. Calidad de agua De acuerdo con la administración del acueducto, el agua se trata previo a su distribución según se detalla a continuación:   

El agua que se capta de la Naciente Los Rodríguez se clora, por medio de pastillas, en la propia captación. El agua que se capta de la Naciente Los Oviedo se clora, por medio de pastillas, en el tanque #2. El agua que se capta del manantial Ojo de Agua se clora, por medio de un sistema de goteo, en el sitio de la Caseta de Bombeo.

4

En el Cuadro 2, se resume la información sobre calidad de agua realizada en los cuatro informes elaborados anteriormente por otras consultorías; Cuadro 2. Calidad de agua.

UCR (2009) No indica.

ICEA (2011) No indica.

GEOTEC (2014) No indica.

UCR (2017) Mediciones de pH y temperatura en los cinco puntos.

Los resultados de UCR (2009), se resumen a continuación:   

Naciente Oviedo: pH 5.83, temperatura 21.5°C. Naciente Rodríguez: pH 5.96, temperatura 21.4°C. Manantial Ojo de Agua: pH 5.91, temperatura 18.5°C.

Además, se cuenta con los estudios AYA-ID-01025-2018, AYA-ID-01024-2018, AYA-ID-01022-2018 y AYAID-01021-2018, del Laboratorio Nacional de Aguas, todos ellos adjuntos al presente informe, en los cuales se determina que todas las mediciones cumplen con el Reglamento para la Calidad de Agua Potable N°38924-S. Las muestras de agua de los cuatro estudios indicados anteriormente fueron en los siguientes sitios: en un punto de la red de distribución, en la naciente Rodríguez, en la naciente Oviedo y en el manantial Ojo de Agua, respectivamente. Por lo tanto, se determina que la calidad del agua captada y distribuida es apta para consumo humano.

III.2. Tuberías Se subdividen las tuberías en cuatro apartados: de impulsión, de conducción/distribución, de distribución y de conducción.

III.2.1. Tuberías de impulsión La única tubería de impulsión es aquella que se extiende desde la caseta de bombeo, que recibe la tubería de conducción proveniente de Ojo de Agua y bombea el agua hacia los tanques “Tanque 1” y “Tanque 2” (referirse a Figura 1). Esta tubería tiene una longitud de 430m, es de PVC SDR 26 de 4” de diámetro nominal; inicia en la cota 972m (Caseta de Bombeo) y termina en la cota 1032m (Tanques 1 y 2).

III.2.2. Tuberías de conducción/distribución Por conducción/distribución se entiende aquellas tuberías que comunican tanques o nacientes con otros tanques, a medida que distribuyen a los abonados de la red. En el acueducto analizado se encuentran tres ejemplos de esta condición: 





Naciente Los Rodríguez – Tanques 1 y 2: tubería de 3.5km de longitud, en PVC SDR 26 con diámetro nominal de 3”. Cota de inicio: 1103m (Naciente Los Rodríguez), cota final: 1032m (Tanque 1 y Tanque 2); diferencia máxima de elevaciones: 71m. Naciente Los Oviedo – Tanques 1 y 2: tubería de 3.57km de longitud, en PVC SDR 26 con diámetro nominal de 3”. Cota de inicio: 1109m (Naciente Los Rodríguez), cota final: 1032m (Tanque 1 y Tanque 2); diferencia máxima de elevaciones: 65m. Tanques 1 y 2 – Tanque El Guayabal: se divide en dos tramos con distinto diámetro, el primero es de 441m de longitud en PVC SDR 26 con diámetro nominal de 4” y, el segundo, es de 244m de

5

longitud en PVC SDR 26 con diámetro nominal de 3”. Cota de inicio: 1032m (Tanque 1 y Tanque 2), cota final: 1015m (Tanque El Guayabal); diferencia de elevaciones entre inicio y fin: 65m.

III.2.3. Tuberías de distribución Las tuberías existentes que son netamente de distribución son las indicadas a continuación: 





Tanque 1 y Tanque 2 hacia las viviendas de la calle La Arena (sector Grecia). Esta tubería es de PVC SDR 26 de 3” de diámetro nominal y tiene una extensión de 1,032m. Cota de inicio: 1032m (Tanque 1 y Tanque 2), cota final: 962m, diferencia máxima de elevaciones: 70m. Tanque El Guayabal hacia las viviendas de la calle pública sin nombre (sector Guayabal), sobre la cual se ubica el Proyecto La Arena. Esta tubería es de PVC SDR 26 de 4” de diámetro nominal y tiene una extensión de 2,610m. Cota de inicio: 1015m (Tanque Guayabal), cota final: 905m, diferencia máxima de elevaciones: 110m. Sector central: Esta tubería es de PVC SDR 26 de 4” de diámetro nominal y tiene una extensión de 1,928m. Cota de inicio: 992m (colindancia con sector Grecia), cota final: 952m, diferencia máxima de elevaciones: 40m.

III.2.4. Tuberías de conducción Solamente una tubería funciona netamente como una conducción: aquella que inicia en el manantial Ojo de Agua y finaliza en la Caseta de Bombeo. Esta tubería es de PVC SDR 26 de 6” de diámetro nominal y tiene una extensión de 1.65km. Cota de inicio: 986m (Tanque 1 y Tanque 2), cota final: 972m (Caseta de Bombeo), diferencia máxima de elevaciones: 14m.

III.3. Tanques de almacenamiento El sistema cuenta con tres tanques de almacenamiento: Tanque 1, Tanque 2 (contiguo a Tanque 1, funcionan como una batería por lo que se tratarán como uno solo) y Tanque El Guayabal. Las principales características de interés de estas estructuras se presentan a continuación. 



Tanque 1 y Tanque 2: Cada uno de estos dos tanques cuenta con un volumen de 45m3, para un total de 90m3. Ambas estructuras son de concreto, se encuentran parcialmente enterrados y se ubican en predios separados, prácticamente a la par (uno a cada lado de la vía pública). Cada uno de estos predios se encuentra cercado con malla ciclón. Tanque El Guayabal: Volumen de 58m3. Estructura de concreto, parcialmente enterrado, con predio cercado por malla ciclón.

III.4. Equipo de bombeo en Caseta de Bombeo Según indica la administración de acueducto, el equipo instalado consiste de un equipo de 15 HP de potencia, el cual usualmente opera a una carga de 70 psi. Se desconoce la marca, modelo y curva característica de la bomba.

6

IV.

BALANCE HÍDRICO PARA EL ESCENARIO ACTUAL En el presente capítulo, se realiza un balance hídrico para la ASADA de La Arena, para determinar si, en la actualidad, existe un superávit o un déficit de agua. IV.1. Demanda actual del sistema A continuación, se procede a calcular la demanda de agua potable del acueducto.

IV.1.1. Servicios atendidos Actualmente, de acuerdo con reporte de la ASADA de todo el año 2017, el acueducto cuenta con 564 abonados activos.

IV.1.2. Densidad poblacional De acuerdo con el censo nacional 2011 (Instituto Nacional de Estadística y Censos – INEC), para el distrito de Tacares, la densidad poblacional promedio es de 3.6 habitantes por vivienda.

IV.1.3. Consumo promedio por habitante El acueducto cuenta con micromedición. De acuerdo con el reporte operacional de la ASADA para el año 2017, el consumo mensual por prevista domiciliar osciló entre los 20m3 (meses mayo y junio) y los 31m3 (abril), para un promedio de 23m3 por mes. Considerando la información expuesta en la sección IV.1.2, el consumo, per cápita, para un mes promedio es de 210 l/hab/d y, para meses de alto consumo, de 283 l/hab/d. Este último dato será el considerado para el análisis.

IV.1.4. Agua no contabilizada El agua no contabilizada (ANC) representa el caudal que no se puede medir directamente, producto principalmente de fugas en las tuberías y de las conexiones ilícitas. El ANC se calcula al restar el agua facturada a los abonados a la producción conocida del sistema. 𝐴𝑁𝐶[%] =

𝑃𝑇 − 𝐶𝑇 ∙ 100 𝑃𝑇

En donde:  

𝑃𝑇 : Producción total conocida del sistema de abastecimiento. 𝐶𝑇 : Consumo total del sistema, conocido por la facturación del servicio.

De acuerdo a AyA (2012), en Costa Rica, “… el agua no contabilizada se origina principalmente en pérdidas en los rebalses y fugas en los tanques de almacenamiento, por infiltración o roturas en las redes de conducción y distribución, usos exentos de cobro como los hidrantes y usuarios no facturados como es el caso de los precarios. Además, el agua no contabilizada puede originarse en conexiones ilegales y débil monitoreo debido a la falta de instrumentos de medición (macromedidores y micromedidores) que alerten sobre fugas en los componentes de los sistemas de acueducto”; adicionalmente, se mencionan fallas en el control de las presiones de agua. El ANC, usualmente representada como un porcentaje de la demanda medible del sistema, debe ser obligatoriamente considerado en los cálculos del acueducto, especialmente si se trata de sistemas antiguos, ya que estos sistemas suelen contar con altos porcentajes de ANC. En la práctica, difícilmente se encontrarán acueductos sin fugas (exceptuando casos de acueducto nuevos) y, para los casos de acueductos antiguos, será frecuente encontrar conexiones ilícitas, que generalmente son en tuberías de gran diámetro y de mala calidad, lo que aumenta las fugas del sistema.

7

Según metodología IWWA, el total de agua entrante es igual al consumo autorizado (resaltado en azul) más las pérdidas de agua (resaltado en rojo), según se muestra en el Cuadro 3: Cuadro 3. Desglose de la producción de agua potable en un acueducto.

Consumo Autorizado Volumen de Entrada Pérdidas de Agua

Autorizado Facturado Autorizado No Facturado Pérdidas Aparentes

Facturado Medido Facturado No-Medido

Agua Facturada

No Facturado - Medido No Facturado - No Medido No Autorizado

Agua No Facturada

Inexactitud Micromedición Pérdidas Físicas

Adaptado de: IWWA (2012).

Se detalla cada uno de los componentes del cuadro anterior: Consumo Autorizado: se descompone en Autorizado Facturado y Autorizado No Facturado. Incluya todas las actividades conocidas y aceptadas dentro de la administración del acueducto. Incluye los siguientes rubros:  

Autorizado Facturado: es el resultado de la suma de Facturado Medido (abonados facturando según consumo) más Facturado No Medido (abonados con tarifa fija). Autorizado No Facturado es el resultado de la suma de No Facturado Medido (precarios, escuelas, ancianatos y otros centros en los que se conozca su consumo, pero no se les cobre) más No Facturado No Medido (bomberos, limpieza de calles y otras actividades que demanden agua, pero por su complejidad no se mide su consumo).

Por otra parte, las Pérdidas de Agua se subdividen en Pérdidas Aparentes y Pérdidas Físicas (fugas). 

Pérdidas Aparentes: se compone de No Autorizado (conexiones ilícitas) + Inexactitud Macromedición (asociado generalmente a medidores viejos).

En el ámbito nacional, se manejan cifras elevadas de ANC real, según se aprecia en la Figura 3. De acuerdo a esta figura, es común tener ANC mayores al 50%; sin embargo, se han detectado acueductos con buena gestión técnica de operación que llegan a valores de ANC entre el 15% y el 25%.

8

Figura 3. ANC en Costa Rica para Acueductos Operados por AyA. Fuente: AyA (2012).

IFAM (2010), en su estudio Anexo 9, parte del Programa de Agua Potable y Saneamiento para el Nivel Subnacional, se enfoca en estimar un valor de ANC real, basándose en las pérdidas técnicas inevitables del acueducto. El estudio desarrolla la siguiente ecuación, la cual se considera válida siempre y cuando la densidad de conexiones 𝑁𝑐 ⁄𝐿 > 20.0; 𝑃𝑇𝐼 = (

18 ∙ 𝐿 𝐿𝑎 + 0.80 ∙ 𝑁𝑐 + 25 ∙ ) ∙ 𝑃 𝑁𝐶 𝑁𝑐

[𝑒𝑐. 1]

En donde:     

𝑃𝑇𝐼: Pérdidas técnicas inevitables [litros/día] 𝐿: Longitud total de la red [km]. 𝑁𝑐 : Número de conexiones de la red [conexiones]. 𝐿𝑎 : Longitud de acometidas [km]. 𝑃: Presión media del sistema [m.c.a.].

Para el acueducto en cuestión, sustituyendo las variables de la ecuación 1 con la información del presente informe: 𝑃𝑇𝐼 = (

18 ∙ 6.5 10 + 0.80 ∙ 564 + 25 ∙ ) ∙ 25 = 0.2 + 451 + 0.4 = 452 𝑙𝑝𝑑 564 564

Se obtiene entonces que las pérdidas técnicas inevitables del acueducto son del orden de los 452 litros por día (0.005 lps), cifra despreciable con respecto a los requerimientos de agua potable del acueducto. Considerando además la reducida extensión del acueducto y la cantidad de previstas existente, se propone, de manera conservadora, utilizar un factor de ANC igual al 20% de la producción total del acueducto, para la situación actual.

9

IV.1.5. Demanda promedio del sistema La demanda promedio del sistema se calcula según la ecuación 2: 𝐷𝑝𝑟𝑜𝑚 =

𝐶𝑝𝑟𝑜𝑚 1 − 𝑃𝐴𝑁𝐶

[𝑒𝑐. 2]

En donde:   

𝐶𝑝𝑟𝑜𝑚 : Consumo promedio [lps]. 𝑃𝐴𝑁𝐶 : Agua no contabilizada [%]. 𝐷𝑝𝑟𝑜𝑚 : Demanda promedio de agua potable del sistema [lps]. Se procede a desarrollar la ecuación 2 utilizando la información recopilada en los dos subcapítulos anteriores. Sin embargo, primero es necesario calcular el consumo promedio de la ASADA (referirse a Cuadro 4). Cuadro 4. Consumo promedio de la ASADA, escenario actual.

Servicios por atender

Densidad poblacional

Consumo individual promedio

Consumo promedio

N [#] 564.0

ρ [hab/serv] 3.60

Ci [litros/hab/d] 283.00

Cprom [lps] 6.65

El consumo promedio de la ASADA, para el escenario actual, corresponde a 6.65 litros por segundo. Conociendo el consumo promedio y el ANC, se calcula la demanda promedio de agua potable (ver Cuadro 5). Cuadro 5. Demanda promedio de la ASADA, escenario actual.

Consumo promedio Cprom [lps] 6.65

Agua no contabilizada

Demanda promedio

Demanda promedio

PANC [%] 20.0%

Dprom [lps] 8.31

Dprom [m3/d] 718.25

La demanda promedio de la ASADA, según calculado en el cuadro anterior, corresponde a 8.31 litros por segundo. Esta cifra equivale a un requerimiento hídrico de 718 metros cúbicos diarios (1.27 metros cúbicos por servicio).

IV.1.6. Demanda máxima diaria del sistema La demanda máxima diaria del sistema se calcula según la ecuación 3: 𝐷𝑀𝐷 = 𝐶𝑝𝑟𝑜𝑚 ∙ 𝐹𝑀𝐷 + 𝑃𝐴𝑁𝐶 ∙ 𝐷𝑝𝑟𝑜𝑚

[𝑒𝑐. 3]

En donde:

10

 

𝐹𝑀𝐷 : Factor máximo diario de consumo [adim]. Valor igual a 1.20 cuando no se tenga información específica del sistema (AyA, 2017). 𝐷𝑀𝐷 : Demanda máxima diaria de agua potable del sistema [lps]. Desarrollando la ecuación 3 con la información recopilada en los tres subcapítulos anteriores: Cuadro 6. Demanda máxima diaria de la ASADA, escenario actual.

Consumo promedio Cprom [lps] 6.65

Factor máximo diario de consumo FMD [adim] 1.20

Agua no Demanda Demanda contabilizada promedio máxima diaria PANC Dprom DMD [%] [lps] [lps] 20.0% 8.31 9.64

Demanda máxima diaria DMD [m3/d] 833.17

La demanda máxima diaria de la ASADA, según calculado en el Cuadro 6, corresponde a 9.64 litros por segundo. Esta cifra equivale a un requerimiento hídrico de 833 metros cúbicos diarios (1.48 metros cúbicos por servicio).

IV.1.7. Demanda máxima horaria del sistema La demanda máxima horaria del sistema se calcula según la ecuación 4: 𝐷𝑀𝐻 = 𝐶𝑝𝑟𝑜𝑚 ∙ 𝐹𝑀𝐻 + 𝑃𝐴𝑁𝐶 ∙ 𝐷𝑝𝑟𝑜𝑚

[𝑒𝑐. 4]

En donde:  

𝐹𝑀𝐻 : Factor máximo horario de consumo [adim]. Valor igual a 1.80 cuando no se tenga información específica del sistema (AyA, 2017). 𝐷𝑀𝐻 : Demanda máxima horaria de agua potable del sistema [lps].

Se procede a resolver la ecuación 4 con base en la información de los subcapítulos IV.1.5. Demanda promedio del sistema y IV.1.4. Agua no contabilizada: Cuadro 7. Demanda máxima horaria de la ASADA, escenario actual.

Consumo promedio Cprom [lps] 6.65

Factor máximo horario de consumo FMH [adim] 1.80

Agua no contabilizada PANC [%] 20.0%

Demanda promedio Dprom [lps] 8.31

Demanda máxima horaria DMH [lps] 13.63

De acuerdo a lo indicado en el Cuadro 7, la demanda máxima horaria para la ASADA, en la actualidad, corresponde a 13.63 lps.

IV.2. Producción del sistema Se utilizará la información expuesta en la sección III.1.1: Fuente de agua, en el cual se indican las producciones de cada naciente. En resumen:

11

   

Naciente Oviedo: 14.73 lps. Naciente Rodríguez: 5.93 lps. Manantial Ojo de Agua: 7.93 lps Total disponible: 28.56 lps

IV.3. Balance hídrico Se procede a realizar un balance hídrico, utilizando la siguiente expresión: 𝐵𝐻 = 𝑃𝐴 − 𝐷𝑀𝐷

[𝑒𝑐. 5]

En donde:   

𝐵𝐻 : balance hídrico del acueducto [m3/d]. 𝑃𝐴 : producción del acueducto [m3/d]. 𝐷𝑀𝐷 : demanda máxima diaria [m3/d].

Para este caso, utilizando la información calculada en los subcapítulos IV.1. Demanda actual del sistema y IV.2. Producción del sistema: 𝐵𝐻 = 28.56 𝑙𝑝𝑠 − 9.64 𝑙𝑝𝑠 = 18.92 𝑙𝑝𝑠 Se determina entonces que, para el caso actual, sin realizar ninguna mejora al sistema, el acueducto cuenta con un superávit de 18.92 lps, o bien, el equivalente a 1,635 m3/d.

IV.4. Análisis volumétrico En este subcapítulo, se explica la metodología de cálculo para determinar el volumen requerido para los tanques de almacenamiento de agua potable, según AyA (2017). Este volumen total de almacenamiento se divide en tres componentes: volumen requerido para combatir incendios, volumen requerido para regulación diaria y volumen requerido para abastecer el sistema durante interrupciones.

IV.4.1. Volumen requerido para combatir incendios El volumen requerido para combatir incendios, se determina con base en el “Reglamento a la Ley de Hidrantes 8461 del Benemérito Cuerpo de Bomberos”: “(…) el tanque debe tener, como reserva adicional para incendio, 15 metros cúbicos de agua para conjuntos habitacionales cuyas casas estés separadas y 22 metros cúbicos de agua para conjuntos habitacionales cuyas casas sean contiguas.”

IV.4.2. Volumen requerido para regulación diaria Según AyA (2017), en caso de no contar con información particular, corresponde a 14% del caudal promedio diario. Es posible que este volumen sea igual a cero, cuando la producción de las fuentes sea mayor a la demanda máxima horaria del sistema. Es decir, no se necesitará volumen de regulación cuando el potencial caudal que ingresa al tanque sea mayor que el caudal que sale del tanque, para cualquier periodo del día.

IV.4.3. Volumen requerido para abastecer el sistema durante interrupciones Aquel volumen equivalente a cuatro horas del caudal promedio diario del acueducto.

12

IV.4.4. Volumen total requerido El volumen total requerido por el tanque es la suma de los tres volúmenes estipulados anteriormente; es decir: 𝑉𝑅𝑒𝑞 = 𝑉𝐼𝑛𝑐 + 𝑉𝑅𝑒𝑔 + 𝑉𝐼𝑛𝑡

[𝑒𝑐. 6]

En donde:    

𝑉𝑅𝑒𝑞 : Volumen total requerido de almacenamiento [m3]. 𝑉𝐼𝑛𝑐 : Volumen requerido para combatir incendios [m3]. 𝑉𝑅𝑒𝑔 : Volumen requerido para regulación diaria [m3]. 𝑉𝐼𝑛𝑡 : Volumen requerido para abastecer el sistema durante interrupciones [m3].

Para este caso,    

El volumen de regulación equivale a 101 m3: demanda promedio diaria de 718 m3/d, según la sección IV.1.5, multiplicado por un factor igual a 14%. El volumen de interrupciones equivale a 120 m3: demanda promedio diaria de 718 m3/d, según la sección IV.1.5, multiplicado por un coeficiente de 4h/24h. Para incendios, se utiliza un volumen de 22 m3 (referirse a sección IV.4.2.). El volumen total requerido es la suma de los tres anteriores: 101 + 120 + 22 = 243m3.

Este volumen requerido de 243 m3 es mayor que los 149 m3 existentes. Por lo tanto, las condiciones actuales de almacenamiento no son satisfactorias. Cabe resaltar que este requerimiento estimado de 243 m3 es conservador, ya que se supone que incluso la población ubicada aguas arriba de los tanques #1 y #2 se abastecen de tanques. De eliminar esta población de los requerimientos de almacenamiento, los requerimientos de almacenamiento son sustancialmente menores: (79 m3 de regulación + 95 m3 de interrupciones + 22 m3 de incendios = 196 m3). De acuerdo con los dos párrafos anteriores, en cualquiera de los dos escenarios, el volumen existente de almacenamiento no es apropiado para los requerimientos actuales del sistema.

V.

ANÁLISIS HIDRÁULICO PARA EL ESCENARIO ACTUAL – SIN PROYECTO Se procede a analizar las velocidades de flujo y presiones en el sistema.

V.1. Metodología Se utiliza la topografía aportada por el desarrollador para crear la superficie digital del terreno en el software Autodesk Civil 3D. Para la modelación hidráulica, se utiliza el software de licencia libre EPAnet 2.0.

13

V.2. Criterios de aceptación Los criterios de aceptación o no-aceptación se realizan con base en normativa AyA:    

Velocidades de flujo menores a 3.0 m/s en las tuberías de distribución. Presión máxima de 70.0 mca en previstas domiciliares. Presión mínima de 10.0 mca en previstas domiciliares. Presión máxima de 90.0 mca en tubería de distribución (considerando un factor de reducción de 0.8 de la presión de trabajo de la tubería PVC SDR 26).

V.3. Modelo Se distribuyen los consumos del sistema de acuerdo con la distribución porcentual de servicios indicada en el estudio de Geotec (2014, tabla 2.1). De acuerdo con este informe, la distribución de servicios obedece a la siguiente proporción: + + + + +

Guayabal: 36% Central: 31% Norte: 21% Grecia: 12% Total: 100%

En la Figura 4, se muestra la elevación de los nodos y los diámetros de tubería utilizados para este escenario, así como la nomenclatura de todos los nodos del sistema.

14

Figura 4. Modelo del acueducto - caso actual.

V.4. Resultados En las figuras Figura 6 y Figura 5 se imprimen los resultados visuales del análisis hidráulico realizado para los escenarios “máximo horario” y “estático”, respectivamente. La memoria de cálculo se incluye en el capítulo Anexos, en los cuadros [Cuadro 18 a Cuadro 21].

15

V.4.1. Escenario estático – caso actual, sin proyecto Prácticamente todo el acueducto presenta presiones satisfactorias; únicamente los sectores Guayabal-sur y Central-sur presenta presiones superiores a lo recomendado, mientras que las zonas cercanas a las nacientes Rodríguez y Oviedo presentan presiones bajas.

Figura 5. Modelo de caso estático, caso actual.

16

V.4.2. Escenario máximo horario – caso actual, sin proyecto La red presenta presiones bajas en los sectores Norte, Central y Grecia; incluso, algunas presentan valores de presión inferior a cero, lo que es señal de las tuberías existentes no se encuentran en capacidad de trasegar el caudal solicitado por cada uno de esos nodos. Por otra parte, el acueducto presenta presiones altas en el sector Guayabal sur.

Figura 6. Modelo de consumo máximo horario, caso actual, sin proyecto.

17

VI.

PROYECTO POR DESARROLLAR A continuación, se realiza una síntesis del proyecto residencial por desarrollar; se detalla la categorización de proyecto bajo el cual se tramitará, se aporta su plano catastrado y se presenta el masterplan (diseño de sitio). Por último, se detallan los requerimientos hídricos de este proyecto. VI.1. Tipo de proyecto El proyecto por desarrollar es propiedad del ing. Alvaro Paniagua Murillo, radicado en Grecia, Alajuela. Este proyecto se tramitará bajo la figura de “condominio residencial de fincas filiales primarias individualizadas”, también conocido como “condominio de FFPI”; es decir, un condominio de lotes.

VI.2. Ubicación de proyecto La ubicación del proyecto La Arena se presenta en la hoja cartográfica 1:50,000 del IGN en la p. 3. Las coordenadas del proyecto se indican a continuación: 

504600 E, 227200 N.

El plano catastrado del proyecto es el siguiente: 

A-1770534-2014.

VI.3. Diseño de sitio de proyecto A continuación, se presenta el diseño de sitio Proyecto La Arena, el cual cuenta con 22 fincas filiales.

18

Figura 7. Diseño de sitio – Proyecto La Arena.

VI.4. Demanda de agua potable asociada a proyecto De acuerdo con el diseño de sitio del proyecto La Arena y utilizando un consumo igual al de la población analizada (capítulo IV.1.), se determina la demanda de agua potable del Proyecto La Arena, utilizando la ecuación 2. Considerando el mismo factor de ANC de 20%, la demanda promedio del proyecto corresponde a 0.32 lps, según se presenta en el Cuadro 9. Cuadro 8. Consumo promedio para proyecto residencial por desarrollar.

Servicios por atender N [#] 22.0

Densidad poblacional ρ [hab/serv] 3.60

Consumo individual promedio

Consumo promedio

Ci [litros/hab/d] 283.00

Cprom [lps] 0.26

19

Cuadro 9. Demanda promedio para proyecto residencial por desarrollar.

Consumo promedio

Agua no contabilizada

Demanda promedio

Demanda promedio

Cprom [lps] 0.26

PANC [%] 20.0%

Dprom [lps] 0.32

Dprom [m3/d] 28.02

Utilizando el mismo factor de consumo máximo diario (FMD) del apartado IV.1.6, se obtiene la demanda máxima diaria esperada para el proyecto residencial por desarrollar. Nuevamente, se utiliza la ecuación 3 para calcular la DMD. De acuerdo con el Cuadro 10, la demanda máxima diaria del Proyecto La Arena corresponde a 0.38 lps (32.50 m3/d). Cuadro 10. Demanda máxima diaria para proyecto residencial por desarrollar.

Consumo promedio

Factor máximo diario de consumo

Agua no contabilizada

Demanda promedio

Demanda máxima diaria

Demanda máxima diaria

Cprom [lps] 0.26

FMD [adim] 1.20

PANC [%] 20.0%

Dprom [lps] 0.32

DMD [lps] 0.38

DMD [m3/d] 32.50

El cálculo de la demanda máxima horaria se presenta en el Cuadro 11. Para este cuadro, se utilizan los mismos factores de demanda que para el resto del acueducto. Para el Proyecto La Arena, la demanda máxima horaria corresponde a 0.53 lps. Cuadro 11. Demanda máxima horaria para proyecto residencial por desarrollar.

Consumo promedio

Factor máximo horario de consumo

Agua no contabilizada

Demanda promedio

Demanda máxima horaria

Cprom [lps] 0.26

FMH [adim] 1.80

PANC [%] 20.0%

Dprom [lps] 0.32

DMH [lps] 0.53

VI.5. Análisis hidráulico para escenario actual – con proyecto Basándose en los escenarios generados en las secciones V.4.1 y V.4.2, se procede a incluir el proyecto indicado en la presente sección VI y realizar las corridas hidráulicas correspondientes.

VI.5.1. Escenario estático – caso actual, con proyecto. Los resultados de este escenario se presentan en los cuadros [Cuadro 22 - Cuadro 23] y la salida gráfica en la Figura 8. Las condiciones se mantienen, para efectos prácticos, idénticos que para el caso “sin proyecto”.

20

Figura 8. Salida gráfica - caso actual, escenario estático, con proyecto.

21

VI.5.2. Escenario máximo horario – caso actual, con proyecto. Los resultados de este escenario se presentan en los cuadros [Cuadro 24 - Cuadro 25] y la salida gráfica en la Figura 9. Las condiciones se mantienen, para efectos prácticos, idénticos que para el caso “sin proyecto”.

Figura 9. Salida gráfica - caso actual, escenario máximo horario, con proyecto.

22

VII.

MEJORAS PROPUESTAS Con base en la infraestructura existente (sección III), los resultados del escenario actual (secciones IV y V) y del escenario propuesto (secciones VIII y IX), se propone la construcción de: 

Una tubería nueva, que inicia en la entrada de la tubería proveniente de los tanques 1 y 2 al tanque Guayabal, para conectar con el proyecto La Arena. Por lo tanto, se propone únicamente la instalación de 130m de tubería PVC SDR 26, hasta el acceso principal del Proyecto La Arena, donde se construirá una derivación hacia el proyecto, según se muestra en la siguiente figura esquemática;

Figura 10. Mejoras propuestas.

 

Instalación de 47m3 de almacenamiento, contiguo a los tanques Tanque #1 y Tanque #2, para abastecimiento de los sectores Grecia y Central. Instalación de 59m3 de almacenamiento, contiguo al tanque Guayabal, para abastecimiento del sector Guayabal.

23

VIII.

BALANCE HÍDRICO PARA EL ESCENARIO FUTURO Se procede a calcular, para el escenario futuro -analizado a veinte años plazo-, el balance hídrico del acueducto. VIII.1. Demanda futura del sistema Primero, se calcula la demanda futura del sistema. Se realiza la suma de dos componentes: 1) aquella demanda correspondiente a la extensión actual de la ASADA y su crecimiento esperado y 2) la demanda asociada al nuevo proyecto residencial por desarrollar.

VIII.1.1. Servicios por atender Según se especificó en el apartado IV.1.1. Servicios atendidos, actualmente se cuenta con 564 servicios en el acueducto. De acuerdo con la plataforma en línea del Instituto Nacional de Estadística y Censos (INEC), http://www.inec.go.cr/proyeccionpoblacion/, para el cantón de distrito de Tacares se espera una tasa de crecimiento de 1.18% en el año 2025. De manera conservadora, se extrapola esta tasa de crecimiento al año 2038 (horizonte de diseño de 20 años) para el distrito de Tacares y, consecuentemente, para los servicios por atender de la ASADA La Arena, los cuales pasan de 564 en la actualidad a 719 en el año 2038. Cuadro 12. Servicios por atender - año 2038, ASADA La Arena.

2018 2019 2020 2021 2022 2023 2024 2025

Población distrito Tacares 9,519 9,655 9,788 9,922 10,050 10,180 10,302 10,424

Tasa de crecimiento 1.43% 1.38% 1.37% 1.29% 1.29% 1.20% 1.18%

Servicios ASADA La Arena 564 572 580 588 595 603 610 618

2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038

10,547 10,671 10,797 10,925 11,054 11,184 11,316 11,450 11,585 11,721 11,860 12,000 12,141

1.18% 1.18% 1.18% 1.18% 1.18% 1.18% 1.18% 1.18% 1.18% 1.18% 1.18% 1.18% 1.18%

625 632 640 647 655 663 670 678 686 694 703 711 719

Fuente

Año

INEC INEC INEC INEC INEC INEC INEC INEC Autor Autor Autor Autor Autor Autor Autor Autor Autor Autor Autor Autor Autor

24

VIII.1.2. Densidad poblacional A pesar de que se espera una densidad poblacional en detrimento (INEC, 2011), de manera conservadora se mantiene la densidad poblacional utilizada en el apartado IV.1.2.

VIII.1.3. Consumo promedio por habitante Se mantiene el mismo consumo promedio por habitante indicado en la sección IV.1.3, de 283.0 litros por persona por día.

VIII.1.4. Agua no contabilizada Considerando que el acueducto es de una extensión del orden de 7.0km, se esperan pocas pérdidas de agua y de conexiones ilícitas a futuro. Además, las tuberías de los proyectos por desarrollar serán nuevas, por lo que se propone mantener el PANC en 20.0%.

VIII.1.5. Demanda promedio del sistema Se desarrolla el Cuadro 13 para calcular el consumo promedio del acueducto (sin incluir el proyecto nuevo por desarrollar). Cuadro 13. Consumo promedio de la ASADA, escenario futuro (sin incluir Proyecto La Arena).

Servicios por atender Densidad poblacional N [#] 719.0

ρ [hab/serv] 3.60

Consumo individual promedio

Consumo promedio

Ci [litros/hab/d] 283.00

Cprom [lps] 8.48

El consumo promedio de la ASADA, más aquel consumo promedio del Proyecto La Arena (p.19) es de: 8.48 + 0.26 = 8.74 lps. La demanda promedio de la ASADA (sin incluir la del Proyecto La Arena), se calcula con base en la ecuación 2 (ver Cuadro 14). Cuadro 14. Demanda promedio de la ASADA, escenario futuro (sin incluir Proyecto La Arena).

Consumo promedio Cprom [lps] 8.48

Agua no contabilizada PANC [%] 20.0%

Demanda promedio Dprom [lps] 10.60

La demanda promedio de la ASADA, más aquella demanda promedio del proyecto La Arena (p.19) es de: 10.60 + 0.32 = 10.92 lps (944 m3/d).

VIII.1.6. Demanda máxima diaria del sistema La demanda máxima diaria de la ASADA (sin incluir el Proyecto La Arena), se calcula con base en la ecuación 3 (ver Cuadro 15). Cuadro 15. Demanda máxima diaria de la ASADA, escenario futuro (sin incluir Proyecto La Arena).

Consumo Factor máximo diario de promedio consumo

Agua no contabilizada

Demanda promedio

Demanda máxima diaria

25

Cprom [lps] 8.48

FMD [adim] 1.20

PANC [%] 20.0%

Dprom [lps] 10.60

DMD [lps] 12.29

La demanda máxima diaria de la ASADA, más aquella demanda máxima diaria del Proyecto La Arena (p.19) es de: 12.29 + 0.38 = 12.67 lps (1,094 m3/d).

VIII.1.7. Demanda máxima horaria del sistema La demanda máxima horaria de la ASADA (sin incluir el Proyecto La Arena), se calcula con base en la ecuación 4 (ver Cuadro 16). Cuadro 16. Demanda máxima horaria de la ASADA, escenario futuro (sin incluir Proyecto La Arena).

Consumo promedio Cprom [lps] 8.48

Factor máximo horario de consumo FMH [adim] 1.80

Agua no contabilizada PANC [%] 20.0%

Demanda promedio Dprom [lps] 10.60

Demanda máxima horaria DMH [lps] 17.38

La demanda máxima horaria de la ASADA, más aquella demanda máxima diaria del Proyecto La Arena (p.19) es de: 17.38 + 0.53 = 17.91 lps.

VIII.2. Producción del sistema Se utiliza la producción actual del sistema de 28.56 lps según indicado en la sección IV.2.

VIII.3. Balance hídrico Con base en la ecuación 5, se realiza el cálculo de balance hídrico para el escenario futuro: 𝐵𝐻 = 28.56 𝑙𝑝𝑠 − 12.67 𝑙𝑝𝑠 = 15.89 𝑙𝑝𝑠 Se determina entonces que, para el escenario futuro, el acueducto cuenta con un superávit de 15.89 lps, o bien, el equivalente a 1,373 m3/d.

VIII.4. Análisis volumétrico Se repite el procedimiento de revisión volumétrica de tanques elaborado en la p.12. Para este caso, conociendo que los servicios ubicados aguas arribas de los tanques 1 y 2 no requieren almacenamiento, el volumen requerido de almacenamiento por el sistema, 𝑉𝑅𝑒𝑞 = 105 + 125 + 22 = 252 𝑚 3 . El volumen requerido por el Proyecto La Arena se está incluyendo dentro de estos 252 metros cúbicos. Por lo tanto, al igual que para el escenario actual, en el escenario futuro también se incumple con la normativa vigente aplicable para volumen de almacenamiento de agua. Para cumplir con la normativa

26

vigente, es necesario instalar 103 metros cúbicos adicionales de almacenamiento: 252 𝑚 3 (𝑟𝑒𝑞𝑢𝑒𝑟𝑖𝑑𝑜𝑠) − 149 𝑚 3 (𝑑𝑖𝑠𝑝𝑜𝑛𝑖𝑏𝑙𝑒𝑠) = 103 𝑚 3 (𝑝𝑜𝑟 𝑖𝑛𝑠𝑡𝑎𝑙𝑎𝑟). Distribuyendo este volumen proporcionalmente a las zonas de presión de cada tanque: 



El sector Central y el sector Grecia (abastecidos por los tanques #1 y #2), requieren de 137 metros cúbicos de almacenamiento, cuando actualmente dispone de 90 m3. Por lo tanto, es necesario aumentar el almacenamiento para estos dos sectores en 47 m3. El remanente, debe ser agregado a la zona de presión del tanque Guayabal, el cual actualmente cuenta con un almacenamiento de 59 metros cúbicos. Por lo tanto, es necesario agregar 44 m3 a los 59 m3 existentes del tanque Guayabal, para cumplir con el volumen requerido de almacenamiento, el cual deberá sumar 103 m3.

Implementando las mejoras propuestas en la sección VII, se solventaría este déficit de almacenamiento.

27

IX.

ANÁLISIS HIDRÁULICO PARA EL ESCENARIO FUTURO Utilizando la información de las demandas calculadas en el capítulo VIII.1. Demanda futura del sistema, la infraestructura existente comentada en el capítulo III y las mejoras propuestas indicadas en el capítulo VII. IX.1. Modelo Se utiliza el mismo modelo de la sección V.3., con la única diferencia de la inclusión de una nueva tubería de 130m de longitud para abastecer el proyecto La Arena.

IX.2. Resultados En las figuras Figura 12 y Figura 11, se imprimen los resultados visuales del análisis hidráulico realizado para los escenarios “estático” y “máximo horario”, respectivamente. La memoria de cálculo se incluye en el capítulo Anexos, en los cuadros [Cuadro 26 a Cuadro 29].

IX.2.1. Escenario estático Similar al análisis desarrollado para el “caso actual”, prácticamente todo el acueducto presenta presiones satisfactorias; únicamente los sectores Guayabal-sur y Central-sur presenta presiones superiores a lo recomendado.

28

Figura 11. Modelo de escenario estático, caso futuro.

29

IX.2.2. Escenario máximo horario Similar al análisis desarrollado para el “caso actual”, la red nuevamente presenta presiones bajas en los sectores Norte, Central y Grecia; incluso, algunas presentan valores de presión inferior a cero, lo que es señal de las tuberías existentes no se encuentran en capacidad de trasegar el caudal solicitado por cada uno de esos nodos. Por otra parte, el acueducto presenta presiones altas en el sector Guayabal sur. El proyecto La Arena presenta presiones ligeramente superiores a los 10 m.c.a.

Figura 12. Modelo de consumo máximo horario, caso futuro.

30

X.

PRESUPUESTO DE OBRAS El presupuesto de obras corresponde a las obras indicadas en la sección VII. Cuadro 17. Presupuesto de obras.

Item

Detalle Tubería 6m PVC SDR 26 DNom 4" 1.0 (130m) Tubería 6m PVC SDR 26 DNom 4" 2.0 (15m derivación) 3.0 Tee 3" x 4" PVC 4.0 Tee 4" x 4" PVC 5.0 Tapón PVC 6.0 Mano de obra 7.0 Maquinaria 8.0 Restitución estructura de pavimento 47 m3 adicionales, sector Central y 9.0 Grecia (incluye valvulería e instalación) 59 m3 adicionales, sector Guayabal 10.0 (incluye valvulería e instalación) 11.0 Administración e imprevistos [15%] Total -

Unidad

Cantidad

Costo unitario

Subtotal

Tubo

22.00

₡47,736

₡1,050,192

Tubo

3.00

₡47,736

₡143,208

Und Und Und d d m2

1.00 1.00 1.00 5.00 5.00 127.50

₡33,598 ₡35,687 ₡17,685 ₡79,040 ₡150,000 ₡19,500

₡33,598 ₡35,687 ₡17,685 ₡395,200 ₡750,000 ₡2,486,250

Glb

1.00

₡4,542,000

₡4,542,000

Glb

1.00

₡5,574,000

₡5,574,000

Glb -

1.00 -

-

₡2,254,173 ₡17,281,993

31

XI.

CONCLUSIONES Se enumeran las principales conclusiones obtenidas del estudio.

XI.1. Conclusión principal 

El acueducto La Arena se encuentra en capacidad de abastecer satisfactoriamente el Proyecto La Arena, siempre y cuando se realicen las obras indicadas en el capítulo VII.

XI.2. Conclusiones secundarias 







El acueducto La Arena se encuentra con superávit de agua y debería de mantenerse en esta condición hasta el año 2038, siempre y cuando las estimaciones de producción de las nacientes y las proyecciones poblaciones se comporten de manera similar a lo expuesto en el presente informe. Las tuberías de distribución existentes no se encuentran en capacidad de abastecer satisfactoriamente los sectores Norte y Grecia del acueducto La Arena. Esta conclusión se obtiene a partir de los resultados de los escenarios máximos horarios realizados para el caso actual y para el año 2038. Por lo tanto, la administración de la ASADA debería analizar el reforzamiento del sistema de distribución mediante nuevas tuberías de distribución, o bien, mediante equipos de presión, que permitan satisfacer a todos los usuarios de la ASADA. El acueducto La Arena presenta altas presiones en el extremo sur del sector Guayabal, por lo que se recomienda a la administración de la ASADA la instalación de tanques quiebragradientes o válvulas reguladoras de presión en esta zona, para mejorar las condiciones de servicio del acueducto. Es necesario ampliar el volumen de los tanques existentes del acueducto La Arena.

32

XII.

BIBLIOGRAFÍA               

American Water Works Association (2012). IWWA/AWWA Water Audit Method. Denver, Colorado. Asociación administradora del acueducto La Arena (2018). Reporte de facturación del año 2017. Contraloría General de la República (2012). Informe No. DFOE-AE-IF-08-2012: Informe sobre la Auditoría Operativa Acerca de la Eficacia y Eficiencia del Instituto Costarricense de Acueductos y Alcantarillados para Garantizar la Prestación del Servicio de Abastecimiento de Agua Potable. Diario La Gaceta, edición No.84 del 03 de mayo de 2005. Decreto No. 32327 -S. Reglamento para la Calidad del Agua Potable. Epypsa (2010). Anexo 2: Criterios de Diseño. Parte del Programa de Agua Potable y Saneamiento para el Nivel Subnacional (CR‐T1034). Geotec (2014). Estudio integral del acueducto de La Arena para análisis de dotación para proyecto de lotificación de finca. Icea (2011). Estudio de evaluación y diseño sistema de agua potable acueducto La Arena de Grecia, sector El Guayabal para abastecer proyecto de 11 lotes. IFAM (2010). Anexo 9: Componente Control y Reducción de Pérdidas de Agua Potable. Parte del Programa de Agua Potable y Saneamiento para el Nivel Subnacional. Instituto Costarricense de Acueductos y Alcantarillados. Criterios para la revisión de estudios técnicos. Ingeniería de sistemas en operación. Instituto Nacional de Estadísticas y Censos (2011). Censo nacional. Instituto Costarricense de Acueductos y Alcantarillados. Volumen IV: Especificaciones Técnicas Generales del Instituto Costarricense de Acueductos y Alcantarillados. Instituto Costarricense de Acueductos y Alcantarillados (2001). Oficio No 2001 -248: Normas de diseño de agua potable y no autorización para el uso de tuberías de PVC-SDR-41. National Risk Management Research Laboratory, Office of Research and Development (2000). Epanet 2 User Manual. Cincinnati, Ohio. Universidad de Costa Rica (2017). ASADA La Arena, informe de aforos realizados en distintas nacientes. Universidad Nacional (2009). Elaboración cartográfica del acueducto de La Arena, Grecia, para la ASADA.

33

XIII.

ANEXOS Cuadro 18. Resumen de resultados - nodos de la red - caso actual – escenario estático, sin proyecto. Nodo [#] Junc n1 Junc n2 Junc n3 Junc n4 Junc n5 Junc n6 Junc n7 Junc n8 Junc n9 Junc n10 Junc n11 Junc n12 Junc n13 Junc n14 Junc n15 Junc n16 Junc n17 Junc n18 Junc n19 Junc n20 Junc n21 Junc n22 Junc n23 Junc n24 Junc n25 Junc n26 Junc n27 Junc n28 Junc n29 Junc n30 Junc n31 Junc n32 Junc n33 Junc n34 Junc n35 Junc n36 Junc n37 Junc n38 Junc n39 Junc n40 Junc n41 Junc n42 Junc n43 Junc n44 Junc n45 Junc n46 Junc n47 Junc n48 Junc n49 Junc n50

Elevación [m] 986.0 986.4 987.1 984.2 978.2 977.2 971.8 962.2 959.3 927.0 1,103.0 1,099.2 1,095.6 1,083.0 1,075.0 1,074.8 1,075.0 1,075.0 1,072.1 1,066.1 1,054.9 1,043.1 1,027.4 1,009.4 991.7 983.5 993.3 996.7 1,015.8 1,017.3 1,028.5 1,109.0 1,088.3 1,075.0 1,072.9 1,071.8 1,075.0 1,074.9 1,072.2 1,066.3 1,055.1 1,041.5 1,025.7 1,007.7 990.2 981.9 995.2 998.6 1,017.8 1,019.3

Demanda [lps] 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

Carga total [m] 981.3 980.5 978.7 973.9 965.0 962.0 958.4 956.2 950.3 927.3 1,102.3 1,100.4 1,098.8 1,089.6 1,087.7 1,084.5 1,080.5 1,079.6 1,077.8 1,074.0 1,066.5 1,061.5 1,058.3 1,052.9 1,048.8 1,047.3 1,043.4 1,041.8 1,036.0 1,034.3 1,032.2 1,092.1 1,085.0 1,078.8 1,078.3 1,075.6 1,072.0 1,071.3 1,070.0 1,066.9 1,060.7 1,056.5 1,053.8 1,049.4 1,046.0 1,044.7 1,041.4 1,040.1 1,035.2 1,033.8

Presión [mca] -4.7 -5.9 -8.4 -10.3 -13.1 -15.1 -13.4 -6.0 -9.0 0.3 -0.7 1.2 3.3 6.6 12.7 9.7 5.5 4.6 5.6 7.9 11.6 18.4 30.8 43.5 57.1 63.9 50.1 45.1 20.2 17.0 3.7 -16.9 -3.3 3.8 5.4 3.8 -3.0 -3.6 -2.3 0.6 5.6 15.0 28.1 41.7 55.8 62.9 46.3 41.5 17.5 14.5

34

Junc n51 Junc n52 Junc n53 Junc n54 Junc n55 Junc n56 Junc n57 Junc n58 Junc n59 Junc n60 Junc n61 Junc n62 Junc n63 Junc n64 Junc n65 Junc n66 Junc n67 Junc n68 Junc n69 Junc n70 Junc n71 Junc n72 Junc n73 Junc n74 Junc n75 Junc n76 Junc n77 Junc n78 Junc n79 Junc n80 Junc n81 Junc n82 Junc n83 Junc n84 Junc n85 Junc n86 Junc n87 Junc n88 Junc n89 Junc n90 Junc n91 Junc n92 Junc n93 Junc n94 Junc n95 Junc n96 Junc n97 Junc n98 Junc n99 Junc n100 Junc n101 Junc n102 Junc n103 Junc n104 Junc n105 Junc n106 Junc n107

1,028.2 929.2 1,028.9 1,028.9 1,028.7 1,028.7 938.6 1,012.0 961.9 982.8 990.0 988.1 990.0 989.5 990.0 993.1 1,011.1 993.8 993.5 995.5 994.9 955.2 951.7 948.9 944.5 930.6 923.0 933.3 935.0 942.4 946.8 960.1 981.3 966.3 959.6 959.0 956.3 948.8 948.6 950.9 956.8 958.3 954.3 912.1 905.3 987.6 991.0 986.3 967.6 970.6 968.8 963.9 977.2 983.1 985.9 964.3 980.9

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

1,032.1 1,036.4 1,032.2 1,032.0 1,032.0 1,031.9 1,028.8 1,015.3 1,028.9 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,029.6 1,029.6 1,029.6 1,029.6 1,029.6 1,029.6 1,029.6 1,029.6 1,029.6 1,029.6 1,029.6 1,015.0 1,015.0 1,030.0 1,029.9 1,029.7 1,029.2 1,029.1 1,029.0 1,029.0 1,029.0 1,030.0 1,030.0 1,030.0 1,030.0

3.9 107.2 3.3 3.1 3.2 3.1 90.2 3.3 67.0 32.2 25.0 26.9 25.0 25.5 25.0 21.9 3.9 21.2 21.5 19.5 20.1 59.8 63.3 66.1 70.5 84.4 92.0 81.7 80.0 72.6 68.2 54.9 48.3 63.3 70.0 70.6 73.3 80.8 81.0 78.6 72.7 71.3 75.3 102.9 109.7 42.4 38.9 43.4 61.6 58.5 60.3 65.1 51.8 46.9 44.2 65.7 49.2

35

Junc n108 Junc n109 Junc n110 Junc n111 Junc n112 Junc n113 Junc n114 Junc n115 Junc n116 Junc n117 Junc n118 Junc n119 Junc n120 Junc n121 Junc n122 Junc n123 Resvr Nac_R Resvr Nac_O Resvr Caseta_Bombeo Resvr Nac_G Tank Tank_G Tank Tank_1 Tank Tank_2

980.5 982.0 983.0 982.5 1,028.1 1,020.2 984.4 978.8 981.8 988.0 989.7 985.2 970.4 972.3 981.3 980.3 1,103.0 1,109.0 927.0 986.0 1,014.0 1,031.0 1,031.0

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 -5.660 -5.110 38.120 -46.370 9.360 4.950 4.700

1,030.0 1,030.0 1,030.0 1,030.0 1,032.0 1,031.2 1,030.0 1,030.0 1,030.0 1,030.0 1,030.0 1,030.0 1,030.0 1,030.0 1,030.0 1,030.0 1,103.0 1,109.0 927.0 986.0 1,015.0 1,032.0 1,032.0

49.6 48.0 47.1 47.5 3.9 11.0 45.7 51.2 48.2 42.1 40.4 44.9 59.7 57.8 48.8 49.8 0.0 0.0 0.0 0.0 1.0 1.0 1.0

36

Cuadro 19. Resumen de resultados - tuberías de la red - caso actual – escenario estático, sin proyecto. Tubería [#] Pipe p1 Pipe p2 Pipe p3 Pipe p4 Pipe p5 Pipe p6 Pipe p7 Pipe p8 Pipe p9 Pipe p10 Pipe p11 Pipe p12 Pipe p13 Pipe p14 Pipe p15 Pipe p16 Pipe p17 Pipe p18 Pipe p19 Pipe p20 Pipe p21 Pipe p22 Pipe p23 Pipe p24 Pipe p25 Pipe p26 Pipe p27 Pipe p28 Pipe p29 Pipe p30 Pipe p31 Pipe p32 Pipe p33 Pipe p34 Pipe p35 Pipe p36 Pipe p37 Pipe p38 Pipe p39 Pipe p40 Pipe p41 Pipe p42 Pipe p43 Pipe p44 Pipe p45 Pipe p46 Pipe p47 Pipe p48 Pipe p49 Pipe p50 Pipe p51 Pipe p52 Pipe p53

Longitud [m] 22.9 57.26 145.2 274.1 91.88 110.7 67.67 183.6 707.5 94.07 76.5 456.4 93.02 155.3 194.9 45.69 91.01 186.4 367.8 245.1 157.8 264 200.8 74.29 193.5 78.21 284.4 85.82 103.3 418.1 365.4 29.7 162.9 209.4 45.34 76.93 180.4 367.4 246.7 158.7 264.8 197.7 74.89 197.5 78.33 285.9 85.77 99.24 415.16 16.64 16.4 451.53 268.6

Diámetro [mm] 150 150 150 150 150 150 150 150 150 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 100 100 100 100 75

Rugosidad [mm] 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002

Flujo [lps] 46.37 46.37 46.37 46.37 46.37 46.37 46.37 46.37 46.37 5.66 5.66 5.66 5.66 5.66 5.66 5.66 5.66 5.66 5.66 5.66 5.66 5.66 5.66 5.66 5.66 5.66 5.66 5.66 5.66 5.11 5.11 5.11 5.11 5.11 5.11 5.11 5.11 5.11 5.11 5.11 5.11 5.11 5.11 5.11 5.11 5.11 5.11 5.11 8.25 8.25 6.62 6.62 9.36

Velocidad [m/s] 2.62 2.62 2.62 2.62 2.62 2.62 2.62 2.62 2.62 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.05 1.05 0.84 0.84 2.12

Factor de fricción [adim] 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.018 0.018 0.019 0.019 0.017

37

Pipe p54 Pipe p56 Pipe p57 Pipe p58 Pipe p59 Pipe p60 Pipe p61 Pipe p62 Pipe p63 Pipe p64 Pipe p65 Pipe p66 Pipe p67 Pipe p68 Pipe p69 Pipe p70 Pipe p71 Pipe p72 Pipe p73 Pipe p74 Pipe p75 Pipe p76 Pipe p77 Pipe p78 Pipe p79 Pipe p80 Pipe p81 Pipe p82 Pipe p83 Pipe p84 Pipe p85 Pipe p86 Pipe p87 Pipe p88 Pipe p89 Pipe p90 Pipe p91 Pipe p92 Pipe p93 Pipe p94 Pipe p95 Pipe p96 Pipe p97 Pipe p99 Pipe p100 Pipe p101 Pipe p102 Pipe p103 Pipe p104 Pipe p105 Pipe p106 Pipe p107 Pipe p108 Pipe p109 Pipe p110 Pipe p111 Pipe p112

90.1 139.4 131.8 40.1 41.36 19.92 43.05 301.2 126 44.44 69.22 102.6 372.6 57.79 59.3 35.24 165.9 62.25 142.1 59.16 69.82 44.36 109.6 263.9 256 52.02 36.71 137.5 128 77.63 53.96 63.99 48.3 93.16 76.81 82.45 148.62 108.5 248.3 78.26 42.89 44.88 80.05 90.25 129.51 145.5 93.51 58.24 34.13 148.6 29.04 137.2 213.1 87.71 40.69 39.89 47.64

100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 75 75 75 75 75 75 75 75 75 75 75 75 75 75

0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002

-2.74 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.74 2.74 2.74 2.74 2.74 2.74 2.74 0 0 0 0 0 0 0 0 0 2.74 2.74 0 0 0 0

0.35 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0 0 0 0 0 0 0 0 0 0.62 0.62 0 0 0 0

0.023 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0 0 1.543 0 0 0 0 1.166 0 0.021 0.021 0 0 0 0

38

Pipe p113 Pipe p114 Pipe p115 Pipe p116 Pipe p117 Pipe p118 Pipe p119 Pipe 1 Pipe 2 Pipe 4 Pipe 5 Pipe 6 Pipe 7 Pipe 8 Pipe 9 Pipe 10 Pipe 12 Pipe 13 Pipe 14 Pipe 15 Pipe 16 Pipe 17 Pump Bomba

51.68 31.45 121.4 128 44.41 85.66 176.5 33.73 1000 20.86 27.96 6.28 7.29 10.28 11.73 11.73 29.09 26.17 17.03 7.93 20.39 24.19 #N/A

75 75 75 75 75 75 75 75 75 100 100 75 75 100 100 100 100 100 100 150 100 100 #N/A

0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 #N/A

0 0 0 0 0 0 0 5.66 5.11 9.36 0 5.11 5.66 -4.28 -3.97 3.66 1.33 1.41 2.96 46.37 46.37 -2.74 8.25

0 0 0 0 0 0 0 1.28 1.16 1.19 0 1.16 1.28 0.54 0.51 0.47 0.17 0.18 0.38 2.62 5.9 0.35 0

0 0 0 0 0 0 0 0.018 0.019 0.017 0 0.019 0.018 0.021 0.021 0.021 0.027 0.027 0.022 0.014 0.013 0.023 0

39

Cuadro 20. Resumen de resultados - nodos de la red - caso actual – consumo máximo horario, sin proyecto. Nodo [#] Junc n1 Junc n2 Junc n3 Junc n4 Junc n5 Junc n6 Junc n7 Junc n8 Junc n9 Junc n10 Junc n11 Junc n12 Junc n13 Junc n14 Junc n15 Junc n16 Junc n17 Junc n18 Junc n19 Junc n20 Junc n21 Junc n22 Junc n23 Junc n24 Junc n25 Junc n26 Junc n27 Junc n28 Junc n29 Junc n30 Junc n31 Junc n32 Junc n33 Junc n34 Junc n35 Junc n36 Junc n37 Junc n38 Junc n39 Junc n40 Junc n41 Junc n42 Junc n43 Junc n44 Junc n45 Junc n46 Junc n47 Junc n48

Elevación [m] 986.0 986.4 987.1 984.2 978.2 977.2 971.8 962.2 959.3 927.0 1,103.0 1,099.2 1,095.6 1,083.0 1,075.0 1,074.8 1,075.0 1,075.0 1,072.1 1,066.1 1,054.9 1,043.1 1,027.4 1,009.4 991.7 983.5 993.3 996.7 1,015.8 1,017.3 1,028.5 1,109.0 1,088.3 1,075.0 1,072.9 1,071.8 1,075.0 1,074.9 1,072.2 1,066.3 1,055.1 1,041.5 1,025.7 1,007.7 990.2 981.9 995.2 998.6

Demanda [lps] 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.200 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.000 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070

Carga total [m] 981.3 980.5 978.7 973.9 965.0 962.0 958.4 956.2 950.3 927.3 1,102.2 1,099.8 1,098.0 1,087.1 1,084.9 1,081.4 1,077.0 1,076.0 1,074.1 1,070.2 1,062.7 1,057.8 1,054.8 1,049.8 1,046.0 1,044.7 1,041.3 1,039.9 1,035.2 1,033.8 1,032.1 1,089.0 1,080.8 1,073.9 1,073.3 1,070.4 1,066.6 1,065.9 1,064.6 1,061.6 1,055.7 1,051.9 1,049.5 1,045.6 1,042.7 1,041.7 1,039.0 1,038.0

Presión [mca] -4.7 -5.9 -8.4 -10.3 -13.2 -15.1 -13.4 -6.0 -9.0 0.3 -0.9 0.6 2.4 4.1 9.9 6.6 2.0 1.0 2.0 4.1 7.8 14.7 27.3 40.3 54.3 61.2 48.0 43.2 19.4 16.5 3.6 -20.0 -7.4 -1.1 0.4 -1.4 -8.4 -9.0 -7.7 -4.7 0.6 10.4 23.8 37.9 52.5 59.8 43.9 39.4

40

Junc n49 Junc n50 Junc n51 Junc n52 Junc n53 Junc n54 Junc n55 Junc n56 Junc n57 Junc n58 Junc n59 Junc n60 Junc n61 Junc n62 Junc n63 Junc n64 Junc n65 Junc n66 Junc n67 Junc n68 Junc n69 Junc n70 Junc n71 Junc n72 Junc n73 Junc n74 Junc n75 Junc n76 Junc n77 Junc n78 Junc n79 Junc n80 Junc n81 Junc n82 Junc n83 Junc n84 Junc n85 Junc n86 Junc n87 Junc n88 Junc n89 Junc n90 Junc n91 Junc n92 Junc n93 Junc n94 Junc n95 Junc n96 Junc n97 Junc n98 Junc n99 Junc n100

1,017.8 1,019.3 1,028.2 929.2 1,028.9 1,028.9 1,028.7 1,028.7 938.6 1,012.0 961.9 982.8 990.0 988.1 990.0 989.5 990.0 993.1 1,011.1 993.8 993.5 995.5 994.9 955.2 951.7 948.9 944.5 930.6 923.0 933.3 935.0 942.4 946.8 960.1 981.3 966.3 959.6 959.0 956.3 948.8 948.6 950.9 956.8 958.3 954.3 912.1 905.3 987.6 991.0 986.3 967.6 970.6

0.070 0.070 0.000 0.200 0.000 0.000 0.000 0.000 0.200 0.170 0.200 0.170 0.170 0.170 0.170 0.170 0.170 0.170 0.170 0.170 0.170 0.170 0.170 0.170 0.170 0.170 0.170 0.170 0.170 0.170 0.170 0.170 0.170 0.170 0.200 0.200 0.200 0.200 0.200 0.200 0.200 0.200 0.200 0.200 0.200 0.170 0.170 0.080 0.200 0.200 0.200 0.200

1,034.3 1,033.3 1,032.1 1,036.2 1,032.2 1,032.0 1,032.0 1,031.8 1,026.2 1,015.2 1,026.2 1,013.8 1,013.8 1,013.8 1,013.8 1,013.8 1,013.9 1,014.0 1,014.9 1,013.9 1,013.8 1,013.8 1,013.8 1,013.4 1,013.3 1,013.3 1,013.3 1,013.2 1,013.2 1,013.1 1,013.1 1,013.1 1,013.1 1,013.1 1,026.2 1,026.0 1,025.9 1,025.8 1,025.8 1,025.8 1,025.7 1,025.7 1,025.7 1,025.7 1,025.7 1,013.2 1,013.1 1,026.8 1,026.6 1,026.4 1,026.2 1,026.2

16.6 14.0 3.9 107.0 3.3 3.1 3.2 3.0 87.6 3.2 64.3 30.9 23.8 25.6 23.8 24.3 23.9 20.9 3.8 20.0 20.3 18.3 19.0 58.2 61.6 64.4 68.8 82.6 90.2 79.8 78.1 70.7 66.3 53.0 44.9 59.7 66.3 66.8 69.5 77.0 77.1 74.8 68.9 67.4 71.4 101.0 107.9 39.2 35.6 40.1 58.7 55.7

41

Junc n101 Junc n102 Junc n103 Junc n104 Junc n105 Junc n106 Junc n107 Junc n108 Junc n109 Junc n110 Junc n111 Junc n112 Junc n113 Junc n114 Junc n115 Junc n116 Junc n117 Junc n118 Junc n119 Junc n120 Junc n121 Junc n122 Junc n123 Junc Proyecto Resvr Nac_R Resvr Nac_O Resvr Caseta_Bombeo Resvr Nac_G Tank Tank_G Tank Tank_1 Tank Tank_2

968.8 963.9 977.2 983.1 985.9 964.3 980.9 980.5 982.0 983.0 982.5 1,028.1 1,020.2 984.4 978.8 981.8 988.0 989.7 985.2 970.4 972.3 981.3 980.3 1,005.0 1,103.0 1,109.0 927.0 986.0 1,014.0 1,031.0 1,031.0

0.200 0.200 0.170 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.000 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.170 -6.390 -5.610 37.900 -46.370 3.630 1.710 1.520

1,026.2 1,026.2 1,026.2 1,026.7 1,026.7 1,026.7 1,026.7 1,026.7 1,026.7 1,026.7 1,026.7 1,032.0 1,029.9 1,026.7 1,026.7 1,026.7 1,026.6 1,026.6 1,026.6 1,026.6 1,026.6 1,026.6 1,026.6 1,014.7 1,103.0 1,109.0 927.0 986.0 1,015.0 1,032.0 1,032.0

57.4 62.3 49.0 43.6 40.9 62.4 45.8 46.2 44.7 43.7 44.2 3.8 9.7 42.4 47.9 44.8 38.7 37.0 41.5 56.2 54.3 45.3 46.3 10.7 0.0 0.0 0.0 0.0 1.0 1.0 1.0

42

Cuadro 21. Resumen de resultados - tuberías de la red - caso actual – escenario estático, sin proyecto. Tubería [#] Pipe p1 Pipe p2 Pipe p3 Pipe p4 Pipe p5 Pipe p6 Pipe p7 Pipe p8 Pipe p9 Pipe p10 Pipe p11 Pipe p12 Pipe p13 Pipe p14 Pipe p15 Pipe p16 Pipe p17 Pipe p18 Pipe p19 Pipe p20 Pipe p21 Pipe p22 Pipe p23 Pipe p24 Pipe p25 Pipe p26 Pipe p27 Pipe p28 Pipe p29 Pipe p30 Pipe p31 Pipe p32 Pipe p33 Pipe p34 Pipe p35 Pipe p36 Pipe p37 Pipe p38 Pipe p39 Pipe p40 Pipe p41 Pipe p42 Pipe p43 Pipe p44 Pipe p45 Pipe p46 Pipe p47 Pipe p48

Longitud [m] 22.9 57.26 145.2 274.1 91.88 110.7 67.67 183.6 707.5 94.07 76.5 456.4 93.02 155.3 194.9 45.69 91.01 186.4 367.8 245.1 157.8 264 200.8 74.29 193.5 78.21 284.4 85.82 103.3 418.1 365.4 29.7 162.9 209.4 45.34 76.93 180.4 367.4 246.7 158.7 264.8 197.7 74.89 197.5 78.33 285.9 85.77 99.24

Diámetro [mm] 150 150 150 150 150 150 150 150 150 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75

Rugosidad [mm] 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002

Flujo [lps] 46.37 46.37 46.37 46.37 46.37 46.37 46.37 46.37 46.37 6.32 6.25 6.18 6.1 6.03 5.96 5.88 5.81 5.74 5.66 5.59 5.52 5.45 5.37 5.3 5.23 5.15 5.08 5.01 4.93 5.53 5.46 5.39 5.31 5.24 5.17 5.09 5.02 4.95 4.88 4.8 4.73 4.66 4.58 4.51 4.44 4.36 4.29 4.22

Velocidad [m/s] 2.62 2.62 2.62 2.62 2.62 2.62 2.62 2.62 2.62 1.43 1.41 1.4 1.38 1.36 1.35 1.33 1.32 1.3 1.28 1.27 1.25 1.23 1.22 1.2 1.18 1.17 1.15 1.13 1.12 1.25 1.24 1.22 1.2 1.19 1.17 1.15 1.14 1.12 1.1 1.09 1.07 1.05 1.04 1.02 1 0.99 0.97 0.95

Factor de fricción [adim] 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.019 0.019 0.019 0.019 0.019 0.018 0.018 0.018 0.018 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019

43

Pipe p49 Pipe p50 Pipe p51 Pipe p52 Pipe p53 Pipe p54 Pipe p56 Pipe p57 Pipe p58 Pipe p59 Pipe p60 Pipe p61 Pipe p63 Pipe p64 Pipe p65 Pipe p66 Pipe p67 Pipe p68 Pipe p69 Pipe p70 Pipe p71 Pipe p72 Pipe p73 Pipe p74 Pipe p75 Pipe p76 Pipe p77 Pipe p78 Pipe p79 Pipe p80 Pipe p81 Pipe p82 Pipe p83 Pipe p84 Pipe p85 Pipe p86 Pipe p87 Pipe p88 Pipe p89 Pipe p90 Pipe p91 Pipe p92 Pipe p93 Pipe p94 Pipe p95 Pipe p96 Pipe p97 Pipe p99 Pipe p100 Pipe p101 Pipe p102 Pipe p103

415.16 16.64 16.4 451.53 268.6 90.1 139.4 131.8 40.1 41.36 19.92 43.05 126 44.44 69.22 102.6 372.6 57.79 59.3 35.24 165.9 62.25 142.1 59.16 69.82 44.36 109.6 263.9 256 52.02 36.71 137.5 128 77.63 53.96 63.99 48.3 93.16 76.81 82.45 148.62 108.5 248.3 78.26 42.89 44.88 80.05 90.25 129.51 145.5 93.51 58.24

100 100 100 100 75 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 75 75 75 75 75

0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002

8.06 8.06 9.2 9.2 8.35 0.64 -0.17 -0.35 -0.52 -2.97 -3.15 -4.03 0.7 0.52 0.35 0.17 2.27 2.1 1.92 1.75 1.57 1.4 0.88 0.7 0.52 0.35 0.17 2.02 1.82 1.62 1.41 1.21 1.01 0.81 0.61 0.4 0.2 0.35 0.17 3.17 2.97 2.76 0.54 0.34 0.14 -0.06 0.17 -0.54 -0.62 -0.08 -0.16 -0.24

1.03 1.03 1.17 1.17 1.89 0.08 0.02 0.04 0.07 0.38 0.4 0.51 0.09 0.07 0.04 0.02 0.29 0.27 0.25 0.22 0.2 0.18 0.11 0.09 0.07 0.04 0.02 0.26 0.23 0.21 0.18 0.15 0.13 0.1 0.08 0.05 0.03 0.04 0.02 0.4 0.38 0.35 0.07 0.04 0.02 0.01 0.02 0.12 0.14 0.02 0.04 0.06

0.018 0.018 0.017 0.017 0.017 0.033 0.03 0.04 0.035 0.022 0.022 0.021 0.032 0.035 0.039 0.032 0.024 0.024 0.025 0.025 0.026 0.027 0.03 0.032 0.035 0.038 0.032 0.024 0.025 0.026 0.027 0.028 0.029 0.031 0.034 0.038 0.027 0.039 0.027 0.022 0.022 0.023 0.035 0.04 0.033 0.048 0.029 0.032 0.031 0.047 0.03 0.041

44

Pipe p104 Pipe p105 Pipe p106 Pipe p107 Pipe p108 Pipe p109 Pipe p110 Pipe p111 Pipe p112 Pipe p113 Pipe p114 Pipe p115 Pipe p116 Pipe p117 Pipe p118 Pipe p119 Pipe 1 Pipe 2 Pipe 4 Pipe 5 Pipe 6 Pipe 7 Pipe 8 Pipe 9 Pipe 10 Pipe 12 Pipe 13 Pipe 14 Pipe 15 Pipe 16 Pipe 17 Pipe 3 Pipe 11 Pump Bomba

34.13 148.6 29.04 137.2 213.1 87.71 40.69 39.89 47.64 51.68 31.45 121.4 128 44.41 85.66 176.5 33.73 1000 20.86 27.96 6.28 7.29 10.28 11.73 11.73 29.09 26.17 17.03 7.93 20.39 24.19 63.96 236.92 #N/A

75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 100 100 75 75 100 100 100 100 100 100 150 100 100 100 100 #N/A

0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 #N/A

-0.32 0.13 0.05 4.79 4.71 0.84 0.76 0.73 0.65 0.57 0.49 0.41 0.32 0.24 0.16 0.08 6.39 5.61 8.18 4.55 4.22 4.93 -4.18 -3.88 5.08 2.32 2.47 4.12 46.17 46.37 0.44 4.38 4.2 8.26

0.07 0.03 0.01 1.08 1.07 0.19 0.17 0.17 0.15 0.13 0.11 0.09 0.07 0.06 0.04 0.02 1.45 1.27 1.04 0.58 0.95 1.12 0.53 0.49 0.65 0.3 0.31 0.52 2.61 5.9 0.06 0.56 0.53 0

0.037 0.03 0.085 0.019 0.019 0.028 0.029 0.029 0.03 0.032 0.033 0.035 0.037 0.04 0.03 0.048 0.018 0.018 0.018 0.02 0.019 0.019 0.021 0.021 0.02 0.024 0.023 0.021 0.014 0.013 0.038 0.02 0.021 0

45

Cuadro 22. Resumen de resultados - nodos de la red - caso actual - escenario estático, con proyecto. Nodo [#] Junc n1 Junc n2 Junc n3 Junc n4 Junc n5 Junc n6 Junc n7 Junc n8 Junc n9 Junc n10 Junc n11 Junc n12 Junc n13 Junc n14 Junc n15 Junc n16 Junc n17 Junc n18 Junc n19 Junc n20 Junc n21 Junc n22 Junc n23 Junc n24 Junc n25 Junc n26 Junc n27 Junc n28 Junc n29 Junc n30 Junc n31 Junc n32 Junc n33 Junc n34 Junc n35 Junc n36 Junc n37 Junc n38 Junc n39 Junc n40 Junc n41 Junc n42 Junc n43 Junc n44 Junc n45 Junc n46 Junc n47 Junc n48

Elevación [m] 986.0 986.4 987.1 984.2 978.2 977.2 971.8 962.2 959.3 927.0 1,103.0 1,099.2 1,095.6 1,083.0 1,075.0 1,074.8 1,075.0 1,075.0 1,072.1 1,066.1 1,054.9 1,043.1 1,027.4 1,009.4 991.7 983.5 993.3 996.7 1,015.8 1,017.3 1,028.5 1,109.0 1,088.3 1,075.0 1,072.9 1,071.8 1,075.0 1,074.9 1,072.2 1,066.3 1,055.1 1,041.5 1,025.7 1,007.7 990.2 981.9 995.2 998.6

Demanda [lps] 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

Carga total [m] 981.3 980.5 978.7 973.9 965.0 962.0 958.4 956.2 950.3 927.3 1,102.3 1,100.4 1,098.8 1,089.6 1,087.7 1,084.5 1,080.5 1,079.6 1,077.8 1,074.0 1,066.5 1,061.5 1,058.3 1,052.9 1,048.8 1,047.3 1,043.4 1,041.8 1,036.0 1,034.3 1,032.2 1,092.1 1,085.0 1,078.8 1,078.3 1,075.6 1,072.0 1,071.3 1,070.0 1,066.9 1,060.7 1,056.5 1,053.8 1,049.4 1,046.0 1,044.7 1,041.4 1,040.1

Presión [mca] -4.7 -5.9 -8.4 -10.3 -13.1 -15.1 -13.4 -6.0 -9.0 0.3 -0.7 1.2 3.3 6.6 12.7 9.7 5.5 4.6 5.6 7.9 11.6 18.4 30.8 43.5 57.1 63.9 50.1 45.1 20.2 17.0 3.7 -16.9 -3.3 3.8 5.4 3.8 -3.0 -3.6 -2.3 0.6 5.6 15.0 28.1 41.7 55.8 62.9 46.3 41.5

46

Junc n49 Junc n50 Junc n51 Junc n52 Junc n53 Junc n54 Junc n55 Junc n56 Junc n57 Junc n58 Junc n59 Junc n60 Junc n61 Junc n62 Junc n63 Junc n64 Junc n65 Junc n66 Junc n67 Junc n68 Junc n69 Junc n70 Junc n71 Junc n72 Junc n73 Junc n74 Junc n75 Junc n76 Junc n77 Junc n78 Junc n79 Junc n80 Junc n81 Junc n82 Junc n83 Junc n84 Junc n85 Junc n86 Junc n87 Junc n88 Junc n89 Junc n90 Junc n91 Junc n92 Junc n93 Junc n94 Junc n95 Junc n96 Junc n97 Junc n98 Junc n99 Junc n100

1,017.8 1,019.3 1,028.2 929.2 1,028.9 1,028.9 1,028.7 1,028.7 938.6 1,012.0 961.9 982.8 990.0 988.1 990.0 989.5 990.0 993.1 1,011.1 993.8 993.5 995.5 994.9 955.2 951.7 948.9 944.5 930.6 923.0 933.3 935.0 942.4 946.8 960.1 981.3 966.3 959.6 959.0 956.3 948.8 948.6 950.9 956.8 958.3 954.3 912.1 905.3 987.6 991.0 986.3 967.6 970.6

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

1,035.2 1,033.8 1,032.1 1,036.4 1,032.2 1,032.0 1,032.0 1,031.9 1,028.8 1,015.3 1,028.9 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,029.6 1,029.6 1,029.6 1,029.6 1,029.6 1,029.6 1,029.6 1,029.6 1,029.6 1,029.6 1,029.6 1,015.0 1,015.0 1,030.0 1,029.9 1,029.7 1,029.2 1,029.1

17.5 14.5 3.9 107.2 3.3 3.1 3.2 3.1 90.2 3.3 67.0 32.2 25.0 26.9 25.0 25.5 25.0 21.9 3.9 21.2 21.5 19.5 20.1 59.8 63.3 66.1 70.5 84.4 92.0 81.7 80.0 72.6 68.2 54.9 48.3 63.3 70.0 70.6 73.3 80.8 81.0 78.6 72.7 71.3 75.3 102.9 109.7 42.4 38.9 43.4 61.6 58.5

47

Junc n101 Junc n102 Junc n103 Junc n104 Junc n105 Junc n106 Junc n107 Junc n108 Junc n109 Junc n110 Junc n111 Junc n112 Junc n113 Junc n114 Junc n115 Junc n116 Junc n117 Junc n118 Junc n119 Junc n120 Junc n121 Junc n122 Junc n123 Junc Proyecto Resvr Nac_R Resvr Nac_O Resvr Caseta_Bombeo Resvr Nac_G Tank Tank_G Tank Tank_1 Tank Tank_2 Tank Tank_2

968.8 963.9 977.2 983.1 985.9 964.3 980.9 980.5 982.0 983.0 982.5 1,028.1 1,020.2 984.4 978.8 981.8 988.0 989.7 985.2 970.4 972.3 981.3 980.3 1,005.0 1,103.0 1,109.0 927.0 986.0 1,014.0 1,031.0 1,031.0 1,031.0

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 -5.660 -5.110 38.120 -46.370 9.360 4.950 4.700 4.700

1,029.0 1,029.0 1,029.0 1,030.0 1,030.0 1,030.0 1,030.0 1,030.0 1,030.0 1,030.0 1,030.0 1,032.0 1,031.2 1,030.0 1,030.0 1,030.0 1,030.0 1,030.0 1,030.0 1,030.0 1,030.0 1,030.0 1,030.0 1,015.0 1,103.0 1,109.0 927.0 986.0 1,015.0 1,032.0 1,032.0 1,032.0

60.2 65.1 51.8 46.9 44.2 65.7 49.2 49.6 48.0 47.1 47.5 3.9 11.0 45.7 51.2 48.2 42.1 40.4 44.9 59.7 57.8 48.8 49.8 11.0 0.0 0.0 0.0 0.0 1.0 1.0 1.0 1.0

48

Cuadro 23. Resumen de resultados - tuberías de la red - caso actual - escenario estático, con proyecto. Tubería [#] Pipe p1 Pipe p2 Pipe p3 Pipe p4 Pipe p5 Pipe p6 Pipe p7 Pipe p8 Pipe p9 Pipe p10 Pipe p11 Pipe p12 Pipe p13 Pipe p14 Pipe p15 Pipe p16 Pipe p17 Pipe p18 Pipe p19 Pipe p20 Pipe p21 Pipe p22 Pipe p23 Pipe p24 Pipe p25 Pipe p26 Pipe p27 Pipe p28 Pipe p29 Pipe p30 Pipe p31 Pipe p32 Pipe p33 Pipe p34 Pipe p35 Pipe p36 Pipe p37 Pipe p38 Pipe p39 Pipe p40 Pipe p41 Pipe p42 Pipe p43 Pipe p44 Pipe p45 Pipe p46 Pipe p47 Pipe p48

Longitud [m] 22.9 57.26 145.2 274.1 91.88 110.7 67.67 183.6 707.5 94.07 76.5 456.4 93.02 155.3 194.9 45.69 91.01 186.4 367.8 245.1 157.8 264 200.8 74.29 193.5 78.21 284.4 85.82 103.3 418.1 365.4 29.7 162.9 209.4 45.34 76.93 180.4 367.4 246.7 158.7 264.8 197.7 74.89 197.5 78.33 285.9 85.77 99.24

Diámetro [mm] 150 150 150 150 150 150 150 150 150 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75

Rugosidad [mm] 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002

Flujo [lps] 46.37 46.37 46.37 46.37 46.37 46.37 46.37 46.37 46.37 5.66 5.66 5.66 5.66 5.66 5.66 5.66 5.66 5.66 5.66 5.66 5.66 5.66 5.66 5.66 5.66 5.66 5.66 5.66 5.66 5.11 5.11 5.11 5.11 5.11 5.11 5.11 5.11 5.11 5.11 5.11 5.11 5.11 5.11 5.11 5.11 5.11 5.11 5.11

Velocidad [m/s] 2.62 2.62 2.62 2.62 2.62 2.62 2.62 2.62 2.62 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.16

Factor de fricción [adim] 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019

49

Pipe p49 Pipe p50 Pipe p51 Pipe p52 Pipe p53 Pipe p54 Pipe p56 Pipe p57 Pipe p58 Pipe p59 Pipe p60 Pipe p61 Pipe p63 Pipe p64 Pipe p65 Pipe p66 Pipe p67 Pipe p68 Pipe p69 Pipe p70 Pipe p71 Pipe p72 Pipe p73 Pipe p74 Pipe p75 Pipe p76 Pipe p77 Pipe p78 Pipe p79 Pipe p80 Pipe p81 Pipe p82 Pipe p83 Pipe p84 Pipe p85 Pipe p86 Pipe p87 Pipe p88 Pipe p89 Pipe p90 Pipe p91 Pipe p92 Pipe p93 Pipe p94 Pipe p95 Pipe p96 Pipe p97 Pipe p99 Pipe p100 Pipe p101 Pipe p102 Pipe p103

415.16 16.64 16.4 451.53 268.6 90.1 139.4 131.8 40.1 41.36 19.92 43.05 126 44.44 69.22 102.6 372.6 57.79 59.3 35.24 165.9 62.25 142.1 59.16 69.82 44.36 109.6 263.9 256 52.02 36.71 137.5 128 77.63 53.96 63.99 48.3 93.16 76.81 82.45 148.62 108.5 248.3 78.26 42.89 44.88 80.05 90.25 129.51 145.5 93.51 58.24

100 100 100 100 75 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 75 75 75 75 75

0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002

8.25 8.25 6.62 6.62 9.36 -2.74 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.74 2.74 2.74 2.74 2.74 2.74 2.74 0 0 0 0 0 0

1.05 1.05 0.84 0.84 2.12 0.35 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0 0 0 0 0 0

0.018 0.018 0.019 0.019 0.017 0.023 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0 0 0 0 0 0

50

Pipe p104 Pipe p105 Pipe p106 Pipe p107 Pipe p108 Pipe p109 Pipe p110 Pipe p111 Pipe p112 Pipe p113 Pipe p114 Pipe p115 Pipe p116 Pipe p117 Pipe p118 Pipe p119 Pipe 1 Pipe 2 Pipe 4 Pipe 5 Pipe 6 Pipe 7 Pipe 8 Pipe 9 Pipe 10 Pipe 12 Pipe 13 Pipe 14 Pipe 15 Pipe 16 Pipe 17 Pipe 3 Pipe 11 Pump Bomba

34.13 148.6 29.04 137.2 213.1 87.71 40.69 39.89 47.64 51.68 31.45 121.4 128 44.41 85.66 176.5 33.73 1000 20.86 27.96 6.28 7.29 10.28 11.73 11.73 29.09 26.17 17.03 7.93 20.39 24.19 63.96 236.92 #N/A

75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 100 100 75 75 100 100 100 100 100 100 150 100 100 100 100 #N/A

0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 #N/A

0 0 0 2.74 2.74 0 0 0 0 0 0 0 0 0 0 0 5.66 5.11 9.36 0 5.11 5.66 -4.28 -3.97 3.66 1.33 1.41 2.96 46.37 46.37 -2.74 0 0 8.25

0 0 0 0.62 0.62 0 0 0 0 0 0 0 0 0 0 0 1.28 1.16 1.19 0 1.16 1.28 0.54 0.51 0.47 0.17 0.18 0.38 2.62 5.9 0.35 0 0 0

0 0 0 0.021 0.021 0 0 0 0 0 0 0 0 0 0 0 0.018 0.019 0.017 0 0.019 0.018 0.021 0.021 0.021 0.027 0.027 0.022 0.014 0.013 0.023 0 0 0

51

Cuadro 24. Resumen de resultados - nodos de la red - caso actual – consumo máximo horario, con proyecto. Nodo [#] Junc n1 Junc n2 Junc n3 Junc n4 Junc n5 Junc n6 Junc n7 Junc n8 Junc n9 Junc n10 Junc n11 Junc n12 Junc n13 Junc n14 Junc n15 Junc n16 Junc n17 Junc n18 Junc n19 Junc n20 Junc n21 Junc n22 Junc n23 Junc n24 Junc n25 Junc n26 Junc n27 Junc n28 Junc n29 Junc n30 Junc n31 Junc n32 Junc n33 Junc n34 Junc n35 Junc n36 Junc n37 Junc n38 Junc n39 Junc n40 Junc n41 Junc n42 Junc n43 Junc n44 Junc n45 Junc n46 Junc n47 Junc n48

Elevación [m] 986.0 986.4 987.1 984.2 978.2 977.2 971.8 962.2 959.3 927.0 1,103.0 1,099.2 1,095.6 1,083.0 1,075.0 1,074.8 1,075.0 1,075.0 1,072.1 1,066.1 1,054.9 1,043.1 1,027.4 1,009.4 991.7 983.5 993.3 996.7 1,015.8 1,017.3 1,028.5 1,109.0 1,088.3 1,075.0 1,072.9 1,071.8 1,075.0 1,074.9 1,072.2 1,066.3 1,055.1 1,041.5 1,025.7 1,007.7 990.2 981.9 995.2 998.6

Demanda [lps] 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.200 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.000 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070

Carga total [m] 981.3 980.5 978.7 973.9 965.0 962.0 958.4 956.2 950.3 927.3 1,102.2 1,099.8 1,098.0 1,087.1 1,084.9 1,081.4 1,077.0 1,076.0 1,074.1 1,070.2 1,062.7 1,057.8 1,054.8 1,049.8 1,046.0 1,044.7 1,041.3 1,039.9 1,035.2 1,033.8 1,032.1 1,089.0 1,080.8 1,073.9 1,073.3 1,070.4 1,066.6 1,065.9 1,064.6 1,061.6 1,055.7 1,051.9 1,049.5 1,045.6 1,042.7 1,041.7 1,039.0 1,038.0

Presión [mca] -4.7 -5.9 -8.4 -10.3 -13.2 -15.1 -13.4 -6.0 -9.0 0.3 -0.9 0.6 2.4 4.1 9.9 6.6 2.0 1.0 2.0 4.1 7.8 14.7 27.3 40.3 54.3 61.2 48.0 43.2 19.4 16.5 3.6 -20.0 -7.4 -1.1 0.4 -1.4 -8.4 -9.0 -7.7 -4.7 0.6 10.4 23.8 37.9 52.5 59.8 43.9 39.4

52

Junc n49 Junc n50 Junc n51 Junc n52 Junc n53 Junc n54 Junc n55 Junc n56 Junc n57 Junc n58 Junc n59 Junc n60 Junc n61 Junc n62 Junc n63 Junc n64 Junc n65 Junc n66 Junc n67 Junc n68 Junc n69 Junc n70 Junc n71 Junc n72 Junc n73 Junc n74 Junc n75 Junc n76 Junc n77 Junc n78 Junc n79 Junc n80 Junc n81 Junc n82 Junc n83 Junc n84 Junc n85 Junc n86 Junc n87 Junc n88 Junc n89 Junc n90 Junc n91 Junc n92 Junc n93 Junc n94 Junc n95 Junc n96 Junc n97 Junc n98 Junc n99 Junc n100

1,017.8 1,019.3 1,028.2 929.2 1,028.9 1,028.9 1,028.7 1,028.7 938.6 1,012.0 961.9 982.8 990.0 988.1 990.0 989.5 990.0 993.1 1,011.1 993.8 993.5 995.5 994.9 955.2 951.7 948.9 944.5 930.6 923.0 933.3 935.0 942.4 946.8 960.1 981.3 966.3 959.6 959.0 956.3 948.8 948.6 950.9 956.8 958.3 954.3 912.1 905.3 987.6 991.0 986.3 967.6 970.6

0.070 0.070 0.000 0.200 0.000 0.000 0.000 0.000 0.200 0.170 0.200 0.170 0.170 0.170 0.170 0.170 0.170 0.170 0.170 0.170 0.170 0.170 0.170 0.170 0.170 0.170 0.170 0.170 0.170 0.170 0.170 0.170 0.170 0.170 0.200 0.200 0.200 0.200 0.200 0.200 0.200 0.200 0.200 0.200 0.200 0.170 0.170 0.080 0.200 0.200 0.200 0.200

1,034.3 1,033.3 1,032.1 1,036.2 1,032.2 1,032.0 1,032.0 1,031.8 1,026.2 1,015.2 1,026.2 1,013.7 1,013.7 1,013.7 1,013.7 1,013.8 1,013.8 1,013.9 1,014.9 1,013.8 1,013.8 1,013.8 1,013.8 1,013.3 1,013.3 1,013.2 1,013.2 1,013.1 1,013.1 1,013.1 1,013.1 1,013.0 1,013.0 1,013.0 1,026.2 1,026.0 1,025.9 1,025.8 1,025.8 1,025.8 1,025.7 1,025.7 1,025.7 1,025.7 1,025.7 1,013.1 1,013.1 1,026.8 1,026.6 1,026.4 1,026.2 1,026.2

16.6 14.0 3.9 107.0 3.3 3.1 3.2 3.0 87.6 3.2 64.3 30.9 23.7 25.6 23.7 24.2 23.8 20.8 3.8 20.0 20.3 18.2 18.9 58.1 61.6 64.3 68.7 82.5 90.1 79.8 78.0 70.7 66.2 52.9 44.9 59.7 66.3 66.8 69.5 77.0 77.1 74.8 68.9 67.4 71.4 100.9 107.8 39.2 35.6 40.1 58.7 55.7

53

Junc n101 Junc n102 Junc n103 Junc n104 Junc n105 Junc n106 Junc n107 Junc n108 Junc n109 Junc n110 Junc n111 Junc n112 Junc n113 Junc n114 Junc n115 Junc n116 Junc n117 Junc n118 Junc n119 Junc n120 Junc n121 Junc n122 Junc n123 Junc Proyecto Resvr Nac_R Resvr Nac_O Resvr Caseta_Bombeo Resvr Nac_G Tank Tank_G Tank Tank_1 Tank Tank_2

968.8 963.9 977.2 983.1 985.9 964.3 980.9 980.5 982.0 983.0 982.5 1,028.1 1,020.2 984.4 978.8 981.8 988.0 989.7 985.2 970.4 972.3 981.3 980.3 1,005.0 1,103.0 1,109.0 927.0 986.0 1,014.0 1,031.0 1,031.0

0.200 0.200 0.170 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.000 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.700 -6.390 -5.610 37.900 -46.370 3.100 1.710 1.520

1,026.2 1,026.2 1,026.2 1,026.7 1,026.7 1,026.7 1,026.7 1,026.7 1,026.7 1,026.7 1,026.7 1,032.0 1,029.9 1,026.7 1,026.7 1,026.7 1,026.6 1,026.6 1,026.6 1,026.6 1,026.6 1,026.6 1,026.6 1,014.6 1,103.0 1,109.0 927.0 986.0 1,015.0 1,032.0 1,032.0

57.4 62.3 49.0 43.6 40.9 62.4 45.8 46.2 44.7 43.7 44.2 3.8 9.7 42.4 47.9 44.8 38.7 37.0 41.5 56.2 54.3 45.3 46.3 10.6 0.0 0.0 0.0 0.0 1.0 1.0 1.0

54

Cuadro 25. Resumen de resultados - tuberías de la red - caso actual – consumo máximo horario, con proyecto. Tubería [#] Pipe p1 Pipe p2 Pipe p3 Pipe p4 Pipe p5 Pipe p6 Pipe p7 Pipe p8 Pipe p9 Pipe p10 Pipe p11 Pipe p12 Pipe p13 Pipe p14 Pipe p15 Pipe p16 Pipe p17 Pipe p18 Pipe p19 Pipe p20 Pipe p21 Pipe p22 Pipe p23 Pipe p24 Pipe p25 Pipe p26 Pipe p27 Pipe p28 Pipe p29 Pipe p30 Pipe p31 Pipe p32 Pipe p33 Pipe p34 Pipe p35 Pipe p36 Pipe p37 Pipe p38 Pipe p39 Pipe p40 Pipe p41 Pipe p42 Pipe p43 Pipe p44 Pipe p45 Pipe p46 Pipe p47 Pipe p48

Longitud [m] 22.9 57.26 145.2 274.1 91.88 110.7 67.67 183.6 707.5 94.07 76.5 456.4 93.02 155.3 194.9 45.69 91.01 186.4 367.8 245.1 157.8 264 200.8 74.29 193.5 78.21 284.4 85.82 103.3 418.1 365.4 29.7 162.9 209.4 45.34 76.93 180.4 367.4 246.7 158.7 264.8 197.7 74.89 197.5 78.33 285.9 85.77 99.24

Diámetro [mm] 150 150 150 150 150 150 150 150 150 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75

Rugosidad [mm] 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002

Flujo [lps] 46.37 46.37 46.37 46.37 46.37 46.37 46.37 46.37 46.37 6.32 6.25 6.18 6.1 6.03 5.96 5.88 5.81 5.74 5.66 5.59 5.52 5.45 5.37 5.3 5.23 5.15 5.08 5.01 4.93 5.53 5.46 5.39 5.31 5.24 5.17 5.09 5.02 4.95 4.88 4.8 4.73 4.66 4.58 4.51 4.44 4.36 4.29 4.22

Velocidad [m/s] 2.62 2.62 2.62 2.62 2.62 2.62 2.62 2.62 2.62 1.43 1.41 1.4 1.38 1.36 1.35 1.33 1.32 1.3 1.28 1.27 1.25 1.23 1.22 1.2 1.18 1.17 1.15 1.13 1.12 1.25 1.24 1.22 1.2 1.19 1.17 1.15 1.14 1.12 1.1 1.09 1.07 1.05 1.04 1.02 1 0.99 0.97 0.95

Factor de fricción [adim] 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.019 0.019 0.019 0.019 0.019 0.018 0.018 0.018 0.018 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019

55

Pipe p49 Pipe p50 Pipe p51 Pipe p52 Pipe p53 Pipe p54 Pipe p56 Pipe p57 Pipe p58 Pipe p59 Pipe p60 Pipe p61 Pipe p63 Pipe p64 Pipe p65 Pipe p66 Pipe p67 Pipe p68 Pipe p69 Pipe p70 Pipe p71 Pipe p72 Pipe p73 Pipe p74 Pipe p75 Pipe p76 Pipe p77 Pipe p78 Pipe p79 Pipe p80 Pipe p81 Pipe p82 Pipe p83 Pipe p84 Pipe p85 Pipe p86 Pipe p87 Pipe p88 Pipe p89 Pipe p90 Pipe p91 Pipe p92 Pipe p93 Pipe p94 Pipe p95 Pipe p96 Pipe p97 Pipe p99 Pipe p100 Pipe p101 Pipe p102 Pipe p103

415.16 16.64 16.4 451.53 268.6 90.1 139.4 131.8 40.1 41.36 19.92 43.05 126 44.44 69.22 102.6 372.6 57.79 59.3 35.24 165.9 62.25 142.1 59.16 69.82 44.36 109.6 263.9 256 52.02 36.71 137.5 128 77.63 53.96 63.99 48.3 93.16 76.81 82.45 148.62 108.5 248.3 78.26 42.89 44.88 80.05 90.25 129.51 145.5 93.51 58.24

100 100 100 100 75 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 75 75 75 75 75

0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002

8.06 8.06 9.2 9.2 8.35 0.64 -0.17 -0.35 -0.52 -2.97 -3.15 -4.03 0.7 0.52 0.35 0.17 2.27 2.1 1.92 1.75 1.57 1.4 0.88 0.7 0.52 0.35 0.17 2.02 1.82 1.62 1.41 1.21 1.01 0.81 0.61 0.4 0.2 0.35 0.17 3.17 2.97 2.76 0.54 0.34 0.14 -0.06 0.17 -0.54 -0.62 -0.08 -0.16 -0.24

1.03 1.03 1.17 1.17 1.89 0.08 0.02 0.04 0.07 0.38 0.4 0.51 0.09 0.07 0.04 0.02 0.29 0.27 0.25 0.22 0.2 0.18 0.11 0.09 0.07 0.04 0.02 0.26 0.23 0.21 0.18 0.15 0.13 0.1 0.08 0.05 0.03 0.04 0.02 0.4 0.38 0.35 0.07 0.04 0.02 0.01 0.02 0.12 0.14 0.02 0.04 0.06

0.018 0.018 0.017 0.017 0.017 0.033 0.03 0.04 0.034 0.022 0.022 0.021 0.032 0.035 0.039 0.029 0.024 0.024 0.025 0.025 0.026 0.027 0.03 0.032 0.035 0.04 0.03 0.024 0.025 0.026 0.027 0.028 0.029 0.031 0.034 0.038 0.027 0.039 0.031 0.022 0.022 0.023 0.035 0.04 0.033 0.048 0.029 0.032 0.031 0.047 0.03 0.041

56

Pipe p104 Pipe p105 Pipe p106 Pipe p107 Pipe p108 Pipe p109 Pipe p110 Pipe p111 Pipe p112 Pipe p113 Pipe p114 Pipe p115 Pipe p116 Pipe p117 Pipe p118 Pipe p119 Pipe 1 Pipe 2 Pipe 4 Pipe 5 Pipe 6 Pipe 7 Pipe 8 Pipe 9 Pipe 10 Pipe 12 Pipe 13 Pipe 14 Pipe 15 Pipe 16 Pipe 17 Pipe 3 Pipe 11 Pump Bomba

34.13 148.6 29.04 137.2 213.1 87.71 40.69 39.89 47.64 51.68 31.45 121.4 128 44.41 85.66 176.5 33.73 1000 20.86 27.96 6.28 7.29 10.28 11.73 11.73 29.09 26.17 17.03 7.93 20.39 24.19 63.96 236.92 #N/A

75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 100 100 75 75 100 100 100 100 100 100 150 100 100 100 100 #N/A

0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 #N/A

-0.32 0.13 0.05 4.79 4.71 0.84 0.76 0.73 0.65 0.57 0.49 0.41 0.32 0.24 0.16 0.08 6.39 5.61 8.18 5.08 4.22 4.93 -4.18 -3.88 5.08 2.32 2.47 4.12 46.17 46.37 0.44 4.91 4.2 8.26

0.07 0.03 0.01 1.08 1.07 0.19 0.17 0.17 0.15 0.13 0.11 0.09 0.07 0.06 0.04 0.02 1.45 1.27 1.04 0.65 0.95 1.12 0.53 0.49 0.65 0.3 0.31 0.52 2.61 5.9 0.06 0.62 0.53 0

0.037 0.03 0.085 0.019 0.019 0.028 0.029 0.029 0.03 0.032 0.033 0.035 0.037 0.04 0.03 0.048 0.018 0.018 0.018 0.02 0.019 0.019 0.021 0.021 0.02 0.024 0.023 0.021 0.014 0.013 0.038 0.02 0.021 0

57

Cuadro 26. Resumen de resultados - nodos de la red - caso futuro – escenario estático, con proyecto. Nodo [#] Junc n1 Junc n2 Junc n3 Junc n4 Junc n5 Junc n6 Junc n7 Junc n8 Junc n9 Junc n10 Junc n11 Junc n12 Junc n13 Junc n14 Junc n15 Junc n16 Junc n17 Junc n18 Junc n19 Junc n20 Junc n21 Junc n22 Junc n23 Junc n24 Junc n25 Junc n26 Junc n27 Junc n28 Junc n29 Junc n30 Junc n31 Junc n32 Junc n33 Junc n34 Junc n35 Junc n36 Junc n37 Junc n38 Junc n39 Junc n40 Junc n41 Junc n42 Junc n43 Junc n44 Junc n45 Junc n46 Junc n47 Junc n48

Elevación [m] 986.0 986.4 987.1 984.2 978.2 977.2 971.8 962.2 959.3 927.0 1,103.0 1,099.2 1,095.6 1,083.0 1,075.0 1,074.8 1,075.0 1,075.0 1,072.1 1,066.1 1,054.9 1,043.1 1,027.4 1,009.4 991.7 983.5 993.3 996.7 1,015.8 1,017.3 1,028.5 1,109.0 1,088.3 1,075.0 1,072.9 1,071.8 1,075.0 1,074.9 1,072.2 1,066.3 1,055.1 1,041.5 1,025.7 1,007.7 990.2 981.9 995.2 998.6

Demanda [lps] 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

Carga total [m] 981.3 980.5 978.7 973.9 965.0 962.0 958.4 956.2 950.3 927.3 1,102.3 1,100.4 1,098.8 1,089.6 1,087.7 1,084.5 1,080.5 1,079.6 1,077.8 1,074.0 1,066.5 1,061.5 1,058.3 1,052.9 1,048.8 1,047.3 1,043.4 1,041.8 1,036.0 1,034.3 1,032.2 1,092.1 1,085.0 1,078.8 1,078.3 1,075.6 1,072.0 1,071.3 1,070.0 1,066.9 1,060.7 1,056.5 1,053.8 1,049.4 1,046.0 1,044.7 1,041.4 1,040.1

Presión [mca] -4.7 -5.9 -8.4 -10.3 -13.1 -15.1 -13.4 -6.0 -9.0 0.3 -0.7 1.2 3.3 6.6 12.7 9.7 5.5 4.6 5.6 7.9 11.6 18.4 30.8 43.5 57.1 63.9 50.1 45.1 20.2 17.0 3.7 -16.9 -3.3 3.8 5.4 3.8 -3.0 -3.6 -2.3 0.6 5.6 15.0 28.1 41.7 55.8 62.9 46.3 41.5

58

Junc n49 Junc n50 Junc n51 Junc n52 Junc n53 Junc n54 Junc n55 Junc n56 Junc n57 Junc n58 Junc n59 Junc n60 Junc n61 Junc n62 Junc n63 Junc n64 Junc n65 Junc n66 Junc n67 Junc n68 Junc n69 Junc n70 Junc n71 Junc n72 Junc n73 Junc n74 Junc n75 Junc n76 Junc n77 Junc n78 Junc n79 Junc n80 Junc n81 Junc n82 Junc n83 Junc n84 Junc n85 Junc n86 Junc n87 Junc n88 Junc n89 Junc n90 Junc n91 Junc n92 Junc n93 Junc n94 Junc n95 Junc n96 Junc n97 Junc n98 Junc n99 Junc n100

1,017.8 1,019.3 1,028.2 929.2 1,028.9 1,028.9 1,028.7 1,028.7 938.6 1,012.0 961.9 982.8 990.0 988.1 990.0 989.5 990.0 993.1 1,011.1 993.8 993.5 995.5 994.9 955.2 951.7 948.9 944.5 930.6 923.0 933.3 935.0 942.4 946.8 960.1 981.3 966.3 959.6 959.0 956.3 948.8 948.6 950.9 956.8 958.3 954.3 912.1 905.3 987.6 991.0 986.3 967.6 970.6

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

1,035.2 1,033.8 1,032.1 1,036.4 1,032.2 1,032.0 1,032.0 1,031.9 1,028.7 1,015.3 1,028.8 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,015.0 1,029.5 1,029.5 1,029.5 1,029.5 1,029.5 1,029.5 1,029.5 1,029.5 1,029.5 1,029.5 1,029.5 1,015.0 1,015.0 1,030.0 1,029.9 1,029.6 1,029.1 1,029.0

17.5 14.5 3.9 107.2 3.3 3.1 3.2 3.1 90.1 3.3 66.9 32.2 25.0 26.9 25.0 25.5 25.0 21.9 3.9 21.2 21.5 19.5 20.1 59.8 63.3 66.1 70.5 84.4 92.0 81.7 80.0 72.6 68.2 54.9 48.2 63.2 69.9 70.5 73.2 80.7 80.9 78.5 72.7 71.2 75.2 102.9 109.7 42.4 38.9 43.4 61.6 58.4

59

Junc n101 Junc n102 Junc n103 Junc n104 Junc n105 Junc n106 Junc n107 Junc n108 Junc n109 Junc n110 Junc n111 Junc n112 Junc n113 Junc n114 Junc n115 Junc n116 Junc n117 Junc n118 Junc n119 Junc n120 Junc n121 Junc n122 Junc n123 Junc nodx Junc 1 Junc Proyecto_LA_ARENA Junc 3 Resvr Nac_R Resvr Nac_O Resvr Caseta_Bombeo Resvr Nac_G Tank Tank_G Tank Tank_1 Tank Tank_2

968.8 963.9 977.2 983.1 985.9 964.3 980.9 980.5 982.0 983.0 982.5 1,028.1 1,020.2 984.4 978.8 981.8 988.0 989.7 985.2 970.4 972.3 981.3 980.3 1,005.0 1,012.0 1,005.0 1,005.0 1,103.0 1,109.0 927.0 986.0 1,014.0 1,031.0 1,031.0

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 -5.660 -5.110 38.120 -46.370 9.520 4.860 4.630

1,028.9 1,028.9 1,028.9 1,030.0 1,030.0 1,030.0 1,030.0 1,030.0 1,030.0 1,030.0 1,030.0 1,032.0 1,031.2 1,030.0 1,030.0 1,030.0 1,030.0 1,030.0 1,030.0 1,030.0 1,030.0 1,030.0 1,030.0 1,015.0 1,016.3 1,016.3 1,016.3 1,103.0 1,109.0 927.0 986.0 1,015.0 1,032.0 1,032.0

60.2 65.0 51.7 46.8 44.1 65.6 49.1 49.5 48.0 47.0 47.5 3.9 11.0 45.6 51.2 48.1 42.0 40.3 44.8 59.6 57.7 48.7 49.7 10.0 4.3 11.3 11.3 0.0 0.0 0.0 0.0 1.0 1.0 1.0

60

Cuadro 27. Resumen de resultados - tuberías de la red - caso futuro – escenario estático, con proyecto. Tubería [#] Pipe p1 Pipe p2 Pipe p3 Pipe p4 Pipe p5 Pipe p6 Pipe p7 Pipe p8 Pipe p9 Pipe p10 Pipe p11 Pipe p12 Pipe p13 Pipe p14 Pipe p15 Pipe p16 Pipe p17 Pipe p18 Pipe p19 Pipe p20 Pipe p21 Pipe p22 Pipe p23 Pipe p24 Pipe p25 Pipe p26 Pipe p27 Pipe p28 Pipe p29 Pipe p30 Pipe p31 Pipe p32 Pipe p33 Pipe p34 Pipe p35 Pipe p36 Pipe p37 Pipe p38 Pipe p39 Pipe p40 Pipe p41 Pipe p42 Pipe p43 Pipe p44 Pipe p45 Pipe p46 Pipe p47 Pipe p48

Longitud [m] 22.9 57.26 145.2 274.1 91.88 110.7 67.67 183.6 707.5 94.07 76.5 456.4 93.02 155.3 194.9 45.69 91.01 186.4 367.8 245.1 157.8 264 200.8 74.29 193.5 78.21 284.4 85.82 103.3 418.1 365.4 29.7 162.9 209.4 45.34 76.93 180.4 367.4 246.7 158.7 264.8 197.7 74.89 197.5 78.33 285.9 85.77 99.24

Diámetro [mm] 150 150 150 150 150 150 150 150 150 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75

Rugosidad [mm] 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002

Flujo [lps] 46.37 46.37 46.37 46.37 46.37 46.37 46.37 46.37 46.37 5.66 5.66 5.66 5.66 5.66 5.66 5.66 5.66 5.66 5.66 5.66 5.66 5.66 5.66 5.66 5.66 5.66 5.66 5.66 5.66 5.11 5.11 5.11 5.11 5.11 5.11 5.11 5.11 5.11 5.11 5.11 5.11 5.11 5.11 5.11 5.11 5.11 5.11 5.11

Velocidad [m/s] 2.62 2.62 2.62 2.62 2.62 2.62 2.62 2.62 2.62 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.16

Factor de fricción [adim] 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019

61

Pipe p49 Pipe p50 Pipe p51 Pipe p52 Pipe p54 Pipe p56 Pipe p57 Pipe p58 Pipe p59 Pipe p60 Pipe p61 Pipe p63 Pipe p64 Pipe p65 Pipe p66 Pipe p67 Pipe p68 Pipe p69 Pipe p70 Pipe p71 Pipe p72 Pipe p73 Pipe p74 Pipe p75 Pipe p76 Pipe p77 Pipe p78 Pipe p79 Pipe p80 Pipe p81 Pipe p82 Pipe p83 Pipe p84 Pipe p85 Pipe p86 Pipe p87 Pipe p88 Pipe p89 Pipe p90 Pipe p91 Pipe p92 Pipe p93 Pipe p94 Pipe p95 Pipe p96 Pipe p97 Pipe p99 Pipe p100 Pipe p101 Pipe p102 Pipe p103 Pipe p104

415.16 16.64 16.4 451.53 90.1 139.4 131.8 40.1 41.36 19.92 43.05 126 44.44 69.22 102.6 372.6 57.79 59.3 35.24 165.9 62.25 142.1 59.16 69.82 44.36 109.6 263.9 256 52.02 36.71 137.5 128 77.63 53.96 63.99 48.3 93.16 76.81 82.45 148.62 108.5 248.3 78.26 42.89 44.88 80.05 90.25 129.51 145.5 93.51 58.24 34.13

100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 75 75 75 75 75 75

0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002

8.25 8.25 6.73 6.73 -2.79 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.79 2.79 2.79 2.79 2.79 2.79 2.79 0 0 0 0 0 0 0

1.05 1.05 0.86 0.86 0.36 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.36 0.36 0.36 0.36 0.36 0.36 0.36 0 0 0 0 0 0 0

0.018 0.018 0.019 0.019 0.023 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0 0 0 0 0 0 0

62

Pipe p105 Pipe p106 Pipe p107 Pipe p108 Pipe p109 Pipe p110 Pipe p111 Pipe p112 Pipe p113 Pipe p114 Pipe p115 Pipe p116 Pipe p117 Pipe p118 Pipe p119 Pipe 1 Pipe 2 Pipe 4 Pipe 5 Pipe 6 Pipe 7 Pipe 8 Pipe 9 Pipe 10 Pipe 12 Pipe 13 Pipe 14 Pipe 15 Pipe 16 Pipe 17 Pipe 3 Pipe 11 Pipe 18 Pipe 19 Pipe 20 Pipe 21 Pump Bomba

148.6 29.04 137.2 213.1 87.71 40.69 39.89 47.64 51.68 31.45 121.4 128 44.41 85.66 176.5 33.73 1000 20.86 27.96 6.28 7.29 10.28 11.73 11.73 29.09 26.17 17.03 7.93 20.39 24.19 63.96 236.92 238.58 19.82 130 15 #N/A

75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 100 100 75 75 100 100 100 100 100 100 150 100 100 100 100 75 75 100 100 #N/A

0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 #N/A

0 0 2.79 2.79 0 0 0 0 0 0 0 0 0 0 0 5.66 5.11 9.52 0 5.11 5.66 -4.28 -3.97 3.72 1.35 1.44 3.01 46.37 46.37 -2.79 0 0 9.52 9.52 0 0 8.25

0 0 0.63 0.63 0 0 0 0 0 0 0 0 0 0 0 1.28 1.16 1.21 0 1.16 1.28 0.54 0.51 0.47 0.17 0.18 0.38 2.62 5.9 0.36 0 0 2.16 2.16 0 0 0

0 0 0.021 0.021 0 0 0 0 0 0 0 0 0 0 0 0.018 0.019 0.017 0 0.019 0.018 0.021 0.021 0.021 0.027 0.026 0.022 0.014 0.013 0.023 0 0 0.016 0.016 0 0 0

63

Cuadro 28. Resumen de resultados - nodos de la red - caso futuro – consumo máximo horario, con proyecto. Nodo

Elevación

Demanda

Carga total

Presión

[#]

[m]

[lps]

[m]

[mca]

Junc n1

986.0

0.000

981.3

-4.7

Junc n2

986.4

0.000

980.5

-5.9

Junc n3

987.1

0.000

978.7

-8.4

Junc n4

984.2

0.000

973.9

-10.3

Junc n5

978.2

0.000

965.0

-13.2

Junc n6

977.2

0.000

962.0

-15.1

Junc n7

971.8

0.000

958.4

-13.4

Junc n8

962.2

0.000

956.2

-6.0

Junc n9

959.3

0.000

950.3

-9.0

Junc n10

927.0

0.260

927.3

0.3

Junc n11

1,103.0

0.090

1,102.1

-0.9

Junc n12

1,099.2

0.090

1,099.6

0.5

Junc n13

1,095.6

0.090

1,097.7

2.1

Junc n14

1,083.0

0.090

1,086.4

3.4

Junc n15

1,075.0

0.090

1,084.2

9.2

Junc n16

1,074.8

0.090

1,080.5

5.7

Junc n17

1,075.0

0.090

1,076.1

1.1

Junc n18

1,075.0

0.090

1,075.0

0.0

Junc n19

1,072.1

0.090

1,073.1

0.9

Junc n20

1,066.1

0.090

1,069.2

3.1

Junc n21

1,054.9

0.090

1,061.7

6.8

Junc n22

1,043.1

0.090

1,056.8

13.7

Junc n23

1,027.4

0.090

1,053.8

26.4

Junc n24

1,009.4

0.090

1,048.9

39.5

Junc n25

991.7

0.090

1,045.3

53.6

Junc n26

983.5

0.090

1,044.0

60.5

Junc n27

993.3

0.090

1,040.7

47.5

Junc n28

996.7

0.090

1,039.4

42.7

Junc n29

1,015.8

0.090

1,034.9

19.2

Junc n30

1,017.3

0.090

1,033.6

16.4

Junc n31

1,028.5

0.000

1,032.1

3.6

Junc n32

1,109.0

0.090

1,088.2

-20.9

Junc n33

1,088.3

0.090

1,079.7

-8.6

Junc n34

1,075.0

0.090

1,072.5

-2.5

Junc n35

1,072.9

0.090

1,071.9

-1.0

Junc n36

1,071.8

0.090

1,068.9

-2.9

Junc n37

1,075.0

0.090

1,065.2

-9.8

Junc n38

1,074.9

0.090

1,064.4

-10.5

Junc n39

1,072.2

0.090

1,063.1

-9.1

Junc n40

1,066.3

0.090

1,060.2

-6.1

Junc n41

1,055.1

0.090

1,054.4

-0.7

Junc n42

1,041.5

0.090

1,050.7

9.2

64

Junc n43

1,025.7

0.090

1,048.3

22.6

Junc n44

1,007.7

0.090

1,044.6

36.9

Junc n45

990.2

0.090

1,041.9

51.7

Junc n46

981.9

0.090

1,040.9

59.0

Junc n47

995.2

0.090

1,038.4

43.2

Junc n48

998.6

0.090

1,037.4

38.8

Junc n49

1,017.8

0.090

1,034.1

16.3

Junc n50

1,019.3

0.090

1,033.1

13.9

Junc n51

1,028.2

0.000

1,032.1

3.8

Junc n52

929.2

0.260

1,036.2

107.0

Junc n53

1,028.9

0.000

1,032.2

3.3

Junc n54

1,028.9

0.000

1,032.0

3.1

Junc n55

1,028.7

0.000

1,031.9

3.2

Junc n56

1,028.7

0.000

1,031.7

3.0

Junc n57

938.6

0.260

1,025.3

86.6

Junc n58

1,012.0

0.220

1,015.2

3.2

Junc n59

961.9

0.260

1,025.2

63.3

Junc n60

982.8

0.220

1,013.0

30.1

Junc n61

990.0

0.220

1,013.0

23.0

Junc n62

988.1

0.220

1,013.0

24.9

Junc n63

990.0

0.220

1,013.0

23.0

Junc n64

989.5

0.220

1,013.1

23.5

Junc n65

990.0

0.220

1,013.1

23.2

Junc n66

993.1

0.220

1,013.3

20.2

Junc n67

1,011.1

0.220

1,014.8

3.7

Junc n68

993.8

0.220

1,013.1

19.3

Junc n69

993.5

0.220

1,013.1

19.6

Junc n70

995.5

0.220

1,013.1

17.6

Junc n71

994.9

0.220

1,013.1

18.2

Junc n72

955.2

0.220

1,012.4

57.2

Junc n73

951.7

0.220

1,012.3

60.6

Junc n74

948.9

0.220

1,012.3

63.3

Junc n75

944.5

0.220

1,012.2

67.7

Junc n76

930.6

0.220

1,012.1

81.5

Junc n77

923.0

0.220

1,012.1

89.1

Junc n78

933.3

0.220

1,012.0

78.7

Junc n79

935.0

0.220

1,012.0

77.0

Junc n80

942.4

0.220

1,012.0

69.6

Junc n81

946.8

0.220

1,012.0

65.2

Junc n82

960.1

0.220

1,012.0

51.8

Junc n83

981.3

0.260

1,025.2

43.9

Junc n84

966.3

0.260

1,024.8

58.5

Junc n85

959.6

0.260

1,024.6

65.0

Junc n86

959.0

0.260

1,024.5

65.5

Junc n87

956.3

0.260

1,024.5

68.2

65

Junc n88

948.8

0.260

1,024.4

75.7

Junc n89

948.6

0.260

1,024.4

75.8

Junc n90

950.9

0.260

1,024.4

73.4

Junc n91

956.8

0.260

1,024.4

67.5

Junc n92

958.3

0.260

1,024.4

66.1

Junc n93

954.3

0.260

1,024.4

70.0

Junc n94

912.1

0.220

1,012.0

99.9

Junc n95

905.3

0.220

1,012.0

106.8

Junc n96

987.6

0.100

1,025.7

38.1

Junc n97

991.0

0.260

1,025.6

34.6

Junc n98

986.3

0.260

1,025.3

39.1

Junc n99

967.6

0.260

1,025.2

57.6

Junc n100

970.6

0.260

1,025.2

54.6

Junc n101

968.8

0.260

1,025.2

56.4

Junc n102

963.9

0.260

1,025.2

61.3

Junc n103

977.2

0.220

1,025.2

48.0

Junc n104

983.1

0.100

1,025.6

42.5

Junc n105

985.9

0.100

1,025.6

39.8

Junc n106

964.3

0.100

1,025.6

61.2

Junc n107

980.9

0.100

1,025.6

44.7

Junc n108

980.5

0.100

1,025.6

45.1

Junc n109

982.0

0.100

1,025.6

43.6

Junc n110

983.0

0.100

1,025.6

42.6

Junc n111

982.5

0.100

1,025.6

43.1

Junc n112

1,028.1

0.000

1,032.0

3.8

Junc n113

1,020.2

0.100

1,029.5

9.3

Junc n114

984.4

0.100

1,025.6

41.3

Junc n115

978.8

0.100

1,025.6

46.8

Junc n116

981.8

0.100

1,025.5

43.7

Junc n117

988.0

0.100

1,025.5

37.5

Junc n118

989.7

0.100

1,025.5

35.8

Junc n119

985.2

0.100

1,025.5

40.3

Junc n120

970.4

0.100

1,025.4

55.1

Junc n121

972.3

0.100

1,025.4

53.1

Junc n122

981.3

0.100

1,025.4

44.1

Junc n123

980.3

0.100

1,025.4

45.2

Junc nodx

1,005.0

0.900

1,014.4

104

Junc 1

1,012.0

0.000

1,015.8

3.9

Junc Proyecto_LA_ARENA

1,005.0

0.680

1,015.8

10.8

Junc 3

1,005.0

0.000

1,015.8

10.8

Resvr Nac_R

1,103.0

-6.590

1,103.0

0.0

Resvr Nac_O

1,109.0

-5.740

1,109.0

0.0

Resvr Caseta_Bombeo

927.0

37.840

927.0

0.0

Resvr Nac_G

986.0

-46.370

986.0

0.0

Tank Tank_G

1,014.0

0.800

1,015.0

1.0

66

Tank Tank_1

1,031.0

0.770

1,032.0

1.0

Tank Tank_2

1,031.0

0.590

1,032.0

1.0

67

Cuadro 29. Resumen de resultados - tuberías de la red - caso futuro – consumo máximo horario, con proyecto. Tubería

Longitud

Diámetro

Rugosidad

Flujo

Velocidad

Factor de fricción

[#]

[m]

[mm]

[mm]

[lps]

[m/s]

[adim]

Pipe p1

22.9

150

0.002

46.37

2.62

0.014

Pipe p2

57.26

150

0.002

46.37

2.62

0.014

Pipe p3

145.2

150

0.002

46.37

2.62

0.014

Pipe p4

274.1

150

0.002

46.37

2.62

0.014

Pipe p5

91.88

150

0.002

46.37

2.62

0.014

Pipe p6

110.7

150

0.002

46.37

2.62

0.014

Pipe p7

67.67

150

0.002

46.37

2.62

0.014

Pipe p8

183.6

150

0.002

46.37

2.62

0.014

Pipe p9

707.5

150

0.002

46.37

2.62

0.014

Pipe p10

94.07

75

0.002

6.5

1.47

0.018

Pipe p11

76.5

75

0.002

6.41

1.45

0.018

Pipe p12

456.4

75

0.002

6.31

1.43

0.018

Pipe p13

93.02

75

0.002

6.22

1.41

0.018

Pipe p14

155.3

75

0.002

6.13

1.39

0.018

Pipe p15

194.9

75

0.002

6.03

1.37

0.018

Pipe p16

45.69

75

0.002

5.94

1.34

0.018

Pipe p17

91.01

75

0.002

5.85

1.32

0.018

Pipe p18

186.4

75

0.002

5.75

1.3

0.018

Pipe p19

367.8

75

0.002

5.66

1.28

0.018

Pipe p20

245.1

75

0.002

5.57

1.26

0.018

Pipe p21

157.8

75

0.002

5.48

1.24

0.018

Pipe p22

264

75

0.002

5.38

1.22

0.018

Pipe p23

200.8

75

0.002

5.29

1.2

0.019

Pipe p24

74.29

75

0.002

5.2

1.18

0.019

Pipe p25

193.5

75

0.002

5.1

1.16

0.019

Pipe p26

78.21

75

0.002

5.01

1.13

0.019

Pipe p27

284.4

75

0.002

4.92

1.11

0.019

Pipe p28

85.82

75

0.002

4.82

1.09

0.019

Pipe p29

103.3

75

0.002

4.73

1.07

0.019

Pipe p30

418.1

75

0.002

5.64

1.28

0.018

Pipe p31

365.4

75

0.002

5.55

1.26

0.018

Pipe p32

29.7

75

0.002

5.46

1.24

0.018

Pipe p33

162.9

75

0.002

5.37

1.21

0.018

Pipe p34

209.4

75

0.002

5.27

1.19

0.019

Pipe p35

45.34

75

0.002

5.18

1.17

0.019

Pipe p36

76.93

75

0.002

5.09

1.15

0.019

Pipe p37

180.4

75

0.002

4.99

1.13

0.019

Pipe p38

367.4

75

0.002

4.9

1.11

0.019

Pipe p39

246.7

75

0.002

4.81

1.09

0.019

Pipe p40

158.7

75

0.002

4.71

1.07

0.019

Pipe p41

264.8

75

0.002

4.62

1.05

0.019

Pipe p42

197.7

75

0.002

4.53

1.02

0.019

68

Pipe p43

74.89

75

0.002

4.43

1

0.019

Pipe p44

197.5

75

0.002

4.34

0.98

0.019

Pipe p45

78.33

75

0.002

4.25

0.96

0.019

Pipe p46

285.9

75

0.002

4.16

0.94

0.019

Pipe p47

85.77

75

0.002

4.06

0.92

0.02

Pipe p48

99.24

75

0.002

3.97

0.9

0.02

Pipe p49

415.16

100

0.002

8.01

1.02

0.018

Pipe p50

16.64

100

0.002

8.01

1.02

0.018

Pipe p51

16.4

100

0.002

10.04

1.28

0.017

Pipe p52

451.53

100

0.002

10.04

1.28

0.017

Pipe p54

90.1

100

0.002

1.61

0.2

0.026

Pipe p56

139.4

100

0.002

-0.22

0.03

0.03

Pipe p57

131.8

100

0.002

-0.45

0.06

0.037

Pipe p58

40.1

100

0.002

-0.67

0.09

0.033

Pipe p59

41.36

100

0.002

-3.79

0.48

0.021

Pipe p60

19.92

100

0.002

-4.02

0.51

0.021

Pipe p61

43.05

100

0.002

-5.13

0.65

0.02

Pipe p63

126

100

0.002

0.89

0.11

0.03

Pipe p64

44.44

100

0.002

0.67

0.09

0.033

Pipe p65

69.22

100

0.002

0.45

0.06

0.037

Pipe p66

102.6

100

0.002

0.22

0.03

0.032

Pipe p67

372.6

100

0.002

2.9

0.37

0.022

Pipe p68

57.79

100

0.002

2.68

0.34

0.023

Pipe p69

59.3

100

0.002

2.45

0.31

0.023

Pipe p70

35.24

100

0.002

2.23

0.28

0.024

Pipe p71

165.9

100

0.002

2.01

0.26

0.024

Pipe p72

62.25

100

0.002

1.78

0.23

0.025

Pipe p73

142.1

100

0.002

1.12

0.14

0.028

Pipe p74

59.16

100

0.002

0.89

0.11

0.03

Pipe p75

69.82

100

0.002

0.67

0.09

0.033

Pipe p76

44.36

100

0.002

0.45

0.06

0.037

Pipe p77

109.6

100

0.002

0.22

0.03

0.031

Pipe p78

263.9

100

0.002

2.58

0.33

0.023

Pipe p79

256

100

0.002

2.32

0.3

0.024

Pipe p80

52.02

100

0.002

2.06

0.26

0.024

Pipe p81

36.71

100

0.002

1.8

0.23

0.025

Pipe p82

137.5

100

0.002

1.55

0.2

0.026

Pipe p83

128

100

0.002

1.29

0.16

0.027

Pipe p84

77.63

100

0.002

1.03

0.13

0.029

Pipe p85

53.96

100

0.002

0.77

0.1

0.031

Pipe p86

63.99

100

0.002

0.52

0.07

0.035

Pipe p87

48.3

100

0.002

0.26

0.03

0.034

Pipe p88

93.16

100

0.002

0.45

0.06

0.037

Pipe p89

76.81

100

0.002

0.22

0.03

0.031

Pipe p90

82.45

100

0.002

3.25

0.41

0.022

69

Pipe p91

148.62

100

0.002

2.99

0.38

0.022

Pipe p92

108.5

100

0.002

2.74

0.35

0.023

Pipe p93

248.3

100

0.002

-0.1

0.01

0.051

Pipe p94

78.26

100

0.002

-0.35

0.05

0.04

Pipe p95

42.89

100

0.002

-0.61

0.08

0.034

Pipe p96

44.88

100

0.002

-0.87

0.11

0.03

Pipe p97

80.05

100

0.002

0.22

0.03

0.032

Pipe p99

90.25

75

0.002

-0.68

0.15

0.03

Pipe p100

129.51

75

0.002

-0.79

0.18

0.029

Pipe p101

145.5

75

0.002

-0.1

0.02

0.037

Pipe p102

93.51

75

0.002

-0.21

0.05

0.038

Pipe p103

58.24

75

0.002

-0.31

0.07

0.037

Pipe p104

34.13

75

0.002

-0.41

0.09

0.035

Pipe p105

148.6

75

0.002

0.17

0.04

0.031

Pipe p106

29.04

75

0.002

0.06

0.01

0.052

Pipe p107

137.2

75

0.002

5.32

1.2

0.018

Pipe p108

213.1

75

0.002

5.21

1.18

0.019

Pipe p109

87.71

75

0.002

1.07

0.24

0.027

Pipe p110

40.69

75

0.002

0.97

0.22

0.027

Pipe p111

39.89

75

0.002

0.93

0.21

0.028

Pipe p112

47.64

75

0.002

0.83

0.19

0.028

Pipe p113

51.68

75

0.002

0.72

0.16

0.03

Pipe p114

31.45

75

0.002

0.62

0.14

0.031

Pipe p115

121.4

75

0.002

0.52

0.12

0.032

Pipe p116

128

75

0.002

0.41

0.09

0.034

Pipe p117

44.41

75

0.002

0.31

0.07

0.038

Pipe p118

85.66

75

0.002

0.21

0.05

0.038

Pipe p119

176.5

75

0.002

0.1

0.02

0.037

Pipe 1

33.73

75

0.002

6.59

1.49

0.018

Pipe 2

1000

75

0.002

5.74

1.3

0.018

Pipe 4

20.86

100

0.002

7.27

0.93

0.018

Pipe 5

27.96

100

0.002

6.48

0.82

0.019

Pipe 6

6.28

75

0.002

3.97

0.9

0.02

Pipe 7

7.29

75

0.002

4.73

1.07

0.019

Pipe 8

10.28

100

0.002

-4.15

0.53

0.021

Pipe 9

11.73

100

0.002

-3.86

0.49

0.021

Pipe 10

11.73

100

0.002

5.54

0.71

0.019

Pipe 12

29.09

100

0.002

2.58

0.33

0.023

Pipe 13

26.17

100

0.002

2.74

0.35

0.023

Pipe 14

17.03

100

0.002

4.5

0.57

0.02

Pipe 15

7.93

150

0.002

46.11

2.61

0.014

Pipe 16

20.39

100

0.002

46.37

5.9

0.013

Pipe 17

24.19

100

0.002

1.35

0.17

0.027

Pipe 3

63.96

100

0.002

6.25

0.8

0.019

Pipe 11

236.92

100

0.002

5.36

0.68

0.02

70

Pipe 18

238.58

75

0.002

8.17

1.85

0.017

Pipe 19

19.82

75

0.002

7.5

1.7

0.017

Pipe 20

130

100

0.002

0.68

0.09

0.032

Pipe 21

15

100

0.002

0.68

0.09

0.033

Pump Bomba

#N/A

#N/A

#N/A

8.27

0

0

71

Fotografía 1. Rotulación en sitio de naciente.

72

Fotografía 2. Naciente Los Oviedo (1).

73

Fotografía 3. Naciente Los Oviedo (2).

74

Fotografía 4. Naciente Los Rodríguez (1).

75

Fotografía 5. Tanque #1.

76

Fotografía 6. Tanque #2.

77

Fotografía 7. Tanque Guayabal (1).

78

Fotografía 8. Tanque Guayabal (2).

79

Fotografía 9. Tanque Guayabal (3).

80

More Documents from "Alejandro Gonzalez"

October 2019 10
Falta Los Problemas.docx
December 2019 17