Dispatch

  • Uploaded by: Danielle Lee
  • 0
  • 0
  • July 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Dispatch as PDF for free.

More details

  • Words: 1,306
  • Pages: 22
S.S.Industries S.No.

Date

Component Name

Bag No.

Qty.

1 2 3 4 5 6 7 8 9 10 11

2/12/2008 2/12/2008 2/12/2008 2/12/2008 2/12/2008 2/12/2008 2/12/2008 2/12/2008 2/12/2008 2/12/2008 12/10/2008

Light switch Light switch Light switch Light switch Light switch Light switch Light switch Light switch Light switch Light switch Light switch

1 2 3 4 5 6 7 8 9 10 11

100 100 100 100 100 100 100 100 100 50 250

Total

1200 Average Weight Burning Shot Rate Total weight with burning Raw material weight / kg. Total Raw Material Amount Total shot amount Total Bill Add 250 pcs 2nd Operation

Weight set set set set set set set set set set set

9.8 9.8 9.78 9.8 9.8 9.78 9.78 9.78 9.78 4.98 24.48

117.56 0.098 6% Rs. 6 /124.62 107 13334.0 7200 20534.0 500

kg

kg Rs. Rs. Rs. Rs. Rs.

S.No.

Date

1 2

3/12/2008 18/1/2009

Rs. Rs.

Amount

Mode

Payment Left

15000 5500

cash Cash

5534.0 34.0

S.S.Industries S.No. 1 2 3 4 5

Date

Component Name

Bag No.

Qty.

charges

1101 Lock Body 1101 Lock Body 1101 Lock Body

Tool Triyal Tool Triyal Tool Triyal

1 1 1

1500 1500 1500 4500

S.S.INDUSTRIES Estimate S.No.

Date

Component Name

Bag No.

Qty.

1 2 3 4 5 6 7 8 9

15/04/2009 15/04/2009 15/04/2009 15/04/2009 15/04/2009 15/04/2009 15/04/2009 15/04/2009 15/04/2009

Body Body Body Body Body Body Body Body Body

1 2 3 4 5 6 7 8 9

100 100 100 100 100 100 100 100 90

Total Average Weight Burning Shot Rate Total weight with burning Raw material weight / kg. Total Raw Material Amount Total shot amount Total Bill Amount Left

890

Weight set set set set set set set set set

13.3 13.3 13.3 13.3 13.3 13.3 13.3 13.3 11.97

118.37 0.133 6% 10 125.47 95 11919.9 8900 20819.9 819.9

kg kg Rs. kg Rs. Rs. Rs. Rs. Rs.

Payment receive on 22/05/2009 of Rs. 20000 /- cash rest of amount remaing

unt remaing

S.S.Industries S.No.

Date

Component Name

Bag No.

Qty.

1

11/4/2009

Light switch

1

90

Total

90 Average Weight Burning Shot Rate Total weight with burning Raw material weight / kg. Total Raw Material Amount Total shot amount Total Bill

Weight set

8.82 8.82 10.204 6% Rs. 6 /9.35 95 888.2 540 1428.2

kg

kg Rs. Rs. Rs. Rs.

S.S.INDUSTRIES Estimate S.No.

Date

Component Name

Bag No.

Qty.

1 2 3 4 5 6 7 8 9

2/6/2009 2/6/2009 2/6/2009 2/6/2009 2/6/2009 2/6/2009 2/6/2009 2/6/2009 2/6/2009

Body Body Body Body Body Body Body Body Body

1 2 3 4 5 6 7 8 9

150 100 150 150 100 100 150 100 70

Total

1070

Average Weight Burning Shot Rate Total weight with burning Raw material weight / kg. Total Raw Material Amount Total shot amount Total Bill Previous Balance

Weight set set set set set set set set set

19.88 13.25 19.88 19.88 13.25 13.25 19.88 13.25 9.28

141.78 0.133 6% 10 150.28 94 14126.5 10700 24826.5 2248

kg kg Rs. kg Rs. Rs. Rs. Rs. Rs.

27074.5

Payment receive on 07/07/2009 of Rs. 25000 /- cash rest of amount remaing

Balance 25000.0 2074.5

est of amount remaing

S.S.INDUSTRIES Estimate S.No.

Date

Component Name

Bag No.

Qty.

1

9/7/2009

Light Switch old

1

307

Total Average Weight Burning Shot Rate Total weight with burning Raw material Rate / kg. Total Raw Material Amount Total shot amount Total Bill Previous Balance

307

Weight set

31.62

kg

31.62

kg

0.103 6% 6 33.52 95 3184.1 1842 5026.1 2074.5

kg Rs. kg Rs. Rs. Rs. Rs. Rs.

S.S.INDUSTRIES Estimate S.No.

Date

Component Name

Bag No.

Qty.

1

11/8/2009

Body

1

491

Total Average Weight Burning Shot Rate Total weight with burning Raw material Rate / kg. Total Raw Material Amount Total shot amount Total Bill

491

Weight set

66.16

66.16 0.135 6% 10 70.13 98 6872.7 4910 11782.7

kg kg Rs. kg Rs. Rs. Rs. Rs. Rs.

S.S.INDUSTRIES Estimate S.No.

Date

Component Name

Bag No.

Qty.

1

20/08/2009

Light Switch New

1

1550

Total

1550

Average Weight Burning Shot Rate Total weight with burning Raw material Rate / kg. Total Raw Material Amount Total shot amount Total Bill

Weight set

160.27

160.27 0.103 6% 6 169.89 98 16648.8 9300 25948.8

kg kg Rs. kg Rs. Rs. Rs. Rs. Rs.

44832.1

Payment receive on 09/09/2009 of Rs. 35000 /- cash rest of amount remaing

35000

est of amount remaing

Balance 9832.1

S.S.INDUSTRIES Estimate S.No.

Date

Component Name

Bag No.

Qty.

1

9/9/2009

Light Switch New

1

160

Total Average Weight Burning Shot Rate Total weight with burning Raw material Rate / kg. Total Raw Material Amount Total shot amount Total Bill

160

Weight set

15.98

15.98 0.100 6% 6 16.94 98 1660.0 960 2620.0 9832.1

kg kg Rs. kg Rs. Rs. Rs. Rs. Rs.

S.S.INDUSTRIES Estimate S.No.

Date

Component Name

Bag No.

Qty.

1

9/9/2009

Body

3

492

Total Average Weight Burning Shot Rate Total weight with burning Raw material Rate / kg. Total Raw Material Amount Total shot amount Total Bill

492

Weight set

66.65

66.65 0.135 6% 10 70.65 98 6923.6 4920 11843.6

kg kg Rs. kg Rs. Rs. Rs. Rs. Rs.

S.S.INDUSTRIES Estimate S.No.

Date

Component Name

Bag No.

Qty.

1

24/09/2009

Light Switch old

1

220

Total

Weight set

220

Average Weight Burning Shot Rate Total weight with burning Raw material Rate / kg. Total Raw Material Amount Total shot amount Total Bill

Till date due amount Tool Repair cost

22

kg

22

kg

0.100 6% 6 23.32 98 2285.4 1320 3605.4

27901.1 15000 42901.1

kg Rs. kg Rs. Rs. Rs. Rs. Rs.

S.S.INDUSTRIES Estimate S.No.

Date

Component Name

Bag No.

Qty.

1

6/10/2009

Body

1

232

Total

Weight set

31.3

232

Average Weight Burning Shot Rate Total weight with burning Raw material Rate / kg. Total Raw Material Amount Total shot amount Total Bill

31.3 0.135 6% 10 33.18 98 3251.4 2320 5571.4 42901.1

kg kg Rs. kg Rs. Rs. Rs. Rs. Rs. Payment

Total Due till date

48472.5 20000 28472.5

Rs.

Payment receive on 22/10/2009 of Rs. 20000 /- cash rest of amount remaing

S.S.INDUSTRIES Estimate S.No.

Date

Component Name

Bag No.

Qty.

1

11/11/2009

Body

1

53

Total

Weight set

6.88

53

Average Weight Burning Shot Rate Total weight with burning Raw material Rate / kg. Total Raw Material Amount Total shot amount Total Bill

6.88 0.130 6% 10 7.29 98 714.7 530 1244.7 28472.5

Total Due till date

29717.2

kg kg Rs. kg Rs. Rs. Rs. Rs. Rs.

S.S.INDUSTRIES Estimate S.No.

Date

Component Name

Bag No.

Qty.

1

21/11/2009

Body

1

477

Total

Weight set

62.2

477

Average Weight Burning Shot Rate Total weight with burning Raw material Rate / kg. Total Raw Material Amount Total shot amount Total Bill

62.2 0.130 6% 10 65.93 98 6461.3 4770 11231.3 29717.2

Total Due till date

40948.5

kg kg Rs. kg Rs. Rs. Rs. Rs. Rs.

S.S.INDUSTRIES Estimate S.No.

Date

Component Name

Bag No.

Qty.

1

21/11/2009

Light Switch Old

1

162

Total

Weight set

16

162

Average Weight Burning Shot Rate Total weight with burning Raw material Rate / kg. Total Raw Material Amount Total shot amount Total Bill

16 0.099 6% 6 16.96 98 1662.1 972 2634.1 40948.5

Total Due till date

43582.6

kg kg Rs. kg Rs. Rs. Rs. Rs. Rs.

S.S.INDUSTRIES Estimate S.No.

Date

Component Name

Bag No.

Qty.

1

22/11/2009

Body

1

30

Total

Weight set

4

30

Average Weight Burning Shot Rate Total weight with burning Raw material Rate / kg. Total Raw Material Amount Total shot amount Total Bill

4 0.133 6% 10 4.24 98 415.5 300 715.5 43582.6

kg kg Rs. kg Rs. Rs. Rs. Rs. Rs. Payment receive

Total Due till date 22/11/2009 Receive Amount Due

44298.1 20000 24298.1

Payment receive on 21/11/2009 of Rs. 20000 /- cash rest of amount remaing

Related Documents

Dispatch
July 2020 12
Dispatch
October 2019 18
Report Dispatch
May 2020 9
Dispatch Ch12
November 2019 24
Dispatch Action
November 2019 31
Dispatch Transcript
May 2020 7

More Documents from ""

Dispatch
July 2020 12
Pp30-1980
June 2020 2
31295010060092.pdf
December 2019 27
Chapter-iii.docx
December 2019 22
De Broglie
June 2020 23
Thesis Questionnaire.docx
December 2019 21