Project Flow Chart
Energy Pro USA 4a Conduct First Principle Process / Equipment Analysis
1 Complete Contract Between Client & Energy Pro
2b Conduct Structured Interviews with Client Personnel
4b
3
2a Gather Data From Existing Systems
Identify Processes / Equipment to be Engineered / Modified 1. Analyze Data 2. Analyze Interview Information
Create EOM Models
4c Create Quantitative Project Payback Calculations
4d Define Enhanced Metering Projects (If Req’d)
No
Write Operating Procedures
11a
Train Project Personnel
11a
12
10 Client Approves Final Analysis Report
Yes
Energy Pro 11c Finances and Implements Modifications
11d
Stand Alone Capital Improvement Projects will be Included In “Project Analysis Report. “ These Projects Will Be Implemented Under Separate Phase II Agreement
5a Deliver EOM Models
Process Improvements Yield Increased Earnings
Define Financial Goals
6 5b Train Client Personnel on use Of EOM Models
Client Approves Project Analysis Report
7a 8 9
Yes 7b
Client Approves Financial Plan And Goals
Identify Train Project Modifications Personnel That Result In Improved Process Savings
Yes
Design Financial Structure
Create Project Analysis Report
5c
No
No
13a Provide Daily Monitoring Of Plant-Wide Improvement
13b Provide Monthly Monitoring Of Plant-Wide Improvement
Provide 13c Daily Monitoring Of Individual Process Improvement
Provide 13d Monthly Monitoring Of Individual Processes Improvement
17 Shares of Increased Earnings Are Calculated
18a Modify 16b The Model To Accurately Depict The Process
Resolve Problem With The Process
16a Discover Problem With A Model
14 15 Investigate And Diagnose Problem
16d
16c Discover Problem With A Process
Yes
Model Indicates A Problem (A Control Rule Violation Has Occurred)
No
Energy Pro Generates Invoice
19 Client Reviews Invoice And Remits Payment
Client Records Increased Earnings
18b