The principles of devising a method statement is based on the construction technology of a particular element. For example, elements in building construction include; 1. 2. 3. 4. 5. 6. 7. 8.
Excavations Concrete works Blockwork and brickwork Roofing Carpentry and joinery Steel structure Finishes Painting and decorations