E-mail: Phone: B.
[email protected] CATARATA 00639192269469 STREET (SMS) BRGY.
[email protected] 0063352262878 BATINGUEL (Home) Chikka DUMAGUETE ID:00966507233010 001742306 CITY 6200 (K.S.A.) PHILIPPINES
PORFERIO ALBERTINO YAP MERCADO Objective
Education
To be a part of a team that could boost company's standard in terms of planning, supervision, inspection and management in the field of mechanical piping construction.
1976 – 1981 UNIVERSITY OF SAN JOSE – RECOLETOS CEBU CITY, PHILIPPINES BACHELOR OF SCIENCE IN MECHANICAL ENGINEERING
Professional Experience
AUGUST 17, 2006 - PRESENT SAUDI ARABIAN BECHTEL COMPANY KHURSANIYAH GAS PLANT PROJECT (KGP) SAUDI ARAMCO, KHURSANIYAH KINGDOM OF SAUDI ARABIA
ASSISTANT SUPERINTENDENT II (PIPING FABRICATION, Completion Group and Painting & Insulation)
Assist clearing of painting ang insulation punclist at common piperack area, and coordinates with subcontractors (OTC-painting & Bin Zagr-insulation) in completing painting and insulation activities as per schedule.
Monitor and assist subcontractor in completion activities, test package clearing and reinstatement of hydrotested lines.
Line-check lines to be hydrotested prior to submission to client (Aramco) for acceptance.
Monitors progress of the works performed by Subcontractor to ensure that the works are carried out on schedule.
Analyzes manpower, material, equipment requirements, and Interfaces the requirements with others as designated by supervising superintendent.
Implements and enforces policies, procedures and related work rules as established by field construction management.
Prepares daily progress reports and keeps supervisors informed on progress of overall assigned activities.
Complies with all company Environmental, Safety & Health, (ESH) policies and
PAY MERCADO. PAGE 1 OF 8
procedures.
Conducts all work activities in a safe and environmentally responsible manner by not taking on any task(s) that are perceived as unsafe and if in doubt, consults supervisor/manager before proceeding.
Participates in ESH meetings and company ESH Training and Workshop programs.
Reports all accidents, incidents or near misses to supervisor/manager or to the ESH Department, if supervisor/manager is not available.
Performs other similar or related duties as required or assigned by supervising superintendent.
JULY 09, 2005 – JULY 14, 2006 TIJD JV (TOYO ENG’G. / IDRO / JGC / DAELIM JOINT VENTURE) SECONDED TO SHIMBAR CO. (SUB-CONTRACTOR) SOUTH PARS DEVELOPMENT PROJECT PHASES 6, 7 & 8 ONSHORE GAS FACILITIES ASSALUYEH, BUSHEHR PROVINCE ISLAMIC REPUBLIC OF IRAN
QA/QC ASST. MANAGER
Responsible in the organization of subcontractors (Shimbar Co.) QA/QC department including proper manpower designation and delegation to conform Contrators (TIJD JV) requirements. Responsible in the coordination of all inspection activities and ensure that all are in accordance with existing inspection standards and procedure (ITP). Responsible in the coordination of all NDE (RT, PWHT, PT, MT, PMI, etc.), including monitoring and updation (Repair and rectification). Monitor all welders status including daily progress and rejection rating. Responsible in the preparation of all Test Packages documentation such as drawing preparation, line check list, punch list, test pressure form and welding and NDE history sheet. Coordinates with the Contractor on pressure test execution, flushing, drying and reinstatement and ensure that activities is well executed. Attend weekly coordination meeting together with Contractors QA/QC manager to discuss and resolves items concerning inspection and other QC items. Responsible in all reports such as daily welding (DWR), welding control system (WCS), field inpection report (FIR), field inspection notice (FIN). Responsible in the controlling all QA/QC documents including updation of all drawing, procedures and transmittals. Coordinates with the construction department on all site modification like Field Revision Instruction (FRI), joint changes request (JCRF) and technical queries.
OCTOBER 27, 2003 – DECEMBER 17, 2004 HYUNDAI ENG’G. & CONSTRUCTION CO., LTD SOUTH PARS DEVELOPMENT PROJECT PHASES 4 & 5 ONSHORE GAS FACILITIES ASSALUYEH, BUSHEHR PROVINCE ISLAMIC REPUBLIC OF IRAN
PIPING ENGINEER
Responsible for the final construction activities and monitoring of Sulfur Forming Plant both mechanical and piping and assist vendor (ENERSUL) in the pre-commissioning and
PAY MERCADO. PAGE 2 OF 8
trial run of angular belt conveyor. Responsible for the final punch list clearing both mechanical and piping scope and facilitate acceptance with the client (AGIP/ENI). Responsible for the preparation of all test packages, including preparation of required drawings (G.A., Isometric, P&I D) and related documents. Coordinates with other Piping Engineers assigned in execution on test packages status. Coordinates with the Field engineering team regarding revisions, as builts and modifications. Performed other activities related to test packages preparation such as updating drawings and documents. Familiar with EDMS (Electronic Drawing Management System) and WJCS (Power Builder System) executions as main source of gathering drawings and status and progress updating.
MAY 9, 2002 – JUNE15, 2003 DODSAL & CO. / SNAMPROGETTI S.A. LTD. NEAT KHUFF CONDENSATE FRACTIONATION PLANT PROJECT SAUDI ARAMCO, RAS TANURA KINGDOM OF SAUDI ARABIA (K.S.A.)
PIPING ENGINEER / SPOOL MOVEMENT COORDINATOR
Responsible in maintaining Data Base of spool movement activities, such as erection, welding and supports installation. Assist scheduling and planning of manpower allocation and mobilization. Responsible in monitoring and updating field progress base on reports from respective area engineers. Responsible for all piping activities for fin fan coolers connection (Area-21) including erection, fit-up, supports and test package clearing. Responsible for all piping activities at Area 12, 15, 17, 19, 22, 25 & 26. Responsible in ensuring that all work activities is well implemented, executed and carried out as per planned. Responsible of the safety of all workers in the execution of task assigned. Responsible for the documentation of work carried out (drawings and other related documents).
JUNE 12, 2001 – NOV. 25, 2001 EEI CORPORATION / PETROFAC INTERNATIONAL LTD. ADCO ASAB THAMAMA ZONE A/B GAS INJECTION PILOT PROJECT ASAB, ABU DHABI, U.A.E.
PIPING SUPERVISOR
Responsible for mechanical piping works at pipe rack no. 1 area including piping connection at fin fan coolers, vessels and compressors Responsible for the early mechanical piping works at pipe rack no. 1 area including piping connection at fin fan coolers, vessels and compressors. Responsible in punch list clearing of all areas and coordinates with QC on test package cleared for hydro-testing. Responsible for the alignment of all flange connection of compressor pipings, pump piping connection both suctions and discharge lines. Perform other activities required by the company such as fabrication of temporary spools for testing.
PAY MERCADO. PAGE 3 OF 8
OCTOBER 17, 2000 – MAY 26, 2001 EEI CORPORATION / SHELL PETROLEUM EXPLORATION / FOSTER WHEELER MALAMPAYA ONSHORE GAS PLANT PROJECT TABANGAO, BATANGAS CITY PHILIPPINES
PIPING ENGINEER
Responsible for the early mechanical piping completion of utility east area (Areas UH, UL, UM, UN), including piping connection to 4 package type boilers, exchangers, vessels, and tanks. Responsible in the coordination with the client’s representative (FW) on FI’s (Field Instructions) and site modifications. Responsible for the mechanical piping work for utility area (East & West Areas – UB, UD, UE, UF, UG, UH, UJ, UL, UM & UN). (Initial piping works) Prepare 3 weeks work schedule base on data input prepared by PCD and ensure that said schedule is properly implemented. Responsible for the safety of all workers by conducting daily safety tool box meeting. Responsible in maintaining ISO 9001 (Total Quality Management) and ISO 14001 (Environmental Management System) coveted by the company (EEI Corp. & SPEX/Foster Wheeler). Responsible for the preparation of test packages.
JUNE 23, 1999 – JUNE 6, 2000 DAELIM INDT’L. CO. LTD. FORMOSA CHEMICAL AND FIBER CORP. AROMA -2 PROJECT MAI-LIAO, YUNLIN COUNTY TAIWAN, R.O.C.
PIPING SUPERVISOR
Responsible for the completion of the Parex Unit Reactors (R911 & R912) grids installation, sieve loading (13 beds each) and piping job. Assist turn over of Parex Unit Reactors to client (FCFC) thru Advisor (UOP). Responsible of coordination with the client’s advisor (UOP) on final inspection of all Aroma 2 equipments (vessels, columns, reactors...) Responsible of the completion of piping works of Areas 100, 200, 300, 400 and 500. Responsible of initial construction punch listing of Areas 500, R001 & R002 common pipe rack piping works.
AUGUST ,1998 – FEBRUARY, 1999 WARGA HIKMAT KEJ. SDN. BHD. / JGC MALAYSIA BHD. SRC LONG RESIDUE CATALYZED CRACKING PROJECT SHELL REFINING CO. (F.O.M.) BHD. PORT DICKSON, NEGERI WEST MALAYSIA
PIPING SUPERINTENDENT
Responsible of fabrication, installation of all pipings around the Catalyst Hopper, Regenerator, Reactors, Flue Gas Area, Columns and Elevator Structure of LRCC plant. Responsible of the preparation of work schedules (weekly and monthly).
PAY MERCADO. PAGE 4 OF 8
Responsible of preparation of all documents needed in fabrication and installation (drawings, field change sheet, etc...). Responsible of forecasting manpower and equipment requirements and mobilization based on schedule. Responsible in monitoring of progress accomplishments based on QC reports and update dia-inch & tonnage out-standing balance for rescheduling purposes. Responsible in updating monthly progress report and spread out balance work to meet planned schedule. Coordinates with the client on daily and weekly basis concerning work progress and schedule. Monitor test packages and clearing until hand-over to client.
NOVEMBER, 1997 – AUGUST, 1998 WARGA HIKMAT KEJ. SDN. BHD. / CHIYODA / MMC / CMSB JOINT VENTURE PSR 2 REFINERY PROJECT STAGE 1
PETRONAS PENAPISAN MELAKA SUNGAI UDANG, MELAKA WEST MALAYSIA TEST PACKAGE COORDINATOR / PIPING SUPERVISOR
Responsible in the preparation of all test packages. Prepare test schedule and coordinates with the client concerning progress development. Monitor and update testing, flushing, drying and reinstatement progress and make necessary rescheduling to meet target date. Prepare manpower mobilization plan base on target schedule.
NOVEMBER,1996 – NOVEMBER, 1997 WARGA HIKMAT KEJ. SDN. BHD. / CHIYODA / MMC / CMSB JOINT VENTURE PSR 2 REFINERY PROJECT STAGE 1
PETRONAS PENAPISAN SUNGAI UDANG, MELAKA WEST MALAYSIA MATERIAL CONTROL SUPERVISOR
Responsible of all material requisition and make traceability of materials from issuance to installation. Monitor and update material status and make necessary resolution in case of damage or lost. Coordinates with field supervisors on materials needed for installation (priorities). Insure proper material storage and handling.
MARCH, 1996 – NOVEMBER,1996 WARGA HIKMAT KEJ. SDN. BHD. / TOYO KANETSU MALAYSIA SDN. BHD. NIIGATA MALAYSIA SDN. BHD. IDEMITSU MSM TANKAGE PROJECT IDEMITSU MALAYSIA SDN. BHD.
PASIR GUDANG, JOHOR WEST MALAYSIA PAY MERCADO. PAGE 5 OF 8
PROJECT SUPERVISOR
Responsible for job implementation of 19 storage tank, including 3 floating roof and 1 double wall stainless tank. Prepare working schedule in accordance with client target plan. Monitor and update daily progress activities and coordinates with QC concerning NDT and other inspection report. Prepare manpower mobilization plan base on target schedule.
DECEMBER, 1995 – MARCH, 1996 WARGA HIKMAT KEJ. SDN. BHD. / JGC MALAYSIA BHD. SRC – CDU REVAMP PROJECT SHELL REFINING CO. (F.O.M.) BHD. PORT DICKSON, NEGERI SEMBILAN WEST MALAYSIA
TEST PACKAGE COORDINATOR / QC INSPECTOR
Responsible for the preparation of all test packages, including preparation of required drawings (G.A., Isometric, P&I D) and related documents. Prepare testing and reinstatement schedule base on client requirements. Witness all hydrostatic and pneumatic testing. Conduct line checking and prepare punch list (QC). Perform visual inspection and non-destructive testing.
JULY, 1995 – DECEMBER, 1995 SYARIKAT KEJ. PERTAMA SDN. BHD./ SHELL MDS MAINTENANCE SHELL MDS BINTULU, SARAWAK EAST MALAYSIA
PIPING SUPERVISOR
Responsible for job implementation of plan changes requirements such as piping modification, vessel fabrications, tanks heating coil fabrication and installation (Wax Tanks). Conduct inspection, ndt and pressure testing. Aside from performing piping and mechanical job, also carried other activities such as instrument piping and structural fabrication and installation.
FEBRUARY, 1995 – JULY, 1995 SYARIKAT KEJ. PERTAMA SDN. BHD./ MALAYSIA LIQUIFIED NATURAL GAS PLANT MLNG DEMINERALIZATION PIPING PROJECT MALAYSIA LIQUEFIED NATURAL GAS PLANT BINTULU, SARAWAK EAST MALAYSIA
PROJECT SUPERVISOR
Responsible for work implementation such as fabrication, erection and installation of pipe line and supports.
PAY MERCADO. PAGE 6 OF 8
Coordinates with QC on testing, ndt and other inspection matters. Prepare schedule, monitor construction progress, material requisition, drawings and documents preparation.
NOVEMBER, 1993 – JANUARY, 1995 HYUNDAI DOZ (M) SDN. BHD. / KELLOG / SIME / JGC JOINT VENTURE MLNG DUA PROJECT MALAYSIA LIQUEFIED NATURAL GAS PLANT BINTULU, SARAWAK EAST MALAYSIA
MATERIAL CONTROLLER
Make traceability of materials and equipment from delivery to site erection. Monitor delivery and installation status and prepare material status report. Conduct inspection of material received to ensure free from damages and exact quantity and observe proper material storage and handling.
OCTOBER, 1991 – JULY 1993 JAMJOOM WESCON SAUDI ARABIA CO. LTD. / CCC W.L.L. JOINT VENTURE MITSUI ENGINEERING AND SHIPBUILDING ARABIA LTD. PETROKEMYA OLEFINS PROJECT JUBAIL INDUSTRIAL CITY KINGDOM OF SAUDI ARABIA (K.S.A.)
PIPING FOREMAN / UTILIZED FIELD ENGINEER
Training and Induction Courses
Monitor construction progress, production updating, material requisition and preparation. Supervise installation of equipment needed. Monitor field discrepancies and initiates field discrepancy report (FDR). Preparation of drawing and related documents needed in fabrication and installation. Prepare schedule and manpower mobilization. Responsible for inspection of installed pipelines as per drawing in conjunction with general piping arrangement
1. Oil, Gas & Construction (OG&C) Behaviour Development Initiative Environmental, Safety and Health Leadership Workshop - Bechtel Technip Joint Venture - Khursaniyah Gas Plant Project (KGP) - Saudi Aramco, Khursaniyah, K.S.A. - February 12, 2007 2. Basic Rigging Safety Course (On-line course)- Bechtel University - May 8, 2007
3. Leadership Course (on-line course)- PBL(People Base Leadership): ABC Analysis Part 1 (May 10, 2007), PBL: ABC Analysis Part 2 (May 12, 2007) & New Direction in Leadership (May 9, 2007)- Bechtel University 4. Six Sigma - From 50,000 Ft.(on-line course) - Bechtel University - November 7, 2006 5. Six Sigma - Literally Speaking (on-line course) - Bechtel University - November 24, 2006 6. Six Sigma - Roles & Phases (on-line course) - Bechtel University - May 6. 2007 PAY MERCADO. PAGE 7 OF 8
7. Request for Information (RFI) Course (on-line course)- Bechtel University - May 10, 2007
8. Permit to Work (PW) (Job Performer) Course - National Training Centre, Abu Dhabi, U.A.E. - July 27, 2001
9. Gas Welding Technology Seminar - National Manpower and Youth Council, Cebu City, Philippines - February 7, 1981
PERSONAL DATA: Date of Birth
February 26. 1960
Place of Birth
Tuburan, Cebu PHILIPPINES
Passport
Passport No.
: TT0416509
Place of Issue
: Cebu City, Philippines
Date of Issue Validity
: 18 JULY, 2006 : 18 JULY, 2011
Computer Literacy
WELL VERSE IN MS Office PROGRAMS, Familiar in EDMS (Electronic Data Management System), WJCS (Power Builder Management) execution. Limited knowledge in AutoCAD.
Language
English, Pilipino (Tagalog & Cebuano), Bahasa Malaysia, Bahasa Indonesia
Religion
Christian
Nationality
Filipino
PAY MERCADO. PAGE 8 OF 8