Cover Laporan Tugas Besar Plambing.docx

  • Uploaded by: Irfan Pambudi
  • 0
  • 0
  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Cover Laporan Tugas Besar Plambing.docx as PDF for free.

More details

  • Words: 1,028
  • Pages: 8
TUGAS BESAR PERENCANAAN SISTEM PLAMBING GEDUNG PERKANTORAN 5 LANTAI

DISUSUN OLEH : IRFAN NOOR PAMBUDI 16513104

ASISTEN DOSEN : QORRY NUGRAHAYU, S.T., M.T

DOSEN PEMBIMBING : YEBI YURIANDALA, S.T., M.ENG

PROGRAM STUDI TEKNIK LINGKUNGAN FAKULTAS TEKNIK SIPIL DAN PERENCANAAN UNIVERSITAS ISLAM INDONESIA YOGYAKARTA 2018 ii

LEMBAR PENGESAHAN TUGAS PERENCANAAN SISTEM PLAMBING GEDUNG PERKANTORAN 5 LANTAI

Disusun Oleh : Irfan Noor Pambudi 16513104

Telah diperiksa dan disetujui sebagai persyaratan laporan untuk memenuhi tugas mata kuliah plambing oleh :

Disetujui,

Diperiksa,

Dosen Pembimbing

Asisten Dosen

Yebi Yuriandala, S.T., M.Eng

Qorry Nugrahayu, S.T., M.T

Tanggal :

Tanggal :

ii

KATA PENGANTAR Puji syukur kehadirat Allah SWT atas berkat rahmat, karunia, dan kemurahan-Nya sehingga saya dapat menyelesaikan laporan Tugas Perencanaan Sistem Plambing Gedung Perkantoran 5 Lantai ini tepat pada waktunya. Tugas Perencanaan Sistem Plambing Gedung Perkantoran 5 Lantai ini disusun sebagai syarat mata kuliah plambing untuk membantu dalam memahami perencanaan sistem plambing pada gedung perkantoran. Selama proses penulisan dan penyelesaian laporan ini, penyusun banyak memperoleh bimbingan dan bantuan dari berbagai pihak. Penyusun menyadari sepenuhnya bahwa tanpa bantuan dan dorongan yang tiada henti itu rasanya sulit bagi penyusun untuk menyelesaikannya. Untuk itu dalam sebuah karya yang sederhana ini penyusun menyampaikan terima kasih kepada: 1. Bapak Yebi Yuriandala, S.T., M.Eng selaku dosen mata kuliah plambing yang telah memberikan bimbingan dan materi. 2. Ibu Qorry Nugrahayu, S.T., M.T selaku dosen pembimbing yang telah memberikan bimbingan dan masukannya sehingga dapat menyelesaikan tugas besar ini. 3. Orangtua yang selalu memberikan doa, motivasi, dan dukungan penuh untuk menyelesaikan tugas besar ini. 4. Seluruh pihak yang telah membantu penyusunan tugas besar ini baik secara langsung maupun tidak langsung. Semoga amal, bantuan, bimbingan, dan doa yang telah diberikan, mendapat balasan dari Allah SWT. Penyusun menyadari sepenuhnya bahwa laporan ini masih jauh dari kesempurnaan. Oleh karena itu, saran dan kritik yang bersifat membangun sangat diharapkan demi kesempurnaan laporan ini. Akhirnya, penyusun berharap semoga apa yang telah penyusun selesaikan ini bermanfaat bagi kita semua. Aamiin.

ii

Yogyakarta, 14 Juli 2018

Penyusun

ii

DAFTAR ISI

HALAMAN DEPAN ....................................................................................... i LEMBAR PENGESAHAN ............................................................................. ii KATA PENGANTAR ..................................................................................... iii DAFTAR ISI .................................................................................................... iv BAB I PENDAHULUAN .............................................................................. 1 1.1 Latar Belakang .................................................................................... 1 1.2 Maksud dan Tujuan ............................................................................. 2 1.3 Ruang Lingkup Perencanaan .............................................................. 2 BAB II KRITERIA PERENCANAAN ........................................................... 4 2.1 Kriteria Perencanaan Jaringan Air Bersih ........................................... 4 2.1.1 Sistem Perencanaan Jaringan Air Bersih .................................. 4 2.1.2 Laju Aliran Air .......................................................................... 5 2.1.3 Penaksiran Laju Aliran Air ....................................................... 8 2.1.4 Perhitungan Dimensi Pipa......................................................... 12 2.1.5 Peralatan Penyediaan Air .......................................................... 13 2.1.5.1 Jenis Peralatan .............................................................. 13 2.1.5.2 Desain Ground Reservoir dan Roof Tank..................... 16 2.1.5.3 Perencanaan Pompa ...................................................... 17 2.2 Kriteria Perencanaan Jaringan Air Buangan ....................................... 19 2.2.1 Jenis Air Buangan ..................................................................... 19 2.2.2 Klasifikasi Sistem Pembuangan Air ......................................... 20 2.2.3 Sistem Pembuangan Air ............................................................ 20 2.2.4 Bagian Sistem Pembuangan ...................................................... 21 2.2.5 Perhitungan Dimensi Pipa......................................................... 22 2.3 Kriteria Perencanaan Jaringan Vent .................................................... 24 2.3.1 Tujuan Sistem Vent................................................................... 24 2.3.2 Jenis Sistem Vent dan Pipa Vent .............................................. 24 2.3.3 Perhitungan Dimensi Pipa......................................................... 26

ii

2.4 Kriteria Perencanaan Jaringan Air Hujan ........................................... 27 2.4.1 Perencanaan Drainase ............................................................... 27 2.4.2 Sumur Resapan ......................................................................... 29 2.5 Kriteria Perencanaan Sistem Pemadam Kebakaran ............................ 30 2.5.1 Perencanaan Unit Pemadam Kebakaran ................................... 30 BAB III DETAIL PERENCANAAN SISTEM PLAMBING ......................... 32 3.1 Deskripsi Umum Bangunan ................................................................ 32 3.2 Perencanaan Jaringan Air Bersih ........................................................ 33 3.2.1 Perhitungan Kebutuhan Air Bersih ........................................... 33 3.2.2 Ground Reservoir dan Roof Tank untuk Air Bersih ................. 38 3.2.2.1 Desain Ground Reservoir ............................................. 38 3.2.2.2 Penentuan Kapasitas Roof Tank ................................... 40 3.2.2.3 Perhitungan Diameter Pipa dari Ground Reservoir ke Roof Tank ................................................................. 41 3.2.3 Perhitungan Pemompaan untuk Air Bersih............................... 42 3.2.3.1 Headloss Statis ............................................................. 42 3.2.3.2 Headloss Suction .......................................................... 43 3.2.3.3 Headloss Discharge...................................................... 44 3.2.3.4 Sisa Tekan .................................................................... 45 3.2.3.5 Kapasitas Daya Pompa ................................................. 45 3.2.4 Perhitungan Diameter Pipa Air Bersih ..................................... 47 3.2.4.1 Tipe Saniter X............................................................... 47 3.2.4.2 Tipe Saniter Y............................................................... 50 3.2.4.3 Tipe Saniter Z ............................................................... 54 3.3 Perencanaan Jaringan Air Buangan .................................................... 57 3.3.1 Perhitungan Diameter Pipa Air Buangan .................................. 57 3.3.1.1 Tipe Saniter X............................................................... 57 3.3.1.2 Tipe Saniter Y............................................................... 62 3.3.1.3 Tipe Saniter Z ............................................................... 67 3.4 Perencanaan Jaringan Vent ................................................................. 72 3.4.1 Perhitungan Diameter Pipa Vent .............................................. 72

ii

3.4.1.1 Tipe Saniter X............................................................... 72 3.4.1.2 Tipe Saniter Y............................................................... 73 3.4.1.3 Tipe Saniter Z ............................................................... 74 3.5 Perencanaan Jaringan Air Hujan ......................................................... 74 3.5.1 Perhitungan Debit Air Hujan .................................................... 74 3.5.2 Perhitungan Sumur Resapan ..................................................... 76 3.6 Perencanaan Sistem Pemadam Kebakaran ......................................... 77 3.6.1 Sistem Fire Hydrant Luar Gedung ........................................... 77 3.6.2 Sistem Fire Hydrant Dalam Gedung ........................................ 77 3.6.3 Perhitungan Diameter Pipa untuk Pillar Hydrant .................... 78 3.6.4 Perhitungan Diameter Pipa untuk Hydrant Box........................ 79 3.6.5 Perhitungan Pemompaan untuk Sistem Pemadam Kebakaran . 80 3.6.5.1 Headloss Statis ............................................................. 81 3.6.5.2 Headloss Suction .......................................................... 81 3.6.5.3 Headloss Discharge...................................................... 82 BAB IV BILL OF QUANTITY DAN RANCANGAN ANGGARAN BIAYA ...... 86 4.1 BOQ dan RAB Alat Plambing ............................................................ 86 4.2 BOQ dan RAB Jaringan Air Bersih .................................................... 86 4.2.1 Pipa Air Bersih .......................................................................... 86 4.2.2 Aksesoris Air Bersih ................................................................. 87 4.2.3 Pompa Air Bersih ...................................................................... 88 4.2.4 Roof Tank .................................................................................. 88 4.2.5 Ground Reservoir...................................................................... 88 4.2.6 Komposisi Beton untuk Ground Reservoir............................... 88 4.2.7 Total Anggaran Sistem Air Bersih ............................................ 89 4.3 BOQ dan RAB Jaringan Air Buangan ................................................ 89 4.3.1 Pipa Grey Water ........................................................................ 89 4.3.2 Aksesoris Grey Water ............................................................... 89 4.3.3 Pipa Black Water ...................................................................... 90 4.3.4 Aksesoris Black water............................................................... 90 4.3.5 Total Anggaran Sistem Air Buangan ........................................ 91

ii

4.4 BOQ dan RAB Jaringan Vent ............................................................. 91 4.4.1 Pipa Vent ................................................................................... 91 4.4.2 Aksesoris Pipa Vent .................................................................. 91 4.4.3 Total Anggaran Sistem Vent ..................................................... 92 4.5 BOQ dan RAB Jaringan Air Hujan .................................................... 92 4.5.1 Pipa Air Hujan .......................................................................... 92 4.5.2 Sumur Resapan ......................................................................... 92 4.5.3 Komposisi Beton untuk Sumur Resapan .................................. 93 4.5.4 Total Anggaran Sistem Air Hujan ............................................ 93 4.6 BOQ dan RAB Sistem Pemadam Kebakaran ..................................... 93 4.6.1 Fire Hydrant ............................................................................. 93 4.6.2 Pipa Fire Hydrant ..................................................................... 93 4.6.3 Aksesoris Pipa Fire Hydrant .................................................... 94 4.6.4 Pompa Fire Hydrant ................................................................. 94 4.6.5 Total Anggaran Sistem Pemadam Kebakaran .......................... 94 4.7 BOQ dan RAB Pekerja ....................................................................... 94 4.8 Total Rancangan Anggaran Biaya ...................................................... 95 DAFTAR PUSTAKA ...................................................................................... 96 LAMPIRAN......................................................................................................97

ii

Related Documents


More Documents from "Abu Abdul Fattah"