BOOKING MANAGEMENT - BR/BRFS GIS PD/VD TRAINING JULY/AUGUST, 2017
AGENDA • •
Overview of Booking Management Understand the Booking Management Process
o o o o o o o o
• • •
CFT Finalizes Assortment PD Brand Likes Cost Option
GIM Publishes Planned Receipts PD-GIS Reviews and Shares with Vendor Vendor Reviews and Assigns Factory PD GIS Confirms or Flags
MST Create PO GIM Completes Size & Pack Activities
Business and System SLAs Understand the Chase & Change Process Appendix
o Tool Navigation o FAQ
2
Overview of Booking Management
PETE CAPABILITIES
PETE = Product End-to-End
Enables end-to-end activities for Planning and Merchandising
Global Assort
Global Buy Plan
Price & Event Mgmt. (PEM)
Receipt Manager (Booking Management) Ad Hoc Reporting
Data feeds across all PETE Modules
Size & Pack
Global Reforecasting*
Allocation*
In Season Pricing (PEM)*
Enables inventory optimization across channels /markets in one platform PETE is continually evolving. Updates and new functionality are released approximately every 2-4 weeks
4
SMEE CAPABILITIES
SMEE = Sourcing & Manufacturing End-to-End
Enables end-to-end sourcing activities to support Product 3.0
Fabric Management
Sample Management
Quality Assurance
PI Test & Certification
Costing Tool
Production Change Management
Responsive Management
Booking Management
WIP
Capacity Management
Optimizes collaboration among brand, GIS and vendors in one platform SMEE is continually evolving. Updates and new functionality are released approximately every 2-4 weeks
5
PETE & SMEE INTEGRATION Brand
Product End-to-End (PETE) GA
Receipt Manager
Allocation
Buy Plan
PEM
IPM
Booking
Responsive
VD
CS/PD
MST
MM
QA
Vendors/ Mills
Sourcing & Manufacturing End-to-End (SMEE) CS/ PD /VD Workspace
MST Workspace
MM/QA Workspace
Vendor/ Mill Workspace
Role-based Workspace Capacity, Booking & Responsive
Fabric Management
Sample Management
Production/WIP Management
Quality Management
Supplier Performance
Core Functional Modules
Enterprise Legacy Applications • VPS
• PLM
• TradeStone
• PROMPT/SCMS
• WMS and Logistics
Product 3.0 • Right Products
• Made Well
• Delivered
• Transformation
6
WHAT IS BOOKING MANAGEMENT SMEE Booking Management module is integrated with PETE and other systems to provide on-line platform for GIS / vendors to review and manage bookings.
PETE Receipt Manager & Global Assort
Web portal
GIS (PD)
Tradestone
RPT2.0
SMEE
CPT
Booking Management
Prompt/SCMS
Brands
GIS (VD) GIS (MST)
Web portal
Vendors 7
WHAT ARE WE SOLVING FOR?
Challenge: As we Booking Management become increasingly will help address these responsive, it our is harder challenges for crossfunctional to manage teams, against all of MST-GIS: whom play a critical role tight booking timelines owns in thetobooking process track receipts creating the and PO that change over time
PD-Brand: owns finalizing costing
PD-GIS: ensures planning intent can be executed by vendors
8
BENEFITS Financial Control Places financial control with the Global Planning team. Receipts are made visible to all business partners when Global Planning chooses to do so
Single Source of Truth Reduces errors through a single source of truth that will increase the speed and efficiency of the booking process
Integration Connected to other PETE modules and GIS systems with plans to extend into order systems (e.g., PROMPT, SCMS), as well
Visibility
Benefits
Includes a reporting solution that aggregates data from a number of different sources (e.g., Buy Plan, Size and Pack, Order, GLV, etc.), providing greater visibility to inventory ownership at any given point in time 9
KEY DIFFERENCES TO TODAY New way of communicating planning intent
Planners have control over which receipts are published and when for partners to review
New way of evaluating draft bookings and confirming demand and supply align
PD-GIS will review the draft booking, flag if needed for brand action or confirm for order creation
New way of accessing the confirmed booking to manually create the PO
MST- GIS will only have visibility to the booking once it is confirmed
More direct communication between PD-GIS & Global Planning
PD-Brand also continues to play key role in managing costs and assessing sourcing options.
Ability to track changes to units over time
Provide full end-to-end receipt visibility, including planned units, published units, confirmed units, and booked units 10
DEFINING KEY TERMS
Receipt to Booking Life Cycle
Planned Receipt Published Receipts Draft Booking Flagged Booking Confirmed Booking
Receipt Plan in Receipt Manager, resulting from your final CP in Global Buy Plan. Includes total units and the fiscal in-DC week for the buy
Finalized receipts that are shared to business partners and downstream systems/reporting & require action (e.g., Capacity validation for RR or PO Creation at the time of a final book date)
The intersection of the planned receipt and sourcing details. Rapid Response bookings will remain in draft status (i.e., unconfirmed) until the final trigger date
Status to indicate an issue exists for the draft booking related to the receipt, sourcing details, or color
Status to indicate the draft booking can move forward with PO creation
11
ROLES & RESPONSIBILITIES All roles have critical responsibilities that impact other key business partners and our ability to achieve the ultimate goal of booking/PO creation Global Merchandising • •
Global Planning (GOP) • • •
Creates assortment Finalizes color in advance of final quantity milestones Resolves flags related to color challenges
•
•
PD-Brand
MST-GIS • •
Finalizes buy and receipt plan Publishes receipts Resolves flags related to unit challenges Owns Size & Pack
•
Reviews confirmed booking Creates PO
• •
PD-GIS • • • •
Attributes publish dates and other details in GA Finalizes sourcing details Resolves flags related to sourcing challenges
Reviews draft booking Validates capacity Shares draft booking with vendor Confirms/flags bookings Confidential
12
ROLLOUT PLAN - BR/BRFS Banana Republic
Banana Republic Factory Store
Go-live date
22 Aug 2017
3 Aug 2017
INDC cut-off
1st week of Jan 2018 and onwards - manage in SMEE
5th week of Dec 2017 and onwards – manage in SMEE
Go-live market/chann el
Retail: US/CA/JP Online: US/CA/JP/EU
Retail: US/CA/JP Online: US
Out of scope
Franchise - continue to manage via Delivery Tracker (excel)
N/A
13
END TO END PROCESS Final book1
Merchant
PD Brand
IM
PD GIS
Vendor
Brands ▪ Realize BOM CC
PETE Global Assort
Confirm booking + 1 week
PD GIS
MST
GIS/ Vendors
▪ Like cost option
Tradestone Costing
Final Book + 1 week
▪ Finalize and CP plan ▪ Publish receipts
PETE GBP /Receipt Manager
1 Refer to brand calendar for exact final book date 2 Flagged bookings for brand reference only 3 IM size & pack - 1 week from PO creation
▪ Review booking ▪ Share with vendor
SMEE Booking Mgmt
▪ Review booking ▪ Assign factory ▪ Review loading report
SMEE Booking Mgmt
▪ Flag booking ▪ Confirm booking
SMEE Booking Mgmt
▪ Review confirmed booking • Create PO3
SMEE Booking Mgmt / Prompt
Daily Box files2 14
END TO END PROCESS Final book1
Merchant
PD Brand
IM
PD GIS
Vendor
Brands ▪ Realize BOM CC
PETE Global Assort
Confirm booking + 1 week
PD GIS
MST
GIS/ Vendors
▪ Like cost option
Tradestone Costing
Final Book + 1 week
▪ Finalize and CP plan ▪ Publish receipts
PETE GBP /Receipt Manager
1 Refer to brand calendar for exact final book date 2 Flagged bookings for brand reference only 3 IM size & pack - 1 week from PO creation
▪ Review booking ▪ Share with vendor
SMEE Booking Mgmt
▪ Review booking ▪ Assign factory ▪ Review loading report
SMEE Booking Mgmt
▪ Flag booking ▪ Confirm booking
SMEE Booking Mgmt
▪ Review confirmed booking • Create PO3
SMEE Booking Mgmt / Prompt
Daily Box files2 15
PUBLISH DATES AND BOOK DATES There are multiple reasons to publish… GIS requires visibility to quantities to plan capacity before the PO needs to be created. Units required for Rapid Response confirmation Passing off final quantities for PO Creation and exercising triggers
To simplify coordination publish dates are defined separately from book dates: Publish Date
When units are shared
Book Date
When units are booked
First date GOP needs to publish receipts.
PD-GIS confirms receipts for PO creation
Attributed in GA by PDBrand.
Attributed in Prod Comments in GA.
Note: VMI and Test Receipts will not be published in Receipt Manager (Out of Scope) Confidential
16
END TO END PROCESS Final book1
Merchant
PD Brand
IM
PD GIS
Vendor
Brands ▪ Realize BOM CC
PETE Global Assort
Confirm booking + 1 week
PD GIS
MST
GIS/ Vendors
▪ Like cost option
Tradestone Costing
Final Book + 1 week
▪ Finalize and CP plan ▪ Publish receipts
PETE GBP /Receipt Manager
1 Refer to brand calendar for exact final book date 2 Flagged bookings for brand reference only 3 IM size & pack - 1 week from PO creation
▪ Review booking ▪ Share with vendor
SMEE Booking Mgmt
▪ Review booking ▪ Assign factory ▪ Review loading report
SMEE Booking Mgmt
▪ Flag booking ▪ Confirm booking
SMEE Booking Mgmt
▪ Review confirmed booking • Create PO3
SMEE Booking Mgmt / Prompt
Daily Box files2 17
PD GIS REVIEW DRAFT BOOKING Action required Use Google Chrome to access SMEE Booking Management Leverage selections on the search panel to scope bookings and click ‘Submit’ Once data loads, then leverage filters at the header to fine tune data set to manage Production Comments from GA will be available in SMEE. Prior to that, the production comments are included in the PDS report -
18
PD GIS REVIEW DRAFT BOOKING Best practice / notes The source of Category/Sub Category/Item Type is Tradestone These selections are mandatory in the search panel: (1) Planning Period or INDC Date [max. 180 days] (2) Brand
* Planning Period (Season) is based on season mapping between Global Assort and Tradestone for costing purpose. To ensure you do not miss any bookings, you may search by INDC date range and leave Planning Period blank. * If you wish to search for “incomplete” bookings as well, please leave Category blank
If the booking status is “incomplete”, it means (1) BOM CC is not realized in PETE GA; or (2) there’s no Liked cost option in Tradestone; or (3) both. Incomplete bookings (along with Flagged bookings) will be auto shared at box.com for Brand follow-up, until an automated approach is available in PETE. The box file is read only. Incomplete bookings can NOT be shared with vendor (as sourcing information such as Category & vendor is missing)
19
PD GIS REVIEW DRAFT BOOKING Best practice / notes Multiple cost options - If there’s “Y” under “Multi Cost” column, it means there’re more than one liked cost options which could occur due to: Late booking/ chase by market/ channel with cost variance: Same style same color, April needs (by sea), May ( by air)
PD GIS need to select the right liked cost option from a dropdown list
20
PD GIS REVIEW DRAFT BOOKING Best practice / notes Multiple cost options - PD GIS need to select the right liked cost option from a dropdown list
“Y” under the Multi Cost column indicates there’re more than one cost option. Click on “Y” to review details
All “liked” cost options are displayed on the pop up screen. Check the box of the correct cost option and click Save.
21
PD GIS SHARE DRAFT BOOKING WITH VENDOR Action required Filter booking status to “Published to PD” Input additional information into GIS-Vendor Comments column for vendor reference (e.g. book greige only)
Select draft bookings to be shared and click the “Share with Vendor” button
Best practice / notes The “Share with Vendor” action applies only to selected bookings on the current page. Leverage the number of styles to be displayed per page to minimize number of pages, as illustrated below OK to share with multiple vendors at once (each vendor can only review its own bookings), or filter by vendor before sharing Once a booking is shared with vendor, all subsequent changes will be visible on vendor workspace automatically When booking status is “Shared with Vendor”, PD GIS is not able to Flag or Confirm, until it’s submitted by vendor and booking status is changed to “Updated by Vendor”.
22
END TO END PROCESS Final book1
Merchant
PD Brand
IM
PD GIS
Vendor
Brands ▪ Realize BOM CC
PETE Global Assort
Confirm booking + 1 week
PD GIS
MST
GIS/ Vendors
▪ Like cost option
Tradestone Costing
Final Book + 1 week
▪ Finalize and CP plan ▪ Publish receipts
PETE GBP /Receipt Manager
1 Refer to brand calendar for exact final book date 2 Flagged bookings for brand reference only 3 IM size & pack - 1 week from PO creation
▪ Review booking ▪ Share with vendor
SMEE Booking Mgmt
▪ Review booking ▪ Assign factory ▪ Review loading report
SMEE Booking Mgmt
▪ Flag booking ▪ Confirm booking
SMEE Booking Mgmt
▪ Review confirmed booking • Create PO3
SMEE Booking Mgmt / Prompt
Daily Box files2 23
VENDOR REVIEW DRAFT BOOKING Action required Use Google Chrome to access SMEE Booking Management Leverage selections on the search panel to scope bookings and click ‘Submit’ Once data loads, then leverage filters at the header to fine tune data set to manage Refer to GIS-Vendor Comments column for additional information from GIS (e.g. book greige only) Input additional information into GIS-Vendor Comments column for GIS reference (e.g. incorrect first cost) Click the “Save” button for internal review
Best practice / notes Do NOT delete or overwrite information input by GIS when entering comments in the GIS-Vendor Comments column If COO is incorrect, it can NOT be updated in Booking Management. Please work with PD GIS to update in Tradestone Costing, which will then reflect in Booking Management.
“Save” will NOT change the booking status
24
VENDOR ASSIGN FACTORY Action required Filter booking status to “Shared with Vendor” Select draft bookings from the same COO Use the mass update function at the header to select a factory from the dropdown list Click the “Save” button for internal review
Best practice / notes The source of factory is Vendor Profile System (VPS). If a new factory needs to be added, please work with PD GIS to add
into VPS first, which will then be available in Booking Management for selection The list of factories available for selection is based on COO. i.e. if COO is X, user is only able to select a factory from the country of X Factory will be auto populated if there’s only one factory from a specific COO
Vendor is able to assign factory at Style, or CC, or booking level Factory assigned by vendor can be over-written by PD GIS. Vendor is able to review the revised factory real time. Vendor is able to review the capacity loading report at factory level once the factory allocation is saved 25
VENDOR UPDATE SPECIAL CONSTRAINTS Action required Filter booking status to “Shared with Vendor” Select draft bookings at style or cc level Use the mass update function at the header to update special constraints Click the “Save” button for internal review
Best practice / notes Special constraints include: Embroidery, Garment Dye, Garment Wash, Print and Yarn Dye
The purpose of updating special constraints is to enable visibility of capacity loading and mitigate delivery risk Special constraints need to be updated if and only if there’s a capacity constraint (bottleneck), which has been indicated by vendor in the Capacity Planning Tool Vendor is able to review the special constraints loading report once the input is saved
26
VENDOR SUBMIT TO GIS Action required Filter booking status to “Shared with Vendor” Select draft bookings to be submitted Click the “Submit to GIS” button
Best practice / notes Before submitting to GIS, review capacity loading report and special constraints report and ensure capacity issue has been addressed (e.g. increase offer capacity, re-assign factory, etc)
The booking is read only for vendor once it’s submitted If factory needs to be updated, vendor need to contact PD GIS to share the booking again, i.e. booking status becomes Shared with Vendor Factory allocation is mandatory. Without factory allocation, vendor is not able to submit to GIS
Generally vendor need to assign factory and submit to GIS within 1 - 2 days. (3 - 5 days if there’re capacity issues)
27
END TO END PROCESS Final book1
Merchant
PD Brand
IM
PD GIS
Vendor
Brands ▪ Realize BOM CC
PETE Global Assort
Confirm booking + 1 week
PD GIS
MST
GIS/ Vendors
▪ Like cost option
Tradestone Costing
Final Book + 1 week
▪ Finalize and CP plan ▪ Publish receipts
PETE GBP /Receipt Manager
1 Refer to brand calendar for exact final book date 2 Flagged bookings for brand reference only 3 IM size & pack - 1 week from PO creation
▪ Review booking ▪ Share with vendor
SMEE Booking Mgmt
▪ Review booking ▪ Assign factory ▪ Review loading report
SMEE Booking Mgmt
▪ Flag booking ▪ Confirm booking
SMEE Booking Mgmt Daily Box files2
▪ Review confirmed booking • Create PO3
SMEE Booking Mgmt / Prompt
28
PD GIS FLAG DRAFT BOOKING Action required Select draft bookings to be flagged Use the mass update function at the header to select one or multiple Flag Reason Code Input additional information into GIS-Brand Comments column for PD Brand/Merchant/IM review Click the “Flag” button
Best practice / notes Flagged booking (along with incomplete booking) with GIS-Brand comments will be shared at box.com for Brand follow-up, until an automated approach is available in PETE. The box file is read only.
Flagged booking will be un-flagged automatically and changed back to “Published to PD” once the corresponding issue has been resolved. Flagged booking can be confirmed by PD GIS if (1) it’s flagged accidentally; (2) PO needs to be created while the issue is being resolved with Brand. Flag reason codes will remain if a flagged booking is confirmed.
User can leverage the functionality of Check Production MOQ to filter bookings below MOQ. This functionality will be further enhanced; it has certain limitations as listed below: It checks style level production MOQ only (no MCQ checking) Not all markets/channels are on board (e.g. Franchise will continue to use Delivery Tracker)
29
FLAGS WILL BE RESOLVED BY CFT WITHIN ONE DAY #
Flag Reason Code
1 2
Incomplete Color
3 4 5 6 7
Incomplete Sourcing
8
Cost not Final
9
Inaccurate Sourcing
10
Use Case
Flag by
Booking Status
BOM CC TBD or missing Color TBD Fabric description TBD (RD# and details mentioned in merch comments column instead) Mill details TBD Vendor TBD COO; Transfer Point TBD Cost TBD Cost is not final according to offline discussion (Cost discrepancies) Cost is inaccurate
System PD-GIS
Incomplete Flagged
PD-GIS
Flagged
PD-GIS System System System
Flagged Incomplete Incomplete Incomplete
PD-GIS
Flagged
PD-GIS
Flagged
Incorrect COO
PD-GIS
Flagged
11
Units Change (incl Units change required (e.g. MOQ/MCQ) due to MOQ/MCQ)
PD-GIS
Flagged
12
INDC Change (incl - INDC change required Split Shipment) - Split shipment required
PD-GIS
Flagged
Accountable by Merchant
Resolution GM realizes color in Global Assort PD-Brand updates in PLM and reconfirms cost option in Tradestone
PD Brand PD-Brand confirms/reconfirms cost in Tradestone
PD Brand (will involve IM as needed)
PD-Brand reviews and communicates action required to GIM. PD-Brand confirms new cost in Tradestone, if needed 30
PD GIS FLAG DRAFT BOOKING - SUPPLEMENT WITH COMMENTS Flag Reason Code Cost not final Cost not final
Inaccurate sourcing INDC Change (incl Split Shipment) Units Change (incl MOQ/MCQ) Incomplete color Incomplete sourcing
Comments Examples Final FC cost should be $$ as per promoted cost option with fabric RD#12345. Please refer to email from XXX dated YYY with subject line “ZZZ” Revised RFQ promoted for MCQ upcharge. Incorrect cost option liked. Vendor should be xxx and FC should be $$ with cost option desc XXX. Please refer to email dated xx/xx Need split delivery due to vendor capacity: 10/15 INDC 2000 units 10/31 INDC 2000 units for details, please refer to email dated XXX. Need to meet MCQ 1000 units. This booking is auto-flagged because of the lack of realized CC for the booking * This booking is auto-flagged because of missing a liked-cost for the style cc *
* This is a generic comments and it’s auto populated
31
FLAGGED - AND INCOMPLETE - BOOKING WILL BE SHARED AT BOX •
Department MENS DENIM MENS DENIM MENS DENIM MENS DENIM MENS KNITS MENS KNITS MENS KNITS MENS KNITS MENS KNITS MENS KNITS MENS KNITS MENS KNITS
Market Canada Europe Japan USA Canada Canada Europe Europe Japan Japan USA USA
Channel Flagged Incomplete Grand Total RETAIL 101 10 111 RETAIL 130 130 RETAIL 103 9 112 RETAIL 128 5 133 ONLINE 51 51 RETAIL 21 21 ONLINE 54 54 RETAIL 11 11 ONLINE 61 61 RETAIL 24 24 ONLINE 61 61 RETAIL 7 7
Each zipped file contains two CSV files: one is the list of incomplete and flagged bookings with comments; one is the summary table by Dept/Market/Channel
PD-Brand and GM are expected to access the Box file every morning in the two weeks following a Book Date o If Global IM input or action is needed (e.g., Capacity issue with an implication on Units), PD-Brand is expected to engage GIM o Global IM will have visibility to flags within the Booking UI and is not expected to access the file on a daily basis
•
The Box file will be saved by Division within the below folder: o ? • The same file will be updated daily at 7:45pm HK time (i.e., there will not be a daily history of flags - once a flag is resolved, it will drop from the file the next day) • The file is read only • Communicate offline if a flag needs to be clarified 32
PD GIS CONFIRM DRAFT BOOKING Action required Select draft bookings to be confirmed Ensure factory has been allocated Use the mass update function at the header to input Agent Dept Code and Corp Dept Code Click the “Confirm” button
Best practice / notes Confirm booking only when PO needs to be created
Factory* / Corp Dept Code / Agent Dept Code are mandatory fields before a booking can be confirmed Confirmed booking will show up on MST & Vendor workspace real time No un-confirm or recall function; communicate offline to MST and other stakeholders if a booking is confirmed accidentally. Confirm all CCs under the same style with the same receipt week at the same time to make sure we don’t inadvertently
create more POs than necessary.
* Factory is auto-populated if there’s only one factory for the vendor-COO. Both PD GIS and vendor can assign factory; PD GIS can over-write vendor’s factory allocation.
33
PD GIS CONFIRM DRAFT BOOKING Best practice / notes (cont.) Monthly Book / RR: the MB and RR attributes and trigger dates will flow from RPT2.0 to Booking Management. MB and RR bookings can only be confirmed on or after final trigger date. Share projection with vendors prior to final trigger date.
Upon PD Brand nomination in RPT2.0, Responsive Capability Type and Trigger will be displayed in Booking Mgmt
Once PD GIS provides trigger dates in RPT2.0, the trigger dates will be displayed in Booking Mgmt
34
TOOL DEMO Final book1
Merchant
PD Brand
IM
PD GIS
Vendor
Brands ▪ Realize BOM CC
PETE Global Assort
▪ Like cost option
Tradestone Costing
1 Refer to brand calendar for exact final book date 2 Flagged bookings for brand reference only 3 IM size & pack - 1 week from PO creation
Final Book + 1 week
Confirm booking + 1 week
PD GIS
MST
GIS/ Vendors ▪ Publish receipts
PETE Receipt Manager
▪ Review booking ▪ Share with vendor
SMEE Booking Mgmt
▪ Review booking ▪ Assign factory ▪ Review loading report
SMEE Booking Mgmt
▪ Flag booking ▪ Confirm booking
SMEE Booking Mgmt
▪ Review confirmed booking • Create PO3
SMEE Booking Mgmt / Prompt
Daily Box files2 35
BOOKING CONFIRMATION - FROM PD TO MST •
PD to leverage Booking Management Tool to confirm bookings to MST o NO email request is required to be sent to MST Mailbox for PO Creation Confirm Booking
36
BOOKING CONFIRMATION - FROM PD TO MST Contd. •
Prior to confirming bookings to MST, PD needs to ensure below checklist is followed: •
Vendor has reviewed and completed their respective detail(s) - like Factory
• Mandatory information required to create POs are complete and accurate in the tool o Enclosed is the list of mandatory fields o If any of the fields are not accurate, update Trade Stone as applicable or work with NY PD / IM / Merchants to get the same fixed
37
KEY CALLOUTS •
PO# would be auto populated (in Near Real Time) on the Booking Management Tool (BMT) itself. MST would NOT send any email confirmation stating closure / PO#s
•
TnR PO Creation would NOT follow BMT process; this needs to follow AS IS process (requesting via Mailbox)
•
Franchise PO Creation would NOT follow BMT process; this needs to follow AS IS process
38
UN-CONFIRM BOOKING In cases of exception, where booking has been confirmed to MST but now needs to unconfirmed (either Cancel or Hold), needs to be managed as an offline process outside the BMT •
PD to extract excel from BMT with ONLY those Styles CCs / Receipts that need to be held up for PO creation o The original format needs to be maintained and NO filters need to be applied
•
Cadence should be within 1 working day
•
PD would need to communicate this over the email (as BMT does not support any unconfirm use case). Email needs to be sent to
[email protected]
•
Subject line of email – BOOKING MANAGEMENT – HOLD PO CREATION
•
Other than HOLD / Cancel requests, NO offline emails need to be sent to MST
39
Looking Ahead
WHAT’S COMING? Systemic Visibility to Attributes & Milestone Dates
Change Log Integration ▪ Enabling the brand to request a change in their native tools (e.g., Buy Plan for Planning) and to route that to functional leadership and GIS for approval. Upon approval, system executes the change ▪ Locking mechanism ▪ Chase attribution
Order Automation ▪ Once a booking is confirmed, the order is auto created. Includes the ability to automatically update a PO if changes are made
Booking Management will be continually enhanced with additional functionality over the next few seasons
▪ Early Book and Critical style attribution ▪ Providing visibility to ALL book dates and other sourcing milestone dates (e.g., fabric dyed, tickets printed) systemically to help manage workflow
Cross-functional, cross-tool Collaboration ▪ The ability to support in-app communication (e.g. flagging) across different functions (e.g., Global Planning and GIS) 41
SMEE BOOKING MANAGEMENT ROADMAP Process & System Enhancements • MST task manager & issue resolution capabilities and streamlined processes • Flagging code and process improvement - make reason codes more specific to drive efficient resolution (e.g. link to cost option status to differentiate accountable party) • Incomplete booking - Brand leverage reporting prior to final book to resolve outstanding issues and minimize incomplete bookings • Notification at different workflow stages and key events (e.g., multiple costs, PO creation, etc.) • Workflow enhancement - e.g. recall sharing with vendor
SPR18 (end Aug)
SUM18
FY18
Process & System Enhancements
Process & System Enhancements
• Attribution - provide visibility for Fast Track/Placeholder on UI and exclude from list of incomplete bookings at box • Flagging code and process improvement - split Unit change and INDC change • Visibility of re-publish status post confirmation • Adoption of PCL by brand and auto-confirm capability (TBC) • Link PO# to both confirmed & non-confirmed booking • Add ship cancel date • Remove confirmation validation for 0 unit receipts • Reporting - compare re-confirmed vs confirmed booking to facilitate PO update by MST
• Publish Gate: receipt can only be published when BOM CC is realized AND cost option is liked. i.e. block publishing of “incomplete” booking. • Publish Locking: receipt can only be re-published post the blackout period AND post approval via PCL • Auto-republish and auto-confirm: post approval via PCL, receipt is auto-republished in Receipt Manager and auto-confirmed in SMEE Booking Management 42
SLA’s
BUSINESS SLA Brand and GIS have pre-established SLAs for all Booking activities Scenario
IM publishes
Days
0
GIS-PD checks for complete/a ccurate info
GIS-PD flags for color/cost 1
GP/GM resolves flag
GIS-PD validates capacity
1
GIS-PD flags for units 1-3*
Task
Timeline - BRFS
Timeline - BR
Owner
Final book received via SMEE
8/04 Asia time
8/23 Asia time
IM
CFT resolves flag
GIS-PD confirms
1
1
Remarks
Review bookings - confirm or raise flags where applicable
8/04 to 8/11
8/23 to 8/30
GIS PD
Applicable for "complete" bookings only . GIS PD will not be reviewing "incomplete” bookings
Resolve Flags
8/04 to 8/11
8/23 to 8/30
Brand CFT
Flag resolution SLA is 1 day
All bookings to be confirmed in SMEE
No later than 8/11
No later than 8/30
GIS PD
Create POs
8/14 to 8/18
8/31 to 9/07
MST
Size/Pack PO
8/21 to 8/25
9/07 to 9/14
IM
This is dependent on Brand CFT resolving flags within 1 day SLA . This activity will be delayed if flags are not resolved within SLA *Applicable for only those bookings which are confirmed by GIS PD in SMEE
* No change to RR SLA’s, i.e. 1 working day for Booking confirmation by PD GIS, 1 working day for PO creation by MST and 1 working day for Size & Pack by IM
44
SYSTEM SLA SLA’s for step execution include… Activity
SLA
Time for a liked cost to be recognized by PD Screen
Near real time
Publishing Receipts from Receipt Manager to be viewed in PD Screen
Near real time
Shared Receipts from PD Screen to Vendor Screen
Immediate
Confirmed Receipts from PD Screen to Vendor/MST Screen
Immediate
MB/RR attribute and trigger date from RPT2.0 to Booking Management
Near real time
GIS flags or confirmed receipts in PD Screen to be visible in Receipt Manager
Near real time
If Order is created, time for Order to be visible in Receipt Manager UI and Booking Management
Near real time
45
Chase & Change Management
CHASE & CHANGE MANAGEMENT As is… Type of changes
BR
BRFS
Receipt changes
SMEE-PCL
Offline/email
Product changes
Merch change log
Offline/email
Vendor changes
SMEE-PCL
Submit in WIP Approve offline/email
To be…
Add “post-confirm” to booking status when the booking is republished post confirmation Integrate SMEE-PCL with Booking Management and enable autoconfirmation More details to be communicated separately 47
Change Indicator and Notifications
CHANGE INDICATOR IN BOOKING MANAGEMENT
Post 6/2 change can be initiated via the change process
49
CHANGE INDICATOR - SCOPE Changes captured in the change indicator
Changes NOT captured in the change indicator (will be reflected in a new booking)
Order units
INDC
First cost
Market
Color code
Channel
Color description
Vendor
Color comment
COO Change Cancel / Cut Chase
CC drop/CC re-activate Ship Mode Responsive Capability Type
Booking status ELC * Transfer point * Terms of sale *
Pack factor * Duty rate *
* Change history will display “Other Sourcing attribute”
50
CHANGE NOTIFICATIONS User can subscribe for notification which will reflect on SMEE homepage. User can also choose to receive notifications by email (optional)
Notification by email: One email per day sent at 09:30am Hong Kong time Detailed bookings based on subscription criteria will be listed in email body, and can be copied and
pasted to excel
Notification on SMEE homepage: Daily refreshed at 09:30am Hong Kong time
Changes of the last 24 hours are captured Notifications can be set up at Brand/Division/Department/Vendor/Category level 51
CHANGE NOTIFICATIONS - SUBSCRIBE Click on user name and then on “My Subscription”
Based on user profile from HR. Not-editable
Subscribe daily email
Subscribe daily email
Define subscription criteria: 1. Select “Daily Email” to receive daily summary email. 2. Click “+Add” to add additional row Click on “Save” to make notification set-up effective 52
CHANGE NOTIFICATIONS - ON SMEE HOMEPAGE
53
CHANGE NOTIFICATIONS - BY EMAIL
54
Tool Navigation - Booking Management (as attached)
Confidential
FAQ - Booking Management (as attached)
Available on SMEE homepage
Confidential
End of Document