Energy Pro Usa Project Flowchart

  • Uploaded by: S. Michael Ratteree
  • 0
  • 0
  • May 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Energy Pro Usa Project Flowchart as PDF for free.

More details

  • Words: 276
  • Pages: 1
Project Flow Chart

Energy Pro USA 4a Conduct First Principle Process / Equipment Analysis

1 Complete Contract Between Client & Energy Pro

2b Conduct Structured Interviews with Client Personnel

4b

3

2a Gather Data From Existing Systems

Identify Processes / Equipment to be Engineered / Modified 1. Analyze Data 2. Analyze Interview Information

Create EOM Models

4c Create Quantitative Project Payback Calculations

4d Define Enhanced Metering Projects (If Req’d)

No

Write Operating Procedures

11a

Train Project Personnel

11a

12

10 Client Approves Final Analysis Report

Yes

Energy Pro 11c Finances and Implements Modifications

11d

Stand Alone Capital Improvement Projects will be Included In “Project Analysis Report. “ These Projects Will Be Implemented Under Separate Phase II Agreement

  5a Deliver EOM Models

Process Improvements Yield Increased  Earnings 

Define Financial Goals

6 5b Train Client Personnel on use Of EOM Models

Client Approves Project Analysis Report

7a 8 9

Yes 7b

Client Approves Financial Plan And Goals

Identify Train Project Modifications Personnel That Result In Improved Process Savings

Yes

Design Financial Structure

Create Project Analysis Report

5c

No

No

13a Provide Daily Monitoring Of Plant-Wide Improvement

13b Provide Monthly Monitoring Of Plant-Wide Improvement

Provide 13c Daily Monitoring Of Individual Process Improvement

Provide 13d Monthly Monitoring Of Individual Processes Improvement

17 Shares of Increased Earnings Are Calculated

18a Modify 16b The Model To Accurately Depict The Process

Resolve Problem With The Process

16a Discover Problem With A Model

14 15 Investigate And Diagnose Problem

16d

16c Discover Problem With A Process

Yes

Model Indicates A Problem (A Control Rule Violation Has Occurred)

No

Energy Pro Generates Invoice

19 Client Reviews Invoice And Remits Payment

Client Records Increased Earnings

18b

Related Documents


More Documents from ""