Commission New

  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Commission New as PDF for free.

More details

  • Words: 2,153
  • Pages: 29
GLOSCORE PHILIPPINES, INC. Summary of Reserved Fund PAUL M. DIAZ DE RIVERA PROJECT MR. VARGAS

GROSS SALES 1,412,239.14

NET CM

%

811,330.26

0.5

AMOUNT' 6,210.08

W/TAX 621.01

RECEIVED 5,030.16

DATE RECEIVED 07.17.07

R.FUND 558.91

558.91

ARVIN J. TORRES PROJECT MR. VARGAS

GROSS SALES 1,412,239.14

NET CM

%

811,330.26

0.5

AMOUNT' 3,105.04

W/TAX 310.50

RECEIVED 2,515.08

DATE RECEIVED 07.17.07

R.FUND 279.45

279.45

MARK ANTHONY A. ALEJO PROJECT

GROSS SALES

NET CM

%

AMOUNT'

W/TAX

RECEIVED

DATE RECEIVED

R.FUND

MR. VARGAS

1,412,239.14

811,330.26

0.5

12,420.16

1,242.02

10,060.33

07.17.07

1,117.81

1,117.81

RAFAEL S. DORADO PROJECT MR. VARGAS Kabayan Kaloocan

GROSS SALES 1,412,239.14 263,842.40

NET CM

%

811,330.26 63,274.19

0.25 0.25

AMOUNT' 3,105.04 494.49

W/TAX 310.50 49.45

RECEIVED 2,515.08 400.53

DATE RECEIVED 07.17.07

R.FUND 279.45 44.51

323.96

HOUSE ACCOUNT PROJECT MR. VARGAS

GROSS SALES 1,412,239.14

% 811,330.26

0.25

AMOUNT' 2,515.08

R.FUND 279.45

279.45

GLOSCORE PHILIPPINES, INC. Commission / Incentive M.R. VARGAS Quezon City Hall TOTAL CONTRACT 1,412,239.14

W/H TAX NET SALES 151,311.34 ### Commission - based on Net sales GROSS SALES NET SALES Collected ### ### Uncollected

21,181.56 ###

18,912.11 ###

LABOR MATERIALS MISCELLANEOUSNET CM 18,169.30 ### ### 811,330.26 1% MAA 12,420.16 378.24 12,798.40

% 64.34%

0.5% PMD 0.025% RSD 0.025% AJT 0.025% Workers 0.025% HA 6,210.08 3,105.04 3,105.04 3,105.04 3,105.04 commission 94.56 6,304.64

94.56 3,199.60

% after Commission

94.56 3,199.60

94.56 3,199.60

94.56 remaining 3,199.60

61.84%

Commission based on Net Margin NET CM Collected 811,330.26 535,477.97 Uncollected 811,330.26 275,852.29 ###

Note: All commission are based on Net sales PMD Commission Total contract CollectedNet Collected Margin (CM) .5% Net collected M.R. Vargas ### ### 6,210.08 ### ###

TOTAL

less Wtax Total less 10% reserved fund Net commission RSD Commission Total contract CollectedNet Collected Margin (CM) .25% Net collected M.R. Vargas ### ### 3,105.04 ### ### Kabayan 263,842.40 ### ### ### 494.49 total less Wtax Total less 10% reserved fund Net commission MAA Commission Total contract CollectedNet Collected Margin (CM) .1% Net collected M.R. Vargas ### ### ### ### ### less Wtax Total less 10% reserved fund Net commission AJT Commission M.R. Vargas

WORKERS M.R. Vargas

Total contract CollectedNet Collected Margin (CM) .25% Net collected ### ### 3,105.04 ### ###

3,105.04 494.49 3,599.53 359.95 3,239.58 323.96 2,915.62 TOTAL ### 1,242.02 ### 1,117.81 ### TOTAL

less Wtax Total less 10% reserved fund Net commission

3,105.04 310.50 2,794.54 279.45 2,515.08 TOTAL

less Wtax Total less 10% reserved fund Net commission

3,105.04 310.50 2,794.54 279.45 2,515.08 TOTAL

Total contract CollectedNet Collected Margin (CM) .25% Net collected ### ### 3,105.04 ### ###

HOUSE ACCOUNT Total contract CollectedNet Collected Margin (CM) .25% Net collected M.R. Vargas ### ### 3,105.04 ### ### less Wtax Total less 10% reserved fund Net commission

TOTAL COMMISSION

note: PMD Cash Advance Partial Payment 12.16.07 01.30.07 02.09.07 07.02.07 07.16.07 Balance

6,210.08 621.01 5,589.07 558.91 5,030.16 TOTAL

3,105.04 310.50 2,794.54 279.45 2,515.08

###

### ### ### ### ### ### ### ###

COMMISION/Incentive Less CashPMD Advance MAA for check Preparation

MAA Cash Advance fully paid

Prepared by:

Approved by:

M. S. Javier

G.S. Correa

P

### 3,373.07 800.00 ###

Commission/ Incentive

PMD Commission Total contract Legend Hotels - kalookan ### Benson Yu ### Fortune Tobacco Corp 2,200.00 Clean Living / Armadillo 4,250.00 Kalinisan/ Armadillo 2,025.00 F.R. Sevilla PU Pipe Fab. 59,745.13 (Overriding Commission) O.B. Montessorri ### Redgold Logistics ### PLDT/ IEEI 53,250.00 Less :w/h tax Total Less :10% reserved fund Net Commission

Collected Net CollectedMargin (CM) Com Received 2% Net collected 221,532.14 197,796.55 63,274.19 3,955.93 135,000.00 120,535.71 19,918.02 2,410.71 2,200.00 1,964.29 1,064.29 39.29 4,250.00 3,794.64 1,769.64 75.89 2,025.00 1,808.04 1,735.76 36.16 1% Net Collected 59,745.13 53,343.87 8,343.87 533.44 .25% Net Collected 300,000.00 267,857.14 135,077.99 669.64 150,000.00 133,928.57 34,228.57 334.82 53,250.00 47,544.64 19,736.29 118.86 P/ P/ TOTAL

MAA Commission Total contract

Collected Net CollectedMargin (CM) Com Received 2% net collected Redgold Logistics ### 150,000.00 133,928.57 34,228.57 2,678.57 PLDT/IEEI 53,250.00 53,250.00 47,544.64 19,736.29 950.89 Implementation .25% Net Collected Legend Hotels - kalookan ### 221,532.14 197,796.55 63,274.19 494.49 P/ Less :w/h tax Total P/ Less :10% reserved fund TOTAL AJT Commission Implementation Benson Yu Redgold Logistics PLDT/IEEI O.B. Montessorri

Total contract Collected Net CollectedMargin (CM) Com Received .25% Net Collected ### 135,000.00 120,535.71 19,918.02 301.34 ### 150,000.00 133,928.57 34,228.57 334.82 53,250.00 53,250.00 47,544.64 19,736.29 118.86 ### 300,000.00 267,857.14 135,077.99 669.64 P/

Less :w/h tax Total Less :10% reserved fund

P/ TOTAL

HOUSE ACCOUNT Daruma Corp. Double Share Dos Palmas Arreceffi Arch Vincent Caisip Southcall Builders

Total contract Collected Net CollectedMargin (CM) Com Received 2% Net Collected 39,000.00 39,000.00 34,821.43 13379.83 696.43 32,000.00 32,000.00 28,571.43 15795.43 571.43 ### 326,800.00 291,785.71 154443.71 5,835.71 16,000.00 16,000.00 14,285.71 7897.72 285.71 9,000.00 9,000.00 8,035.71 4841.71 160.71

P/ Less :w/h tax Total Less :10% reserved fund

P/ TOTAL

TOTAL COMMISSION Commission/Incentive Less: PMD Cash Advance For Check Preparation

P/

Prepared by:

Approved by:

Eugene L. Galanao

G.S. Correa

Note: PMD cash Advance less Payment Mode

Balance

P/ partial pay com 12/11/06 com 01/30/07 com 02/09/07 com 07/02/07

17,231.43 (3,500.00) 13,731.43

45,000.00 (15,000.00) (6,219.07) (5,550.23) (8,857.63) (3,000.00) 6,373.07

TOTAL 3,955.93 2,410.71 39.29 75.89 36.16 533.44 669.64 334.82 118.86 8,174.75 (817.47) 7,357.27 (735.73) 6,621.55 TOTAL 2,678.57 950.89 494.49 4,123.96 (412.40) 3,711.56 (371.16) 3,340.40 TOTAL 301.34 334.82 118.86 669.64 1,424.67 (142.47) 1,282.20 (128.22) 1,153.98 TOTAL 696.43 571.43 5,835.71 285.71 160.71

7,550.00 (755.00) 6,795.00 (679.50) 6,115.50 17,231.43

GLOSCORE PHILIPPINES, INC. COMMISSION/INCENTIVE as of January 2007 FORTUNE TOBACCO Contract Amount Subject

-

W.Tax

Labor Cost

Material Cost

Net margin afterw/h tax

Collected

Less Tax and Vat -

2% com -

-

-

ATENEO DE MANILA Rockwell Contract Amount W.Tax Labor Cost Material cost 785,000.00 Upper deck ### 79,789.60 273,120.41 686,773.02 Plant boxes 49,309.12 Addil Plant box 62,000.00 Gravel bed 798,082.14 ### ### 277,767.00 1,583,082.14 ### ### 550,887.41

Net margin afterw/h tax

Collected Uncollected

ATENEO DE MANILA Salcedo Contract Amount 1,900,000.00 1,900,000.00

Less Tax and Vat .5% com 2% com ### 956,893.56 4,784.47 ### 125,712.45 102,855.64 514.28 2,057.11 ### ### 5,298.75 ###

W.Tax Labor Cost ### ### 253,213.00

Material Cost 274,821.90 Net margin afterw/h tax

Collected Uncollected FR SEVILLA Contract Amount 1,400,000.00 1,400,000.00

LESS TAX AND VAT .5% com 2% com ### ### 6,995.45 ### 190,000.00 155,454.55 777.27 3,109.09 ### ### 7,772.73 ### W.Tax Labor Cost ### ### 72,694.79

Material Cost 439,205.60 Net margin afterw/h tax

Actual accomplishment Amount 932,789.21

Collected Uncollected RSTI Contract Amount 689,600.00 689,600.00

111,934.71

72,694.79

439,205.60

Less Tax and Vat 490,160.49 401,040.40 909,839.51 744,414.14 ### ### W.Tax Labor Cost 564,218.18 ### 17,439.10

2% com 8,020.81 ### ### Material Cost 230,390.00 Net margin afterw/h tax

Collected Uncollected MOLDEX Contract Amount SI#2624 P/ 54,000.00 SI#2625 P/ 54,000.00 SI#2626 P/108,000.00 216,000.00

Less Tax and Vat 150,000.00 122,727.27

.5% com 613.64

539,600.00 441,490.91 ### ###

2,207.45 2,821.09

W. Tax 44,181.82 44,181.82 88,363.64 ###

Labor Cost

39,988.00

2% com 2,454.55 8,829.82 ###

Material Cost

74,247.00 Net margin after w/h tax and commission

Collected

MOLDEX Contract Amount 128,250.00 128,250.00

Less Tax and Vat 216,000.00 176,727.27 ### ###

W. Tax 88,363.64 88,363.64

Labor Cost 18,922.50

-

2% commission 3,534.55 3,534.55

Material Cost 44,735.00 Net margin after w/h tax and commission

Collected

PMD Commission

Less Tax and Vat 128,250.00 104,931.82 ### ### Total contract

Collected

Uncollected

2% commission 2,098.64 2,098.64

FR. Sevilla Moldex

### 401,040.40 216,000.00 176,727.27 128,250.00 104,931.82

2% contract 8,020.81 3,534.55 2,098.64

Monolith Metrostone Ateneo SDC-AVR/Irwin theater Ateneo Rockwell Ateneo Salcedo

### ###

### ###

.5% contract 125,712.45 4,784.47 190,000.00 6,995.45

### ###

Collected ### ###

2% contract 125,712.45 ### 190,000.00 ###

Less :w/h tax on commission Total Less :10% reserved fund Net Commission Essel Commission Ateneo SDC-AVR/Irwin theater Ateneo Rockwell Ateneo Salcedo Total Less :w/h tax on commission Total Less :10% reserved fund Net Commission MARK Commission

Collected

2% contract

Total Less :w/h tax Total Less :10% reserved fund Net Commission TOTAL COMMISSION Prepared by: _________ MSJ / DCC

Approved by: _______________ G.S. Correa

Commission / Incentive P/

(25,271.95)

Less:

Pmd CA

(5,550.23)

TOTAL for check preparation

(30,822.18)

Note: Balance from the Cash Advance PMD (P/45thou-15thou-6,219.17) Mark

18,230.60

(P/10thou-3,700.00) 6,300.00 (Salary deduction P/500.00every pay day effective February 2007)

Misc.

CM

Net margin afterw/h tax

%

-

#DIV/0!

-

#DIV/0!

Distribution of Commission

.5% com -

2.0% Essel 0.5% PMD

-

3.5%

Misc ###

CM ###

% 39%

### ###

### ###

28% 34%

Net margin afterw/h tax

245,875.06

19%

Distribution of Commission 2.0% Essel 0.5% PMD

Misc, ###

Net margin afterw/h tax

CM

%

###

65%

886,321.35

57%

Distribution of Commission 2.0% Essel 0.5% PMD

Misc

CM

2,602.83 885,496.78

Net margin afterw/h tax

630,951.33

% 63% 55%

2,602.83

418,285.99

45%

Distribution of Commission

2.0% PMD

Misc

CM

%

9,972.13 431,798.77

Net margin afterw/h tax

63%

306,416.95

54%

Distribution of Commission 0.5% PMD 2.0% Essel

Misc

15,053.72

h tax and commission

2% commission

CM

%

86,711.28

40%

43,904.01

20%

Distribution of Commission 2.0% PMD

Misc

h tax and commission

2% commission

CM

%

64,592.50

50%

22,607.50

18%

Distribution of Commission 2.0% PMD

COM received

TOTAL

% contract 8,020.81 2,650.91 2,098.64 -

883.64

% contract 8,794.06 4,784.47 6,995.45

(8,794.06) (0.00) 0.00 TOTAL 3,976.29 (397.63) P/ 3,578.66 (357.87) P/ 3,220.80

COM received 35,176.23 19,137.87 27,981.82 P/ P/ P/

% contract

Approved by: _______________ G.S. Correa

P/ P/ P/

TOTAL ### 0.00 (0.00) ### 3,517.62 ### 3,165.86 ### TOTAL -

COMMISSION/INCENTIVE ATENEO DE MANILA CONTRACT AMOUNT SUBJECT

W/H TAX

95,000.00 SDC-AVR

LABOR COST

MATERIALS COST

2,282,953.60 Irwin Theater 1,867,871.13 2,377,953.60

MISC

CM

77,727.27 1,945,598.40

excess espenses irwin 360,301.88

582,067.02

61,814.41

282,457.50

Net margin afterw/h tax

1,091,312.79 658,957.59

Distribution of Commission LESS TAX AND VAT COLLECTED

2% com

.5% com

2.0%

2,377,953.60

1,945,598.40

38,911.97

9,727.99

0.5%

2,377,953.60

1,945,598.40

38,911.97

9,727.99

3.5%

ATENEO DE MANILA Rockwell CONTRACT AMOUNT

W/H TAX

LABOR COST

785,000.00 Upper deck 642,272.73

MATERIALS COST

79,789.60

273,120.41

MISC

CM

122,492.67

309,597.32

79,493.03

224,110.86

201,985.70

533,708.18

686,773.02 Plant boxes 49,309.12 Addil Plant box 62,000.00 Gravel bed 798,082.14

652,976.30

216,711.25

277,767.00

1,583,082.14

1,295,249.02

296,500.85

550,887.41

-

Net margin afterw/h tax LESS TAX AND VAT .5% com COLLECTED UNCOLLECTED

2% com

245,875.06

Distribution of Commission

1,169,536.57

956,893.56

4,784.47

19,137.87

2.0%

125,712.45

102,855.64

514.28

2,057.11

0.5%

1,295,249.02

1,059,749.20

5,298.75

21,194.98

ATENEO DE MANILA Salcedo CONTRACT AMOUNT

W/H TAX

LABOR COST

1,900,000.00

1,554,545.45

1,900,000.00

1,554,545.45

253,213.00

MATERIALS COST

MISC

274,821.90

140,189.20 Net margin afterw/h tax

LESS TAX AND VAT .5% com COLLECTED UNCOLLECTED

2% com

CM 1,231,775.90 886,321.35

Distribution of Commission

1,710,000.00

1,399,090.91

6,995.45

27,981.82

2.0%

190,000.00

155,454.55

777.27

3,109.09

0.5%

1,900,000.00

1,554,545.45

7,772.73

31,090.91

FR SEVILLA CONTRACT AMOUNT

W/H TAX

LABOR COST

1,400,000.00

1,145,454.55

1,400,000.00

1,145,454.55

MATERIALS COST

MISC

CM 1,400,000.00

Net margin afterw/h tax LESS TAX AND VAT

2% com

COLLECTED

490,160.49

401,040.40

8,020.81

UNCOLLECTED

909,839.51

744,414.14

14,888.28

1,400,000.00

1,145,454.55

22,909.09

1,145,454.55

Distribution of Commission 2.0%

RSTI CONTRACT AMOUNT

W/H TAX

LABOR COST

689,600.00

564,218.18

689,600.00

564,218.18

17,666.00

MATERIALS COST

MISC

230,390.00

9,972.13 Net margin afterw/h tax

LESS TAX AND VAT

.5% com

2% com

CM 431,571.87 306,190.05

Distribution of Commission

COLLECTED

150,000.00

122,727.27

613.64

2,454.55

0.5%

UNCOLLECTED

539,600.00

441,490.91

2,207.45

8,829.82

2.0%

689,600.00

564,218.18

2,821.09

11,284.36

MOLDEX CONTRACT AMOUNT

W/H TAX

SI#2624 P/ 54,000.00

44,181.82

SI#2625 P/ 54,000.00

44,181.82

LABOR COST

SI#2626 P/108,000.00

88,363.64

216,000.00

176,727.27

39,988.00

MATERIALS COST

MISC

74,247.00

15,053.72

Net margin after w/h tax and commission LESS TAX AND VAT COLLECTED

216,000.00

176,727.27

216,000.00

176,727.27

2% commission

CM

86,711.28 43,904.01

Distribution of Commission

3,534.55 -

2.0%

3,534.55

MOLDEX CONTRACT AMOUNT

W/H TAX

128,250.00

88,363.64

128,250.00

88,363.64

LABOR COST 18,922.50

MATERIALS COST

MISC

44,735.00

64,592.50

Net margin after w/h tax and commission LESS TAX AND VAT COLLECTED

PMD Commission

128,250.00

104,931.82

128,250.00

104,931.82

Total contract

Collected

2% commission

22,607.50

Distribution of Commission

2,098.64 -

CM

2.0%

2,098.64

Uncollected

COM received 2% contract

FR. Sevilla Moldex

1,400,000.00

401,040.40

8,020.81

216,000.00

176,727.27

3,534.55

128,250.00

104,931.82

2,098.64

883.64

Monolith Metrostone .5% contract Ateneo SDC-AVR/Irwin theater

2,377,953.60

2,377,953.60

9,727.99

8,794.06

Ateneo Rockwell

1,583,082.14

1,169,536.57

125,712.45

4,784.47

4,784.47

Ateneo Salcedo

1,900,000.00

1,710,000.00

190,000.00

6,995.45

6,995.45

689,600.00

122,727.27

441,490.91

777.27

RSTI

TOTAL Less :w/h tax on commission Total

P/

Less :10% reserved fund Net Commission

P/

Essel Commission

Collected

Ateneo SDC-AVR/Irwin theater

2,377,953.60

2,377,953.60

Ateneo Rockwell

1,583,082.14

1,169,536.57

Ateneo Salcedo

1,900,000.00

1,710,000.00

689,600.00

122,727.27

RSTI

2% contract

COM received

38,911.97

35,176.23

125,712.45

19,137.87

19,137.87

190,000.00

27,981.82

27,981.82

441,490.91

2,454.55

Total

P/

Less :w/h tax on commission Total

P/

Less :10% reserved fund Net Commission MARK Commission

P/ Collected

2% contract

Total

P/

Less :w/h tax Total

P/

Less :10% reserved fund Net Commission

P/

TOTAL COMMISSION Prepared by:

Approved by:

Marilou Sanchez

G.S. Correa Commission / Incentive Less:

P/

16,744.19

Mark CA

(3,700.00)

Pmd CA

(6,219.07)

TOTAL for check preparation

Note :

6,825.12

PMD Cash Advance Balance (P/45thou-15thou-6,219.17)

23,780.83

Mark Cash Advance Balance (P/10thou-3,700.00)

6,300.00

%

46% 34%

n of Commission Essel PMD

% 39%

28% 34% 19%

n of Commission Essel PMD

% 65% 57%

n of Commission Essel PMD

% 100% 100%

n of Commission PMD

% 63% 54%

n of Commission PMD Essel

%

40% 20%

n of Commission PMD

% 50% 18%

n of Commission PMD

TOTAL 8,020.81 2,650.91 2,098.64 933.93 (0.00) 0.00 777.27 14,481.56 (1,448.16) 13,033.40 (1,303.34) 11,730.06 TOTAL 3,735.74 0.00 (0.00) 2,454.55 6,190.28 (619.03) 5,571.25 (557.13) 5,014.13 TOTAL -

-

Related Documents

Commission New
November 2019 10
Commission Plan New
April 2020 2
Commission
May 2020 24
Commission
May 2020 29
Commission
November 2019 37