AYUNTAMIENTO DEL NOBLE VALLE Y UNIVERSIDAD DE BAZTAN BAZTAN BALLEKO UDALA

ESTUDIO DE ALTERNATIVAS PARA ACCESO A LA CANTERA DE ATXA

Plaza Ezcabazabal, 8-6º 31.600 BURLADA (Navarra) Tfno. 948 36 34 56 FAX 948 13 66 94 E-mail: [email protected]

Diciembre de 2003

AYUNTAMIENTO DEL NOBLE VALLE Y UNIVERSIDAD DE BAZTAN BAZTAN BALLEKO UDALA

ESTUDIO DE ALTERNATIVAS PARA ACCESO A LA CANTERA DE ATXA

INDICE 1.- INTRODUCCIÓN ............................................................................. 1 2.- DESCRIPCIÓN DE LAS SOLUCIONES .......................................... 1 2.1.- Alternativa 1 ............................................................................... 2 2.2.- Alternativa 2 ............................................................................... 3 2.3.- Alternativa 3 ............................................................................... 4 3.- COMPARACIÓN DE ALTERNATIVAS ............................................ 4 4.- CONCLUSIÓN ................................................................................. 5 ANEJOS Listados de las alineaciones Planos Presupuestos de las alternativas

ESTUDIO DE ALTERNATIVAS PARA ACCESO A LA CANTERA DE ATXA

AYUNTAMIENTO DEL NOBLE VALLE Y UNIVERSIDAD DE BAZTAN BAZTAN BALLEKO UDALA

1.- INTRODUCCIÓN El acceso a la cantera de Atxa en Almandotz se realiza en la actualidad por una pista que parte del casco urbano, con lo que se origina un tráfico a través de la localidad que provoca molestias continuas a la población y deteriora continuamente el firme de las calles. En junio de 2001 se realizó una Memoria Técnica Valorada en la que se planteaba una solución a este problema, aunque aún afectaba a una serie propiedades muy ligadas al casco urbano. Por todo ello, se ha solicitado a esta ingeniería un estudio de alternativas posibles que solucionen en mayor medida el problema planteado por l tráfico de las canteras en la localidad. En este estudio se plantean tres alternativas de trazado, procediendo a su medición y valoración, para poder plantear las ventajas e inconvenientes de cada una de ellas frente al resto.

2.- DESCRIPCIÓN DE LAS SOLUCIONES Se han planteado tres soluciones que unen el antiguo trazado de la N-121 con la cantera, evitando en lo posible la afección a la localidad. El trazado de la antigua carretera discurre en sentido SO-NE descendiendo desde la cota 447 hasta la 286 en el tramo estudiado situándose la cota de acceso actual a Almandotz en la cota 398. Las canteras se sitúan a la cota 523. Se han planteado tres alternativas partiendo desde distintos puntos de la antigua carretera: ESTUDIO DE ALTERNATIVAS PARA ACCESO A LA CANTERA DE ATXA

Pág 1

AYUNTAMIENTO DEL NOBLE VALLE Y UNIVERSIDAD DE BAZTAN BAZTAN BALLEKO UDALA



Alternativa 1: se desarrolla al oeste de la localidad, partiendo desde el sur.



Alternativa 2: es la que parte de un punto más septentrional, y por lo tanto de menor cota.



Alternativa

3:

utilizando

el

acceso

actual

se

desvía

inmediatamente para desarrollarse por el oeste. A continuación se describen por separado las distintas alternativas en las que se ha dispuesto una sección tipo común de cinco metros de anchura con cincuenta centímetros de suelo seleccionado con capacidad portante tal que el índice C.B.R. sea mayor que 20, veinticinco centímetros de zahorra artificial, cinco centímetros de mezcla bituminosa en caliente tipo G-20 y cinco centímetros de mezcla bituminosa en caliente tipo S-12 en la capa de rodadura.

2.1.- Alternativa 1 Parte de la cota 437,55 desde el punto situado más al sur de las consideradas en el estudio, salvando la diferencia de cotas necesaria por un recorrido situado al oeste de la localidad hasta alcanzar el acceso actual a la cota 524,44. Presenta una longitud total de 1.274,529 metros en planta, con una serie de curvas, con radio mínimo de 25 m en la curva situada entre los P.K. 0+017,376 y 0+057,443 posterior a la estructura necesaria para salvar el cauce existente. A partir de este punto, el trazado se acopla al terreno discurriendo a media ladera con pendientes pronunciadas. La pendiente máxima es cercana al quince por ciento (14,948 %) en un tramo de aproximadamente cuatro metros a partir del P.K. 0+976,409. Además presenta una pendiente del trece

ESTUDIO DE ALTERNATIVAS PARA ACCESO A LA CANTERA DE ATXA

Pág 2

AYUNTAMIENTO DEL NOBLE VALLE Y UNIVERSIDAD DE BAZTAN BAZTAN BALLEKO UDALA

por ciento (13%) entre los P.K. 0+062,554 y 0+230,397, con una longitud, por tanto de 167,843 m. De las tres alternativas es la que alcanza mayor cota con trazado nuevo, por lo que afecta menos a los caminos existentes. De los transversales obtenidos en el estudio de esta solución resulta un volumen de excavación de 20.479,00 m3 de excavación y 2.125,35 m3 de terraplén, y un presupuesto de ejecución por contrata (I.V.A. incluido) de cuatrocientos cuarenta y siete mil trescientos euros con dieciséis céntimos (446.300,16 €)

2.2.- Alternativa 2 Parte de la cota 286,25 desde las proximidades del enlace sur con el nuevo trasado de la N-121 y discurre por el norte de Almandotz hasta alcanzar la cota 480,00 en las inmediaciones de Arrobiko Etxeak. Presenta una longitud total de 2.096,830 metros en planta, con una serie de curvas, con radio mínimo de 50 m en la curva situada entre los P.K. 0+102,077 y 0+142,258. A partir de este punto, el trazado se acopla al terreno discurriendo a media ladera con pendientes pronunciadas. La pendiente máxima es cercana al trece por ciento (12,736 %), siendo superior al doce por ciento en una longitud total de 1.199,42 m. De los transversales obtenidos en el estudio de esta solución resulta un volumen de excavación de 16.604,00 m3 de excavación y 6.423,45 m3 de terraplén, y un presupuesto de ejecución por contrata (I.V.A. incluido) de seiscientos ocho mil quinientos treinta y ocho euros con treinta y cinco céntimos (608.538,35 €) ESTUDIO DE ALTERNATIVAS PARA ACCESO A LA CANTERA DE ATXA

Pág 3

AYUNTAMIENTO DEL NOBLE VALLE Y UNIVERSIDAD DE BAZTAN BAZTAN BALLEKO UDALA

2.3.- Alternativa 3 Es una solución intermedia a las dos anteriores, discurriendo al oeste de la localidad entre las cotas 396,26 junto al acceso actual a Almandotz desde la antigua N-121 y la cota 480 en la misma zona de enlace con trazados actuales que la alternativa 2 Presenta una longitud total de 1.314,59 metros en planta, con una serie de curvas, con radio mínimo de 12 m en la curva situada entre los P.K. 0+859,33 y 0+891,25 con una pendiente en esta zona del 10,944 %. La pendiente máxima es del 14,188 % en el tramo inicial, entre los P.K. 0+000 y 0+097,63 siendo superior al doce por ciento desde el P.K. 1+025,892 hasta su final. De los transversales obtenidos en el estudio de esta solución resulta un volumen de excavación de 12.730,00 m3 de excavación y 5.586,12 m3 de terraplén, y un presupuesto de ejecución por contrata (I.V.A. incluido) de trescientos ochenta y siete mil setecientos setenta y ocho euros con treinta y siete céntimos (387.778,37 €)

3.- COMPARACIÓN DE ALTERNATIVAS A continuación se presenta una tabla en la que se comparan las alternativas estudiadas con los siguientes parámetros: •

Presupuesto de Ejecución por Contrata, I.V.A. incluido



Cota de llegada, como parámetro que expresa la lejanía del casco urbano de la zona de conexión con los trazados actuales



Longitud expresada en metros

ESTUDIO DE ALTERNATIVAS PARA ACCESO A LA CANTERA DE ATXA

Pág 4

AYUNTAMIENTO DEL NOBLE VALLE Y UNIVERSIDAD DE BAZTAN BAZTAN BALLEKO UDALA



Pendiente media de la solución. En la alternativa 3, por presentar pendientes en ambos sentidos se calcula la media del tramo final, entre la cota más baja del trazado y su conexión junto a Arrobiko Etxeak.



Tramos con fuertes pendientes junto a su longitud.

Presupuesto (€)

z final

Long. (m)

Pend. Media (%)

Alternativa 1

447.300,16

524,44

1.274,529

6,817

Alternativa 2

608.538,35

480,00

2.096,830

9,240

Alternativa 3

387.778,37

480,00

1.314,590

11,275

Pend. Máximas (%) longitud 14,948 % - 4,00 m 13,000 % - 167,83 m 12,726 % - 904,11 m 12,736 % - 295,31 m 14,188 % - 97,63 m 12,013 % - 288,70 m

4.- CONCLUSIÓN Con los datos presentados en el apartado anterior, junto con los listados, planos y presupuestos que se adjuntan como anejos, quedan expresados los datos necesarios para la toma de decisiones por parte de la propiedad. Burlada, Diciembre de 2003

Fdo.: Gabriel Silva Uríbarri Ingeniero de Caminos, C. y P.

ESTUDIO DE ALTERNATIVAS PARA ACCESO A LA CANTERA DE ATXA

Pág 5

AYUNTAMIENTO DEL NOBLE VALLE Y UNIVERSIDAD DE BAZTAN BAZTAN BALLEKO UDALA

LISTADOS DE ALINEACIONES ESTUDIO DE ALTERNATIVAS PARA ACCESO A LA CANTERA DE ATXA

AYUNTAMIENTO DEL NOBLE VALLE Y UNIVERSIDAD DE BAZTAN BAZTAN BALLEKO UDALA

Horizontal Alignment Station and Curve Report. Alignment: list1 Desc: listados de la alternativa 1 Desc. Station Spiral/Curve Data Northing Easting ------------------------------------------------------------------------------------------------------------------------------------------------------------PI 0+000 771553.235 613419.318 Length: 43.186 Course: 300.0000 ------------------------------------------------------------------------------PI 0+043.186 771553.235 613376.132 Length: 82.123 Course: 2.0292 Delta: 102.0292 ------------------------------------------------------------------------------Tangent Data 0+000 771553.235 613419.318 0+017.376 771553.235 613401.942 Length: 17.376 Course: 300.0000 ------------------------------------------------------------------------------Circular Curve Data PC 0+017.376 771553.235 613401.942 CC 771578.235 613401.942 PT 0+057.443 771579.032 613376.954 Delta: 102.0292 Type: RIGHT Radius: 25.000 DOC: 254.6479 Length: 40.067 Tangent: 25.810 Mid-Ord: 7.606 External: 10.933 Chord: 35.914 Course: 351.0146 Es: 10.933 ------------------------------------------------------------------------------PI 0+113.755 771635.316 613378.749 Length: 78.203 Course: 368.1344 Delta: 33.8947 ------------------------------------------------------------------------------Tangent Data 0+057.443 771579.032 613376.954 0+100.121 771621.689 613378.314 Length: 42.679 Course: 2.0292 -------------------------------------------------------------------------------

ESTUDIO DE ALTERNATIVAS PARA ACESO A LA CANTERA DE ATXA

Listado de curvas y vértices de alineación horizontal. Alternativa 1

AYUNTAMIENTO DEL NOBLE VALLE Y UNIVERSIDAD DE BAZTAN BAZTAN BALLEKO UDALA

Circular Curve Data PC CC PT

0+100.121 0+126.742 Delta: Radius: Length: Mid-Ord: Chord: Es:

771621.689 771623.283 771647.278 33.8947 Type: 50.000 DOC: 26.621 Tangent: 1.761 External: 26.308 Course: 1.826

613378.314 613328.340 613372.206

LEFT 127.3240 13.634 1.826 385.0818

------------------------------------------------------------------------------PI 0+191.312 771703.926 613341.219 Length: 182.566 Course: 52.8748 Delta: 84.7404 ------------------------------------------------------------------------------Circular Curve Data PC 0+126.742 771647.278 613372.206 CC 771686.750 613444.366 PT 0+236.226 771747.476 613388.891 Delta: 84.7404 Type: RIGHT Radius: 82.250 DOC: 77.4002 Length: 109.483 Tangent: 64.569 Mid-Ord: 17.554 External: 22.317 Chord: 101.578 Course: 10.5046 Es: 22.317 ------------------------------------------------------------------------------PI 0+354.222 771827.061 613476.009 Length: 138.994 Course: 342.3874 Delta: 110.4874 ------------------------------------------------------------------------------Circular Curve Data PC 0+236.226 771747.476 613388.891 CC 771821.307 613321.444 PT 0+409.779 771899.948 613383.215 Delta: 110.4874 Type: LEFT Radius: 100.000 DOC: 63.6620 Length: 173.553 Tangent: 117.997 Mid-Ord: 35.347 External: 54.671 Chord: 152.577 Course: 397.6311 Es: 54.671 ------------------------------------------------------------------------------PI 0+430.777 771912.918 613366.702 Length: 66.904 Course: 6.2800 Delta: 63.8927 -------------------------------------------------------------------------------

ESTUDIO DE ALTERNATIVAS PARA ACESO A LA CANTERA DE ATXA

Listado de curvas y vértices de alineación horizontal. Alternativa 1

AYUNTAMIENTO DEL NOBLE VALLE Y UNIVERSIDAD DE BAZTAN BAZTAN BALLEKO UDALA

Circular Curve Data PC CC PT

0+409.779

771899.948 771930.044 771933.814 RIGHT 166.3446 20.998 5.382 374.3337

613383.215 613406.855 613368.770

0+448.189 Delta: 63.8927 Type: Radius: 38.271 DOC: Length: 38.410 Tangent: Mid-Ord: 4.718 External: Chord: 36.818 Course: Es: 5.382 ------------------------------------------------------------------------------PI 0+494.095 771979.497 613373.291 Length: 170.451 Course: 311.7110 Delta: 94.5690 ------------------------------------------------------------------------------Circular Curve Data PC 0+448.189 771933.814 613368.770 CC 771938.738 613319.013 PT 0+522.463 771987.894 613328.159 Delta: 94.5690 Type: LEFT Radius: 50.000 DOC: 127.3240 Length: 74.274 Tangent: 45.907 Mid-Ord: 13.169 External: 17.878 Chord: 67.631 Course: 358.9955 Es: 17.878 ------------------------------------------------------------------------------PI 0+647.007 772010.676 613205.716 Length: 76.767 Course: 38.1278 Delta: 126.4168 ------------------------------------------------------------------------------Tangent Data 0+522.463 771987.894 613328.159 0+570.240 771996.634 613281.188 Length: 47.777 Course: 311.7110 ------------------------------------------------------------------------------Circular Curve Data PC 0+570.240 771996.634 613281.188 CC 772045.857 613290.346 PT 0+669.662 772074.082 613248.993 Delta: 126.4168 Type: RIGHT Radius: 50.068 DOC: 127.1522 Length: 99.422 Tangent: 76.767 Mid-Ord: 22.716 External: 41.584 Chord: 83.873 Course: 374.9194 Es: 41.584

ESTUDIO DE ALTERNATIVAS PARA ACESO A LA CANTERA DE ATXA

Listado de curvas y vértices de alineación horizontal. Alternativa 1

AYUNTAMIENTO DEL NOBLE VALLE Y UNIVERSIDAD DE BAZTAN BAZTAN BALLEKO UDALA

------------------------------------------------------------------------------PI 0+669.662 772074.082 613248.993 Length: 55.541 Course: 37.3952 Delta: 0.7327 ------------------------------------------------------------------------------PI 0+725.203 772120.313 613279.774 Length: 55.541 Course: 372.8482 Delta: 64.5470 ------------------------------------------------------------------------------Circular Curve Data PC CC PT

0+669.662 0+771.061 Delta: Radius: Length: Mid-Ord: Chord: Es:

772074.082 772129.507 772170.879 64.5470 Type: 100.009 DOC: 101.399 Tangent: 12.578 External: 97.111 Course: 14.388

613248.993 613165.747 613256.797

LEFT 63.6564 55.541 14.388 5.1217

------------------------------------------------------------------------------PI 0+771.061 772170.879 613256.797 Length: 103.853 Course: 372.8467 Delta: 0.0014 ------------------------------------------------------------------------------PI 0+874.914 772265.428 613213.832 Length: 99.246 Course: 83.2786 Delta: 110.4319 ------------------------------------------------------------------------------Tangent Data 0+771.061 772170.879 613256.797 0+815.968 772211.763 613238.219 Length: 44.907 Course: 372.8467 ------------------------------------------------------------------------------Circular Curve Data PC 0+815.968 772211.763 613238.219 CC 772232.448 613283.739 PT 0+902.701 772280.733 613270.757 Delta: 110.4319 Type: RIGHT Radius: 50.000 DOC: 127.3240 Length: 86.733 Tangent: 58.946 Mid-Ord: 17.657 External: 27.296 Chord: 76.260 Course: 28.0627 Es: 27.296

ESTUDIO DE ALTERNATIVAS PARA ACESO A LA CANTERA DE ATXA

Listado de curvas y vértices de alineación horizontal. Alternativa 1

AYUNTAMIENTO DEL NOBLE VALLE Y UNIVERSIDAD DE BAZTAN BAZTAN BALLEKO UDALA

------------------------------------------------------------------------------PI 0+943.001 772291.197 613309.675 Length: 153.600 Course: 68.6823 Delta: 14.5963 ------------------------------------------------------------------------------Circular Curve Data PC CC PT

0+902.701 0+982.948 Delta: Radius: Length: Mid-Ord: Chord: Es:

772280.733 772618.729 772310.232 14.5963 Type: 350.000 DOC: 80.247 Tangent: 2.297 External: 80.072 Course: 2.313

613270.757 613179.880 613345.196

LEFT 18.1891 40.300 2.313 75.9805

------------------------------------------------------------------------------PI 1+096.248 772363.748 613445.061 Length: 61.563 Course: 72.5985 Delta: 3.9162 ------------------------------------------------------------------------------Tangent Data 0+982.948 772310.232 613345.196 1+080.864 772356.481 613431.501 Length: 97.916 Course: 68.6823 ------------------------------------------------------------------------------Circular Curve Data PC 1+080.864 772356.481 613431.501 CC 771915.772 613667.668 PT 1+111.622 772370.166 613459.041 Delta: 3.9162 Type: RIGHT Radius: 500.000 DOC: 12.7324 Length: 30.757 Tangent: 15.384 Mid-Ord: 0.236 External: 0.237 Chord: 30.753 Course: 70.6404 Es: 0.237 ------------------------------------------------------------------------------PI 1+157.801 772389.435 613501.008 Length: 59.733 Course: 58.1958 Delta: 14.4027 ------------------------------------------------------------------------------Tangent Data 1+111.622 772370.166 613459.041 1+132.801 772379.004 613478.289 Length: 21.179 Course: 72.5985 -------------------------------------------------------------------------------

ESTUDIO DE ALTERNATIVAS PARA ACESO A LA CANTERA DE ATXA

Listado de curvas y vértices de alineación horizontal. Alternativa 1

AYUNTAMIENTO DEL NOBLE VALLE Y UNIVERSIDAD DE BAZTAN BAZTAN BALLEKO UDALA

Circular Curve Data PC CC PT

1+132.801 1+182.587 Delta: Radius: Length: Mid-Ord: Chord: Es:

772379.004 772578.995 772404.697 14.4027 Type: 220.064 DOC: 49.787 Tangent: 1.406 External: 49.680 Course: 1.415

613478.289 613386.466 613520.809

LEFT 28.9289 25.000 1.415 65.3971

------------------------------------------------------------------------------PI 1+217.320 772425.901 613548.319 Length: 57.515 Course: 75.4260 Delta: 17.2302 ------------------------------------------------------------------------------Tangent Data 1+182.587 772404.697 613520.809 1+192.320 772410.639 613528.518 Length: 9.733 Course: 58.1958 ------------------------------------------------------------------------------Circular Curve Data PC 1+192.320 772410.639 613528.518 CC 772265.213 613640.608 PT 1+242.015 772435.313 613571.480 Delta: 17.2302 Type: RIGHT Radius: 183.610 DOC: 34.6724 Length: 49.694 Tangent: 25.000 Mid-Ord: 1.679 External: 1.694 Chord: 49.543 Course: 66.8109 Es: 1.694 ------------------------------------------------------------------------------PI 1+274.529 772447.554 613601.602 ------------------------------------------------------------------------------Tangent Data 1+242.015 772435.313 613571.480 1+274.529 772447.554 613601.602 Length: 32.515 Course: 75.4260

ESTUDIO DE ALTERNATIVAS PARA ACESO A LA CANTERA DE ATXA

Listado de curvas y vértices de alineación horizontal. Alternativa 1

AYUNTAMIENTO DEL NOBLE VALLE Y UNIVERSIDAD DE BAZTAN BAZTAN BALLEKO UDALA

Vertical alignment station and curve report. Alignment: list1 Vertical Alignment: FGC Surface: curvas5000 ------------------------------------------------------------------------------Station Elevation Curve Length Grade ------------------------------------------------------------------------------0+000 437.55 0.000 0+032.554 437.55 60.000 13.000 ------------------------------------------------------------------------------Vertical Curve Information: Sag curve PVC Station: 0+002.554 Elevation: 437.55 PVI Station: 0+032.554 Elevation: 437.55 PVT Station: 0+062.554 Elevation: 441.45 Grade in (%): 0.000 Grade out (%): 13.000 Change (%): 13.000 K/100: 4.615 Curve Length: 60.000 LOW Station: 0+002.554 Elevation: 437.55 ------------------------------------------------------------------------------0+280.397 469.77 100.000 10.155 ------------------------------------------------------------------------------Vertical Curve Information: Crest curve PVC Station: 0+230.397 Elevation: 463.27 PVI Station: 0+280.397 Elevation: 469.77 PVT Station: 0+330.397 Elevation: 474.85 Grade in (%): 13.000 Grade out (%): 10.155 Change (%): -2.845 K/100: 35.147 Curve Length: 100.000 Passing SD: 214.722 Stopping SD: 120.073 ------------------------------------------------------------------------------0+503.388 492.41 132.619 5.994 ------------------------------------------------------------------------------Vertical Curve Information: Crest curve PVC Station: 0+437.078 Elevation: 485.68 PVI Station: 0+503.388 Elevation: 492.41 PVT Station: 0+569.697 Elevation: 496.39 Grade in (%): 10.155 Grade out (%): 5.994 Change (%): -4.160 K/100: 31.876 Curve Length: 132.619 Passing SD: 178.958 Stopping SD: 112.741 ------------------------------------------------------------------------------0+590.125 497.61 20.000 -1.675 -------------------------------------------------------------------------------

ESTUDIO DE ALTERNATIVAS PARA ACCESO A LA CANTERA DE ATXA

Listado de curvas y vértices de alineación vertical. Alternativa 1

AYUNTAMIENTO DEL NOBLE VALLE Y UNIVERSIDAD DE BAZTAN BAZTAN BALLEKO UDALA

Vertical Curve Information: Crest curve PVC Station: 0+580.125 Elevation: 497.01 PVI Station: 0+590.125 Elevation: 497.61 PVT Station: 0+600.125 Elevation: 497.45 Grade in (%): 5.994 Grade out (%): -1.675 Change (%): -7.670 K/100: 2.608 Curve Length: 20.000 HIGH Station: 0+595.757 Elevation: 497.48 Passing SD: 71.107 Stopping SD: 35.995 ------------------------------------------------------------------------------0+669.746 496.28 44.638 11.384 ------------------------------------------------------------------------------Vertical Curve Information: Sag curve PVC Station: 0+647.427 Elevation: 496.65 PVI Station: 0+669.746 Elevation: 496.28 PVT Station: 0+692.065 Elevation: 498.82 Grade in (%): -1.675 Grade out (%): 11.384 Change (%): 13.059 K/100: 3.418 Curve Length: 44.638 LOW Station: 0+653.153 Elevation: 496.61 ------------------------------------------------------------------------------0+741.113 504.40 60.131 -8.448 ------------------------------------------------------------------------------Vertical Curve Information: Crest curve PVC Station: 0+711.048 Elevation: 500.98 PVI Station: 0+741.113 Elevation: 504.40 PVT Station: 0+771.179 Elevation: 501.86 Grade in (%): 11.384 Grade out (%): -8.448 Change (%): -19.832 K/100: 3.032 Curve Length: 60.131 HIGH Station: 0+745.564 Elevation: 502.95 Passing SD: 53.311 Stopping SD: 34.771 ------------------------------------------------------------------------------0+807.140 498.83 40.000 10.584 ------------------------------------------------------------------------------Vertical Curve Information: Sag curve PVC Station: 0+787.140 Elevation: 500.52 PVI Station: 0+807.140 Elevation: 498.83 PVT Station: 0+827.140 Elevation: 500.94 Grade in (%): -8.448 Grade out (%): 10.584 Change (%): 19.032 K/100: 2.102 Curve Length: 40.000 LOW Station: 0+804.895 Elevation: 499.77 ------------------------------------------------------------------------------0+867.778 505.24 50.000 0.000 ------------------------------------------------------------------------------ESTUDIO DE ALTERNATIVAS PARA ACCESO A LA CANTERA DE ATXA

Listado de curvas y vértices de alineación vertical. Alternativa 1

AYUNTAMIENTO DEL NOBLE VALLE Y UNIVERSIDAD DE BAZTAN BAZTAN BALLEKO UDALA

Vertical Curve Information: Crest curve PVC Station: 0+842.778 Elevation: 502.60 PVI Station: 0+867.778 Elevation: 505.24 PVT Station: 0+892.778 Elevation: 505.24 Grade in (%): 10.584 Grade out (%): 0.000 Change (%): -10.584 K/100: 4.724 Curve Length: 50.000 HIGH Station: 0+892.778 Elevation: 505.24 Passing SD: 69.280 Stopping SD: 43.402 ------------------------------------------------------------------------------0+915.048 505.24 40.000 10.110 ------------------------------------------------------------------------------Vertical Curve Information: Sag curve PVC Station: 0+895.048 Elevation: 505.24 PVI Station: 0+915.048 Elevation: 505.24 PVT Station: 0+935.048 Elevation: 507.27 Grade in (%): 0.000 Grade out (%): 10.110 Change (%): 10.110 K/100: 3.957 Curve Length: 40.000 LOW Station: 0+895.048 Elevation: 505.24 ------------------------------------------------------------------------------0+956.409 509.43 40.000 14.948 ------------------------------------------------------------------------------Vertical Curve Information: Sag curve PVC Station: 0+936.409 Elevation: 507.40 PVI Station: 0+956.409 Elevation: 509.43 PVT Station: 0+976.409 Elevation: 512.42 Grade in (%): 10.110 Grade out (%): 14.948 Change (%): 4.838 K/100: 8.268 Curve Length: 40.000 ------------------------------------------------------------------------------1+010.295 517.48 60.000 6.282 ------------------------------------------------------------------------------Vertical Curve Information: Crest curve PVC Station: 0+980.295 Elevation: 513.00 PVI Station: 1+010.295 Elevation: 517.48 PVT Station: 1+040.295 Elevation: 519.37 Grade in (%): 14.948 Grade out (%): 6.282 Change (%): -8.666 K/100: 6.923 Curve Length: 60.000 Passing SD: 84.080 Stopping SD: 52.542 ------------------------------------------------------------------------------1+115.987 524.12 60.000 -0.315 -------------------------------------------------------------------------------

ESTUDIO DE ALTERNATIVAS PARA ACCESO A LA CANTERA DE ATXA

Listado de curvas y vértices de alineación vertical. Alternativa 1

AYUNTAMIENTO DEL NOBLE VALLE Y UNIVERSIDAD DE BAZTAN BAZTAN BALLEKO UDALA

Vertical Curve Information: Crest curve PVC Station: 1+085.987 Elevation: 522.24 PVI Station: 1+115.987 Elevation: 524.12 PVT Station: 1+145.987 Elevation: 524.03 Grade in (%): 6.282 Grade out (%): -0.315 Change (%): -6.596 K/100: 9.096 Curve Length: 60.000 HIGH Station: 1+143.124 Elevation: 524.03 Passing SD: 101.049 Stopping SD: 60.225 ------------------------------------------------------------------------------1+173.549 523.94 40.000 2.954 ------------------------------------------------------------------------------Vertical Curve Information: Sag curve PVC Station: 1+153.549 Elevation: 524.00 PVI Station: 1+173.549 Elevation: 523.94 PVT Station: 1+193.549 Elevation: 524.53 Grade in (%): -0.315 Grade out (%): 2.954 Change (%): 3.269 K/100: 12.236 Curve Length: 40.000 LOW Station: 1+157.402 Elevation: 524.00 ------------------------------------------------------------------------------1+224.391 525.44 50.000 -1.990 ------------------------------------------------------------------------------Vertical Curve Information: Crest curve PVC Station: 1+199.391 Elevation: 524.70 PVI Station: 1+224.391 Elevation: 525.44 PVT Station: 1+249.391 Elevation: 524.94 Grade in (%): 2.954 Grade out (%): -1.990 Change (%): -4.944 K/100: 10.113 Curve Length: 50.000 HIGH Station: 1+229.266 Elevation: 525.14 Passing SD: 119.791 Stopping SD: 65.325 ------------------------------------------------------------------------------1+272.654 524.48

ESTUDIO DE ALTERNATIVAS PARA ACCESO A LA CANTERA DE ATXA

Listado de curvas y vértices de alineación vertical. Alternativa 1

AYUNTAMIENTO DEL NOBLE VALLE Y UNIVERSIDAD DE BAZTAN BAZTAN BALLEKO UDALA

Horizontal Alignment Station and Curve Report. Alignment: list2 Desc: listado para alt 2 Desc. Station Spiral/Curve Data Northing Easting ------------------------------------------------------------------------------------------------------------------------------------------------------------PI 0+000 772955.3177 614415.9488 Length: 123.32 Course: 312.1672 ------------------------------------------------------------------------------PI 0+123.323 772978.7443 614294.8710 Length: 147.30 Course: 363.3281 Delta: 51.1609 ------------------------------------------------------------------------------Tangent Data 0+000 772955.3177 614415.9488 0+102.077 772974.7083 614315.7309 Length: 102.08 Course: 312.1672 ------------------------------------------------------------------------------Circular Curve Data PC 0+102.077 772974.7083 614315.7309 RP 773023.7978 614325.2290 PT 0+142.258 772996.5624 614283.2977 Delta: 51.1609 Type: RIGHT Radius: 50.00 DOC: 127.3240 Length: 40.18 Tangent: 21.25 Mid-Ord: 3.98 External: 4.33 Chord: 39.11 Course: 337.7477 Es: 4.33 ------------------------------------------------------------------------------PI 0+268.316 773102.2779 614214.6329 Length: 162.62 Course: 20.4549 Delta: 57.1268 ------------------------------------------------------------------------------Tangent Data 0+142.258 772996.5624 614283.2977 0+172.032 773021.5317 614267.0795 Length: 29.77 Course: 363.3281 -------------------------------------------------------------------------------

ESTUDIO DE ALTERNATIVAS PARA ACCESO A LA CANTERA DE ATXA

Listado de curvas y vértices de alineación horizontal. Alternativa 2

AYUNTAMIENTO DEL NOBLE VALLE Y UNIVERSIDAD DE BAZTAN BAZTAN BALLEKO UDALA

Circular Curve Data PC RP PT

0+172.032 0+351.501 Delta: Radius: Length: Mid-Ord: Chord: Es:

57.1268 Type: 200.00 DOC: 179.47 Tangent: 19.80 External: 173.51 Course: 21.97

773021.5317 773130.4733 773193.6343 RIGHT 31.8310 96.28 21.97 391.8915

614267.0795 614434.8047 614245.0398

------------------------------------------------------------------------------PI 0+417.840 773256.5778 614265.9898 Length: 162.93 Course: 8.6190 Delta: 11.8359 ------------------------------------------------------------------------------Tangent Data 0+351.501 773193.6343 614245.0398 0+389.872 773230.0408 614257.1573 Length: 38.37 Course: 20.4549 ------------------------------------------------------------------------------Circular Curve Data PC 0+389.872 773230.0408 614257.1573 RP 773324.7822 613972.5100 PT 0+445.647 773284.2902 614269.7648 Delta: 11.8359 Type: LEFT Radius: 300.00 DOC: 21.2207 Length: 55.78 Tangent: 27.97 Mid-Ord: 1.30 External: 1.30 Chord: 55.70 Course: 14.5369 Es: 1.30 ------------------------------------------------------------------------------PI 0+580.609 773418.0177 614287.9811 Length: 134.35 Course: 365.0969 Delta: 43.5220 ------------------------------------------------------------------------------Tangent Data 0+445.647 773284.2902 614269.7648 0+492.622 773330.8356 614276.1052 Length: 46.98 Course: 8.6190 -------------------------------------------------------------------------------

ESTUDIO DE ALTERNATIVAS PARA ACCESO A LA CANTERA DE ATXA

Listado de curvas y vértices de alineación horizontal. Alternativa 2

AYUNTAMIENTO DEL NOBLE VALLE Y UNIVERSIDAD DE BAZTAN BAZTAN BALLEKO UDALA

Circular Curve Data PC RP PT

0+492.622 0+661.689 Delta: Radius: Length: Mid-Ord: Chord: Es:

773330.8356 773364.2149 773493.1091 43.5220 Type: 247.30 DOC: 169.07 Tangent: 14.31 External: 165.79 Course: 15.19

614276.1052 614031.0653 614242.1222

LEFT 25.7425 87.99 15.19 386.8580

------------------------------------------------------------------------------PI 0+708.052 773532.6771 614217.9577 Length: 102.02 Course: 303.7978 Delta: 61.2992 ------------------------------------------------------------------------------Circular Curve Data PC 0+661.689 773493.1091 614242.1222 RP 773446.8564 614166.3861 PT 0+747.138 773535.4413 614171.6769 Delta: 61.2992 Type: LEFT Radius: 88.74 DOC: 71.7377 Length: 85.45 Tangent: 46.36 Mid-Ord: 10.09 External: 11.38 Chord: 82.19 Course: 334.4474 Es: 11.38 ------------------------------------------------------------------------------PI 0+802.799 773538.7598 614116.1151 Length: 128.84 Course: 230.1529 Delta: 73.6449 ------------------------------------------------------------------------------Circular Curve Data PC 0+747.138 773535.4413 614171.6769 RP 773450.3401 614166.5942 PT 0+845.759 773489.2264 614090.7265 Delta: 73.6449 Type: LEFT Radius: 85.25 DOC: 74.6743 Length: 98.62 Tangent: 55.66 Mid-Ord: 13.87 External: 16.56 Chord: 93.21 Course: 266.9753 Es: 16.56 ------------------------------------------------------------------------------PI 0+918.936 773424.1055 614057.3485 Length: 120.48 Course: 169.8471 Delta: 60.3058 -------------------------------------------------------------------------------

ESTUDIO DE ALTERNATIVAS PARA ACCESO A LA CANTERA DE ATXA

Listado de curvas y vértices de alineación horizontal. Alternativa 2

AYUNTAMIENTO DEL NOBLE VALLE Y UNIVERSIDAD DE BAZTAN BAZTAN BALLEKO UDALA

Circular Curve Data PC RP PT

0+845.759 0+981.001 Delta: Radius: Length: Mid-Ord: Chord: Es:

773489.2264 773424.1055 773358.9845 60.3058 Type: 142.77 DOC: 135.24 Tangent: 15.72 External: 130.24 Course: 17.66

614090.7265 614217.7783 614090.7265

LEFT 44.5910 73.18 17.66 200.0000

------------------------------------------------------------------------------PI 1+028.301 773316.8918 614112.3014 Length: 803.58 Course: 207.3588 Delta: 37.5117 ------------------------------------------------------------------------------Tangent Data 0+981.001 773358.9845 614090.7265 0+997.957 773343.8960 614098.4603 Length: 16.96 Course: 169.8471 ------------------------------------------------------------------------------Circular Curve Data PC 0+997.957 773343.8960 614098.4603 RP 773298.2830 614009.4689 PT 1+056.880 773286.7496 614108.8016 Delta: 37.5117 Type: RIGHT Radius: 100.00 DOC: 63.6620 Length: 58.92 Tangent: 30.34 Mid-Ord: 4.31 External: 4.50 Chord: 58.07 Course: 188.6029 Es: 4.50 ------------------------------------------------------------------------------PI 1+830.113 772518.6768 614019.6214 Length: 116.91 Course: 296.0744 Delta: 88.7157 ------------------------------------------------------------------------------Tangent Data 1+056.880 773286.7496 614108.8016 1+746.434 772601.7968 614029.2724 Length: 689.55 Course: 207.3588 -------------------------------------------------------------------------------

ESTUDIO DE ALTERNATIVAS PARA ACCESO A LA CANTERA DE ATXA

Listado de curvas y vértices de alineación horizontal. Alternativa 2

AYUNTAMIENTO DEL NOBLE VALLE Y UNIVERSIDAD DE BAZTAN BAZTAN BALLEKO UDALA

Circular Curve Data PC RP PT

1+746.434 1+885.788 Delta: Radius: Length: Mid-Ord: Chord: Es:

88.7157 Type: 100.00 DOC: 139.35 Tangent: 23.31 External: 128.35 Course: 30.39

772601.7968 772613.3302 772513.5203 RIGHT 63.6620 83.68 30.39 251.7166

614029.2724 613929.9397 613936.1021

------------------------------------------------------------------------------PI 1+919.021 772511.4723 613902.9326 Length: 95.79 Course: 271.2330 Delta: 24.8415 ------------------------------------------------------------------------------Circular Curve Data PC 1+885.788 772513.5203 613936.1021 RP 772345.6737 613946.4651 PT 1+951.408 772496.9613 613873.0354 Delta: 24.8415 Type: LEFT Radius: 168.17 DOC: 37.8566 Length: 65.62 Tangent: 33.23 Mid-Ord: 3.19 External: 3.25 Chord: 65.20 Course: 283.6537 Es: 3.25 ------------------------------------------------------------------------------PI 2+013.961 772469.6477 613816.7611 Length: 73.27 Course: 251.4818 Delta: 19.7511 ------------------------------------------------------------------------------Circular Curve Data PC 1+951.408 772496.9613 613873.0354 RP 772137.1087 614047.6954 PT 2+075.508 772426.4578 613771.5123 Delta: 19.7511 Type: LEFT Radius: 400.00 DOC: 15.9155 Length: 124.10 Tangent: 62.55 Mid-Ord: 4.80 External: 4.86 Chord: 123.60 Course: 261.3574 Es: 4.86 ------------------------------------------------------------------------------PI 2+086.223 772419.0599 613763.7618 Length: 10.71 Course: 267.0895 Delta: 15.6077 -------------------------------------------------------------------------------

ESTUDIO DE ALTERNATIVAS PARA ACCESO A LA CANTERA DE ATXA

Listado de curvas y vértices de alineación horizontal. Alternativa 2

AYUNTAMIENTO DEL NOBLE VALLE Y UNIVERSIDAD DE BAZTAN BAZTAN BALLEKO UDALA

Circular Curve Data PC RP PT

2+075.508 2+096.830 Delta: Radius: Length: Mid-Ord: Chord: Es:

15.6077 Type: 86.97 DOC: 21.32 Tangent: 0.65 External: 21.27 Course: 0.66

772426.4578 772489.3680 772413.7645 RIGHT 73.2017 10.71 0.66 259.2857

613771.5123 613711.4647 613754.4474

------------------------------------------------------------------------------PI 2+096.830 772413.7645 613754.4474

ESTUDIO DE ALTERNATIVAS PARA ACCESO A LA CANTERA DE ATXA

Listado de curvas y vértices de alineación horizontal. Alternativa 2

AYUNTAMIENTO DEL NOBLE VALLE Y UNIVERSIDAD DE BAZTAN BAZTAN BALLEKO UDALA

Vertical alignment station and curve report. Alignment: list2 Vertical Alignment: FGC Surface: curvas5000 ------------------------------------------------------------------------------Station Elevation Curve Length Grade ------------------------------------------------------------------------------0+000 286.25 12.726 0+904.11 401.31 0.000 0+904.11 401.31 4.578 1+801.52 442.39 0.000 1+801.52 442.39 12.736

ESTUDIO DE ALTERNATIVAS PARA ACCESO A LA CANTERA DE ATXA

Listado de curvas y vértices de alineación vertical. Alternativa 2

AYUNTAMIENTO DEL NOBLE VALLE Y UNIVERSIDAD DE BAZTAN BAZTAN BALLEKO UDALA

Horizontal Alignment Station and Curve Report. Alignment: list3 Desc: alternativa 3 para listados Desc. Station Spiral/Curve Data Northing Easting ------------------------------------------------------------------------------------------------------------------------------------------------------------PI 0+000 772001.103 613716.044 Length: 160.889 Course: 55.3685 ------------------------------------------------------------------------------PI 0+160.89 772104.882 613838.988 Length: 121.391 Course: 32.7198 Delta: 22.6486 ------------------------------------------------------------------------------Tangent Data 0+000 772001.103 613716.044 0+124.93 772081.689 613811.511 Length: 124.933 Course: 55.3685 ------------------------------------------------------------------------------Circular Curve Data PC 0+124.93 772081.689 613811.511 RP 772234.520 613682.504 PT 0+196.09 772136.193 613856.665 Delta: 22.6486 Type: LEFT Radius: 200.000 DOC: 31.8310 Length: 71.153 Tangent: 35.956 Mid-Ord: 3.156 External: 3.206 Chord: 70.778 Course: 44.0441 Es: 3.206 ------------------------------------------------------------------------------PI 0+281.52 772210.590 613898.667 Length: 101.659 Course: 378.5856 Delta: 54.1343 ------------------------------------------------------------------------------Tangent Data 0+196.09 772136.193 613856.665 0+236.24 772171.161 613876.407 Length: 40.156 Course: 32.7198 -------------------------------------------------------------------------------

ESTUDIO DE ALTERNATIVAS PARA ACCESO A LA CANTERA DE ATXA

Listado de curvas y vértices de alineación horizontal. Alternativa 3

AYUNTAMIENTO DEL NOBLE VALLE Y UNIVERSIDAD DE BAZTAN BAZTAN BALLEKO UDALA

Circular Curve Data PC RP PT

0+236.24 0+321.28 Delta: Radius: Length: Mid-Ord: Chord: Es:

772171.161 772220.324 772253.331 54.1343 Type: 100.000 DOC: 85.034 Tangent: 8.903 External: 82.495 Course: 9.773

613876.407 613789.326 613883.722

LEFT 63.6620 45.279 9.773 5.6527

------------------------------------------------------------------------------PI 0+377.66 772306.552 613865.113 Length: 10.285 Course: 20.6366 Delta: 42.0510 ------------------------------------------------------------------------------Tangent Data 0+321.28 772253.331 613883.722 0+367.37 772296.844 613868.507 Length: 46.096 Course: 378.5856 ------------------------------------------------------------------------------Circular Curve Data PC 0+367.37 772296.844 613868.507 RP 772306.746 613896.826 PT 0+387.19 772316.301 613868.388 Delta: 42.0510 Type: RIGHT Radius: 30.000 DOC: 212.2066 Length: 19.816 Tangent: 10.285 Mid-Ord: 1.621 External: 1.714 Chord: 19.458 Course: 399.6111 Es: 1.714 ------------------------------------------------------------------------------PI 0+387.19 772316.301 613868.388 Length: 45.701 Course: 47.7327 Delta: 27.0961 ------------------------------------------------------------------------------PI 0+432.89 772349.747 613899.533 Length: 45.001 Course: 66.6191 Delta: 18.8864 ------------------------------------------------------------------------------Tangent Data 0+387.19 772316.301 613868.388 0+432.89 772349.747 613899.533 Length: 45.701 Course: 47.7327

ESTUDIO DE ALTERNATIVAS PARA ACCESO A LA CANTERA DE ATXA

Listado de curvas y vértices de alineación horizontal. Alternativa 3

AYUNTAMIENTO DEL NOBLE VALLE Y UNIVERSIDAD DE BAZTAN BAZTAN BALLEKO UDALA

------------------------------------------------------------------------------PI 0+477.89 772372.277 613938.488 Length: 45.311 Course: 60.8434 Delta: 5.7757 ------------------------------------------------------------------------------Tangent Data 0+432.89 772349.747 613899.533 0+477.89 772372.277 613938.488 Length: 45.001 Course: 66.6191 ------------------------------------------------------------------------------PI 0+523.20 772398.422 613975.495 Length: 45.746 Course: 59.3703 Delta: 1.4731 ------------------------------------------------------------------------------Tangent Data 0+477.89 772372.277 613938.488 0+523.20 772398.422 613975.495 Length: 45.311 Course: 60.8434 ------------------------------------------------------------------------------PI 0+568.95 772425.676 614012.236 Length: 44.311 Course: 65.8493 Delta: 6.4790 ------------------------------------------------------------------------------Tangent Data 0+523.20 772398.422 613975.495 0+568.95 772425.676 614012.236 Length: 45.746 Course: 59.3703 ------------------------------------------------------------------------------PI 0+613.26 772448.322 614050.323 Length: 45.454 Course: 53.7281 Delta: 12.1212 ------------------------------------------------------------------------------Tangent Data 0+568.95 772425.676 614012.236 0+613.26 772448.322 614050.323 Length: 44.311 Course: 65.8493 ------------------------------------------------------------------------------PI 0+658.71 772478.527 614084.290 Length: 45.058 Course: 22.4801 Delta: 31.2480 ------------------------------------------------------------------------------Tangent Data 0+613.26 772448.322 614050.323 0+658.71 772478.527 614084.290 Length: 45.454 Course: 53.7281 ESTUDIO DE ALTERNATIVAS PARA ACCESO A LA CANTERA DE ATXA

Listado de curvas y vértices de alineación horizontal. Alternativa 3

AYUNTAMIENTO DEL NOBLE VALLE Y UNIVERSIDAD DE BAZTAN BAZTAN BALLEKO UDALA

------------------------------------------------------------------------------PI 0+703.77 772520.804 614099.872 Length: 45.012 Course: 395.7324 Delta: 26.7476 ------------------------------------------------------------------------------Tangent Data 0+658.71 772478.527 614084.290 0+703.77 772520.804 614099.872 Length: 45.058 Course: 22.4801 ------------------------------------------------------------------------------PI 0+748.78 772565.715 614096.857 Length: 45.331 Course: 387.8118 Delta: 7.9206 -------------------------------------------------------------------------------

ESTUDIO DE ALTERNATIVAS PARA ACCESO A LA CANTERA DE ATXA

Listado de curvas y vértices de alineación horizontal. Alternativa 3

AYUNTAMIENTO DEL NOBLE VALLE Y UNIVERSIDAD DE BAZTAN BAZTAN BALLEKO UDALA

Tangent Data 0+703.77 0+748.78 Length:

45.012

Course:

772520.804 772565.715 395.7324

614099.872 614096.857

------------------------------------------------------------------------------PI 0+794.11 772610.217 614088.231 Length: 114.083 Course: 383.2658 Delta: 4.5460 ------------------------------------------------------------------------------Tangent Data 0+748.78 772565.715 614096.857 0+794.11 772610.217 614088.231 Length: 45.331 Course: 387.8118 ------------------------------------------------------------------------------PI 0+908.19 772720.382 614058.587 Length: 122.066 Course: 213.9261 Delta: 169.3397 ------------------------------------------------------------------------------Tangent Data 0+794.11 772610.217 614088.231 0+859.33 772673.194 614071.285 Length: 65.217 Course: 383.2658 ------------------------------------------------------------------------------Circular Curve Data PC 0+859.33 772673.194 614071.285 RP 772670.076 614059.697 PT 0+891.25 772672.680 614047.983 Delta: 169.3397 Type: LEFT Radius: 12.000 DOC: 530.5165 Length: 31.920 Tangent: 48.866 Mid-Ord: 9.138 External: 38.318 Chord: 23.308 Course: 298.5960 Es: 38.318 ------------------------------------------------------------------------------PI 0+964.45 772601.225 614032.098 Length: 48.894 Course: 216.0366 Delta: 2.1104 ------------------------------------------------------------------------------Tangent Data 0+891.25 772672.680 614047.983 0+964.45 772601.225 614032.098 Length: 73.200 Course: 213.9261

ESTUDIO DE ALTERNATIVAS PARA ACCESO A LA CANTERA DE ATXA

Listado de curvas y vértices de alineación horizontal. Alternativa 3

AYUNTAMIENTO DEL NOBLE VALLE Y UNIVERSIDAD DE BAZTAN BAZTAN BALLEKO UDALA

------------------------------------------------------------------------------PI 1+013.34 772553.874 614019.911 Length: 48.894 Course: 262.0772 Delta: 46.0406 ------------------------------------------------------------------------------Circular Curve Data PC RP PT

0+964.45 1+057.94 Delta: Radius: Length: Mid-Ord: Chord: Es:

46.0406 Type: 129.270 DOC: 93.488 Tangent: 8.360 External: 91.464 Course: 8.938

772601.225 772633.445 772526.440 RIGHT 49.2474 48.894 8.938 239.0569

614032.098 613906.908 613979.439

------------------------------------------------------------------------------PI 1+057.94 772526.440 613979.439 Length: 23.212 Course: 267.0345 Delta: 4.9574 ------------------------------------------------------------------------------PI 1+081.15 772514.951 613959.270 Length: 56.444 Course: 296.0744 Delta: 29.0399 ------------------------------------------------------------------------------Circular Curve Data PC 1+057.94 772526.440 613979.439 RP 772613.330 613929.940 PT 1+103.55 772513.520 613936.102 Delta: 29.0399 Type: RIGHT Radius: 100.000 DOC: 63.6620 Length: 45.616 Tangent: 23.212 Mid-Ord: 2.590 External: 2.659 Chord: 45.221 Course: 281.5545 Es: 2.659 ------------------------------------------------------------------------------PI 1+136.79 772511.472 613902.933 Length: 95.785 Course: 271.2330 Delta: 24.8415 -------------------------------------------------------------------------------

ESTUDIO DE ALTERNATIVAS PARA ACCESO A LA CANTERA DE ATXA

Listado de curvas y vértices de alineación horizontal. Alternativa 3

AYUNTAMIENTO DEL NOBLE VALLE Y UNIVERSIDAD DE BAZTAN BAZTAN BALLEKO UDALA

Circular Curve Data PC RP PT

1+103.55 1+169.17 Delta: Radius: Length: Mid-Ord: Chord: Es:

772513.520 772345.674 772496.961 24.8415 Type: 168.166 DOC: 65.620 Tangent: 3.191 External: 65.204 Course: 3.252

613936.102 613946.465 613873.035

LEFT 37.8566 33.233 3.252 283.6537

------------------------------------------------------------------------------PI 1+231.73 772469.648 613816.761 Length: 73.267 Course: 251.4818 Delta: 19.7511 ------------------------------------------------------------------------------Circular Curve Data PC 1+169.17 772496.961 613873.035 RP 772137.109 614047.695 PT 1+293.27 772426.458 613771.512 Delta: 19.7511 Type: LEFT Radius: 400.000 DOC: 15.9155 Length: 124.100 Tangent: 62.553 Mid-Ord: 4.803 External: 4.861 Chord: 123.603 Course: 261.3574 Es: 4.861 ------------------------------------------------------------------------------PI 1+303.99 772419.060 613763.762 Length: 10.714 Course: 267.0895 Delta: 15.6077 ------------------------------------------------------------------------------Circular Curve Data PC 1+293.27 772426.458 613771.512 RP 772489.368 613711.465 PT 1+314.59 772413.764 613754.447 Delta: 15.6077 Type: RIGHT Radius: 86.968 DOC: 73.2017 Length: 21.321 Tangent: 10.714 Mid-Ord: 0.653 External: 0.658 Chord: 21.268 Course: 259.2857 Es: 0.658 ------------------------------------------------------------------------------PI 1+314.59 772413.764 613754.447

ESTUDIO DE ALTERNATIVAS PARA ACCESO A LA CANTERA DE ATXA

Listado de curvas y vértices de alineación horizontal. Alternativa 3

AYUNTAMIENTO DEL NOBLE VALLE Y UNIVERSIDAD DE BAZTAN BAZTAN BALLEKO UDALA

Vertical alignment station and curve report. Alignment: list3 Vertical Alignment: FGC Surface: curvas5000 ------------------------------------------------------------------------------Station Elevation Curve Length Grade ------------------------------------------------------------------------------0+000 396.26 -14.188 0+097.63 382.41 -5.604 0+226.50 375.19 -0.382 0+379.78 374.60 10.944 1+025.89 445.32 12.013

ESTUDIO DE ALTERNATIVAS PARA ACCESO A LA CANTERA DE ATXA

Listado de curvas y vértices de alineación vertical. Alternativa 3

PLANOS

ESTUDIO DE ALTERNATIVAS PARA ACentro curva circular ESO A LA CANTERA DE ATXA

AYUNTAMIENTO DEL NOBLE VALLE Y UNIVERSIDAD DE BAZTAN BAZTAN BALLEKO UDALA

PRESUPUESTOS DE LAS ALTERNATIVAS ESTUDIO DE ALTERNATIVAS PARA ACCESO A LA CANTERA DE ATXA

Acceso a la cantera de Atxa (Almandotz) Pág. 1

MEDICIONES Y PRESUPUESTO N.ºOrd

Descripción

Uds.

Longitud

Latitud

Altura

Subtotal

Medición

Precio

Importe

Acceso a la cantera de Atxa (Almandotz) 01 01.01

Alternativa 1 M2 Despeje y desbroce de terreno, con tala y retirada de árboles y arbustos, arrancado de tocones y retirada de tierra vegetal, incluso transporte de los productos sobrantes a vertedero, herramientas y medios auxiliares. (110008) 1

1.300,00

14,00

18.200,00

Total partida 01.01

01.02

1

20.479,00

2.125,35

2,40

49.149,60

2.125,35

5,19

11.030,57

3.575,00

8,76

31.317,00

14.170,00

1,36

19.271,20

1.706,25

16,23

27.692,44

2.125,35

M3 Terraplén con suelo seleccionado (CBR > 20) procedente de préstamos, extendido, humectación, nivelado y compactado al 100% de Proctor Normal, incluso canon de extracción de las tierras de préstamos. (110005) 1

1.300,00

5,50

0,50

3.575,00

Total partida 01.04

M2 Refino de taludes en desmontes o terraplenes existentes, incluso p.p. de transporte de materiales sobrantes a lugar de empleo o vertedero. (110100) 2

1.300,00

5,45

14.170,00

Total partida 01.05

01.06

20.479,00

M3 Terraplen con suelo tolerable (CBR > 3) procedente de préstamos, extendido, nivelado y compactado al 98% de Próctor Normal en tongadas máximo de 30 cm., incluso extracción y canon de las tierras de préstamos, transporte y preparación del asiento. (110006) 1

01.05

17.108,00

20.479,00

Total partida 01.03

01.04

0,94

M3 Excavación a cielo abierto a cualquier tipo de terreno, excepto roca dura, con medios mecánicos, incluso rasanteo, p.p. de demolición de pavimento y transporte de sobrante a lugar de empleo o vertedero. (110012) Total partida 01.02

01.03

18.200,00

M3 Zahorra artificial huso ZA-25 procedente de machaqueo de cantera, que incluye transporte, colocación, compactación al 100% del P.M. y medios auxiliares en capa de espesor según planos una vez consolidada. (120007) 1 Total partida 01.06

1.300,00

5,25

0,25

1.706,25

Acceso a la cantera de Atxa (Almandotz) Pág. 2

MEDICIONES Y PRESUPUESTO N.ºOrd

01.07

Descripción

Uds.

Longitud

Latitud

Altura

Subtotal

1

1.300,00

5,00

6.500,00

11,03

71.695,00

1,00

48.681,98

48.681,98

1,00

43.489,24

43.489,24

1,00

12.981,86

12.981,86

Ud Estructura prefabricada L = 10 m. formada por estribos y vigas pretensadas de sección doble T, incluso barandillas (150100) 1

1,00

Ud P.A. Señalización vertical y horizontal (150101) 1

1,00

Total partida 01.09

01.10

Importe

6.500,00

Total partida 01.08

01.09

Precio

M2 Pavimento de mezcla bituminosa en caliente, con árido ofítico de 5 cm. de espesor y árido calizo de 5 cm. una vez compactado, incluso riego de imprimación y adherencia, compactación, herramientas y medios auxiliares. (150006) Total partida 01.07

01.08

Medición

Ud P.A. Seguridad y Salud (150102) 1 Total partida 01.10

1,00

Total capítulo 01

332.416,89

Total presupuesto

332.416,89

Acceso a la cantera de Atxa (Almandotz) Pág. 1

RESUMEN DE CAPITULOS ________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Descripción

Importe

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

01 Alternativa 1 .......................................................................................................... 332.416,89 100,00 % . ________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Presupuesto de Ejecución Material........................................................ 332.416,89 €.............. Gastos Generales 10 % ............................................................................... 33.241,69 +.............. Beneficio Industrial 6 %................................................................................ 19.945,01 +.............. Presupuesto Total.................................................................................... 385.603,59 €..............

_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

I.V.A. 16 % ................................................................................................... 61.696,57 +.............. Presupuesto de Ejecución por Contrata................................................ 447.300,16 €..............

_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Asciende el presente presupuesto a la expresada cantidad de: CUATROCIENTOS CUARENTA Y SIETE MIL TRESCIENTOS CON DIECISEIS Euros Burlada, Diciembre de 2.003

El Ingeniero de Caminos, C. y P. Fdo. Gabriel Silva Uríbarri

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Acceso a la cantera de Atxa (Almandotz) Pág. 1

MEDICIONES Y PRESUPUESTO N.ºOrd

Descripción

Uds.

Longitud

Latitud

Altura

Subtotal

Medición

Precio

Importe

Acceso a la cantera de Atxa (Almandotz) 01 01.01

Alternativa 2 M2 Despeje y desbroce de terreno, con tala y retirada de árboles y arbustos, arrancado de tocones y retirada de tierra vegetal, incluso transporte de los productos sobrantes a vertedero, herramientas y medios auxiliares. (110008) 1

2.100,00

14,00

29.400,00

Total partida 01.01

01.02

1

16.604,00

6.423,45

2,40

39.849,60

6.423,45

5,19

33.337,71

5.775,00

8,76

50.589,00

25.830,00

1,36

35.128,80

2.756,25

16,23

44.733,94

6.423,45

M3 Terraplén con suelo seleccionado (CBR > 20) procedente de préstamos, extendido, humectación, nivelado y compactado al 100% de Proctor Normal, incluso canon de extracción de las tierras de préstamos. (110005) 1

2.100,00

5,50

0,50

5.775,00

Total partida 01.04

M2 Refino de taludes en desmontes o terraplenes existentes, incluso p.p. de transporte de materiales sobrantes a lugar de empleo o vertedero. (110100) 2

2.100,00

6,15

25.830,00

Total partida 01.05

01.06

16.604,00

M3 Terraplen con suelo tolerable (CBR > 3) procedente de préstamos, extendido, nivelado y compactado al 98% de Próctor Normal en tongadas máximo de 30 cm., incluso extracción y canon de las tierras de préstamos, transporte y preparación del asiento. (110006) 1

01.05

27.636,00

16.604,00

Total partida 01.03

01.04

0,94

M3 Excavación a cielo abierto a cualquier tipo de terreno, excepto roca dura, con medios mecánicos, incluso rasanteo, p.p. de demolición de pavimento y transporte de sobrante a lugar de empleo o vertedero. (110012) Total partida 01.02

01.03

29.400,00

M3 Zahorra artificial huso ZA-25 procedente de machaqueo de cantera, que incluye transporte, colocación, compactación al 100% del P.M. y medios auxiliares en capa de espesor según planos una vez consolidada. (120007) 1 Total partida 01.06

2.100,00

5,25

0,25

2.756,25

Acceso a la cantera de Atxa (Almandotz) Pág. 2

MEDICIONES Y PRESUPUESTO N.ºOrd

01.07

Descripción

Uds.

Longitud

Latitud

Altura

Subtotal

1

2.100,00

5,00

10.500,00

11,03

115.815,00

1,00

48.681,98

48.681,98

1,00

43.489,24

43.489,24

1,00

12.981,86

12.981,86

Ud Estructura prefabricada L = 10 m. formada por estribos y vigas pretensadas de sección doble T, incluso barandillas (150100) 1

1,00

Ud P.A. Señalización vertical y horizontal (150101) 1

1,00

Total partida 01.09

01.10

Importe

10.500,00

Total partida 01.08

01.09

Precio

M2 Pavimento de mezcla bituminosa en caliente, con árido ofítico de 5 cm. de espesor y árido calizo de 5 cm. una vez compactado, incluso riego de imprimación y adherencia, compactación, herramientas y medios auxiliares. (150006) Total partida 01.07

01.08

Medición

Ud P.A. Seguridad y Salud (150102) 1 Total partida 01.10

1,00

Total capítulo 01

452.243,13

Total presupuesto

452.243,13

Acceso a la cantera de Atxa (Almandotz) Pág. 1

RESUMEN DE CAPITULOS ________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Descripción

Importe

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

01 Alternativa 2 .......................................................................................................... 452.243,13 100,00 % . ________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Presupuesto de Ejecución Material........................................................ 452.243,13 €.............. Gastos Generales 10 % ............................................................................... 45.224,31 +.............. Beneficio Industrial 6 %................................................................................ 27.134,59 +.............. Presupuesto Total.................................................................................... 524.602,03 €..............

_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

I.V.A. 16 % ................................................................................................... 83.936,32 +.............. Presupuesto de Ejecución por Contrata................................................ 608.538,35 €..............

_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Asciende el presente presupuesto a la expresada cantidad de: SEISCIENTOS OCHO MIL QUINIENTOS TREINTA Y OCHO CON TREINTA Y CINCO Euros Burlada, Diciembre de 2.003

El Ingeniero de Caminos, C. y P. Fdo. Gabriel Silva Uríbarri

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Acceso a la cantera de Atxa (Almandotz) Pág. 1

MEDICIONES Y PRESUPUESTO N.ºOrd

Descripción

Uds.

Longitud

Latitud

Altura

Subtotal

Medición

Precio

Importe

Acceso a la cantera de Atxa (Almandotz) 01 01.01

Alternativa 3 M2 Despeje y desbroce de terreno, con tala y retirada de árboles y arbustos, arrancado de tocones y retirada de tierra vegetal, incluso transporte de los productos sobrantes a vertedero, herramientas y medios auxiliares. (110008) 1

1.320,00

14,00

18.480,00

Total partida 01.01

01.02

1

12.730,00

5.586,12

2,40

30.552,00

5.586,12

5,19

28.991,96

3.630,00

8,76

31.798,80

16.236,00

1,36

22.080,96

1.732,50

16,23

28.118,48

5.586,12

M3 Terraplén con suelo seleccionado (CBR > 20) procedente de préstamos, extendido, humectación, nivelado y compactado al 100% de Proctor Normal, incluso canon de extracción de las tierras de préstamos. (110005) 1

1.320,00

5,50

0,50

3.630,00

Total partida 01.04

M2 Refino de taludes en desmontes o terraplenes existentes, incluso p.p. de transporte de materiales sobrantes a lugar de empleo o vertedero. (110100) 2

1.320,00

6,15

16.236,00

Total partida 01.05

01.06

12.730,00

M3 Terraplen con suelo tolerable (CBR > 3) procedente de préstamos, extendido, nivelado y compactado al 98% de Próctor Normal en tongadas máximo de 30 cm., incluso extracción y canon de las tierras de préstamos, transporte y preparación del asiento. (110006) 1

01.05

17.371,20

12.730,00

Total partida 01.03

01.04

0,94

M3 Excavación a cielo abierto a cualquier tipo de terreno, excepto roca dura, con medios mecánicos, incluso rasanteo, p.p. de demolición de pavimento y transporte de sobrante a lugar de empleo o vertedero. (110012) Total partida 01.02

01.03

18.480,00

M3 Zahorra artificial huso ZA-25 procedente de machaqueo de cantera, que incluye transporte, colocación, compactación al 100% del P.M. y medios auxiliares en capa de espesor según planos una vez consolidada. (120007) 1 Total partida 01.06

1.320,00

5,25

0,25

1.732,50

Acceso a la cantera de Atxa (Almandotz) Pág. 2

MEDICIONES Y PRESUPUESTO N.ºOrd

01.07

Descripción

Uds.

Longitud

Latitud

Altura

Subtotal

1

1.320,00

5,00

Importe

6.600,00 6.600,00

11,03

72.798,00

1,00

43.489,24

43.489,24

1,00

12.981,86

12.981,86

Ud P.A. Señalización vertical y horizontal (150101) 1

1,00

Total partida 01.08

01.09

Precio

M2 Pavimento de mezcla bituminosa en caliente, con árido ofítico de 5 cm. de espesor y árido calizo de 5 cm. una vez compactado, incluso riego de imprimación y adherencia, compactación, herramientas y medios auxiliares. (150006) Total partida 01.07

01.08

Medición

Ud P.A. Seguridad y Salud (150102) 1 Total partida 01.09

1,00

Total capítulo 01

288.182,50

Total presupuesto

288.182,50

Acceso a la cantera de Atxa (Almandotz) Pág. 1

RESUMEN DE CAPITULOS ________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Descripción

Importe

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

01 Alternativa 3 .......................................................................................................... 288.182,50 100,00 % . ________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Presupuesto de Ejecución Material........................................................ 288.182,50 €.............. Gastos Generales 10 % ............................................................................... 28.818,25 +.............. Beneficio Industrial 6 %................................................................................ 17.290,95 +.............. Presupuesto Total.................................................................................... 334.291,70 €..............

_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

I.V.A. 16 % ................................................................................................... 53.486,67 +.............. Presupuesto de Ejecución por Contrata................................................ 387.778,37 €..............

_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Asciende el presente presupuesto a la expresada cantidad de: TRESCIENTOS OCHENTA Y SIETE MIL SETECIENTOS SETENTA Y OCHO CON TREINTA Y SIETE Euros Burlada , Diciembre de 2.003

El Ingeniero de Caminos, C. y P. Fdo. Gabriel Silva Uríbarri

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________