Caliber Copy Paste

  • July 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Caliber Copy Paste as PDF for free.

More details

  • Words: 472
  • Pages: 7
COPY PASTE REQUIREMENTS BETWEEN DIFFERENT CALIBER PROJECTS This document details the steps to be followed to copy and paste requirements from one Caliber Project to other Caliber Project. Launch CaliberRM 2006: Start ->All Programs -> Borland CaliberRM -> CaliberRM:

1. Enter required login data on the Login Windows screen with the following information Server: User: Password:

TTCCALIB01 Your Lan ID Your Caliber password (case sensitive)

Press Logon

2. The Open Project Window will appear. From the drop down Select the project that you want to paste the data to (You must have update access for this project) and Press OK

Version#1.0

INTERNAL

Page 1 of 7

COPY PASTE REQUIREMENTS BETWEEN DIFFERENT CALIBER PROJECTS 3. The tool should open and the selected project should be visible in the Project window.

1st Instance

Launch 2nd instance of CaliberRM 2006: Start ->All Programs -> Borland CaliberRM -> CaliberRM:

4. Enter required login data on the Login Windows screen with the following information Server: User: Password: Press Logon

Version#1.0

TTCCALIB01 guest (case sensitive)

INTERNAL

Page 2 of 7

COPY PASTE REQUIREMENTS BETWEEN DIFFERENT CALIBER PROJECTS 5. The Open Project Window will appear. From the drop down Select the project that you want to copy data from and Press OK

6. The tool should open and the selected project should be visible in the Project window.

2nd Instance

Version#1.0

INTERNAL

Page 3 of 7

COPY PASTE REQUIREMENTS BETWEEN DIFFERENT CALIBER PROJECTS 7. Expand the Requirement Type from which you want to copy the requirements from the 2nd instance

8. Right Click on the selected requirement and Press Copy

Version#1.0

INTERNAL

Page 4 of 7

COPY PASTE REQUIREMENTS BETWEEN DIFFERENT CALIBER PROJECTS 9. Switch to the 1st instance, Click on the Requirement Type and select the requirement in where you want to paste data

10. Right Click on the Requirement Type, and Press Paste (Note: You will notice only Paste option when you Highlight the Requirement Type)

Version#1.0

INTERNAL

Page 5 of 7

COPY PASTE REQUIREMENTS BETWEEN DIFFERENT CALIBER PROJECTS 11. To paste a requirement as a child, Right Click on the selected requirement, Highlight on Paste and Press Paste as Child (Note: If you want the requirement to be at the high level, instead of Paste as Child, select the option Paste Above or Paste Below)

12. The Paste Options window will be displayed. (Note: This window will be displayed only if the copied requirements have child requirements underneath)

13. Select the option Paste the copied requirement and all child requirements and Press OK (Note: If you want to paste only selected requirement, not the child requirements, select the option Paste only the copied requirement and Press OK)

Version#1.0

INTERNAL

Page 6 of 7

COPY PASTE REQUIREMENTS BETWEEN DIFFERENT CALIBER PROJECTS

14. You will notice that the requirements are pasted

Version#1.0

INTERNAL

Page 7 of 7

Related Documents