REKAPITULASI KEGIATAN Kegiatan Lokasi

: REHABILITASI BANGUNAN KANTOR UNIT PENYELENGGARA PELABUHAN KELAS I TANJUNG LAUT BONTANG : Kota Bontang

Tahun

: 2018

NO

URAIAN PEKERJAAN

A

PELAKSANA / FISIK

B

PENGAWASAN

JUMLAH BIAYA

1,050,000,000.00

50,000,000.00

a.

JUMLAH KEGIATAN TERMASUK PAJAK

1,100,000,000.00

b.

PEMBULATAN

1,100,000,000.00

TERBILANG : SATU MILYAR SERATUS JUTA RUPIAH

REKAPITULASI RENCANA ANGGARAN BIAYA (RAB) Kegiatan Lokasi

: REHABILITASI BANGUNAN KANTOR UNIT PENYELENGGARA PELABUHAN KELAS I TANJUNG LAUT BONTANG : Kota Bontang

Tahun

: 2018

NO

URAIAN PEKERJAAN

JUMLAH BIAYA

A

PEKERJAAN PENDAHULUAN

5,500,000.00

B

PEKERJAAN TANAH & PONDASI

C

PEKERJAAN BETON

152,738,229.06

D

PEKERJAAN DINDING

116,276,474.19

E

PEKERJAAN ATAP

F

PEKERJAAN PLAFOND

G

PEK. KUSEN, PINTU, JENDELA & PENGGANTUNG

H

PEK. PENUTUP LANTAI

I

PEKERJAAN INSTALASI LISTRIK

72,483,800.00

J

PEKERJAAN CAT-CATAN DAN ASSESORIS

47,285,891.60

K

PEKERJAAN LAIN LAIN

36,221,842.15

97,399,231.50

103,856,836.95

91,790,968.75

137,886,672.68

100,388,678.61

a.

JUMLAH PEKERJAAN FISIK TERMASUK PAJAK

961,828,625.49

b.

PPN 10%

c.

TOTAL

1,058,011,488.04

b.

PEMBULATAN

1,050,000,000.00

96,182,862.55

TERBILANG : SATU MILYAR LIMA PULUH JUTA RUPIAH

RENCANA ANGGARAN BIAYA (RAB)

NO

PEMBANGUNAN RUMAH DINAS ESELON II, III Dan PREASARANA LINGKUNGNA

Pekerjaan Lokasi

:

Tahun

: 2015

Instansi

: Kementrian Keuangan Republik Indonesia

: Kota Samarinda

URAIAN PEKERJAAN

Notasi

VOLUME/ SATUAN

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

PENINGGIAN LAHAN KOMPLEKS, PEMB JALAN LINGKUNGAN DAN LAND SCAPING JL.A.W. SYAHRNI A

PEKERJAAN TANAH 1

Urugan Tanah

AN.01.d

860.08 M3

282,000.00

2

Memadatkan Urugan

AN.01.e

860.08 M3

282,000.00

Sub Total A B

242,542,560.00 242,542,560.00 485,085,120.00

PEKERJAAN LANTAI 1

Lantai Paving Blok segi Enam

AN.08.n

190.58 M2

307,835.00

58,667,194.30

2

Pasir Urug Bawah Paving

AN.01.b

3

7.62 M

277,800.00

2,117,724.96

3

Pasir urug Halaman Rumah T = 5cm

AN.01.b

2.08 M3

277,800.00

576,435.00

4

Cor Rabat Halaman Rumah T = 5cm

AN.04.a

2.08 M3

1,361,800.00

2,825,735.00

5

Rolag Bata (Parit) Halaman Rumah

AN.02.c

33.40 M3

180,534.63

6,029,856.53

6

Cor Rabat Jalan Taman T = 5cm

AN.04.a

1.34 M3

1,361,800.00

1,824,812.00

7

Batu Sikat Jalan Taman

AN.08.j

26.80 M2

570,000.00

15,276,000.00

Sub Total B C

87,317,757.79

PEKERJAAN BETON 1

Sloof beton 15/20

M'

Pembesian

AN.04.c1

193.05 kg

Beton 1:2:3

#N/A

#N/A

AN.04.k

3.30 M3

222,659.25

734,975.92

Begisting Sloof

AN.04.e

43.51 M2

49,570.00

2,156,889.84

Sub Total C D

#N/A

PEKERJAAN DINDING (Pot Taman) 1

Pas. Dinding bata merah 1 : 4

AN.05.b

40.18 M2

161,194.25

6,476,784.97

2

Plesteran 1 : 4

AN.05.d

28.70 M2

86,907.00

2,494,230.90

3

Acian

4

Pas batu Alam

AN.05.e

2

28.70 M

48,300.00

1,386,210.00

AN.08.f

28.70 M2

468,325.00

13,440,927.50

Sub Total D E

23,798,153.37

SANITAIR 1

BAK Kontrol Halaman Rumah

Up-LL - 11

2

Pipa Air Limbah Lingkungan rumah Ø 4'

AN.09.c

1.00 Unit 33.30 M'

900,000.00 148,902.75

Sub Total E F

900,000.00 4,958,461.58 5,858,461.58

LAIN - LAIN 1

tanaman Pisang - pisang + sampai tumbuh

AN.14.s

81.00 Polibag

61,185.00

4,955,985.00

2

Tanaman Airis + Sampai Tumbuh

AN.14.r

162.00 Polibag

31,185.00

5,051,970.00

3

Pupuk Kompos

AN.14.a

13.55 M2

18,750.00

254,141.25

4

Rumput Gajah Mini

AN.14.b

87.92 M2

68,265.00

6,001,858.80

Sub Total F

16,263,955.05

JUMLAH

#N/A

PPN 10%

#N/A

JUMLAH TOTAL

#N/A

PEMBULATAN

#N/A

RENCANA ANGGARAN BIAYA (RAB)

NO

PEMBANGUNAN RUMAH DINAS ESELON II, III Dan PREASARANA LINGKUNGNA

Pekerjaan Lokasi

:

Tahun

: 2015

Instansi

: Kementrian Keuangan Republik Indonesia

: Kota Samarinda

URAIAN PEKERJAAN

Notasi

VOLUME/ SATUAN

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

PEMBANGUNAN PAGAR KELILING RUMAG DINAS TYPE 70 A

PEKERJAAN TANAH & PONDASI 1

Galian Tanah

AN.01.a

12.66 M3

94,500.00

1,195,992.00

2

Pancang/ Cerucuk ulin 10/10 x 3M (lokal)

AN.03.b

95.00 Ttk

213,075.00

20,242,125.00

3

Pondasi batu gunung

AN.02.b

140.24 M3

1,759,775.00

246,792,781.75

Sub Total A

268,230,898.75

B

PEK. SANITAIR 1

C

Pemasangan pipa air Ø2'

AN.09.l

28.00 m'

1,952,990.00

54,683,720.00

Sub Total B

54,683,720.00

PEKERJAAN BETON 1

2

3

4

D

Sloof beton 13/13

M'

Pembesian

AN.04.c1

222.87 kg

Beton Cam 1:2:3

#N/A

#N/A

AN.04.k

1.38 M3

222,659.25

306,717.35

Begisting Sloof

AN.04.e

21.19 M2

49,570.00

1,050,517.18

Balok Latai 13/13

M'

Pembesian

AN.04.c1

320.59 kg

#N/A

#N/A

Beton Cam 1:2:3

AN.04.k

2.00 M3

222,659.25

445,908.55

Begisting Balok

AN.04.i

30.49 M2

235,811.75

7,188,721.20

Kolom beton 25/50

M'

Pembesian

AN.04.c1

111.53 kg

Beton Cam 1:2:3

#N/A

#N/A

AN.04.k

3.50 M3

222,659.25

779,307.38

Begisting Kolom

AN.04.f

31.50 M2

#N/A

#N/A

Kolom Beton KP

M'

Pembesian

AN.04.c1

227.23 kg

#N/A

#N/A

Beton Cam 1:2:3

AN.04.k

1.09 M3

222,659.25

242,709.72

Begisting Kolom

AN.04.f

16.77 M2

#N/A

#N/A

Sub Total C

#N/A

PEKERJAAN DINDING 1

Pas. Dinding bata merah 1 : 4

AN.05.b

238.81 M2

161,194.25

38,495,475.86

2

Plesteran 1 : 4

AN.05.d

339.63 M2

86,907.00

29,516,085.36

3

Acian

AN.05.e

381.63 M2

48,300.00

18,432,651.72

4

Pas batu Alam

AN.08.f

91.15 M2

468,325.00

42,687,823.75

Sub Total D

129,132,036.69

E

PEKERJAAN CAT 1

F

Pengecatan Dinding Luar

AN.13.b

381.63 M2

51,960.00

19,829,411.66

Sub Total E

19,829,411.66

1,350,000.00

16,200,000.00

LAIN - LAIN 1

Pagar Geser

Up-LL - 13

12.00 M2

2

Hollow Galvanis

Up-LL - 14

21.24 M

2

900,000.00

19,116,000.00

Sub Total F

35,316,000.00

RENCANA ANGGARAN BIAYA (RAB)

NO

PEMBANGUNAN RUMAH DINAS ESELON II, III Dan PREASARANA LINGKUNGNA

Pekerjaan Lokasi

:

Tahun

: 2015

Instansi

: Kementrian Keuangan Republik Indonesia

: Kota Samarinda

URAIAN PEKERJAAN

G

Notasi

VOLUME/ SATUAN

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

PEKERJAAN PAPAN NAMA 1

Pas. Dinding bata merah 1 : 4

AN.05.b

9.90 M2

161,194.25

1,595,823.08

2

Plesteran 1 : 4

AN.05.d

2

4.49 M

86,907.00

390,212.43

3

Acian

AN.05.e

4.49 M2

48,300.00

216,867.00

4

Pas batu Alam

AN.08.f

8.38 M2

468,325.00

3,924,563.50

5

Poer Plat AN.04.c1

1.07 kg

#N/A

#N/A

Beton Cam 1:2:3

AN.04.k

0.08 M3

222,659.25

16,699.44

Begisting pondasi

AN.04.f

0.15 M2

117,870.00

17,680.50

Pembesian

6

M'

Kolom beton 15/15

M'

Pembesian

AN.04.c1

103.65 kg

#N/A

#N/A

Beton Cam 1:2:3

AN.04.k

0.72 M3

222,659.25

160,314.66

Begisting Kolom

AN.04.f

21.12 M2

#N/A

#N/A

7

Plat Papan Nama + Rangka

Up-LL - 17

1.74 M2

1,200,000.00

2,088,000.00

8

Tulisan Papan Nama Plat Besi

Up-LL - 15

1.00 Unit

7,500,000.00

7,500,000.00

9

Pohon Taman dan Pagar Pohon Glodokan Tiang + Sampai Tumbuh

AN.14.p

5.00 Phn

323,685.00

1,618,425.00

Pohon Pucuk Merah + Sampai Tumbuh

AN.14.i

2.00 Phn

196,185.00

392,370.00

Pohon Ketapang kencana+ Sampai Tumbuh

AN.14.q

3.00 Phn

323,685.00

971,055.00

Bunga Lamtana + Sampai Tumbuh

AN.14.u

186.00 Polibag

81,060.00

15,077,160.00

Tanah Urug

AN.01.d

2.00 M3

282,000.00

564,000.00

Top Soil

Up-V -2

0.53 M3

180,000.00

95,400.00

Sub Total F

#N/A

JUMLAH

#N/A

PPN 10%

#N/A

JUMLAH TOTAL

#N/A

PEMBULATAN

#N/A

RENCANA ANGGARAN BIAYA (RAB)

NO

Kegiatan

: REHABILITASI BANGUNAN KANTOR UNIT PENYELENGGARA PELABUHAN KELAS I TANJUNG LAUT BONTANG

Lokasi

: Kota Bontang

Tahun

: 2018

URAIAN PEKERJAAN

Notasi

VOLUME/ SATUAN

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

REHABILITASI BANGUNAN A

PEKERJAAN PENDAHULUAN 1

Pekerjaan persiapan Pembersihan,Pembongkaran, Pengukuran, penyiapan lahan

1.00 Ls

5,000,000.00

5,000,000.00

Papan Nama Proyek

1.00 Bh

500,000.00

500,000.00

Sub Total A B

5,500,000.00

PEKERJAAN TANAH & PONDASI 1

Pancang Ulin 10/10 + Sunduk Kalang

AN.03.b

25.00 Titik

213,075.00

5,326,875.00

2

Galian Tanah Pondasi

AN.01.a

24.59 M3

94,500.00

2,324,133.00

3

Pondasi Batu Gunung

AN.02.b

10.16 M3

1,759,775.00

17,874,738.59

4

Tanah Urug kembali

AN.01.c

14.44 M3

31,500.00

454,752.90

5

Urugan pasir bawah lantai 7 cm

AN.01.b

7.94 M3

277,800.00

2,206,969.32

6

Cor Rabat (Rabat Bawah Lantai) 5 cm

AN.04.l

5.40 M3

1,487,610.00

8,034,373.34

Sub Total B C

36,221,842.15

PEKERJAAN BETON 1

2

3

4

Sloof 15/20 Pembesian

AN.04.d'

Beton cam 1:2:3

AN.04.m

Begisting Sloof

AN.04.g

555.59 kg

25,477.50

14,155,039.13

2.55 M3

1,700,550.00

4,336,402.50

34.00 M2

96,379.50

3,276,903.00

Kolom Beton K1

###

Pembesian

AN.04.d'

25,477.50

12,265,501.62

Beton cam 1:2:3

AN.04.m

481.42 kg 1.44 M3

1,700,550.00

2,457,209.72

Begisting Kolom

AN.04.h

44.46 M2

140,650.00

6,253,299.00

RingBalk Beton

###

Pembesian

AN.04.d'

Beton cam 1:2:3

AN.04.m

Begisting RingBalk

AN.04.i

820.96 kg

25,477.50

20,915,908.02

3.38 M3

1,700,550.00

5,747,859.00

52.00 M2

235,811.75

12,262,211.00

Balok Latai Pembesian

AN.04.d'

130.68 Kg

25,477.50

3,329,355.67

Beton cam 1:2:3

AN.04.m

0.81 M3

1,700,550.00

1,379,486.16

Begisting Balok Latai

AN.04.i

12.48 M2

235,811.75

2,942,930.64

5

6

Kanopi Pembesian

AN.04.d'

Beton cam 1:2:3

AN.04.m

Begisting Kanopi

AN.04.j

38.19 kg

25,477.50

973,041.14

0.39 M3

1,700,550.00

668,231.12

5.65 M2

267,436.75

1,509,814.17

Dak Atap Beton

###

Pembesian

AN.04.d'

Beton cam 1:2:3

AN.04.m

Begisting Dak

AN.04.j

742.86 kg

25,477.50

18,926,317.69

8.83 M3

1,700,550.00

15,013,101.61

98.44 M2

267,436.75

26,325,617.87

Sub Total C D

152,738,229.06

PEKERJAAN DINDING 1

Pas. Dinding bata merah 1 : 4

AN.05.b

266.23 M2

161,194.25

42,915,325.48

2

Plesteran 1 : 4

AN.05.d

532.47 M2

86,907.00

46,275,126.95

3

Acian

AN.05.e

560.79 M2

48,300.00

Sub Total D E

27,086,021.76 116,276,474.19

PEKERJAAN ATAP 1

Pek. Penutup atap Metal

AN.06.b

475.50 M2

191,180.00

90,906,090.00

2

pek.Nok /bubungan Atap Metal

AN.06.k

23.50 M

154,815.00

3,638,152.50

3

Listplankcalciboard 2 x 30 - rangkap 20 cm AN.06.e

42.58 M

67,050.00

Sub Total E F

2,854,989.00 97,399,231.50

PEKERJAAN PLAFOND 1

Pek. Plafond Gypsum

AN.07.b

374.42 M2

87,965.00

32,935,855.30

2

Rangka Plafond metal furring

AN.07.d

374.42 M2

145,000.00

54,290,900.00

3

pek.List plafond Gipsum

AN.07.c

273.78 M

60,742.50

16,630,081.65

Sub Total F G

103,856,836.95

PEK. KUSEN, PINTU, JENDELA & PENGGANTUNG 1

Pintu PJ1

AN.11.e

1.00 Bh

7,864,540.00

7,864,540.00

2

Pintu PJ2

AN.11.f

1.00 Bh

4,550,871.25

4,550,871.25

3

Pintu PJ3

AN.11.g

1.00 Bh

10,907,175.00

10,907,175.00

4

Pintu PJ4

AN.11.h

1.00 Bh

6,749,177.50

6,749,177.50

5

Pintu D1

AN.11.i

6.00 Bh

3,451,140.00

20,706,840.00

6

Pintu D2

AN.11.j

1.00 Bh

3,337,765.00

3,337,765.00

7

Jendela W1

AN.11.k

5.00 Bh

3,495,682.50

17,478,412.50

8

Jendela W2

AN.11.l

2.00 Bh

6,364,100.00

12,728,200.00

9

Jendela W3

AN.11.m

5.00 Bh

1,493,597.50

7,467,987.50

Sub Total G H

91,790,968.75

PEK. PENUTUP LANTAI 1

Pas. Keramik Lantai uk 60/60

AN.08.k

199.91 M2

646,631.67

129,268,944.13

2

Pas. Keramik Lantai uk 40/40

AN.08.a

17.37 M2

496,270.00

8,617,728.55

Sub Total H

137,886,672.68

I

PEKERJAAN INSTALASI LISTRIK 1

OutBow Lighting PLC 15 Watt

listrik-23

15.00 Bh

225,000.00

3,375,000.00

2

Reccessed Downlight 5 Watt Lengkap

listrik-26

55.00 Bh

195,000.00

10,725,000.00

3

Saklar tunggal

listrik-05

4.00 Bh

69,300.00

277,200.00

4

Saklar ganda

listrik-06

21.00 Bh

96,150.00

2,019,150.00

5

Stop Kontak AC

listrik-17

9.00 Bh

67,500.00

607,500.00

6

Stop Kontak

listrik-04

22.00 Bh

75,225.00

1,654,950.00

7

Titik Lampu + Instalasi

listrik-14

103.00 titik

400,000.00

41,200,000.00

8

Stop Kontak + Instalasi

listrik-14

31.00 titik

400,000.00

12,400,000.00

9

Pasang Panel box + Acc

listrik-11

1.00 Bh

225,000.00

225,000.00

Garden Light 15 Watt

listrik-29

8.00 Bh

700,000.00

5,600,000.00

10

Sub Total I J

72,483,800.00

PEKERJAAN CAT-CATAN DAN ASSESORIS 1

Cat dinding baru (Dinding Luar )

AN.13.b

186.19 M2

51,960.00

9,674,328.48

2

Cat dinding baru (Dinding Dalam )

AN.13.c

406.79 M2

48,360.00

19,672,199.98

3

Cat Plafond

AN.13.d

374.42 M2

27,987.60

10,479,117.19

4

Waterproofing

AN.13.f

88.28 M2

84,503.00

7,460,245.95

Sub Total J K

47,285,891.60

PEKERJAAN LAIN LAIN Partisi Sekat R. Kasi 1

Profil Alumunium

AN.11.q

2

Pas. Kaca Bening 5 mm

AN.11.r

3

Pas. Kaca Es 3 mm

AN.11.s

4

Double Tripleks Lapis HPL

AN.11.t

160.50 m'

471,900.00

75,739,950.00

23.44 M2

531,750.00

12,464,884.69

24.03 M2

427,800.00

10,278,108.90

5.68 M2

335,629.00

Sub Total K JUMLAH

1,905,735.02 100,388,678.61 961,828,625.49

RENCANA ANGGARAN BIAYA (RAB) Kegiatan

: REHABILITASI BANGUNAN KANTOR UNIT PENYELENGGARA PELABUHAN KELAS I TANJUNG LAUT BONTANG

Lokasi

: Kota Bontang

Tahun

: 2018

###

: #REF!

URAIAN PEKERJAAN

NO

Notasi

VOLUME/ SATUAN

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

PENINGGIAN LAHAN KOMPLEKS, PEMB JALAN LINGKUNGAN DAN LAND SCAPING JL.JUANDA

A

PEKERJAAN TANAH & PONDASI 1

Pancang/ Cerucuk ulin 10/10 x 3M (lokal)

AN.03.b

98.00 Ttk

213,075.00

20,881,350.00

2

Urugan pasir bawah lantai

AN.01.b

9.62 M3

277,800.00

2,671,715.11

3

Pondasi batu gunung

AN.02.b

3

1,759,775.00

389,345,819.31

4

Cor Rabat (Rabat Bawah Lantai)

AN.04.a

9.62 M3

1,361,800.00

13,096,982.13

5

Galian Tanah

AN.01.a

27.99 M3

94,500.00

2,645,433.00

6

Urugan Kembali

AN.01.c

4.64 M3

31,500.00

146,257.97

7

Urugan tanah

AN.01.d

#REF! M3

282,000.00

221.25 M

Sub Total A B

#REF! #REF!

PEKERJAAN BETON 1

Sloof beton 13/20

M'

Pembesian

2

AN.04.d'

Beton cam 1:3:5

AN.04.l

Begisting Sloof

AN.04.g

C

25,477.50

8,657,055.81

2.95 M3

1,487,610.00

4,384,908.99

45.35 M2

96,379.50

4,370,617.57

90.58 kg

25,477.50

2,307,846.23

2.42 M3

1,487,610.00

3,592,578.15

25.76 M2

140,650.00

3,623,144.00

Kolom beton K1

M'

Pembesian

3

339.79 kg

AN.04.d'

Beton cam 1:3:5

AN.04.l

Begisting Kolom

AN.04.h

Kolom Beton KP

M'

Pembesian

AN.04.d'

155.54 kg

25,477.50

3,962,738.23

Beton cam 1:3:5

AN.04.l

0.41 M3

1,487,610.00

603,374.62

Begisting Kolom

AN.04.h

6.24 M2

140,650.00

877,656.00

Sub Total B

32,379,919.58

PEKERJAAN DINDING 1

Pas. Dinding bata merah 1 : 4

AN.05.b

151.40 M2

161,194.25

24,404,809.45

2

Plesteran 1 : 4

AN.05.d

302.80 M2

86,907.00

26,315,439.60

3

Acian

AN.05.e

302.80 M2

48,300.00

14,625,240.00

Sub Total C

65,345,489.05

D

PEK. PENUTUP LANTAI 1

Pas Bt Alam (dinding pondasi)

AN.08.f

57.60 M2

468,325.00

26,973,646.70

2

Pas Bt Alam (Jalan masul)

AN.08.f

41.60 M2

468,325.00

19,482,320.00

3

Pas Bt Sikat

AN.08.j

93.15 M2

570,000.00

53,096,697.00

Sub Total D

99,552,663.70

E

PEK. SANITAIR 1

Pemasangan pipa air Hujan 2"

AN.09.n JUMLAH

12.00

m'

65,493.38

785,920.50

Sub Total E

785,920.50 #REF!

PPN 10%

#REF!

JUMLAH TOTAL

#REF!

PEMBULATAN

#REF!

Jenis Pekerjaan : Keramik lantai 60/60 Satuan : m2 No Panjang Lebar Titik Volume Ruang Pelayanan 1 2.97 4.09 1.00 12.15 Ruang Konsultasi 2 2.17 2.82 1.00 6.12 Ruang Tunggu 3 3.49 6.82 1.00 23.80 Ruang Staf Karyawan 4 5.51 6.43 1.00 35.42 5 4.31 6.95 1.00 29.95 6 4.27 3.27 1.00 13.96 7 1.65 4.27 1.00 7.05 8 5.69 2.53 1.00 14.40 9 5.81 3.67 1.00 21.32 10 1.41 3.03 1.00 4.27 Ruang Kepala Kantor 11 6.81 4.62 1.00 31.46 Total 199.91 Jenis Pekerjaan : Satuan : No Panjang Bagian Teras 1 3.75 2 1.50 3 1.00

Keramik lantai 40/40 m2 Lebar Titik Volume 1.00 8.08 1.50

1.00 1.00 1.00 Total

3.75 12.12 1.50 17.37

sudah ket M2 M2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m3 sudah ket M2 M2 m2 m3

Jenis Pekerjaan : Satuan : Besi Sloof Besi D

Sloof 15/20 kg,m3,m2

sudah

=

12

95.00

0.8878

Besi D

=

10

0.59

0.6165

Koefisienbesi 0.006165

a.Unit

4.00

b.Unit Total Titik

600.00 1.00

Beton 85.00

0.15 Titik

0.20 1.00

Begisting 85.00

0.40 Titik

Pembesian: Beton : Begisting : Jenis Pekerjaan : Satuan :

555.59 Kg 2.55 m3 34.00 m2 Pancang Ulin 10/10 + sunduk kalang Titik

sudah

1.00

No

Uraian Volume Ket 1 Pancang Ulin 25 Titik

Jenis Pekerjaan : Satuan : No Panjang 1 8.50 2 4.22 3 2.90 4 3.82 5 6.75 6 2.08 7 4.65 8 6.88 9 3.60 10 4.95 11 1.20

Jenis Pekerjaan : Satuan : No Uraian 2 type b 3 type c 4 type d 5 type e 6 type f 7 type g 8 type h 9 type i 10 type j 11 type k 12 type l

Galian Tanah m3 Lebar Tinggi Titik Volume 0.60 0.50 1.00 2.55 0.60 0.50 1.00 1.27 0.60 0.50 1.00 0.87 0.60 0.50 2.00 2.29 0.60 0.50 2.00 4.05 0.60 0.50 2.00 1.25 0.60 0.50 3.00 4.19 0.60 0.50 2.00 4.13 0.60 0.50 2.00 2.16 0.60 0.50 1.00 1.49 0.60 0.50 1.00 0.36 Total 24.59 18.00 Pasangan Batu Gunung m3 Panjang Lebar (atas) Lebar (bawah) Tinggi 8.50 0.20 0.40 0.60 4.22 0.20 0.40 0.60 2.90 0.20 0.40 0.60 3.82 0.20 0.40 0.60 6.75 0.20 0.40 0.60 2.08 0.20 0.40 0.60 4.65 0.20 0.40 0.60 6.88 0.20 0.40 0.60 3.60 0.20 0.40 0.60 4.95 0.20 0.40 0.60 1.20 0.20 0.40 0.60

Jenis Pekerjaan : Tanah urug kembali Satuan : m3 No Panjang 1 Galian Tanah 24.59 2 Batu Gunung 10.16

Besi D

=

10

ket m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 sudah Luas Titik Volume 1.00 0.18 1.00 0.18 1.00 0.18 1.00 0.18 1.00 0.18 1.00 0.18 1.00 0.18 2.00 0.18 1.00 0.18 1.00 0.18 1.00 0.18 Total

1.53 0.76 0.52 0.69 1.22 0.37 0.84 2.48 0.65 0.89 0.22 10.16

sudah Titik 1.00 1.00 Total

Jenis Pekerjaan : RingBalk 15/20 Satuan : kg,m3,m2 Besi Ringbalk Besi D = 12

sudah

Volume 24.59 10.16 14.44

ket m3 m3 m3 sudah

139.00

0.8878

0.59

0.6165

Koefisienbesi 0.006165

a.Unit

4.00

b.Unit Total Titik

900.00 1.00

Beton 130.00

0.13

0.20

Titik

1.00

Begisting 130.00 Pembesian: Beton : Begisting :

0.40 Titik

1.00

a.Unit

6.00

b.Unit Total Titik

52.00

820.96 Kg 3.38 m3 52.00 m2

Jenis Pekerjaan : Satuan : Dak atap 2 Besi D

Dak Atap kg,m3,m2

sudah

=

10

7.90

0.6165

Besi D

=

10

1.10

0.6165

Koefisienbesi 0.006165

1.00

Beton 0.10

0.94 Titik

7.89 1.00

Begisting 0.10

17.66 Titik

0.94

1.00 7.89

Besi D

=

10

3.62

0.6165

Besi D

=

10

1.10

0.6165

Koefisienbesi 0.006165

Titik

1.00

a.Unit

6.00

b.Unit Total Titik

24.00 1.00

Beton 0.10

3.61 Titik

0.94 1.00

Begisting 0.10

9.10 Titik

3.61 Dak atap 3 Besi D Besi D

= =

10 10

3.00 1.45

Koefisienbesi 0.006165

1.00 0.94

Titik

1.00

a.Unit

8.00

b.Unit Total Titik

20.00

0.6165 0.6165

1.00

Beton 0.10

2.95 Titik

1.30 1.00

Begisting 0.10

8.50 Titik

2.95

1.00 1.30

Titik Besi D

=

10

1.00

0.6165

Besi D

=

10

5.90

0.6165

Koefisienbesi 0.006165

1.00

a.Unit

39.00

b.Unit Total Titik

6.00 1.00

Beton 0.10

0.82 Titik

5.90 1.00

Begisting 0.10

13.44 Titik

1.00

0.82

5.90 Titik

Dak atap 4 Besi D

=

10

7.40

0.6165

Besi D

=

10

5.50

0.6165

Koefisienbesi 0.006165

1.00

a.Unit

35.00

b.Unit Total Titik

49.00 1.00

Beton 0.10

7.38 Titik

5.31 1.00

Begisting 0.10

25.38 Titik

1.00

7.38

5.31 Titik

Dak atap 5 Besi D

=

10

5.45

0.6165

Besi D

=

10

5.10

0.6165

Koefisienbesi 0.006165

1.00

a.Unit

33.00

b.Unit Total Titik

35.00 1.00

Beton 0.10

5.31 Titik

5.05 1.00

Begisting 0.10

20.72 Titik

5.31

1.00 5.05

Titik Besi D

=

10

1.50

0.6165

Besi D

=

10

2.00

0.6165

Koefisienbesi 0.006165

1.00

a.Unit

12.00

b.Unit Total Titik

10.00 1.00

Beton 0.10

1.50

1.87

Titik

1.00

Begisting 0.10

6.73 Titik

1.50 Titik Pembesian: Beton : Begisting :

742.86 Kg 8.83 m3 98.44 m2

Jenis Pekerjaan : Satuan : No Panjang 2 4.07 3 6.80 4 2.13 5 6.93 6 3.65 7 4.60

Pasir Urug Bawah Lantai m3 Lebar Tinggi Titik 2.95 0.07 3.47 0.07 2.80 0.07 4.29 0.07 1.50 0.07 6.80 0.07 Total

sudah

Jenis Pekerjaan : Satuan : No Panjang 1 4.07 2 6.80 3 2.13 4 6.93 5 3.65 6 4.60

Cor Lantai m3 Lebar Tinggi Titik Volume 2.95 0.05 1.00 0.60 3.47 0.05 1.00 1.18 2.80 0.05 1.00 0.30 4.29 0.05 1.00 1.49 1.50 0.05 1.00 0.27 6.80 0.05 1.00 1.56 Total 5.40

sudah

Jenis Pekerjaan : Satuan : No Uraian 1 type a 2 type b 3 type c 4 type d 5 e 6 f 7 g 8 h 9 i 10 j 11 k 12 l 13 m 14 n 15 o 16 p 17 q

Rangka Plafond m2 Panjang lebar 6.82 2.82 4.09 5.47 3.05 5.05 6.32 4.31 1.63 4.27 6.95 3.03 5.69 4.17 4.12 3.67 4.62

sudah

1.00 1.00 1.00 1.00 2.00 1.00

titik 3.51 2.17 2.97 4.09 1.27 3.05 5.54 2.96 4.51 3.40 4.31 1.47 2.68 2.94 4.17 5.81 6.81

Volume 0.84 1.65 0.42 2.08 0.77 2.19 7.94

luas 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

23.90 6.12 12.15 22.37 3.87 15.40 35.01 12.76 7.35 14.52 29.95 4.45 15.25 12.26 17.18 21.32 31.46

1.00 1.87

ket m3 m3 m3 m3 m3 m3 m3

ket m3 m3 m3 m3 m3 m3 m3

ket m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

1.00

18 r 19 s 20 t Calciboard 1 type a 2 type b

2.53 5.52 1.50

2.75 8.02 3.97

1.00 1.00 1.00

6.96 m2 44.27 m2 5.96 m2

1.89 2.39

1.89 5.80

1.00 1.00

3.57 m2 13.86 m2

Total Jenis Pekerjaan : Satuan : No Uraian 1 type a 2 type b 3 type c 4 type d 5 j 6 k 7 p 8 q

Plafond gypsum m2 Panjang lebar 6.82 2.82 4.09 5.47 4.27 6.95 3.67 4.62

359.96 m2 sudah

titik 3.51 2.17 2.97 4.09 3.53 4.31 5.94 6.81

luas 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Total Jenis Pekerjaan : Satuan : No Uraian 1 type a

Plafond Calciboard m2 Panjang lebar titik 1.89 1.89

23.90 6.12 12.15 22.37 15.07 29.95 21.80 31.46

162.83 m2 sudah luas 1.00

Total Jenis Pekerjaan : Satuan : No Uraian 1 type a 2 type b 3 type c 4 type d 5 j 6 k 7 p 8 q

List Plafond m Panjang 20.65 9.98 14.12 19.12 15.60 22.52 19.22 22.86

3.57 m2

titik

luas 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Jenis Pekerjaan : Balok latai 13/13 Satuan : kg,m3,m2 Besi Balok Latai Besi D = 8 =

ket 3.57 m2

sudah

Total

Besi D

ket m2 m2 m2 m2 m2 m2 m2 m2

8

20.65 9.98 14.12 19.12 15.60 22.52 19.22 22.86 144.07

ket m' m' m' m' m' m' m' m' m' sudah

50.00

0.3946

0.41

0.3946

Koefisienbesi 0.006165

a.Unit

4.00

b.Unit Total Titik

320.00 1.00

Beton 48.00

0.13 Titik

0.13 1.00

Begisting 48.00

0.26 Titik

Pembesian: Beton : Begisting : Jenis Pekerjaan : Satuan : Besi Gewel Besi D Besi D

1.00

130.68 Kg 0.81 m3 12.48 m2 Balok Gewel 11/11 kg,m3,m2

Tidak ada kerjaan

=

8

107.50

0.3946

=

8

0.33

0.3946

Koefisienbesi 0.006165

a.Unit

4.00

b.Unit Total Titik

530.00 1.00

Beton 107.50

0.11 Titik

0.11 1.00

Begisting 107.50

0.22 Titik

Pembesian: Beton : Begisting :

1.00

238.67 Kg 1.30 m3 23.65 m2

Jenis Pekerjaan : Satuan : kanopi 1 Besi D

Kanopi kg,m3,m2

sudah

=

10

1.20

0.6165

Besi D

=

10

1.70

0.6165

Koefisienbesi 0.006165

a.Unit

10.00

b.Unit Total Titik

6.00 1.00

Beton 0.10

1.00 Titik

1.50 1.00

Begisting 0.10

5.00 Titik

1.00 kanopi 2 Besi D

=

10

5.85

0.6165

Besi D

=

10

0.60

0.6165

Koefisienbesi 0.006165

1.00 1.50

Titik

1.00

a.Unit

3.00

b.Unit Total Titik

37.00 1.00

Beton 0.10

0.43 Titik

5.65 1.00

Begisting 0.10

12.16 Titik

1.00

0.43 Pembesian: Beton : Begisting :

Titik

1.00

a.Unit

4.00

b.Unit Total Titik

30.00

38.19 Kg 0.39 m3 5.65 m2

Jenis Pekerjaan : kolom Praktis 13/13 Satuan : kg,m3,m2 Besi Kolom 1 Besi D = 12 Besi D

5.65

=

sudah 5.30

10

5.00

0.8878

0.41

0.6165

Koefisienbesi 0.006165

19.00

Beton 4.50

0.13 Titik

0.13 19.00

Begisting 4.50

0.52 Titik

Pembesian: Beton : Begisting : Jenis Pekerjaan : Satuan : No Uraian Toilet Luar 1 type a Pengurangan 1 D2 2 Bouven

481.42 Kg 1.44 m3 44.46 m2 Pas. Dinding bata 1:2 m2 panjang Tinggi Unit

luas

ket

2.00

2.70

3.00 Total a

16.20 m2 16.20 m2

0.70 0.95

2.10 0.60

1.00 1.00 Total b Total a-b

1.47 0.57 2.04 14.16

M2 m2 m2 m2

Jenis Pekerjaan : Plesteran 1:2 Satuan : m2 No Uraian Luas Pas.bTitik luas ket 1 Bagian dinding 14.16 2.00 28.32 m2 Total 28.32 m2 Jenis Pekerjaan : Satuan : No Uraian Bagian Luar 1 type a 2 type b

19.00

Pas. Dinding bata 1:4 m2 panjang Tinggi Unit 6.57 1.00

4.30 4.00

luas 1.00 1.00

ket 28.25 m2 4.00 m2

56.64

3 type c 4 type d 5 type e 6 type f 7 type g 8 type h 9 type i 10 type j 11 type k 12 l 13 m 14 n Bagian Dalam 15 16 17 18 19 20 21 22 Mainan 1 o 2 p 3 q 4 r 5 s 6 t 7 8

3.49 6.82 0.54 2.15 0.87 6.95 0.87 3.67 4.62 1.25 5.44 3.64

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00

1.00 1.00 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.00 1.00 1.00

13.94 27.28 2.14 8.60 3.48 27.80 6.96 14.68 18.48 5.00 21.74 14.54

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

4.09 1.47 2.82 2.15 3.23 1.49 2.97 1.27

4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30

2.00 1.00 1.00 1.00 1.00 1.00 2.00 1.00

35.17 6.32 12.13 9.25 13.87 6.39 25.54 5.46

m2 m2 m2 m2 m2 m2 m2 m2

2.00 2.00 Total a

2.04 1.55 7.20 0.40 1.05 0.70 7.00 3.00 333.95

m2 m2 m2 m2 m2 m2 m2 m2 m2

3.50 1.50

130.95 51,070,500.00

35.17 6.32 12.13 9.25 13.87 6.39 25.54 5.46 Pengurangan 3.15 1.50 4.09 2.84 0.80 0.70 1.20 3.20

2.15 2.10 2.15 2.15 2.10 2.10 2.20 2.50

Pengurangan

0.54

2.66

1 PJ1

3.15

2.15

1.00

6.77 M2

2 PJ2

1.50

2.10

1.00

3.15 m2

3 PJ3

4.09

2.15

1.00

8.79 m2

4 PJ4

2.84

2.15

1.00

6.11 m2

5 D1

0.80

2.10

3.00

5.04 m2

6 D2

0.70

2.10

1.00

1.47 m2

7 W1 8 W2 9 W3

1.20 3.20 0.54

2.20 2.50 2.66

5.00 2.00 5.00 Total b Total a-b

13.20 16.00 7.19 67.72 266.23

m2 m2 m2 m2 m2

huruf 201.3

Jenis Pekerjaan : Plesteran 1:4 Satuan : m2 No Uraian Luas Pas.bTitik luas ket 1 Bagian dinding 266.23 2.00 532.47 m2 Total 532.47 m2 Jenis Pekerjaan : Satuan : No Uraian 1 1:02 2 1:04

Acian m2 titik 28.32 532.47

luas 1.00 1.00

Total Jenis Pekerjaan :

Pengecatan plafond

Satuan : No Uraian 1 Calsiboard 2 Gypsum

m2 Luas 3.57 162.83

sudah titik

Cat Luar

luas 1.00 1.00

Total Jenis Pekerjaan :

ket 28.32 m2 532.47 m2 560.79 m2

ket 3.57 m2 162.83 m2 166.40 m2

Satuan No Uraian Toilet 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Mainan 17 Mainan 18 Mainan 19 Mainan 20 Mainan 21 Mainan

:

m2 Panjang 1.92 2.16 2.00 6.57 1.13 3.75 7.08 0.66 2.15 1.00 7.21 3.67 4.88 1.34 13.50

tinggi

titik 2.70 2.70 2.70 3.50 3.50 3.50 3.50 3.50 3.50 3.50 3.50 3.50 3.50 3.50 3.50 2.04 1.55 7.20 0.40 1.05 0.70

luas 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 3.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00

5.18 5.83 5.40 23.00 3.96 13.13 24.78 2.31 7.53 10.50 25.24 12.85 17.08 4.69 47.25 4.08 3.10 14.40 0.80 2.10 1.40 234.59

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

1.00 1.00 5.00 5.00 1.00 2.00 1.00

0.57 1.47 13.20 7.13 6.88 16.00 3.15 48.40 186.19

m2 m2 m2 m2 m2 m2 m2 m2 m2

total Pengurangan 1 Bv 2 D2 3 W1 4 W3 5 PJ1 6 W2 7 PJ2

0.95 0.70 1.20 0.54 3.20 3.20 1.50

0.60 2.10 2.20 2.64 2.15 2.50 2.10 total Total

Jenis Pekerjaan : Satuan : No Uraian 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Cat dalam m2 Panjang tinggi titik 1.87 2.70 5.39 4.00 4.09 4.00 2.97 4.00 1.13 4.00 3.49 4.00 6.82 4.00 2.17 4.00 1.60 4.00 2.75 4.00 4.62 4.00 6.81 4.00 5.44 4.00 3.67 4.00

ket

luas 4.00 1.00 4.00 5.00 1.00 3.00 1.00 3.00 2.00 2.00 2.00 3.00 1.00 1.00

20.20 21.54 65.44 59.40 4.52 41.82 27.28 26.04 12.80 22.00 36.96 81.72 21.74 14.68

ket m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

15 16 17 18

1.74 6.95 2.44 4.53

4.00 4.00 4.00 4.00

1.00 1.00 1.00 1.00

6.94 4.00 4.00 4.00 475.08

m2 m2 m2 m2 m2

1.00 1.00 1.00 1.00 3.00 1.00 5.00 2.00 5.00 1.00

6.77 3.15 8.79 6.11 5.04 1.47 13.20 16.00 7.19 0.57 68.29 406.79

M2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

total Pengurangan 1 PJ1 2 PJ2 3 PJ3 4 PJ4 5 D1 6 D2 7 W1 8 W2 9 W3 10 Bouven

3.15 1.50 4.09 2.84 0.80 0.70 1.20 3.20 0.54 0.95

2.15 2.10 2.15 2.15 2.10 2.10 2.20 2.50 2.66 0.60 total Total

Partisi Kaca Kaca 5 mm no panjang 1 0.95

tinggi 1.175

luas 4 total

2

0.95

1.175

3 total jumlah

Profil alumunium 1 2.5 2 0.95

6 18

2.5 0.95

4 12

96.30 m

0.562

64.20 m 160.50 m 9

total 2

0.95

0.562

6 total Jumlah

Double triplek lapis HPL 1 0.27

4.06

1 total

2

0.27

2.95

1 total jumlah

atap

m2 m2 m2 m2 m2

10 m 11.4 m 21.4 m total jumlah

Kaca es 3 mm 1 0.95

4.47 13.40 3.35 10.05 23.44

15 m 17.1 m 32.1 m total

3 4

592.97

4.81 14.42 3.20 9.61 24.03

m2 m2 m2 m2 m2

1.10 3.29 0.80 2.39 5.68

m2 m2 m2 m2 m2

2.925 3.5 10.2375

23.48 19.44

1.318 10.642

23.48 1 2.75 15.35

1 1 1 1

2 61.89328 m2 2 413.761 m2 475.6542 m2 23.48 1 2.75 15.35 42.58

beton 337.35 218.24 555.59 Kg 555.59 Kg 2.55 M3 2.55 M3 34.00 M2 34.00 M2

besi 8.49 4.09 2.97 3.49 6.82 2.15 4.23 6.95 3.65 4.62 1.24

beton 8.69 4.29 3.17 3.69 7.02 2.35 4.43 7.15 3.85 4.82 1.44

1.00 1.00 1.00 2.00 2.00 2.00 3.00 2.00 3.00 1.00 1.00

0.00 8.49 4.09 2.97 6.97 13.64 4.30 12.68 13.90 10.95 4.62 1.24 83.84

besi 0.00 8.69 4.29 3.17 7.37 14.04 4.70 13.28 14.30 11.55 4.82 1.44 87.64

Ket m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3

beton 493.59 327.36 820.96 Kg 820.96 Kg 3.38 M3

besi

beton

besi

0.65 4.55 7.60

0.85 4.75 7.80

4.00 2.00 2.00

2.60 9.10 15.20

3.40 9.50 15.60

1.00 3.49 5.68

1.20 3.69 5.88

3.00 2.00 2.00

3.00 6.97 11.36

3.60 7.37 11.76

3.38 M3 52.00 M2 52.00 M2

4.86 7.23 3.65 4.59 4.60 6.40 1.00

5.06 7.43 3.85 4.79 4.80 6.60 1.20

2.00 4.00 3.00 3.00 1.00 2.00 2.00 total

7.4166 29.22 35.26 64.49 Kg 64.49 Kg 0.74 M3 0.74 M3 1.77 1.77 7.42 7.42

M2 M2 M2 M2 3.3934

13.39 16.28 29.67 Kg 29.67 Kg 0.34 M3 0.34 M3 0.91 0.91 3.39 3.39

M2 M2 M2 M2 3.835

14.80 17.88 32.67 Kg 32.67 Kg 0.38 M3 0.38 M3 0.85 M2 0.85 M2 3.84 M2

9.71 28.92 10.95 13.76 4.60 12.80 2.00

10.11 29.72 11.55 14.36 4.80 13.20 2.40

130.97

137.37

3.84 M2 24.04

4.838

21.82 45.87 Kg 45.87 Kg 0.48 M3 0.48 M3 1.34 1.34 4.84 4.84

M2 M2 M2 M2 39.1878

159.67 166.15 325.82 Kg 325.82 Kg 3.92 M3 3.92 M3 2.54 2.54 39.19 39.19

M2 M2 M2 M2 26.8155

110.88 110.05 220.92 Kg 220.92 Kg 2.68 M3 2.68 M3 2.07 2.07 26.82 26.82

M2 M2 M2 M2 2.7975

11.10 12.33 23.43 Kg 23.43 Kg 0.28 M3

0.28 M3 0.67 0.67 2.80 2.80

M2 M2 M2 M2 88.2838 Waterprofing

beton 78.91 51.77 130.68 Kg 130.68 Kg 0.81 M3 0.81 M3

besi 1.80 6.57 3.50 6.82 2.15 6.95 3.67 4.62 9.20

beton 2.00 6.77 3.70 7.02 2.35 7.15 3.87 4.82 9.40

2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

besi 3.60 6.57 3.50 6.82 2.15 6.95 3.67 4.62 9.20

4.00 6.77 3.70 7.02 2.35 7.15 3.87 4.82 9.40

47.08

49.08

12.48 M2 12.48 M2

169.66 69.01 238.67 Kg 238.67 Kg 1.30 M3 1.30 M3

beton besi 10.07 10.07 10.92 10.92 9.11 9.11 9.48 9.48 15.23 15.23 9.48 9.48 2.03 2.03 2.11 2.11

23.65 M2 23.65 M2

7.40 6.29 13.69 Kg 13.69 Kg 0.15 M3 0.15 M3 0.50 0.50 1.50 1.50

M2 M2 M2 M2

10.82 13.69 24.51 Kg 24.51 Kg 0.24 M3 0.24 M3

kanopi 4.145 3.35 2.08

0.5 0.5 0.75

2 1 1 2 2 1 2 2.00

beton besi 20.14 20.14 10.92 10.92 9.11 9.11 18.96 18.96 30.46 30.46 9.48 9.48 4.06 4.06 4.22 4.22 107.35 107.35

1.22 1.22 2.43 2.43

M2 M2 M2 M2

17.76 7.58 25.34 Kg 481.42 Kg 0.08 M3 1.44 M3 2.34 M2 44.46 M2

114.12

228.244

1.00 1.00 1.00 1.00 3.00 1.00 5.00 2.00

6.77 3.15 8.79 6.11 5.04 1.47 13.20 16.00

5.00

7.19

38

7649.4

15298.8

rehab Jenis Pekerjaan : Pancang Ulin 10/10 + sunduk kalang Satuan : Titik No Uraian Volume Ket 1 Pancang Ulin 15 Titik

sudah

Jenis Pekerjaan : Galian Tanah Satuan : m3 No Panjang Lebar Tinggi Titik Volume 1 2.68 0.60 0.80 1.00 1.29 2 4.40 0.60 0.80 1.00 2.11 3 3.44 0.60 0.80 2.00 3.30 4 5.19 0.60 0.80 1.00 2.49 5 4.00 0.60 0.80 4.00 7.68 6 4.75 0.60 0.80 1.00 2.28 7 8.15 0.60 0.80 1.00 3.91 8 6.35 0.60 0.80 1.00 3.05 9 1.50 0.60 0.80 1.00 0.72 10 2.25 0.60 0.80 1.00 1.08 Total 27.91

sudah

Jenis Pekerjaan Satuan No Uraian 1 type a 2 type b 3 type c 4 type d 5 type e 6 type f 7 type g 8 type h 9 type i 10 type j

: Pasangan Batu Gunung sudah : m3 Panjang Lebar (atas) Lebar (bawah) Tinggi Luas Titik Volume 2.68 0.30 0.55 0.60 0.26 1.00 0.68 4.40 0.30 0.55 0.60 0.26 1.00 1.12 3.44 0.30 0.55 0.60 0.26 2.00 1.75 5.19 0.30 0.55 0.60 0.26 1.00 1.32 4.00 0.30 0.55 0.60 0.26 4.00 4.08 4.75 0.30 0.55 0.60 0.26 1.00 1.21 8.15 0.30 0.55 0.60 0.26 1.00 2.08 6.35 0.30 0.55 0.60 0.26 1.00 1.62 1.50 0.30 0.55 0.60 0.26 1.00 0.38 2.25 0.30 0.55 0.60 0.26 1.00 0.57 Total 14.83

Jenis Pekerjaan : Tanah urug kembali Satuan : m3 No Panjang 1 Galian Tanah 27.91 2 Batu Gunung 14.83

sudah Titik 1.00 1.00 Total

Jenis Pekerjaan : Pasir Urug Bawah Lantai Satuan : m3 No Panjang Lebar Tinggi Titik 1 3.44 2.68 0.10 2 6.84 4.40 0.10 3 6.50 4.75 0.10 4 8.15 7.85 0.10 5 1.50 3.79 0.10 6 5.95 3.67 0.10 Total Jenis Pekerjaan Satuan No Panjang

ket m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3

: Cor Lantai : m3 Lebar Tinggi

Volume 27.91 14.83 13.08

ket m3 m3 m3 sudah

1.00 1.00 1.00 1.00 1.00 1.00

Volume 0.92 3.01 3.09 6.40 0.57 2.18 16.17

ket m3 m3 m3 m3 m3 m3 m3 sudah

Titik

Volume

ket

Ket m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3

1 2 3 4 5 6

3.44 6.84 6.50 8.15 1.50 5.95

2.68 4.40 4.75 7.85 3.79 3.67

0.05 0.05 0.05 0.05 0.05 0.05

1.00 1.00 1.00 1.00 1.00 1.00 Total

Jenis Pekerjaan : Sloof 15/20 Satuan : kg,m3,m2 Besi Sloof Besi D = Besi D

=

0.46 1.50 1.54 3.20 0.28 1.09 8.08

m3 m3 m3 m3 m3 m3 m3 sudah

12

55.05

0.8878

10

0.59

0.6165

Koefisienbesi 0.006165

a.Unit

4.00

b.Unit Total Titik

350.00

195.48

1.00

127.31 322.79 Kg 322.79 Kg

0.20 1.00

1.65 M3 1.65 M3

Titik

1.00

22.00 M2 22.00 M2

a.Unit

4.00

13.49

b.Unit Total Titik

23.00

Beton 55.00

0.15 Titik

Begisting 55.00 Pembesian : Beton : Begisting :

322.79 Kg 1.65 m3 22.00 m2

Jenis Pekerjaan : kolom 13/13 Satuan : kg,m3,m2 Besi Kolom Besi D = Besi D

0.40

=

sudah

12

3.80

0.8878

10

0.41

0.6165

Koefisienbesi 0.006165

12.00

5.81 19.31 Kg 231.69 Kg

0.13 12.00

0.06 M3 0.71 M3

12.00

1.82 M2 21.84 M2

Beton 3.50

0.13 Titik

Begisting 3.50

0.52 Titik

Pembesian : Beton : Begisting :

231.69 Kg 0.71 m3 21.84 m2

Jenis Pekerjaan : Ringbalk 13/20 Satuan : kg,m3,m2 Besi Ringbalk Besi D = 12 Besi D

=

10

sudah

55.05

0.8878

0.55

0.6165

Koefisienbesi 0.006165

a.Unit

4.00

b.Unit Total Titik

350.00

195.48

1.00

118.68 314.16 Kg 314.16 Kg

0.20 1.00

1.43 M3 1.43 M3

Beton 55.00

0.13 Titik

Begisting

55.00 Pembesian : Beton : Begisting :

1.00

a.Unit

4.00

b.Unit Total Titik

850.00

22.00 M2 22.00 M2

314.16 Kg 1.43 m3 22.00 m2

Jenis Pekerjaan : Balok Gewel 13/13 Satuan : kg,m3,m2 Balok Gewel Besi D = 10 Besi D

0.40 Titik

=

10

sudah

128.40

0.6165

0.41

0.6165

Koefisienbesi 0.006165

316.63

1.00

214.85 531.48 Kg 531.48 Kg

0.13 1.00

2.16 M3 2.16 M3

Titik

1.00

33.28 M2 33.28 M2

a.Unit

4.00

33.78

b.Unit Total Titik

90.00

Beton 128.00

0.13 Titik

Begisting 128.00 Pembesian : Beton : Begisting :

531.48 Kg 2.16 m3 33.28 m2

Jenis Pekerjaan : Balok Latai 11/11 Satuan : kg,m3,m2 Besi Balok latai type a Besi D = 10 Besi D

0.26

=

10

sudah

13.70

0.6165

0.33

0.6165

Koefisienbesi 0.006165

1.00

18.31 52.09 Kg 52.09 Kg

0.11 1.00

0.16 M3 0.16 M3

Titik

1.00

2.97 M2 2.97 M2

a.Unit

4.00

b.Unit Total Titik

28.00

Beton 13.50

0.11 Titik

Begisting 13.50

0.22

Besi Balok latai type b Besi D =

10

4.40

0.6165

Besi D

10

0.33

0.6165

=

Koefisienbesi 0.006165

10.85

1.00

5.70 16.55 Kg 16.55 Kg

0.11 1.00

0.05 M3 0.05 M3

1.00

0.92 M2 0.92 M2

Beton 4.20

0.11 Titik

Begisting 4.20

0.22 Titik

Pembesian : Beton : Begisting :

68.64 Kg 0.21 m3 3.89 m2

Jenis Pekerjaan : Kanopi Satuan : kg,m3,m2 Besi Kanopi Besi D = Besi D

=

sudah

10

1.50

0.6165

10

13.50

0.6165

Koefisienbesi 0.006165

a.Unit

90.00

b.Unit Total Titik

10.00

83.23

1.00

83.23 166.46 Kg 166.46 Kg

13.50 1.00

2.63 M3 2.63 M3

Beton 0.13

1.50 Titik

Begisting 0.13

30.00

1.00

3.90 3.90 20.25 20.25

a.Unit

90.00

27.74

b.Unit Total Titik

3.00

Titik 1.50

1.00 13.50

Titik Besi Kanopi Besi D

=

10

0.50

0.6165

Besi D

=

10

13.50

0.6165

Koefisienbesi 0.006165

M2 M2 M2 M2

1.00

24.97 52.71 Kg 52.71 Kg

10.70 1.00

0.70 M3 0.70 M3

Beton 0.13

0.50 Titik

Begisting 0.13

22.40

Titik

1.00

2.91 2.91 5.35 5.35

a.Unit

1.00

0.31

b.Unit Total Titik

3.00 3.00

0.37 0.68 Kg 2.03 Kg

0.20 3.00

0.01 M3 0.04 M3

3.00

0.18 M2 0.55 M2

Titik 0.50

10.70

Besi Kanopi dudukan Besi D =

10

0.50

0.6165

Besi D

10

0.20

0.6165

=

1.00

Koefisienbesi 0.006165

M2 M2 M2 M2

Beton 0.13

0.50 Titik

Begisting 0.13

1.40 Titik

Besi Kanopi Besi D

=

10

0.50

0.6165

Besi D

=

10

4.20

0.6165

Koefisienbesi 0.006165

a.Unit

28.00

b.Unit Total Titik

3.00

8.63

1.00

7.77 16.40 Kg 16.40 Kg

4.20 1.00

0.21 M3 0.21 M3

Beton 0.10

0.50 Titik

Begisting 0.10

9.40 Titik

0.50

1.00 4.20

Titik

1.00

0.94 0.94 2.10 2.10

M2 M2 M2 M2

Besi Kanopi Besi D

=

10

1.50

0.6165

Besi D

=

10

8.00

0.6165

Koefisienbesi 0.006165

a.Unit

53.00

49.01

b.Unit Total Titik

10.00 1.00

49.32 98.33 Kg 98.33 Kg

8.00 1.00

1.20 M3 1.20 M3

Beton 0.10

1.50 Titik

Begisting 0.10

19.00 Titik

1.50

8.00 Titik

Pembesian : Beton : Begisting :

335.93 Kg 4.99 m3 49.94 m2

1.00 1.00

1.90 1.90 12.00 12.00

M2 M2 M2 M2

Jenis Pekerjaan : Dak Atap Satuan : kg,m3,m2 Besi Dak Atap Besi D = Besi D

=

sudah

10

3.20

0.6165

10

5.60

0.6165

Koefisienbesi 0.006165

a.Unit

37.00

b.Unit Total Titik

21.00

72.99

1.00

72.50 145.49 Kg 145.49 Kg

5.60 1.00

1.79 M3 1.79 M3

Beton 0.10

3.20 Titik

Begisting 0.10

17.60

1.00

1.76 1.76 17.92 17.92

a.Unit

70.00

142.41

b.Unit Total Titik

22.00 1.00

145.12 287.54 Kg 287.54 Kg

10.70 1.00

3.42 M3 3.42 M3

Titik

1.00

3.20

5.60 Titik

Besi Dak Atap Besi D

=

10

3.30

0.6165

Besi D

=

10

10.70

0.6165

Koefisienbesi 0.006165

M2 M2 M2 M2

Beton 0.10

3.20 Titik

Begisting 0.10

27.80 Titik

3.20

10.70 Titik

Pembesian : Beton : Begisting :

433.03 Kg 5.22 m3 56.70 m2

Jenis Pekerjaan : Pas. Dinding bata Satuan : m2 No Uraian panjang Tinggi Unit luas ket Ruang Rapat 1 type a 3.79 4.00 2.00 30.28 m2 2 type b 8.02 4.00 1.00 32.08 m2 Bagian Toilet Ruang Rapat 3 type c 6.22 4.00 1.00 24.88 m2 4 type d 1.37 4.00 1.00 5.48 m2 5 type e 2.12 4.00 1.00 8.48 m2 Toilet Bagian depan 6 type f 2.55 4.00 3.00 30.60 m2 7 type g 1.50 4.00 4.00 24.00 m2 Ruang Pelayanan Terpadu 8 type h 4.27 4.00 2.00 34.16 m2 9 type i 0.77 4.00 1.00 3.08 m2 Ruang KA tata usaha 10 type j 1.44 4.00 1.00 5.74 m2 11 1.21 4.00 1.00 4.82 m2 12 4.62 4.00 1.00 18.48 m2 Tambahan

1.00 1.00

2.78 2.78 34.24 34.24

M2 M2 M2 M2

11 12 13 14 15 16 17 18 19 20

4.40 4.40 1.60 1.00 1.40 1.10 0.90 1.80 1.00 0.60

Pengurangan 1 J1 2 Bouven 3 4 5 6

6.50 4.00 6.00 13.00 13.00 13.50 13.50 12.30 10.70 8.20

0.90 2.70 0.78 0.98 2.10 0.90

1.60 5.00 2.10 2.10 3.50 1.60

1.00 1.00 1.00 2.00 2.00 1.00 1.00 1.00 1.00 2.00 Total a

28.60 17.60 9.60 26.00 36.40 14.85 12.15 22.14 10.70 9.84 409.96

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

9.00 4.00 2.00 1.00 1.00 4.00 Total b Total a-b

12.96 54.00 3.28 2.06 7.35 5.76 85.40 324.55

M2 m2 m2 m2 m2 m2 m2

Jenis Pekerjaan : Plesteran Satuan : m2 No Uraian Luas Pas.bTitik luas ket 1 Bagian dinding 324.55 2.00 649.10 m2 Total 649.10 m2 Jenis Pekerjaan Satuan No Uraian 1 Plesteran

Jenis Pekerjaan Satuan No Uraian Toilet 1 2 3 4 5 6 7 8 9 10 11 12 13

: Acian : m2 titik Total

luas ket 649.10 m2 649.10 m2

titik

luas

649.10

1.00

: Cat Dalam : m2 Panjang tinggi 2.55 1.59 6.71 4.27 3.80 3.53 4.62 4.09 8.02 3.97 1.50 1.37 2.25

3.50 3.50 3.50 3.50 3.50 3.50 3.50 3.50 3.50 3.50 3.50 3.50 3.50

4.00 4.00 1.00 3.00 1.00 1.00 1.00 2.00 1.00 1.00 2.00 1.00 1.00

35.70 22.26 23.49 44.84 13.30 12.36 16.17 28.60 28.07 13.90 10.50 4.80 7.88 261.84

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

2.00 3.00 2.00 2.00 1.00 1.00 1.00

3.28 15.30 6.36 3.20 7.00 14.70 13.21

m2 m2 m2 m2 m2 m2 m2

total Pengurangan 1 pintu 2 keramik dindin 3 keramik dindin 4 keramik dindin 5 pintu p1 6 J2 7

0.78 2.55 1.59 0.80 2.00 4.20 3.78

2.10 2.00 2.00 2.00 3.50 3.50 3.50

ket

187.88

0.90

1.60

9.00 total Total

12.96 m2 76.01 m2 185.83 m2

Jenis Pekerjaan : Cat luar Satuan : m2 No Uraian Panjang tinggi titik 1 type a 19.07 3.50 2 type b 0.55 3.50 3 type c 4.88 3.50 4 type d 1.00 3.50 5 type e 13.50 3.50 6 bagian atas 187.88 7 8.28 3.50 8 4.00 3.50 9 7.95 3.50 total Pengurangan 1 P1 2.10 3.50 2 J1 1.00 3.50 3 J2 4.20 2.80 4 J3 6.80 3.20 5 J4 1.20 3.20 6 Bouven 2.70 5.00 7 0.90 1.60 total Total Jenis Pekerjaan Satuan No Uraian 1 type a 2 type b 3 type c 4 type d 5 e 6 f 7 g 8 h 9 i 10 j 11 k 12 l 13 m 14 n 15 o 16 p 17 q 18 r 19 s 20 t Calciboard 1 type a 2 type b 3 type c

: Rangka Plafond : m2 Panjang lebar 5.49 4.09 5.03 6.33 3.75 1.37 1.50 4.40 6.71 3.67 5.53 6.36 4.12 2.54 1.50 3.50 2.00 1.78 3.36 7.72 1.59 2.37 1.37

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

luas 66.73 1.93 17.08 1.00 13.50 187.88 8.28 4.00 7.95 308.34

ket m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

1.00 1.00 1.00 1.00 5.00 4.00 9.00

7.35 3.50 11.76 21.76 19.20 54.00 12.96 130.53 177.81

m2 m2 m2 M2 m2 m2 m2 m2 m2

3 1 4.2 6.8 1.2 2.7

sudah titik

luas

ket m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

2.37 2.97 2.50 5.40 3.53 3.43 0.77 3.18 4.27 5.81 5.58 4.62 4.17 8.17 3.97 1.52 3.90 1.65 3.87 8.02

1.00 3.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

13.01 36.44 12.58 34.18 13.22 4.70 1.16 13.99 28.65 21.32 30.86 29.38 17.18 20.75 5.96 5.32 7.80 2.94 13.00 61.91

2.57 5.52 3.72

2.00 1.00 1.00

8.17 m2 13.08 m2 5.10 m2

Total Jenis Pekerjaan Satuan No Uraian 1 type a 2 type b 3 type c

Panjang Pintu P1 Jendela J1 J2 J3 J4 Bouven

: Plafond Gypsum : m2 Panjang lebar titik 5.49 2.37 4.09 2.97 5.03 2.50

400.70 m2 sudah luas 1.00 3.00 1.00

ket 13.01 m2 36.44 m2 12.58 m2

15.72 14.12 15.06

1.00 3.00 1.00

15.72 42.36 15.06

Tinggi 4 3.5 2.8 3.2 3.2 5

4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

type d e f g h i j k l m n o p q r s t

6.33 3.75 1.37 1.50 4.40 6.71 3.67 5.53 6.36 4.12 2.54 1.50 3.50 2.00 1.78 3.36 7.72

5.40 3.53 3.43 0.77 3.18 4.27 5.81 5.58 4.62 4.17 8.17 3.97 1.52 3.90 1.65 3.87 8.02

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Total

34.18 13.22 4.70 1.16 13.99 28.65 21.32 30.86 29.38 17.18 20.75 5.96 5.32 7.80 2.94 13.00 61.91

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

374.35 m2

23.46 14.55 9.60 4.54 15.16 21.96 18.96 22.22 21.96 16.58 21.42 10.94 10.04 11.80 6.86 14.46 31.48

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

23.46 14.55 9.6 4.54 15.16 21.96 18.96 22.22 21.96 16.58 21.42 10.94 10.04 11.8 6.86 14.46 31.48 349.13

Jenis Pekerjaan Satuan No Uraian 1 type a 2 type b 3 type c

: Plafond Calciboard : m2 Panjang lebar titik 1.59 2.57 2.37 5.52 1.37 3.72

sudah luas 2.00 1.00 1.00

Total Jenis Pekerjaan

26.35 m2

: Pengecatan plafond

Satuan : m2 No Uraian 1 Calsiboard 2 Gypsum

Luas 26.35 374.35

sudah titik

luas 1.00 1.00

Total Jenis Pekerjaan Satuan No Uraian 1 type a 2 type b 3 type c 4 type d 5 type e 6 type f 7 type g

ket 8.17 m2 13.08 m2 5.10 m2

: List Plafond : m Panjang 3.52 5.37 2.87 4.52 1.37 1.37 1.87

ket 26.35 m2 374.35 m2 400.70 m2 sudah

titik

luas 2.00 2.00 8.00 2.00 2.00 2.00 2.00

7.04 10.74 22.96 9.04 2.74 2.74 3.74 59.00

Total Jenis Pekerjaan Satuan No Uraian 1 type a 2 type b 3 type c 4 type d 5 type e

: Rangka Atap Baja Ringan : m2 Panjang lebar titik 12.00 16.00 7.30 14.60 10.00 11.70 2.15 9.15 4.30 2.70 Total

Jenis Pekerjaan Satuan No Uraian 1 type a 2 type b 3 type c 4 type d 5 type e

: Atap Bitumen : m2 Panjang lebar titik 12.00 16.00 7.30 14.60 10.00 11.70 2.15 9.15 4.30 2.70 Total

Jenis Pekerjaan Satuan No Uraian 1 type a 2 type b 3 type c 4 type d 5 type e 6 type f

: List plank : m Panjang 12.00 16.00 7.30 14.60 10.00 11.70

ket m' m' m' m' m' m' m' m' sudah

1.00 1.00 1.00 1.00 1.00

luas 192.00 106.58 117.00 19.67 11.61 446.86

ket m2 m2 m2 m2 m2 m2 sudah

1.00 1.00 1.00 1.00 1.00

luas 192.00 106.58 117.00 19.67 11.61 446.86

ket m2 m2 m2 m2 m2 m2 sudah

titik

luas 2.00 2.00 2.00 2.00 2.00 2.00

24.00 32.00 14.60 29.20 20.00 23.40

ket m' m' m' m' m' m'

7 8 9 10

type g type h type i type j

2.15 9.15 4.30 2.70

2.00 2.00 2.00 2.00

4.30 18.30 8.60 5.40 179.80

Total Jenis Pekerjaan : Keramik lantai 40/40 Satuan : m2 No Panjang Lebar Titik Volume 1 6.84 4.40 1.00 30.10 2 5.49 3.67 1.00 20.15 3 6.49 4.75 1.00 30.83 4 8.02 7.72 1.00 61.91 Total 142.99

m' m' m' m' m' sudah

ket M2 M2 M2 M2 m3

Jenis Pekerjaan : Keramik lantai 30/30 Satuan : m2 No Panjang Lebar Titik Volume ket 1 1.50 4.10 1.00 6.15 M2 Total 6.15 M2

sudah

Jenis Pekerjaan : Keramik lantai wc 20/20 Satuan : m2 No Panjang Lebar Titik Volume 1 3.44 2.68 1.00 9.22 2 1.50 3.85 1.00 5.78 Total 9.22

sudah

Jenis Pekerjaan : Keramik dinding wc 20/40 Satuan : m2 No Panjang tinggi Titik Volume 1 3.72 2.00 2.00 14.88 2 1.37 2.00 2.00 5.48 3 2.55 2.00 4.00 20.40 4 1.68 2.00 4.00 13.44 Total 54.20 Pengurangan pintu 1 0.78 2.10 1.00 1.64 2 0.78 2.10 2.00 3.28 Total 4.91 Total 49.29 Jenis Pekerjaan Satuan No Uraian 1 type a 2 type b

ket M2 M2 M2 sudah ket M2 M2 M2 M2 M2 M2 M2 M2 M2

: waterprofing sudah : m2 Panjang lebar titik luas ket 3.20 5.60 1.00 17.92 m2 3.30 10.70 1.00 35.31 m2 Total 53.23 m2

53.94

Panjang Pintu P1 Jendela J1 J2 J3 J4 Bouven Alkopan 1 2 3 4

4.6 2.3 0.8 6.6

Tinggi

Unit

2 1 4.2 6.8 1.2 2.7

3.5 3.5 2.8 3.2 3.2 5

1 1 1 1 5 4

0.6 4.6 6.6 0.6

2 2 1 1

5.52 21.16 5.28 3.96 35.92

7 3.5 11.76 21.76 3.84 13.5

Rekap Analia Harga Satuan (RAHS) No Uraian A

B

C

PEKERJAAN TANAH

E

Nilai

Keterangan

AN.01

1 M³ Galian tanah biasa

AN.01.a

94,500.00

1 M³ Urugan Pasir

AN.01.b

277,800.00

1 M³ Urugan tanah kembali

AN.01.c

31,500.00

1 M³ Urugan tanah

AN.01.d

282,000.00

Memadatkan 1 m3 tanah (per 20 cm)

AN.01.e

282,000.00

1 Karung Sand bag

AN.01.f

29,780.00

PEKERJAAN PONDASI

AN.02

1 M³ Pasang batu kosong (aanstamping)

AN.02.a

1,113,555.00

1 M³ Pasang pondasi batu gunung, 1 Pc : 4 PP

AN.02.b

1,759,775.00

1 M' Pasang parit rolag bata, 1 Pc : 4 Ps

AN.02.c

180,534.63

1 M2 Pasang Non Moven Geotextile

AN.02.d

15,780.00

PEKERJAAN PANCANG

AN.03

1 M' Memancang tiang 10x10

AN.03.a

25,575.00

1 Titik Memancang Cerucuk Ulin 10x10, p = 3 m

AN.03.b

213,075.00

1m' Pengadaan tiang pancang mini pile 25/25

AN.03.c

330,604.17

Pengadaan 1 tiang pancang mini pile25/25 = 6m

AN.03.c1

1,983,625.00

1 m' Memancang Tiang Mini Pile

AN.03.d

40,364.58

AN.03.d.1

242,187.50

Memancang 1Tiang Mini Pile 25/25 = 6m D

Notasi

PEKERJAAN BETON

AN.04

1 m3 Beton lantai kerja mutu f'c = 19,3 Mpa (K 225)

AN.04.a

1,361,800.00

1 m3 Beton lantai kerja mutu f'c = 19,3 Mpa (K 225)

AN.04.b

1,548,600.00

1 m3 Beton mutu f'c = 21.7 Mpa (K 250), slump (12 ± 2) cm, w/c = 0,56

AN.04.c

1,996,250.00

Pembesian 10 kg dengan besi polos atau ulir

AN.04.d

254,775.00

Pembesian 1 kg dengan besi polos atau ulir (AN.04.c)/10

AN.04.d'

25,477.50

Pembesian 1 kg jaring kawat baja/wire mesh

AN.04.e

49,570.00

1 m2 bekisting untuk pondasi

AN.04.f

117,870.00

1 M² Pasang Bekisting untuk sloof 3x Pakai

AN.04.g

96,379.50

1 M² Pasang Bekisting untuk kolom 3x Pakai

AN.04.h

140,650.00

1 M² Pasang Bekisting untuk balok/Ring Balk 2x Pakai

AN.04.i

235,811.75

1 m2 bekisting untuk plat lantai 2x pakai

AN.04.j

267,436.75

1 m2 bekisting untuk tangga 2x Pakai

AN.04.k

222,659.25

1 m3 Beton Cor Camp. 1 : 3 : 5

AN.04.l

1,487,610.00

1 m3 Cor Camp. 1 : 2 : 3

AN.04.m

1,700,550.00

1 m3 Pembongkaran beton bertulang

AN.04.n

1,719,960.00

PEKERJAAN DINDING

AN.05

1 M² Pasangan Bata Merah tebal ½ bata , 1 Pc : 2 Ps

AN.05.a

194,647.50

1 M² Pasangan Bata Merah tebal ½ bata , 1 Pc : 4 Ps

AN.05.b

161,194.25

1 M² Plesteran 1 Pc : 2 Ps

AN.05.c

92,078.20

1 M² Plesteran 1 Pc : 4 Ps

AN.05.d

86,907.00

1 m2 Acian

AN.05.e

48,300.00

Rekap Analia Harga Satuan (RAHS) No Uraian F

G

H

PEKERJAAN ATAP

Notasi

Nilai

Keterangan

AN.06

1 M2 Pasang konstruksi kuda-kuda baja Ringan

AN.06.a

200,000.00

1 M² : Pasang atap genteng metal

AN.06.b

191,180.00

1 M' : Pasang nok genteng metal

AN.06.c

139,415.00

1 m' Pasang talang datar/ jurai seng BJLS 25 lebar 90 cm

AN.06.d

154,800.00

1 M' Pasang listplank Calsiboard ukuran 2 x.30 - rangkap 20 cm

AN.06.e

67,050.00

1 m2 Pasang aluminium foil/ Sisalation

AN.06.f

19,215.00

1 M² : Pasang atap Zincalum

AN.06.g

183,530.00

1 M² : Pasang atap genteng Keramik

AN.06.h

550,830.00

1 M' : Pasang nok Genteng keramik

AN.06.i

356,565.00

1 M² : Pasang atap bahan bitumen

AN.06.j

190,830.00

1 M : Pasang nok bahan bitumen

AN.06.k

154,815.00

PEKERJAAN PLAFOND

AN.07

1 M² Pasang langit-langit calsiboard

AN.07.a

79,735.00

1 m2 Memasang Plafondn gypsum board, uk. (120 x 240 x 0.9)cm

AN.07.b

87,965.00

1 m1 Memasang list gypsum profil

AN.07.c

60,742.50

1 M2 Pasang Rangka Plafond Metal furring

AN.07.d

145,000.00

PEKERJAAN PENUTUP LANTAI & DINDING

AN.08

1 M² : Pasang Lantai Keramik 40 x 40 cm

AN.08.a

496,270.00

1 M² : Pasang Lantai Keramik 20 x 20 cm

AN.08.b

288,265.00

1 M² : Pasang Keramik Dinding 20 x 40 cm

AN.08.c

237,012.50

1 M' : Pasang Plint Keramik artistik

AN.08.d

201,990.00

1 M' : Pasang Plint Keramik lantai

AN.08.e

151,365.00

1 M2 : Pasang Dinding Batu tempel/Alam

AN.08.f

468,325.00

1 M2 : Pasang Step nosing lantai Tangga

AN.08.g

901,365.00

1 M' : List Keramik dinding km/wc 6x20

AN.08.h

44,523.00

1 M² : Pasang Lantai Granit 60 x 60 cm

AN.08.i

1,234,711.67

1 M2 PASANGAN Batu Sikat

AN.08.j

570,000.00

1 M² : Pasang Lantai Homogenius uk. 60/60

AN.08.k

646,631.67

1 M² : Pasang Lantai Homogenius uk. 80/80

AN.08.l

363,640.00

1 M² : Pasang Lantai Homogenius uk. 100/100

AN.08.m

298,015.00

1 M² : Pasangan Paving Block Segi Enam

AN.08.n

307,835.00

1 M² : Pasang Lantai Homogenius uk. 100/100

AN.08.o

298,015.00

1 M² : Pasang Dinding Keramik Border 20 x 20 cm

AN.08.p

240,565.00

1 M² : Pasang Dinding Keramik Border 30 x 30

AN.08.q

209,015.00

Rekap Analia Harga Satuan (RAHS) No Uraian I

K

PEKERJAAN SANITAIR

Notasi

Nilai

Keterangan

AN.09

Memasang 1 m' pipa PVC type AW Ø ½"

AN.09.a

32,634.00

Memasang 1 m' pipa PVC type AW Ø 3/4"

AN.09.b

44,139.00

Memasang 1 m' pipa PVC type AW Ø 4"

AN.09.c

148,902.75

Memasang 1 m' pipa PVC type AW Ø 3"

AN.09.d

186,393.38

Memasang 1 buah kran Ø 3/4" - ½"

AN.09.e

57,337.50

Memasang 1 m' pipa PVC type AW Ø 6"

AN.09.d'

340,134.00

Memasang 1 unit Pasang floordrain

AN.09.f

56,250.00

Memasang 1 unit Pasang Kran Shower

AN.09.g

243,750.00

Memasang 1 unit Pasang Jet Washer

AN.09.h

168,750.00

Memasang 1 buah Closet jongkok

AN.09.i

627,020.00

Memasang 1 buah Closet duduk

AN.09.j

5,558,715.00

Memasang 1 buah Urinoir

AN.09.k

4,149,125.00

Memasang 1 buah Wastafel

AN.09.l

1,952,990.00

1 buah bak mandi batu bata vol. 0,3 m3

AN.09.m

935,946.43

Memasang 1 m' pipa PVC type AW Ø 2"

AN.09.n

65,493.38

PEKERJAAN BESI & ALUMINIUM

AN.11

1 m2 Pasang pintu rolling door besi

AN.11.a

778,005.00

1 m2 Pasang pintu lipat (folding gate)

AN.11.b

2,295,645.00

1 m2 Pasang rolling door aluminium

AN.11.c

595,500.00

1 m' Pasang kusen pintu/jendela aluminium

AN.11.d

51,483.75

Jendela W1

AN.11.k

3,495,682.50

Bouven

AN.11.o

1,459,282.50

1 Kusen Jendela J3

AN.11.k

3,495,682.50

1 Kusen Jendela J4

AN.11.l

6,364,100.00

1 Unit Pintu P1

AN.11.m

1,493,597.50

1 Unit Pintu P2

AN.11.n

3,220,775.00

1 Unit Pintu P3

AN.11.o

1,459,282.50

1 Kusen Jendela J5

AN.11.p

2,274,863.75

1 Kusen Jendela J6

AN.11.q

1,667,770.00

1 Kusen Jendela J7

AN.11.r

966,775.00

Kusen BV1

AN.11.s

439,900.00

1 Unit Pintu P4

AN.11.t

9,539,140.00

Rekap Analia Harga Satuan (RAHS) No Uraian L

M

PEKERJAAN KAYU, PENGGANTUNG & PENGUNCI

Notasi

Nilai

Keterangan

AN.12

Pasang 1 buah kunci tanam

AN.12.a

303,750.00

1 buah Pasang engsel pintu

AN.12.b

101,910.00

1 buah Pasang engsel jendela

AN.12.c

56,865.00

1 buah Pasang Grendel jendela

AN.12.d

56,865.00

1 buah Pasang grendel pintu

AN.12.e

65,865.00

1 buah Pasang hak angin

AN.12.f

74,550.00

1 buah Pasang kunci tanam Cilinder

AN.12.g

380,910.00

1 buah Pasang kunci (km/wc)

AN.12.h

287,160.00

1 buah Pasang Expanyolet

AN.12.i

479,400.00

1 buah Pasang Hendel Pintu

AN.12.j

389,700.00

1 M3 Pek kusen pintu/jendela kayu Bengkirai

AN.12.k

9,265,250.00

1 M3 Pek kusen pintu/jendela kayu Ulin

AN.12.l

10,465,250.00

1 Unit P1 (type 120)

AN.12.m

5,600,791.39

1 Unit P1 (type 70)

AN.12.n

3,189,783.72

1 Unit P2

AN.12.o

2,293,617.97

1 Unit PJ 1 (Type 70)

AN.12.p

6,358,206.44

1 Unit PJ(Type 120)

AN.12.q

8,691,759.47

1 Unit PJ 2 (Type 70)

AN.12.r

3,461,315.79

1 Unit J1 (Type 70)

AN.12.s

1,008,997.35

1 Unit J2 (Type 70)

AN.12.t

993,642.14

1 Unit J3 (Type 70)

AN.12.u

1,423,807.70

1 m2 Pasang kaca bening 5 mm

AN.12.v

233,160.00

1 m2 Pasang Dinding Roster

AN.12.w

1,751,710.00

1 Unit BV.1 (Type 70)

AN.12.x

73,540.24

1 Unit BV.2 (Type 70)

AN.12.y

159,870.10

1 Unit P3 (type 120)

AN.12.z

2,624,810.66

1 Unit J1 (Type 120)

AN.12.aa

1,374,057.81

1 Unit J2 (Type 120)

AN.12.ab

1,139,627.24

1 Unit J3 (Type 120)

AN.12.ac

2,563,705.82

1 Unit Pintu Garasi (Type 120)

AN.12.ad

12,886,389.45

PEKERJAAN PENGECATAN

AN.13

1 M² : pengecatan bidang kayu baru,

AN.13.a

55,105.20

1 m2 Mengecat bidang tembok baru (luar)

AN.13.b

51,960.00

1 m2 Mengecat bidang tembok baru (dalam)

AN.13.c

48,360.00

1 m2 Mengecat plafon eternit/ gypsum/Calsiboard

AN.13.d

27,987.60

1 m2 Mengecat list plank

AN.13.e

29,787.60

1 m2 Waterproofing

AN.13.f

84,503.00

Rekap Analia Harga Satuan (RAHS) No Uraian N

PEKERJAAN VEGETASI

Notasi

Nilai

Keterangan

AN.14

1 m2 Pupus Kompos Aktif

AN.14.a

18,750.00

1 m2 Rumput Gajah Mini + Pupus Kompos Aktif

AN.14.b

68,265.00

Tanaman Bayam Merah

AN.14.c

25,861.50

Tanaman bakung Bunga Putih

AN.14.d

31,111.50

Tanaman Sambang Dara

AN.14.e

44,611.50

Tanaman Ararea

AN.14.f

52,861.50

Tanaman Brokoli

AN.14.g

48,361.50

Tanaman Karambosa mini

AN.14.h

52,861.50

Tanaman Pohon Pucuk Merah 1 - 1.2 m

AN.14.i

196,185.00

Tanaman Pohon Tabe Buya Kuning 3 - 4 m

AN.14.j

413,685.00

Tanaman Pohon Palm Ekor Tupai 3 - 4 m

AN.14.k

698,685.00

Tanaman Pohon Palm Botol 1 - 1.3 m

AN.14.l

661,185.00

Tanaman Pohon Palm Ponix 1.2 - 1.8 m

AN.14.m

1,223,685.00

Tanaman Pohon Kelengkeng 1.2 - 1.8 m

AN.14.n

406,185.00

Tanaman Pohon Mangga 1.2 - 1.8 m

AN.14.o

406,185.00

Tanaman Pohon Glodokan Tiang

AN.14.p

323,685.00

Tanaman Pohon ketapang Kencana

AN.14.q

323,685.00

Tanaman Airis

AN.14.r

31,185.00

Tanaman Pisang - pisang

AN.14.s

61,185.00

Tanaman Pohon Tabe Buya Besar

AN.14.t

698,685.00

Tanaman Lamtana

AN.14.u

81,060.00

ANALISA HARGA SATUAN Kota Bontang

NO

URAIAN PEKERJAAN

AN.01 AN.01.a

HARGA SATUAN (Rp)

1 M³ Galian tanah biasa 0.750 OH Pekerja 0.025 OH Mandor

120,000.00 180,000.00

1 M³ Urugan Pasir 1.200 M³ 0.300 OH 0.010 OH

Pasir Urug Pekerja Mandor

200,000.00 120,000.00 180,000.00 Jumlah

AN.01.c

1 M³ Urugan tanah kembali dihitung 1/3 kali pekerjaan galian 0.250 OH Pekerja 0.008 OH Mandor

120,000.00 180,000.00 Jumlah

AN.01.d

1 M³ Urugan tanah 1.100 M³ 0.250 OH 0.025 OH

Tanah Urug Pekerja Mandor

225,000.00 120,000.00 180,000.00 Jumlah

AN.01.e

Memadatkan 1 m3 tanah (per 20 cm) 1.100 M³ Tanah Urug 0.250 OH Pekerja 0.025 OH Mandor

225,000.00 120,000.00 180,000.00 Jumlah

AN.01.f

AN.02 AN.02.a

1 Karung Sand bag 0.120 M³ 1.000 Bh 0.030 OH 0.001 OH

Pasir Urug Karung Pekerja Mandor

200,000.00 2,000.00 120,000.00 180,000.00 Jumlah PEKERJAAN PONDASI

1 M³ Pasang batu kosong (aanstamping) 1.200 M³ Batu gunung 0.300 M³ Pasir urug 0.780 OH Pekerja 0.390 OH Tukang 0.039 OH Kepala Tukang 0.039 OH Mandor

740,000.00 200,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah

AN.02.b

1 M³ Pasang pondasi batu gunung, 1 Pc : 4 PP 1.200 M³ Batu Gunung 163.000 Kg Semen portland 0.520 M³ Pasir pasang 1.500 OH Pekerja 0.750 OH Tukang 0.075 OH Kepala Tukang 0.075 OH Mandor

740,000.00 1,800.00 500,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah

AN.02.c

1 M' Pasang parit rolag bata, 1 Pc : 4 Ps 45.500 Bh Bata Merah 8.620 Kg Semen portland 0.018 M³ Pasir pasang 0.600 OH Pekerja 0.200 OH Tukang 0.020 OH Kepala Tukang 0.030 OH Mandor

1,000.00 1,800.00 500,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah

AN.02.d

JUMLAH HARGA UPAH (Rp)

TOTAL HARGA (Rp)

PEKERJAAN TANAH

Jumlah AN.01.b

JUMLAH HARGA BAHAN (Rp)

1 M2 Pasang Non Moven Geotextile 1.000 M2 Non Moven Gotextile 0.030 OH Pekerja 0.001 OH Mandor

12,000.00 120,000.00 180,000.00 Jumlah

SNI : 2835:2008 90,000.00 4,500.00 94,500.00 SNI : 2835:2008 240,000.00 36,000.00 1,800.00 240,000.00 37,800.00 SNI : 2835:2008 30,000.00 1,500.00 31,500.00 SNI : 2835:2008 247,500.00 30,000.00 4,500.00 247,500.00 34,500.00 SNI : 2835:2008 247,500.00 30,000.00 4,500.00 247,500.00 34,500.00 SNI : 2835:2008 24,000.00 2,000.00 3,600.00 180.00 26,000.00 3,780.00 SNI : 2836:2008 888,000.00 60,000.00 93,600.00 58,500.00 6,435.00 7,020.00 948,000.00 165,555.00 SNI : 2836:2008 888,000.00 293,400.00 260,000.00 180,000.00 112,500.00 12,375.00 13,500.00 1,441,400.00 318,375.00 SNI : 2836:2008 45,500.00 15,516.23 8,818.39 72,000.00 30,000.00 3,300.00 5,400.00 69,834.63 110,700.00

94,500.00

277,800.00

31,500.00

282,000.00

282,000.00

29,780.00

1,113,555.00

1,759,775.00

180,534.63

12,000.00

12,000.00

3,600.00 180.00 3,780.00

15,780.00

ANALISA HARGA SATUAN Kota Bontang

NO

AN.03 AN.03.a

HARGA SATUAN (Rp)

URAIAN PEKERJAAN

AN.03.c

120,000.00 150,000.00 165,000.00 180,000.00

1 Titik Memancang Cerucuk Ulin 10x10, p = 3 m 0.0300 m3 Kayu ulin balok 0.0075 m3 Kayu ulin balok 1.0000 m' Memancang tiang (AN.03.a)

5,000,000.00 5,000,000.00 25,575.00 Jumlah

150,000.00 37,500.00

325,000.00 28,125.00 120,000.00 180,000.00

325,000.00 937.50

1m' Pengadaan tiang pancang mini pile 25/25 1.0000 m' Tiang pancang mini pile 25/25 0.0333 Jam Crane Service 0.0222 Oh Pekerja 0.0111 Oh Mandor Pengadaan 1 tiang pancang mini pile25/25 = 6m 6.0000 m' Tiang pancang

330,604.17

1 m' Memancang Tiang Mini Pile 0.1944 jam Hidrolic Jack Hammer 0.1111 Oh Pekerja 0.0556 Oh Tukang 0.0278 Oh Mandor 0.0278 Oh Operator pancang

46,875.00 120,000.00 150,000.00 180,000.00 165,000.00 Jumlah

AN.03.d.1

Memancang 1Tiang Mini Pile 25/25 = 6m 6.0000 m' Tiang pancang

40,364.58

AN.04.a 1,800.00 650,000.00 550,000.00 80.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah

Kg M³ M³ liter OH OH OH OH

1,800.00 650,000.00 550,000.00 80.00 120,000.00 150,000.00 165,000.00 180,000.00

1 m3 Beton mutu f'c = 21.7 Mpa (K 250), slump (12 ± 2) cm, w/c = 0,56 1.000 0.300 0.500 0.050 0.150

M3 OH OH OH OH

Beton K-250 Redimix Pekerja Tukang Kepala Tukang Mandor

2,666.67 2,000.00 4,666.67

330,604.17

-

1,983,625.00

13,333.33 8,333.33 5,000.00 4,583.33 31,250.00

40,364.58

242,187.50 242,187.50

-

242,187.50

414,000.00 357,500.00 385,000.00 17,200.00 144,000.00 30,000.00 3,300.00 10,800.00 188,100.00

1,361,800.00

SNI : 7394:2008

Semen Portland Pasir beton Koral air Pekerja Tukang Kepala Tukang Mandor Jumlah

AN.04.c

213,075.00

9,114.58

1,173,700.00

1 m3 Beton lantai kerja mutu f'c = 19,3 Mpa (K 225) 371.00 0.43 0.72 215.00 1.200 0.200 0.020 0.060

25,575.00 25,575.00

SNI : 7394:2008

1 m3 Beton lantai kerja mutu f'c = 7,4 Mpa (K 100), slump (3-6) cm (Rabat) 230.00 Kg Semen Portland 0.55 M³ Pasir beton 0.70 M³ Koral 215.00 liter air 1.200 OH Pekerja 0.200 OH Tukang 0.020 OH Kepala Tukang 0.060 OH Mandor AN.04.b

25,575.00

1,983,625.00 1,983,625.00

9,114.58

Jumlah PEKERJAAN BETON

AN.04

187,500.00

7,500.00 825.00 2,250.00 10,575.00

325,937.50

Jumlah AN.03.d

TOTAL HARGA (Rp)

15,000.00

15,000.00

Jumlah AN.03.c1

JUMLAH HARGA UPAH (Rp)

PEKERJAAN PANCANG 1 M' Memancang tiang 10x10 0.1250 Oh Pekerja 0.0500 Oh Tukang 0.0050 Oh Kepala Tukang 0.0125 Oh mandor Jumlah

AN.03.b

JUMLAH HARGA BAHAN (Rp)

667,800.00 279,500.00 396,000.00 17,200.00

1,360,500.00

144,000.00 30,000.00 3,300.00 10,800.00 188,100.00

1,548,600.00

SNI : 7394:2008 1,850,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah

1,850,000.00

1,850,000.00

36,000.00 75,000.00 8,250.00 27,000.00 146,250.00

1,996,250.00

ANALISA HARGA SATUAN Kota Bontang

NO

AN.04.d

URAIAN PEKERJAAN

HARGA SATUAN (Rp)

Pembesian 10 kg dengan besi polos atau ulir 10.500 Kg Besi beton 0.150 Kg Kawat bendrat 0.070 OH Pekerja 0.070 OH Tukang 0.007 OH Kepala Tukang 0.004 OH Mandor

22,000.00 20,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah

AN.04.e

Pembesian 1 kg jaring kawat baja/wire mesh 1.020 Kg Kawat Wiremesh M6 0.050 Kg Kawat bendrat 0.025 OH Pekerja 0.025 OH Tukang 0.002 OH Kepala Tukang 0.001 OH Mandor

AN.04.f

1 m2 bekisting untuk pondasi 0.040 m3 Kayu Begisting 0.300 kg Paku biasa 5cm - 10cm 0.100 liter Minyak begisting 0.520 OH Pekerja 0.260 OH Tukang 0.026 OH Kepala Tukang 0.026 OH Mandor

AN.04.g

1 M² Pasang Bekisting untuk sloof 3x Pakai Kayu Begisting 0.016 m3 Paku biasa 5cm - 10cm 0.105 kg Minyak begisting 0.035 liter Pekerja 0.182 OH Tukang 0.091 OH Kepala Tukang 0.009 OH Mandor 0.009 OH

AN.04.h

1 M² Pasang Bekisting untuk kolom 3x Pakai Kayu begisting 0.014 M³ Paku biasa 5cm - 10cm 0.140 Kg Minyak begisting 0.070 Ltr Kayu meranti balok 0.005 M³ Plywood tebal 9 mm 0.123 Lbr Dolken kayu galam 0.700 Btg Pekerja 0.150 OH Tukang 0.105 OH Kepala Tukang 0.005 OH Mandor 0.005 OH

AN.04.i

1 M² Pasang Bekisting untuk balok/Ring Balk 2x Pakai Kayu begisting 0.022 M³ Paku biasa 5cm - 10cm 0.220 Kg Minyak begisting 0.110 Ltr Kayu meranti balok 0.010 M³ Plywood tebal 9 mm 0.193 Lbr Dolken kayu galam 1.100 Btg Pekerja 0.300 OH Tukang 0.150 OH Kepala Tukang 0.018 OH Mandor 0.018 OH

JUMLAH HARGA BAHAN (Rp)

JUMLAH HARGA UPAH (Rp)

TOTAL HARGA (Rp)

SNI : 7394:2008 231,000.00 3,000.00 8,400.00 10,500.00 1,155.00 720.00 20,775.00

234,000.00 1 kg -------------------> Jumlah 40,500.00 41,310.00 20,000.00 1,000.00 120,000.00 3,000.00 150,000.00 3,750.00 165,000.00 330.00 180,000.00 180.00 Jumlah 42,310.00 7,260.00 SNI : 7394:2008 3,500,000.00 140,000.00 20,000.00 6,000.00 15,000.00 1,500.00 120,000.00 62,400.00 150,000.00 39,000.00 165,000.00 4,290.00 180,000.00 4,680.00 Jumlah 7,500.00 110,370.00 SNI : 7394:2008 3,500,000.00 55,125.00 20,000.00 2,100.00 15,000.00 525.00 120,000.00 21,840.00 150,000.00 13,650.00 165,000.00 1,501.50 180,000.00 1,638.00 Jumlah 57,750.00 38,629.50 SNI : 7394:2008 3,500,000.00 49,000.00 20,000.00 2,800.00 15,000.00 1,050.00 3,500,000.00 18,375.00 180,000.00 22,050.00 17,000.00 11,900.00 120,000.00 18,000.00 150,000.00 15,750.00 165,000.00 825.00 180,000.00 900.00 Jumlah 105,175.00 35,475.00 SNI : 7394:2008 3,500,000.00 77,000.00 20,000.00 4,400.00 15,000.00 1,650.00 3,500,000.00 34,650.00 180,000.00 34,650.00 17,000.00 18,700.00 120,000.00 36,000.00 150,000.00 22,500.00 165,000.00 2,994.75 180,000.00 3,267.00 Jumlah 171,050.00 64,761.75

254,775.00 25,477.50

49,570.00

117,870.00

96,379.50

140,650.00

235,811.75

ANALISA HARGA SATUAN Kota Bontang

NO

AN.04.j

URAIAN PEKERJAAN

1 m2 bekisting untuk plat lantai 2x pakai Kayu begisting 0.022 M³ Paku biasa 5cm - 10cm 0.220 Kg Minyak begisting 0.110 Ltr Kayu meranti balok 0.008 M³ Plywood tebal 9 mm 0.193 Lbr Dolken kayu galam 3.300 Btg Pekerja 0.300 OH Tukang 0.150 OH Kepala Tukang 0.018 OH Mandor 0.018 OH

HARGA SATUAN (Rp)

3,500,000.00 20,000.00 15,000.00 3,500,000.00 180,000.00 17,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah

AN.04.k

AN.04.l

M³ Kg Ltr M³ Lbr Btg OH OH OH OH

Kayu begisting Paku biasa 5cm - 10cm Minyak begisting Kayu meranti balok Plywood tebal 9 mm Dolken kayu galam Pekerja Tukang Kepala Tukang Mandor

3,500,000.00 20,000.00 15,000.00 3,500,000.00 180,000.00 17,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah

AN.05.a

145,612.50

Semen Portland Pasir beton

1,800.00 650,000.00

444,600.00 338,000.00

0.780 215.000 1.650 0.275 0.028 0.083

Koral Air Pekerja Tukang Kepala Tukang Mandor

550,000.00 80.00 120,000.00 150,000.00 165,000.00 180,000.00

429,000.00 17,200.00

1 m3 Cor Camp. 1 : 2 : 3 371.000 Kg Semen Portland 0.520 M³ Pasir beton 0.780 M³ Koral 215.000 liter Air 1.000 OH Pekerja 0.500 OH Tukang 0.150 OH Kepala Tukang 0.160 OH Mandor

1,800.00 650,000.00 550,000.00 80.00 120,000.00 150,000.00 165,000.00 180,000.00

1 m3 Pembongkaran beton bertulang 13.334 OH Pekerja 0.666 OH Mandor

120,000.00 180,000.00 Jumlah PEKERJAAN DINDING

AN.05

64,761.75

267,436.75

57,750.00 4,400.00 1,237.50 28,875.00 34,650.00 18,700.00

247.000 Kg 0.520 M³

Jumlah AN.04.n

SNI : 7394:2008 77,000.00 4,400.00 1,650.00 28,875.00 34,650.00 56,100.00 36,000.00 22,500.00 2,994.75 3,267.00

43,560.00 27,225.00 2,994.75 3,267.00 77,046.75

222,659.25

198,000.00 41,250.00 4,620.00 14,940.00 258,810.00

1,487,610.00

120,000.00 75,000.00 24,750.00 28,800.00 248,550.00

1,700,550.00

SNI : 2002

Jumlah AN.04.m

TOTAL HARGA (Rp)

SNI : 7394:2008

1 m3 Beton Cor Camp. 1 : 3 : 5

M³ liter OH OH OH OH

JUMLAH HARGA UPAH (Rp)

202,675.00

1 m2 bekisting untuk tangga 2x Pakai 0.017 0.220 0.083 0.008 0.193 1.100 0.363 0.182 0.018 0.018

JUMLAH HARGA BAHAN (Rp)

1 M² Pasangan Bata Merah tebal ½ bata , 1 Pc : 2 Ps 45.500 Bh Bata Merah 14.138 Kg Semen portland

1,000.00 1,800.00

0.026 M³ 0.600 OH 0.200 OH

Pasir pasang Pekerja Tukang

500,000.00 120,000.00 150,000.00

0.020 OH 0.030 OH

Kepala Tukang Mandor

165,000.00 180,000.00 Jumlah

1,228,800.00 SNI : 2002 667,800.00 338,000.00 429,000.00 17,200.00

1,452,000.00 SNI : 2002 1,600,080.00 119,880.00 1,719,960.00

1,719,960.00

SNI 6897 : 2008 45,500.00 25,447.50 13,000.00 72,000.00 30,000.00 3,300.00 5,400.00 83,947.50

110,700.00

194,647.50

ANALISA HARGA SATUAN Kota Bontang

NO

AN.05.b

URAIAN PEKERJAAN

HARGA SATUAN (Rp)

1 M² Pasangan Bata Merah tebal ½ bata , 1 Pc : 4 Ps 45.500 Bh Bata Merah

1,000.00 1,800.00 500,000.00

0.500 OH 0.150 OH

Pekerja Tukang

120,000.00 150,000.00

60,000.00 22,500.00

0.010 OH 0.005 OH

Kepala Tukang Mandor

165,000.00 180,000.00

1,650.00 900.00 76,144.25

1,800.00

18,403.20

0.020 M³ 0.300 OH

Pasir pasang Pekerja

500,000.00 120,000.00

10,000.00

0.150 OH 0.015 OH

Tukang Kepala Tukang

150,000.00 165,000.00

0.015 OH

Mandor

22,500.00 2,475.00 2,700.00 63,675.00

92,078.20

SNI 2837 : 2008

6.240 Kg 0.024 M³

Semen portland Pasir pasang

1,800.00 500,000.00

0.300 OH 0.150 OH

Pekerja Tukang

120,000.00 150,000.00

36,000.00 22,500.00

0.015 OH 0.015 OH

Kepala Tukang Mandor

165,000.00 180,000.00

2,475.00 2,700.00

11,232.00 12,000.00

23,232.00

63,675.00

86,907.00

SNI 2837 : 2008

1 m2 Acian 3.250 kg 0.200 OH 0.100 OH

Semen portland Pekerja Tukang

1,800.00 120,000.00 150,000.00

0.010 OH 0.010 OH

Kepala Tukang Mandor

165,000.00 180,000.00

5,850.00 24,000.00 15,000.00 1,650.00 1,800.00 29,850.00

18,450.00

48,300.00

PEKERJAAN ATAP 1 M2 Pasang konstruksi kuda-kuda baja Ringan 1.000 M2 Pasang Kuda - Kuda Baja Ringan

200,000.00 Jumlah

SNI : 03-3436-2002 200,000.00 200,000.00 SNI : 03-3436-2002

1 M² : Pasang atap genteng metal 1.020 Lbr 0.200 Kg

Genteng metal Paku genteng metal

142,500.00 25,000.00

145,350.00 5,000.00

0.200 0.100 0.010 0.001

Pekerja Tukang Kepala Tukang Mandor

120,000.00 150,000.00 165,000.00 180,000.00

24,000.00 15,000.00 1,650.00 180.00 150,350.00 40,830.00 SNI : 03-3436-2002 80,850.00 1,250.00 30,000.00 22,500.00 2,475.00 2,340.00 82,100.00 57,315.00

OH OH OH OH

Jumlah AN.06.c

161,194.25

36,000.00

28,403.20

Jumlah

AN.06.b

85,050.00

180,000.00

1 M² Plesteran 1 Pc : 4 Ps

AN.06 AN.06.a

15,531.75 15,112.50

SNI 2837 : 2008

1 M² Plesteran 1 Pc : 2 Ps 10.224 Kg Semen portland

Jumlah AN.05.e

TOTAL HARGA (Rp)

SNI 6897 : 2008 45,500.00

Semen portland Pasir pasang

Jumlah AN.05.d

JUMLAH HARGA UPAH (Rp)

8.629 Kg 0.030 M³

Jumlah AN.05.c

JUMLAH HARGA BAHAN (Rp)

1 M' : Pasang nok genteng metal 1.100 Bh Bubungan Genteng Metal 0.050 Kg Paku genteng metal 0.250 OH Pekerja 0.150 OH Tukang 0.015 OH Kepala Tukang 0.013 OH Mandor

73,500.00 25,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah

200,000.00

191,180.00

139,415.00

ANALISA HARGA SATUAN Kota Bontang

NO

AN.06.d

AN.06.e

URAIAN PEKERJAAN

1 m' Pasang talang datar/ jurai seng BJLS 25 lebar 90 cm 1.050 m' seng BJLS 25 lebar 90 cm 0.015 kg Paku 1 cm - 2,5 cm 0.019 m3 Kayu meranti papan 0.200 OH Pekerja 0.400 OH Tukang 0.025 OH Kepala Tukang 0.010 OH Mandor

HARGA SATUAN (Rp)

61,500.00 20,000.00 6,205,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah

M2 Kg OH OH OH OH

Calsi Board 9 mm Paku 1 cm - 2,5 cm Pekerja Tukang Kepala Tukang Mandor

235,000.00 20,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah

1 m2 Pasang aluminium foil/ Sisalation 1.050 m2 Sisalation/ aluminium foil 0.150 OH Pekerja 0.050 OH Tukang 0.005 OH Kepala Tukang 0.008 OH Mandor

9,000.00 120,000.00 150,000.00 165,000.00 180,000.00

1 M² : Pasang atap Zincalum Atap Zincalume 1.020 Lbr Paku genteng metal 0.200 Kg Pekerja 0.200 OH Tukang 0.100 OH Kepala Tukang 0.010 OH Mandor 0.001 OH

135,000.00 25,000.00 120,000.00 150,000.00 165,000.00 180,000.00

1 M² : Pasang atap genteng Keramik 13.600 Bh Genteng Keramik 0.200 0.100 0.010 0.001

OH OH OH OH

37,500.00

Pekerja Tukang Kepala Tukang Mandor

120,000.00 150,000.00 165,000.00 180,000.00 Jumlah

AN.06.i

1 M' : Pasang nok Genteng keramik 3.800 Bh Bubungan Zincalume 0.250 OH Pekerja 0.150 OH Tukang 0.015 OH Kepala Tukang 0.013 OH Mandor

78,750.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah

AN.06.j

24,000.00 60,000.00 4,125.00 1,800.00 89,925.00

154,800.00

12,000.00 15,000.00 1,650.00 9,000.00 37,650.00

67,050.00

18,000.00 7,500.00 825.00 1,440.00 9,765.00

19,215.00

28,200.00 1,200.00

9,450.00

137,700.00 5,000.00 24,000.00 15,000.00 1,650.00 180.00 142,700.00 40,830.00 SNI : 03-3436-2002 510,000.00 24,000.00 15,000.00 1,650.00 180.00 510,000.00 40,830.00 SNI : 03-3436-2002 299,250.00 30,000.00 22,500.00 2,475.00 2,340.00 299,250.00 57,315.00

183,530.00

550,830.00

356,565.00

1 M² : Pasang atap bahan bitumen 1.000 0.200 0.100 0.010 0.001

Bh OH OH OH OH

Genteng Bitumen Pekerja Tukang Kepala Tukang Mandor

150,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah

AN.06.k

64,875.00

9,450.00

Jumlah AN.06.h

TOTAL HARGA (Rp)

SNI : 7393:2008 64,575.00 300.00

29,400.00

Jumlah AN.06.g

JUMLAH HARGA UPAH (Rp)

1 M' Pasang listplank Calsiboard ukuran 2 x.30 - rangkap 20 cm 0.120 0.060 0.100 0.100 0.010 0.050

AN.06.f

JUMLAH HARGA BAHAN (Rp)

150,000.00

150,000.00

24,000.00 15,000.00 1,650.00 180.00 40,830.00

190,830.00

30,000.00 22,500.00 2,475.00 2,340.00 57,315.00

154,815.00

1 M : Pasang nok bahan bitumen 1.000 0.250 0.150 0.015 0.013

Lbr OH OH OH OH

Nok Genteng Bitumen Pekerja Tukang Kepala Tukang Mandor

97,500.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah

97,500.00

97,500.00

ANALISA HARGA SATUAN Kota Bontang

NO

HARGA SATUAN (Rp)

URAIAN PEKERJAAN

AN.07 AN.07.a

JUMLAH HARGA BAHAN (Rp)

1 M² Pasang langit-langit calsiboard 0.350 Lbr Calsi Board 4 mm 0.010 Dos Paku Calsi Board 0.100 Pack Kompon 0.028 Roll Fiber Tape 0.100 Oh Pekerja 0.050 Oh Mandor 0.005 Oh Tukang 0.005 Oh Kepala Tukang

150,000.00 18,000.00 35,000.00 35,000.00 120,000.00 180,000.00 150,000.00 165,000.00

1 m2 Memasang Plafondn gypsum board, uk. (120 x 240 x 0.9)cm 0.364 lbr Gypsum board 0.110 kg Paku Gypsum 0.100 Pack Kompon 0.028 Roll Fiber Tape 0.100 OH Pekerja 0.050 OH Tukang 0.005 OH Kepala Tukang 0.005 OH Mandor

165,000.00 20,000.00 35,000.00 35,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah

AN.07.c

1 m1 Memasang list gypsum profil 1.050 m' List Plafond Gypsum 0.150 kg Tepung Gypsum 0.060 OH Pekerja 0.060 OH Tukang 0.006 OH Kepala Tukang 0.003 OH Mandor

40,000.00 6,750.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah

AN.07.d

1 M2 Pasang Rangka Plafond Metal furring Rangka Plafond Metal Furring 1.000 m'

AN.08 AN.08.a

145,000.00 Jumlah PEKERJAAN PENUTUP LANTAI & DINDING

1 M² : Pasang Lantai Keramik 40 x 40 cm 6.250 Bh Keramik lantai 40/40 14.150 Kg Semen portland 0.039 M³ Pasir pasang 2.000 Kg Semen warna 0.560 OH Pekerja 0.300 OH Tukang 0.030 OH Kepala Tukang 0.030 OH Mandor

51,000.00 1,800.00 500,000.00 5,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah

AN.08.b

1 M² : Pasang Lantai Keramik 20 x 20 cm 26.500 bh Keramik lantai 20/20 9.300 kg Semen portland 0.018 m3 Pasir pasang 1.940 kg Semen warna 0.090 OH Pekerja 0.450 OH Tukang 0.045 OH Kepala Tukang 0.045 OH Mandor

6,000.00 1,800.00 500,000.00 5,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah

AN.08.c

TOTAL HARGA (Rp)

PEKERJAAN PLAFOND

Jumlah AN.07.b

JUMLAH HARGA UPAH (Rp)

1 M² : Pasang Keramik Dinding 20 x 40 cm 12.500 Bh Keramik dinding 20/40 9.300 Kg Semen portland 0.018 M³ Pasir pasang 1.552 Kg Semen warna 0.090 OH Pekerja 0.450 OH Tukang 0.045 OH Kepala Tukang 0.045 OH Mandor

8,775.00 1,800.00 500,000.00 5,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah

52,500.00 180.00 3,500.00 980.00 12,000.00 9,000.00 750.00 825.00 57,160.00 22,575.00 SNI : 2839:2008 60,060.00 2,200.00 3,500.00 980.00 12,000.00 7,500.00 825.00 900.00 66,740.00 21,225.00 SNI : 2839:2008 42,000.00 1,012.50 7,200.00 9,000.00 990.00 540.00 43,012.50 17,730.00 SNI : 2839:2008 145,000.00 145,000.00 -

79,735.00

87,965.00

60,742.50

145,000.00

318,750.00 25,470.00 19,500.00 10,000.00 67,200.00 45,000.00 4,950.00 5,400.00 373,720.00 122,550.00 SNI : 7395:2008 159,000.00 16,740.00 9,000.00 9,700.00 10,800.00 67,500.00 7,425.00 8,100.00 194,440.00 93,825.00

496,270.00

288,265.00

109,687.50 16,740.00 9,000.00 7,760.00

143,187.50

10,800.00 67,500.00 7,425.00 8,100.00 93,825.00

237,012.50

ANALISA HARGA SATUAN Kota Bontang

NO

AN.08.d

URAIAN PEKERJAAN

HARGA SATUAN (Rp)

1 M' : Pasang Plint Keramik artistik 5.000 Bh Plint keramik artistik 1.650 Kg Semen portland 0.003 M³ Pasir pasang 0.100 Kg Semen warna 0.900 OH Pekerja 0.090 OH Tukang 0.009 OH Kepala Tukang 0.005 OH Mandor

14,625.00 1,800.00 500,000.00 5,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah

AN.08.e

1 M' : Pasang Plint Keramik lantai 2.500 Bh Plint keramik lantai 1.650 Kg Semen portland 0.003 M³ Pasir pasang 0.100 Kg Semen warna 0.900 OH Pekerja 0.090 OH Tukang 0.009 OH Kepala Tukang 0.005 OH Mandor

9,000.00 1,800.00 500,000.00 5,000.00 120,000.00 150,000.00 165,000.00 180,000.00

1 M2 : Pasang Dinding Batu tempel/Alam Batu tempel/Alam 1.100 M2 Semen portland 11.750 Kg Pasir pasang 0.003 M³ Pekerja 0.700 OH Tukang 0.350 OH Kepala Tukang 0.035 OH Mandor 0.035 OH Jumlah

AN.08.g

1 M2 : Pasang Step nosing lantai Tangga 50.000 Bh Step Nosing 1.650 Kg Semen portland 0.003 M³ Pasir pasang 0.100 Kg Semen warna 0.900 OH Pekerja 0.090 OH Tukang 0.009 OH Kepala Tukang 0.005 OH Mandor Jumlah

AN.08.h

1 M' : List Keramik dinding km/wc 6x20 5.000 Bh Keramik list dinding 6x20 0.330 Kg Semen portland 0.001 M³ Pasir pasang 0.020 Kg Semen warna 0.180 OH Pekerja 0.018 OH Tukang 0.002 OH Kepala Tukang 0.001 OH Mandor Jumlah

AN.08.i

1 M² : Pasang Lantai Granit 60 x 60 cm 2.778 Bh Granit Lantai 60/60 14.150 Kg Semen portland 0.039 M³ Pasir pasang 2.000 Kg Semen warna 0.620 OH Pekerja 0.350 OH Tukang 0.035 OH Kepala Tukang 0.030 OH Mandor Jumlah

AN.08.j

1 M2 PASANGAN Batu Sikat 1.000 m2 Pas Batu Sikat

151,365.00

84,000.00 52,500.00 5,775.00 6,300.00 148,575.00

468,325.00

108,000.00 13,500.00 1,485.00 810.00 123,795.00

901,365.00

21,600.00 2,700.00 297.00 162.00 24,759.00

44,523.00

74,400.00 52,500.00 5,775.00 5,400.00 138,075.00

1,234,711.67

1,041,666.67 25,470.00 19,500.00 10,000.00

1,096,636.67 570,000.00

Jumlah

108,000.00 13,500.00 1,485.00 810.00 123,795.00

18,750.00 594.00 320.00 100.00

19,764.00 375,000.00 1,800.00 500,000.00 5,000.00 120,000.00 150,000.00 165,000.00 180,000.00

201,990.00

772,500.00 2,970.00 1,600.00 500.00

777,570.00 3,750.00 1,800.00 500,000.00 5,000.00 120,000.00 150,000.00 165,000.00 180,000.00

108,000.00 13,500.00 1,485.00 810.00 123,795.00

297,000.00 21,150.00 1,600.00

319,750.00 15,450.00 1,800.00 500,000.00 5,000.00 120,000.00 150,000.00 165,000.00 180,000.00

TOTAL HARGA (Rp)

22,500.00 2,970.00 1,600.00 500.00

27,570.00 270,000.00 1,800.00 500,000.00 120,000.00 150,000.00 165,000.00 180,000.00

JUMLAH HARGA UPAH (Rp)

73,125.00 2,970.00 1,600.00 500.00

78,195.00

Jumlah AN.08.f

JUMLAH HARGA BAHAN (Rp)

570,000.00 570,000.00

-

570,000.00

ANALISA HARGA SATUAN Kota Bontang

NO

AN.08.k

URAIAN PEKERJAAN

HARGA SATUAN (Rp)

1 M² : Pasang Lantai Homogenius uk. 60/60 2.778 bh Keramik Homogenius 60/60 9.300 kg Semen portland 0.018 m3 Pasir pasang 1.940 kg Semen warna 0.075 OH Pekerja 0.300 OH Tukang 0.045 OH Kepala Tukang 0.045 OH Mandor

195,000.00 1,800.00 500,000.00 5,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah

AN.08.l

1 M² : Pasang Lantai Homogenius uk. 80/80 1.563 bh Keramik Homogenius 80/80 9.300 kg Semen portland 0.018 m3 Pasir pasang 1.940 kg Semen warna 0.090 OH Pekerja 0.450 OH Tukang 0.045 OH Kepala Tukang 0.045 OH Mandor

150,000.00 1,800.00 500,000.00 5,000.00 120,000.00 150,000.00 165,000.00 180,000.00

1 M² : Pasang Lantai Homogenius uk. 100/100 1.000 bh Keramik Homogenius 100/100 9.300 kg Semen portland 0.018 m3 Pasir pasang 1.940 kg Semen warna 0.090 OH Pekerja 0.450 OH Tukang 0.045 OH Kepala Tukang 0.045 OH Mandor Jumlah

AN.08.n

1 M² : Pasangan Paving Block Segi Enam 36.500 bh Paving Block 0.178 m3 Pasir Urug 0.250 OH Pekerja 0.125 OH Tukang 0.013 OH Kepala Tukang 0.013 OH Mandor Jumlah

AN.08.o

1 M² : Pasang Lantai Homogenius uk. 100/100 1.000 bh Keramik Homogenius 100/100 9.300 kg Semen portland 0.018 m3 Pasir pasang 1.940 kg Semen warna 0.090 OH Pekerja 0.450 OH Tukang 0.045 OH Kepala Tukang 0.045 OH Mandor Jumlah

AN.08.p

1 M² : Pasang Dinding Keramik Border 20 x 20 cm 26.500 bh Dinding Keramik Border 20/20 9.300 kg Semen portland 0.018 m3 Pasir pasang 1.940 kg Semen warna 0.090 OH Pekerja 0.450 OH Tukang 0.045 OH Kepala Tukang 0.045 OH Mandor

4,200.00 1,800.00 500,000.00 5,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah

646,631.67

10,800.00 67,500.00 7,425.00 8,100.00 93,825.00

363,640.00

10,800.00 67,500.00 7,425.00 8,100.00 93,825.00

298,015.00

30,000.00 18,750.00 2,145.00 2,340.00 53,235.00

307,835.00

219,000.00 35,600.00

254,600.00 168,750.00 1,800.00 500,000.00 5,000.00 120,000.00 150,000.00 165,000.00 180,000.00

9,000.00 45,000.00 7,425.00 8,100.00 69,525.00

168,750.00 16,740.00 9,000.00 9,700.00

204,190.00 6,000.00 200,000.00 120,000.00 150,000.00 165,000.00 180,000.00

TOTAL HARGA (Rp)

234,375.00 16,740.00 9,000.00 9,700.00

269,815.00 168,750.00 1,800.00 500,000.00 5,000.00 120,000.00 150,000.00 165,000.00 180,000.00

JUMLAH HARGA UPAH (Rp)

541,666.67 16,740.00 9,000.00 9,700.00

577,106.67

Jumlah AN.08.m

JUMLAH HARGA BAHAN (Rp)

168,750.00 16,740.00 9,000.00 9,700.00 10,800.00 67,500.00 7,425.00 8,100.00 204,190.00 93,825.00 SNI : 7395:2008 111,300.00 16,740.00 9,000.00 9,700.00 10,800.00 67,500.00 7,425.00 8,100.00 146,740.00 93,825.00

298,015.00

240,565.00

ANALISA HARGA SATUAN Kota Bontang

NO

AN.08.q

URAIAN PEKERJAAN

HARGA SATUAN (Rp)

1 M² : Pasang Dinding Keramik Border 30 x 30 11.000 bh Keramik lantai 30/30 9.300 kg Semen portland 0.018 m3 Pasir pasang 1.940 kg Semen warna 0.090 OH Pekerja 0.450 OH Tukang 0.045 OH Kepala Tukang 0.045 OH Mandor

7,250.00 1,800.00 500,000.00 5,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah

AN.08.r

1 M² : Pasang Lantai Vinyl OutDoor 10/90 11.000 bh Vinyl 10/90 8.000 kg Semen portland 0.018 m3 Self leveling floor 3-10 mm 1.940 kg Lem/adhesive 0.090 OH Pekerja 0.450 OH Tukang 0.045 OH Kepala Tukang 0.045 OH Mandor

Jumlah PEKERJAAN SANITAIR

AN.09 AN.09.a

33,000.00 1,800.00 287,000.00 64,600.00 120,000.00 150,000.00 165,000.00 180,000.00

Memasang 1 m' pipa PVC type AW Ø ½" 1.200 M' Pipa PVC Ø 1/2" Perlengkapan (35% Harga pipa) 0.036 OH Pekerja 0.060 OH Tukang 0.006 OH Kepala Tukang 0.002 OH Mandor

15,000.00 5,250.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah

AN.09.b

Memasang 1 m' pipa PVC type AW Ø 3/4" 1.200 M' Pipa PVC Ø 3/4" Perlengkapan (35% Harga pipa) 0.030 OH Pekerja 0.060 OH Tukang 0.006 OH Kepala Tukang 0.002 OH Mandor

19,500.00 6,825.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah

AN.09.c

Memasang 1 m' pipa PVC type AW Ø 4" 1.200 M' Pipa PVC Ø 4" Perlengkapan (35% Harga pipa) 0.036 OH Pekerja 0.060 OH Tukang 0.006 OH Kepala Tukang 0.002 OH Mandor

86,625.00 30,318.75 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah

AN.09.d

Memasang 1 m' pipa PVC type AW Ø 3" 1.200 M' Pipa PVC Ø 3" Perlengkapan (35% Harga pipa) 0.036 OH Pekerja 0.060 OH Tukang 0.006 OH Kepala Tukang 0.002 OH Mandor

110,812.50 38,784.38 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah

AN.09.d'

Memasang 1 m' pipa PVC type AW Ø 6" 1.200 M' Pipa PVC Ø 6" Perlengkapan (35% Harga pipa) 0.036 OH Pekerja 0.060 OH Tukang 0.006 OH Kepala Tukang 0.002 OH Mandor

210,000.00 73,500.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah

JUMLAH HARGA BAHAN (Rp)

JUMLAH HARGA UPAH (Rp)

SNI : 7395:2008 79,750.00 16,740.00 9,000.00 9,700.00 10,800.00 67,500.00 7,425.00 8,100.00 115,190.00 93,825.00 SNI : 7395:2008 363,000.00 14,400.00 5,166.00 125,324.00 10,800.00 67,500.00 7,425.00 8,100.00 507,890.00 93,825.00

TOTAL HARGA (Rp)

209,015.00

601,715.00

SNI : 2002 18,000.00 -

18,000.00 SNI : 2002 23,400.00 6,825.00

30,225.00 SNI : 2002 103,950.00 30,318.75

134,268.75 SNI : 2002 132,975.00 38,784.38

171,759.38 SNI : 2002 252,000.00 73,500.00

325,500.00

4,320.00 9,000.00 990.00 324.00 14,634.00

32,634.00

3,600.00 9,000.00 990.00 324.00 13,914.00

44,139.00

4,320.00 9,000.00 990.00 324.00 14,634.00

148,902.75

4,320.00 9,000.00 990.00 324.00 14,634.00

186,393.38

4,320.00 9,000.00 990.00 324.00 14,634.00

340,134.00

ANALISA HARGA SATUAN Kota Bontang

NO

AN.09.e

URAIAN PEKERJAAN

HARGA SATUAN (Rp)

Memasang 1 buah kran Ø 3/4" - ½" 1.000 Bh Kran 1/2" 0.250 Bh Seal tape 0.010 OH Pekerja 0.100 OH Tukang 0.010 OH Kepala Tukang 0.005 OH Mandor

37,500.00 4,350.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah

AN.09.f

Memasang 1 unit Pasang floordrain 1.000 Bh Floor drain 0.010 OH Pekerja 0.100 OH Tukang 0.010 OH Kepala Tukang 0.005 OH Mandor

37,500.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah

AN.09.g

Memasang 1 unit Pasang Kran Shower 1.000 Bh Kran Shower 0.010 OH Pekerja 0.100 OH Tukang 0.010 OH Kepala Tukang 0.005 OH Mandor

225,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah

AN.09.h

Memasang 1 unit Pasang Jet Washer 1.000 Bh Jet washer 0.010 OH Pekerja 0.100 OH Tukang 0.010 OH Kepala Tukang 0.005 OH Mandor

150,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah

AN.09.i

Memasang 1 buah Closet jongkok 1.000 Bh Closet Jongkok 6.000 Kg Semen portland 0.010 M³ Pasir pasang 1.000 OH Pekerja 0.500 OH Tukang 0.500 OH Kepala Tukang 0.160 OH Mandor

304,920.00 1,800.00 500,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah

AN.09.j

Memasang 1 buah Closet duduk 1.000 Bh Kloset duduk Perlengkapan (6% Harga closet) 3.300 OH Pekerja 1.100 OH Tukang batu 0.001 OH Kepala Tukang 0.160 OH Mandor

4,687,500.00

JUMLAH HARGA BAHAN (Rp)

TOTAL HARGA (Rp)

SNI : 2002 37,500.00 1,087.50

38,587.50 SNI : 2002 37,500.00

37,500.00 SNI : 2002 225,000.00

225,000.00 SNI : 2002 150,000.00

150,000.00 SNI : 2002 304,920.00 10,800.00 5,000.00

320,720.00 SNI : 2002 4,687,500.00 281,250.00

120,000.00 150,000.00 165,000.00 180,000.00 Jumlah

JUMLAH HARGA UPAH (Rp)

4,968,750.00

1,200.00 15,000.00 1,650.00 900.00 18,750.00

57,337.50

1,200.00 15,000.00 1,650.00 900.00 18,750.00

56,250.00

1,200.00 15,000.00 1,650.00 900.00 18,750.00

243,750.00

1,200.00 15,000.00 1,650.00 900.00 18,750.00

168,750.00

120,000.00 75,000.00 82,500.00 28,800.00 306,300.00

627,020.00

396,000.00 165,000.00 165.00 28,800.00 589,965.00

5,558,715.00

ANALISA HARGA SATUAN Kota Bontang

NO

AN.09.k

URAIAN PEKERJAAN

Memasang 1 buah Urinoir 1.000 Bh Urinoir Perlengkapan (30% Harga Urinoir) 6.000 kg Semen portland 0.010 m3 Pasir pasang 1.000 OH Pekerja 1.000 OH Tukang batu 0.100 OH Kepala Tukang 0.100 OH Mandor

HARGA SATUAN (Rp)

2,945,250.00 1,800.00 500,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah

AN.09.l

Memasang 1 buah Wastafel 1.000 Bh Urinoir Wastafel Perlengkapan (12% Harga wastafel) 6.000 kg Semen portland 0.010 m3 Pasir pasang 1.200 OH Pekerja 0.750 OH Tukang batu 0.070 OH Kepala Tukang 0.110 OH Mandor

1,472,625.00 1,800.00 500,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah

AN.09.m

1 buah bak mandi batu bata vol. 0,3 m3 45.000 bh bata merah 20.779 kg Semen portland 0.052 m3 Pasir pasang 84.000 bh Keramik lantai 20/20 1.039 kg Semen warna 1.500 OH Pekerja 0.750 OH Tukang 0.075 OH Kepala Tukang 0.075 OH Mandor

1,000.00 1,800.00 500,000.00 6,000.00 5,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah

AN.09.n

AN.11 AN.11.a

Memasang 1 m' pipa PVC type AW Ø 2" 1.200 M' Pipa PVC Ø 2" Perlengkapan (35% Harga pipa) 0.036 OH Pekerja 0.060 OH Tukang 0.006 OH Kepala Tukang 0.002 OH Mandor

32,812.50 11,484.38 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah PEKERJAAN BESI & ALUMINIUM

1 m2 Pasang pintu rolling door besi 1.000 m2 Pintu Rolling Door besi 1.200 OH Pekerja 1.200 OH Tukang besi konstruksi 0.120 OH Kepala Tukang 0.006 OH Mandor

433,125.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah

AN.11.b

AN.11.c

1 m2 Pasang pintu lipat (folding gate) 1.000 m2 Pintu lipat 0.440 OH Pekerja 0.440 OH Tukang 0.044 OH Kepala Tukang 0.022 OH Mandor

2,165,625.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah

1 m2 Pasang rolling door aluminium 1.000 m2 Rolling door aluminium 1.000 OH Pekerja 1.000 OH Tukang 0.100 OH Kepala Tukang 0.050 OH Mandor

300,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah

JUMLAH HARGA BAHAN (Rp)

JUMLAH HARGA UPAH (Rp)

TOTAL HARGA (Rp)

SNI : 2002 2,945,250.00 883,575.00 10,800.00 5,000.00

3,844,625.00 SNI : 2002 1,472,625.00 176,715.00 10,800.00 5,000.00

1,665,140.00 SNI : 2002 45,000.00 37,402.60 25,974.03 504,000.00 5,194.81

617,571.43 SNI : 2002 39,375.00 11,484.38

50,859.38

120,000.00 150,000.00 16,500.00 18,000.00 304,500.00

4,149,125.00

144,000.00 112,500.00 11,550.00 19,800.00 287,850.00

1,952,990.00

180,000.00 112,500.00 12,375.00 13,500.00 318,375.00

935,946.43

4,320.00 9,000.00 990.00 324.00 14,634.00

65,493.38

SNI : 7393:2008 433,125.00 144,000.00 180,000.00 19,800.00 1,080.00 433,125.00 344,880.00 SNI : 7393:2008 2,165,625.00 52,800.00 66,000.00 7,260.00 3,960.00 2,165,625.00 130,020.00 SNI : 7393:2008 300,000.00 120,000.00 150,000.00 16,500.00 9,000.00 300,000.00 295,500.00

778,005.00

2,295,645.00

595,500.00

ANALISA HARGA SATUAN Kota Bontang

NO

AN.11.e

URAIAN PEKERJAAN

Pintu PJ1 15.000 2.000 2.460 6.000 2.000 1.000 2.000 1.000 1.000 0.100 0.050

m' bh m2 bh bh bh bh OH OH OH OH

Profil aluminium Daun Pintu Kaca bening tebal 8mm Engsel pintu 4" Kunci pintu 2 slag Kunci Silinder Hendel Pintu Pekerja Tukang Kepala Tukang Mandor Acesories ( 6 % harga bahan ) Upah pembuatan profil ( 20 % bahan )

HARGA SATUAN (Rp)

140,000.00 1,425,000.00 232,500.00 75,000.00 225,000.00 354,000.00 300,000.00 120,000.00 150,000.00 165,000.00 180,000.00

Jumlah AN.11.f

Pintu PJ2 9.420 1.000 0.923 3.000 1.000 1.000 1.000 1.000 1.000 0.100 0.050

m' bh m2 bh bh bh bh OH OH OH OH

Profil aluminium Daun Pintu Kaca bening tebal 8mm Engsel pintu 4" Kunci pintu 2 slag Kunci Silinder Hendel Pintu Pekerja Tukang Kepala Tukang Mandor Acesories ( 6 % harga bahan ) Upah pembuatan profil ( 20 % bahan )

140,000.00 1,425,000.00 232,500.00 75,000.00 225,000.00 354,000.00 300,000.00 120,000.00 150,000.00 165,000.00 180,000.00

Jumlah AN.11.g

Pintu PJ3 24.600 3.360 4.510 2.000 2.000 2.000 1.000 1.000 0.100 0.050

m' m2 m2 bh bh bh OH OH OH OH

Profil aluminium Pintu Kaca 8mm Kaca bening tebal 8mm Engsel Tanam Pintu Kaca Kunci Tanam Pintu Kaca Hendel Pintu Kaca Pekerja Tukang Kepala Tukang Mandor Acesories ( 6 % harga bahan ) Upah pembuatan profil ( 20 % bahan )

140,000.00 232,500.00 232,500.00 1,500,000.00 735,000.00 325,000.00 120,000.00 150,000.00 165,000.00 180,000.00

Jumlah AN.11.h

Pintu PJ4 20.050 1.720 3.567 1.000 1.000 1.000 1.000 1.000 0.100 0.050

m' m2 m2 bh bh bh OH OH OH OH

Profil aluminium Pintu Kaca 8mm Kaca bening tebal 8mm Engsel Tanam Pintu Kaca Kunci Tanam Pintu Kaca Hendel Pintu Kaca Pekerja Tukang Kepala Tukang Mandor Acesories ( 6 % harga bahan ) Upah pembuatan profil ( 20 % bahan )

140,000.00 30,000.00 232,500.00 1,500,000.00 735,000.00 325,000.00 120,000.00 150,000.00 165,000.00 180,000.00

Jumlah

JUMLAH HARGA BAHAN (Rp)

JUMLAH HARGA UPAH (Rp)

TOTAL HARGA (Rp)

2,100,000.00 2,850,000.00 571,950.00 450,000.00 450,000.00 354,000.00 600,000.00

7,375,950.00

120,000.00 150,000.00 16,500.00 9,000.00 165,090.00 28,000.00 488,590.00

7,864,540.00

120,000.00 150,000.00 16,500.00 9,000.00 165,090.00 28,000.00 488,590.00

4,550,871.25

120,000.00 150,000.00 16,500.00 9,000.00 189,900.00 28,000.00 513,400.00

10,907,175.00

120,000.00 150,000.00 16,500.00 9,000.00 177,750.00 28,000.00 501,250.00

6,749,177.50

1,318,800.00 1,425,000.00 214,481.25 225,000.00 225,000.00 354,000.00 300,000.00

4,062,281.25 3,444,000.00 781,200.00 1,048,575.00 3,000,000.00 1,470,000.00 650,000.00

10,393,775.00 2,807,000.00 51,600.00 829,327.50 1,500,000.00 735,000.00 325,000.00

6,247,927.50

ANALISA HARGA SATUAN Kota Bontang

NO

AN.11.i

URAIAN PEKERJAAN

Pintu D1 4.900 1.000 3.000 1.000 1.000 1.000 1.000 0.100 0.050

m' bh bh bh bh OH OH OH OH

Profil aluminium Daun Pintu Engsel pintu 4" Kunci Silinder Hendel Pintu Pekerja Tukang Kepala Tukang Mandor Acesories ( 6 % harga bahan ) Upah pembuatan profil ( 20 % bahan )

HARGA SATUAN (Rp)

140,000.00 1,425,000.00 75,000.00 354,000.00 300,000.00 120,000.00 150,000.00 165,000.00 180,000.00

Jumlah AN.11.j

Pintu D2 4.800 1.000 3.000 1.000 1.000 1.000 1.000 0.100 0.050

m' bh bh bh bh OH OH OH OH

Profil aluminium Daun Pintu Engsel pintu 4" Kunci kamar mandi Hendel Pintu Pekerja Tukang Kepala Tukang Mandor Acesories ( 6 % harga bahan ) Upah pembuatan profil ( 20 % bahan )

140,000.00 1,425,000.00 75,000.00 260,250.00 300,000.00 120,000.00 150,000.00 165,000.00 180,000.00

Jendela W1 12.150 4.900 2.865 1.000 2.000 1.000 1.000 0.100 0.050

m' m' m2 bh bh OH OH OH OH

Profil aluminium Profil aluminium Daun Jendela Kaca bening tebal 8mm Rambuncis Engsel Jendela Casement Pekerja Tukang Kepala Tukang Mandor Acesories ( 6 % harga bahan ) Upah pembuatan profil ( 20 % bahan ) Jumlah

AN.11.l

Jendela W2 19.040 14.420 1.000 1.000 0.100 0.050

m' m2 OH OH OH OH

Profil aluminium Kaca bening tebal 8mm Pekerja Tukang Kepala Tukang Mandor Acesories ( 6 % harga bahan ) Upah pembuatan profil ( 20 % bahan ) Jumlah

AN.11.m

Jendela W3 6.300 1.143 1.000 1.000 0.100 0.050

m' m2 OH OH OH OH

Profil aluminium Kaca bening tebal 8mm Pekerja Tukang Kepala Tukang Mandor Acesories ( 6 % harga bahan ) Upah pembuatan profil ( 20 % bahan ) Jumlah

3,451,140.00

120,000.00 150,000.00 16,500.00 9,000.00 132,015.00 28,000.00 455,515.00

3,337,765.00

120,000.00 150,000.00 16,500.00 9,000.00 41,820.00 28,000.00 365,320.00

3,495,682.50

120,000.00 150,000.00 16,500.00 9,000.00 22,350.00 28,000.00 345,850.00

6,364,100.00

120,000.00 150,000.00 16,500.00 9,000.00 22,350.00 28,000.00 345,850.00

1,493,597.50

2,665,600.00 3,352,650.00

6,018,250.00 140,000.00 232,500.00 120,000.00 150,000.00 165,000.00 180,000.00

120,000.00 150,000.00 16,500.00 9,000.00 137,640.00 28,000.00 461,140.00

1,701,000.00 281,750.00 666,112.50 52,500.00 429,000.00

3,130,362.50 140,000.00 232,500.00 120,000.00 150,000.00 165,000.00 180,000.00

TOTAL HARGA (Rp)

672,000.00 1,425,000.00 225,000.00 260,250.00 300,000.00

2,882,250.00 140,000.00 57,500.00 232,500.00 52,500.00 214,500.00 120,000.00 150,000.00 165,000.00 180,000.00

JUMLAH HARGA UPAH (Rp)

686,000.00 1,425,000.00 225,000.00 354,000.00 300,000.00

2,990,000.00

Jumlah AN.11.k

JUMLAH HARGA BAHAN (Rp)

882,000.00 265,747.50

1,147,747.50

ANALISA HARGA SATUAN Kota Bontang

NO

AN.11.n

URAIAN PEKERJAAN

Jendela W4 16.400 2.490 1.000 1.000 0.100 0.050

m' m2 OH OH OH OH

HARGA SATUAN (Rp)

Profil aluminium Kaca bening tebal 8mm Pekerja Tukang Kepala Tukang Mandor Acesories ( 6 % harga bahan ) Upah pembuatan profil ( 20 % bahan )

140,000.00 232,500.00 120,000.00 150,000.00 165,000.00 180,000.00

Jumlah AN.11.o

m' m' m2 bh bh OH OH OH OH

Profil aluminium Profil aluminium Daun Jendela Kaca bening tebal 8mm Rambuncis Engsel Jendela Casement Pekerja Tukang Kepala Tukang Mandor Acesories ( 6 % harga bahan ) Upah pembuatan profil ( 20 % bahan ) Upah pembuatan daun jendela (20 % bahan)

140,000.00 57,500.00 232,500.00 52,500.00 214,500.00 120,000.00 150,000.00 165,000.00 180,000.00

Jendela W5 11.200 4.140 1.000 1.000 0.100 0.050

m' m2 OH OH OH OH

Profil aluminium Kaca bening tebal 8mm Pekerja Tukang Kepala Tukang Mandor Acesories ( 6 % harga bahan ) Upah pembuatan profil ( 20 % bahan )

140,000.00 232,500.00 120,000.00 150,000.00 165,000.00 180,000.00

Profil Alumunium 1.000 m' 1.000 OH 1.000 OH 0.100 OH 0.050 OH

3,220,775.00

120,000.00 150,000.00 16,500.00 9,000.00 41,820.00 28,000.00 11,500.00 376,820.00

1,459,282.50

120,000.00 150,000.00 16,500.00 9,000.00 22,350.00 28,000.00 345,850.00

2,876,400.00

Profil aluminium Pekerja Tukang Kepala Tukang Mandor Acesories ( 6 % harga bahan ) Upah pembuatan profil ( 20 % bahan )

120,000.00 150,000.00 16,500.00 9,000.00 8,400.00 28,000.00 331,900.00

140,000.00 120,000.00 150,000.00 165,000.00 180,000.00

1 m2 Kaca Bening 5 mm 1.000 m2 Kaca bening tebal 5mm 1.000 OH Pekerja 1.000 OH Tukang 0.100 OH Kepala Tukang 0.050 OH Mandor Acesories ( 6 % harga bahan ) Upah pembuatan profil ( 20 % bahan )

471,900.00

120,000.00 150,000.00 16,500.00 9,000.00 11,250.00 37,500.00 344,250.00

531,750.00

187,500.00 120,000.00 150,000.00 165,000.00 180,000.00

Kaca Es 3 mm Pekerja Tukang Kepala Tukang Mandor Acesories ( 6 % harga bahan ) Upah pembuatan profil ( 20 % bahan )

120,000.00 150,000.00 16,500.00 9,000.00 6,300.00 21,000.00 322,800.00

427,800.00

187,500.00

187,500.00 105,000.00 120,000.00 150,000.00 165,000.00 180,000.00

Jumlah

140,000.00

140,000.00

Jumlah 1 m2 Kaca Es 3mm 1.000 m2 1.000 OH 1.000 OH 0.100 OH 0.050 OH

1,568,000.00 962,550.00

2,530,550.00

Jumlah

AN.11.s

120,000.00 150,000.00 16,500.00 9,000.00 22,350.00 28,000.00 345,850.00

406,000.00 138,000.00 56,962.50 52,500.00 429,000.00

1,082,462.50

Jumlah

AN.11.r

TOTAL HARGA (Rp)

2,296,000.00 578,925.00

2,874,925.00

Jumlah

AN.11.q

JUMLAH HARGA UPAH (Rp)

Bouven 2.900 2.400 0.245 1.000 2.000 1.000 1.000 0.100 0.050

AN.11.p

JUMLAH HARGA BAHAN (Rp)

105,000.00

105,000.00

ANALISA HARGA SATUAN Kota Bontang

NO

AN.11.t

AN.12 AN.12.a

URAIAN PEKERJAAN

1 m2 Double Triplek Lapis HPL 0.364 lbr Plywood tebal 4 mm 0.110 kg Paku plywood 0.100 Pack Kompon 1.000 m2 HPL 0.028 Roll Fiber Tape 0.500 OH Pekerja 0.500 OH Tukang 0.005 OH Kepala Tukang 0.005 OH Mandor

Pasang 1 buah kunci tanam 1.000 bh Kunci Pintu 2 Slag 0.010 OH Pekerja 0.500 OH Tukang 0.010 OH Kepala Tukang 0.005 OH Mandor

AN.12.b

1 buah Pasang engsel pintu 1.000 bh Engsel pintu 4" 0.015 OH Pekerja 0.150 OH Tukang 0.015 OH Kepala Tukang 0.001 OH Mandor

AN.12.c

1 buah Pasang engsel jendela 1.000 bh Grendel jendela 0.015 OH Pekerja 0.150 OH Tukang 0.015 OH Kepala Tukang 0.001 OH Mandor

AN.12.d

1 buah Pasang Grendel jendela 1.000 bh Grendel jendela 0.015 OH Pekerja 0.150 OH Tukang 0.015 OH Kepala Tukang 0.001 OH Mandor

HARGA SATUAN (Rp)

SNI : 2839:2008 42,224.00 2,200.00 3,500.00 150,000.00 980.00 60,000.00 75,000.00 825.00 900.00 Jumlah 198,904.00 136,725.00 PEKERJAAN KAYU, PENGGANTUNG & PENGUNCI SNI : 2008 225,000.00 225,000.00 120,000.00 1,200.00 150,000.00 75,000.00 165,000.00 1,650.00 180,000.00 900.00 Jumlah 225,000.00 78,750.00 SNI : 2008 75,000.00 75,000.00 120,000.00 1,800.00 150,000.00 22,500.00 165,000.00 2,475.00 180,000.00 135.00 Jumlah 75,000.00 26,910.00 SNI : 2008 30,000.00 30,000.00 120,000.00 1,800.00 150,000.00 22,500.00 165,000.00 2,475.00 180,000.00 90.00 Jumlah 30,000.00 26,865.00 30,000.00 120,000.00 150,000.00 165,000.00 180,000.00

1 buah Pasang grendel pintu 1.000 bh Grendel Pintu 0.015 OH Pekerja 0.150 OH Tukang 0.015 OH Kepala Tukang 0.001 OH Mandor

39,000.00 120,000.00 150,000.00 165,000.00 180,000.00

1 buah Pasang hak angin 1.000 bh Hak angin 0.015 OH Pekerja 0.150 OH Tukang 0.015 OH Kepala Tukang 0.001 OH Mandor

47,640.00 120,000.00 150,000.00 165,000.00 180,000.00

1 buah Pasang kunci tanam Cilinder 1.000 bh Kunci Silinder 0.015 OH Pekerja 0.150 OH Tukang 0.015 OH Kepala Tukang 0.001 OH Mandor Jumlah

303,750.00

101,910.00

56,865.00

1,800.00 22,500.00 2,475.00 90.00 26,865.00

56,865.00

1,800.00 22,500.00 2,475.00 90.00 26,865.00

65,865.00

1,800.00 22,500.00 2,475.00 135.00 26,910.00

74,550.00

1,800.00 22,500.00 2,475.00 135.00 26,910.00

380,910.00

47,640.00

47,640.00 354,000.00 120,000.00 150,000.00 165,000.00 180,000.00

335,629.00

39,000.00

39,000.00

Jumlah AN.12.g

TOTAL HARGA (Rp)

30,000.00

30,000.00

Jumlah AN.12.f

JUMLAH HARGA UPAH (Rp)

116,000.00 20,000.00 35,000.00 150,000.00 35,000.00 120,000.00 150,000.00 165,000.00 180,000.00

Jumlah AN.12.e

JUMLAH HARGA BAHAN (Rp)

354,000.00

354,000.00

ANALISA HARGA SATUAN Kota Bontang

NO

AN.12.h

URAIAN PEKERJAAN

HARGA SATUAN (Rp)

1 buah Pasang kunci (km/wc) 1.000 bh Kunci Kamar Mandi 0.015 OH Pekerja 0.150 OH Tukang 0.015 OH Kepala Tukang 0.001 OH Mandor

260,250.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah

AN.12.i

1 buah Pasang Expanyolet 1.000 Bh Expanyolet 0.100 OH Pekerja 1.000 OH Tukang 0.100 OH Kepala Tukang 0.005 OH Mandor

300,000.00 120,000.00 150,000.00 165,000.00 180,000.00

1 buah Pasang Hendel Pintu 1.000 Bh Hendel Pintu 0.050 OH Pekerja 0.500 OH Tukang 0.050 OH Kepala Tukang 0.003 OH Mandor Jumlah

AN.12.k

AN.12.l

AN.13 AN.13.a

1 M3 Pek kusen pintu/jendela kayu Bengkirai 1.200 M3 Kayu bengkirai balok 1.000 kg Lem kayu 1.250 kg Paku Ulin 21.000 OH Tukang 2.200 OH Kepala tukang 7.000 OH Pekerja 0.350 OH Mandor 1 M3 Pek kusen pintu/jendela kayu Ulin 1.200 M3 Kayu ulin balok 1.000 kg Lem kayu 1.250 kg Paku Ulin 21.000 OH Tukang 2.200 OH Kepala tukang 7.000 OH Pekerja 0.350 OH Mandor

300,000.00 4,800,000.00 18,000.00 31,250.00

5,000,000.00 18,000.00 25,000.00 150,000.00 165,000.00 120,000.00 180,000.00 Jumlah PEKERJAAN PENGECATAN

6,000,000.00 18,000.00 31,250.00

37,500.00 30,000.00 60,000.00 83,520.00 120,000.00 150,000.00 165,000.00 180,000.00

7,500.00 4,500.00 10,200.00 21,715.20

Jumlah AN.13.b

1 m2 Mengecat bidang tembok baru (luar) (1 lapis cat dasar , 2 lapis cat penutup). Cat dasar tembok 0.100 kg Cat Tembok (Luar) 0.360 kg Pekerja 0.020 OH Tukang 0.063 OH Kepala Tukang 0.006 OH Mandor 0.003 OH Jumlah

4,849,250.00

6,049,250.00

43,915.20

68,205.00 95,000.00 120,000.00 150,000.00 165,000.00 180,000.00

1,800.00 22,500.00 2,475.00 135.00 26,910.00

287,160.00

12,000.00 150,000.00 16,500.00 900.00 179,400.00

479,400.00

6,000.00 75,000.00 8,250.00 450.00 89,700.00

389,700.00

3,150,000.00 363,000.00 840,000.00 63,000.00 4,416,000.00

9,265,250.00

3,150,000.00 363,000.00 840,000.00 63,000.00 4,416,000.00

10,465,250.00

8,400.00 1,350.00 990.00 450.00 11,190.00

55,105.20

2,400.00 9,450.00 1,039.50 450.00 10,939.50

51,960.00

300,000.00

4,000,000.00 18,000.00 25,000.00 150,000.00 165,000.00 120,000.00 180,000.00 Jumlah

1 M² : pengecatan bidang kayu baru, (1 lapis cat dasar , 2 lapis cat penutup). 0.200 kg Cat meni Plamir Kayu 0.150 kg Cat dasar kayu 0.170 kg 0.260 kg Cat minyak 0.070 OH Pekerja 0.009 OH Tukang 0.006 OH Kepala Tukang 0.003 OH Mandor

TOTAL HARGA (Rp)

300,000.00

300,000.00 300,000.00 120,000.00 150,000.00 165,000.00 180,000.00

JUMLAH HARGA UPAH (Rp)

260,250.00

260,250.00

Jumlah AN.12.j

JUMLAH HARGA BAHAN (Rp)

6,820.50 34,200.00

41,020.50

ANALISA HARGA SATUAN Kota Bontang

NO

AN.13.c

URAIAN PEKERJAAN

HARGA SATUAN (Rp)

1 m2 Mengecat bidang tembok baru (dalam) (1 lapis cat dasar , 2 lapis cat penutup). Cat dasar tembok 0.100 kg Cat tembok (dalam) 0.360 kg Pekerja 0.020 OH Tukang 0.063 OH Kepala Tukang 0.006 OH Mandor 0.003 OH

68,205.00 85,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah

AN.13.d

1 m2 Mengecat plafon eternit/ gypsum/Calsiboard Cat dasar Tembok 0.120 kg Cat tembok (dalam) 0.180 kg Pekerja 0.028 OH Tukang 0.042 OH Kepala Tukang 0.004 OH Mandor 0.003 OH

JUMLAH HARGA BAHAN (Rp)

1 m2 Mengecat list plank Cat dasar Tembok 0.120 kg Cat Tembok (Luar) 0.180 kg Pekerja 0.028 OH Tukang 0.042 OH Kepala Tukang 0.004 OH Mandor 0.003 OH

68,205.00 95,000.00 120,000.00 150,000.00 165,000.00 180,000.00

1 m2 Waterproofing 1.000 kg 0.028 OH 0.042 OH 0.004 OH 0.003 OH

Waterproofing Pekerja Tukang Kepala Tukang Mandor

80,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah

48,360.00

6,300.00 693.00 450.00 1,143.00

27,987.60

6,300.00 693.00 450.00 1,143.00

29,787.60

6,300.00 693.00 450.00 1,143.00

84,503.00

8,184.60 17,100.00 3,360.00

28,644.60 AN.13.f

2,400.00 9,450.00 1,039.50 450.00 10,939.50

8,184.60 15,300.00 3,360.00

26,844.60 AN.13.e

TOTAL HARGA (Rp)

6,820.50 30,600.00

37,420.50 68,205.00 85,000.00 120,000.00 150,000.00 165,000.00 180,000.00

JUMLAH HARGA UPAH (Rp)

80,000.00 3,360.00

83,360.00

HARGA SATUAN UPAH DAN BAHAN Kota Bontang

NO

A

URAIAN

SATUAN

HARGA (Rp)

UPAH 1

Pekerja

Oh

120,000.00

2

Tukang

Oh

150,000.00

3

Kepala Tukang

Oh

165,000.00

4

Operator Pancang

Oh

165,000.00

5

Mandor

Oh

180,000.00

M3

225,000.00

M3 M3 M3 M3 M3 M3 Bh

200,000.00 500,000.00 650,000.00 550,000.00 740,000.00 225,000.00 1,000.00

Kg Kg ltr M3

1,800.00 5,000.00 80.00 1,850,000.00

B

BAHAN I 1 2 3 4 5 6 7 8 II 1 2 3 4

TANAH, PASIR & BATU Tanah urug Pasir urug Pasir pasang Pasir beton Koral Batu gunung Batu Padas bata merah SEMEN Semen portland Semen warna air Beton K-250 Redimix

III BESI 1

Besi beton

Kg

22,000.00

2

Kawat bendrat

Kg

20,000.00

3

Paku biasa 5cm - 10cm

Kg

20,000.00

4

Paku 1 cm - 2,5 cm

Kg

20,000.00

5

Paku ulin

Kg

25,000.00

6

Paku plywood

Kg

20,000.00

7

Paku Payung

Kg

20,000.00

8

Paku genteng metal

Kg

25,000.00

9

Paku Gypsum

Kg

20,000.00

Besi profil

Kg

33,000.00

10

HARGA SATUAN UPAH DAN BAHAN Kota Bontang

NO

URAIAN

SATUAN

HARGA (Rp)

IV KERAMIK 1

Keramik lantai 40/40

Bh

51,000.00

2

Keramik lantai 20/20

Bh

6,000.00

3

Keramik dinding 20/40

Bh

8,775.00

4

Plint keramik artistik

Bh

14,625.00

5

Plint keramik lantai

Bh

9,000.00

6

Batu Tempel/alam

M2

270,000.00

7

Step Nosing

Bh

15,450.00

8

Keramik list dinding 6x20

Bh

3,750.00

9

Granit Lantai 60/60

Bh

375,000.00

10

Roster Keramik

Bh

11,250.00

11

Pas Batu Sikat

M2

570,000.00

12

Keramik Homogenius 60/60

Bh

195,000.00

15

Paving Block

Bh

6,000.00

16

Dinding Keramik Border 20/20

Bh

4,200.00

17

Keramik lantai 30/30

Bh

7,250.00

V

KAYU 1

Kayu begisting

M3

3,500,000.00

2

Kayu meranti balok

M3

3,500,000.00

3

Kayu meranti papan

M

3

6,205,000.00

4

Kayu bengkirai balok

M3

4,000,000.00

5

Kayu bengkirai papan

M

3

4,000,000.00

6

Kayu ulin balok

M3

5,000,000.00

7

Kayu ulin papan

M

3

5,000,000.00

8

Dolken kayu galam

Blg

17,000.00

9

Plywood tebal 9 mm

Lbr

180,000.00

10

Plywood tebal 4 mm

Lbr

116,000.00

HARGA SATUAN UPAH DAN BAHAN Kota Bontang

NO

URAIAN

SATUAN

HARGA (Rp)

11

Gypsum board tebal 9mm

Lbr

123,000.00

12

Minyak begisting

Ltr

15,000.00

VI ATAP 1

Genteng metal

Lbr

142,500.00

2

Bubungan Genteng Metal

M'

73,500.00

seng BJLS 20 lebar 45 cm

m

25,500.00

seng BJLS 20 lebar 55 cm

m

27,000.00

seng BJLS 20 lebar 60 cm

m

30,000.00

seng BJLS 20 lebar 70 cm

m

33,000.00

seng BJLS 20 lebar 80 cm

m

34,500.00

seng BJLS 20 lebar 90 cm

m

37,500.00

seng BJLS 25 lebar 90 cm

m

61,500.00

3 Seng Plat

4

Pasang Kuda - Kuda Baja Ringan

M2

200,000.00

5

Sisalation/ aluminium foil

M2

9,000.00

6

Atap Zincalume

M'

135,000.00

7

Genteng Keramik

bh

37,500.00

8

Nok Genteng Keramik

bh

26,250.00

9

Bubungan Zincalume

M'

78,750.00

10

Genteng Bitumen

Lbr

150,000.00

11

Nok Genteng Bitumen

M

97,500.00

VII PLAPHOND 1

Calsi Board 4 mm

lembar

150,000.00 Up-1

2

Calsi Board 9 mm

lembar

235,000.00 Up-2

3

Paku Calsi Board

dos

18,000.00 Up-3

4

Kompon

pack

35,000.00 Up-4

5

Fiber Tape

roll

35,000.00 Up-5

6

List Plafond Gypsum

m1

40,000.00 Up-6

7

Paku Gypsum

kg

45,750.00 Up-7

8

Gypsum Board

Lembar

165,000.00 Up-8

9

Tepung Gypsum

kg

6,750.00 Up-9

Rangka Plafond Metal Furring

m2

145,000.00 Up-10

10

HARGA SATUAN UPAH DAN BAHAN Kota Bontang

NO

URAIAN

SATUAN

HARGA (Rp)

11

Dynabolt

bh

6,750.00 Up-11

12

Ornamen Gypsum kecil

m2

150,000.00 Up-12

13

Ornamen Gypsum Besar

bh

180,000.00 Up-13

M'

112,500.00 h-KPJ-01

VII KUSEN, PINTU & JENDELA 1

Kusen

2

Daun Pintu

Unit

1,425,000.00 h-KPJ-02

3

Daun Pintu wc ulin

Unit

1,050,000.00 h-KPJ-03

4

Daun Pintu PJ

Unit

1,200,000.00 h-KPJ-04

5

Expanyolet

bh

300,000.00 h-KPJ-05

6

Lem Kayu

kg

18,000.00 h-KPJ-06

7

Rolling Door

M2

433,125.00 h-KPJ-07

8

Pintu Lipat (folding Gate)

M2

2,165,625.00 h-KPJ-08

9

Rolling door aluminium

M2

300,000.00 h-KPJ-09

10

Profil aluminium

M'

140,000.00 h-KPJ-10

11

Profil aluminium Daun Jendela

M'

57,500.00 h-KPJ-11

12

Plat Aluminium untuk Jalusi

M'

45,000.00 h-KPJ-12

13

Prifil Kaca

m'

12,000.00 h-KPJ-13

14

Skrup fixer

Bh

1,200.00 h-KPJ-14

15

Sealant

tube

9,000.00 h-KPJ-15

16

Daun pintu uk 100 cm

Bh

1,425,000.00 h-KPJ-16

17

Daun jendela uk 60 cm t = 110 cm

Bh

487,500.00 h-KPJ-17

18

Roster

Bh

67,500.00 h-KPJ-18

19

Kaca bening tebal 5mm

M2

187,500.00 h-KPJ-19

20

Kaca Buram tebal 5mm

M2

225,000.00 h-KPJ-20

21

Kaca riben/gelap tebal 5mm

M2

195,000.00 h-KPJ-21

22

Kaca bening tebal 8mm

M

2

232,500.00 h-KPJ-22

23

Kaca riben/gelap tebal 8mm

M2

240,000.00 h-KPJ-23

24

Kaca Cermin

M

2

37,500.00 h-KPJ-24

25

Engsel pintu 4"

Bh

75,000.00 h-KPJ-25

HARGA SATUAN UPAH DAN BAHAN Kota Bontang

NO

URAIAN

SATUAN

HARGA (Rp)

26

Engsel jendela 3"

Bh

58,500.00 h-KPJ-26

27

Kunci pintu 2 slag

Bh

225,000.00 h-KPJ-27

28

Kunci kamar mandi

Bh

260,250.00 h-KPJ-28

29

Kunci Silinder

Bh

354,000.00 h-KPJ-29

30

Hendel Pintu

Bh

300,000.00 h-KPJ-30

31

Grendel pintu

Bh

39,000.00 h-KPJ-31

32

Grendel jendela

Bh

30,000.00 h-KPJ-32

33

Hak angin

Psg

47,640.00 h-KPJ-33

34

Tarikan jendela

Bh

22,500.00 h-KPJ-34

35

Sunscren Besi Hollow

M2

450,000.00 h-KPJ-35

36

Rel Bawah (pintu Garasi)

Bh

570,000.00 h-KPJ-36

37

Rel Atas (Pintu Garasi)

Bh

675,000.00 h-KPJ-37

38

Engsel Atas Tengah (pintu Garasi)

Bh

292,500.00 h-KPJ-38

39

Engsel Atas Pinggir (pintu Garasi )

bh

270,000.00 h-KPJ-39

40

Engsel Bawah Tengah (pintu Garasi)

Bh

195,000.00 h-KPJ-40

41

Engsel Bawah Pinggir (pintu Garasi )

bh

150,000.00 h-KPJ-41

42

Pintu Garasi

Bh

1,350,000.00 h-KPJ-42

43

Pintu km/wc PVC

Bh

1,125,000.00 h-KPJ-43

44

Rambuncis

Bh

52,500.00 h-KPJ-44

45

Engsel jendela casement

Bh

214,500.00 h-KPJ-45

46

Kaca Es 3 mm

M2

105,000.00 h-KPJ-46

VIII SANITAIR 1

Pipa PVC Ø 2"

M'

32,812.50 Sanitair-01

2

Pipa PVC Ø 1/2"

M'

15,000.00 Sanitair-02

3

Pipa PVC Ø 3/4"

M'

19,500.00 Sanitair-03

4

Pipa PVC Ø 4"

M'

86,625.00 Sanitair-04

5

Pipa PVC Ø 3"

M'

110,812.50 Sanitair-05

6

Kran 1/2"

Bh

37,500.00 Sanitair-06

7

Seal tape

Bh

4,350.00 Sanitair-07

8

Closed Duduk

Unit

4,687,500.00 Sanitair-08

9

Closet Jongkok

Unit

304,920.00 Sanitair-09

Urinoir

Unit

2,945,250.00 Sanitair-10

10

HARGA SATUAN UPAH DAN BAHAN Kota Bontang

NO

URAIAN

11

Wastafel

12

Floor drain

13

SATUAN

HARGA (Rp)

Unit

1,472,625.00 Sanitair-11

Bh

37,500.00 Sanitair-12

Septictank Biofil+obat kap 2-4org

Unit

6,750,000.00 Sanitair-13

14

Septictank Biofil+obat kap 4-6org

Unit

10,500,000.00 Sanitair-14

15

Tandon air 1.200 L Fiber

Unit

2,550,000.00 Sanitair-15

16

Jet washer

Unit

150,000.00 Sanitair-16

17

Kran Shower

Unit

225,000.00 Sanitair-17

18

Bak mandi Fiber

Unit

600,000.00 Sanitair-18

19

Pipa PVC Ø 6"

M'

210,000.00 Sanitair-19

IX INSTALASI LISTRIK 1

Lampu SL 8 Watt + Acc Downlight

Bh

75,000.00 listrik-01

2

Lampu SL 18 Watt

Bh

63,000.00 listrik-02

3

Lampu TL 18 Watt

Bh

75,000.00 listrik-03

4

Stop kontak

Bh

75,225.00 listrik-04

5

Saklar tunggal

Bh

69,300.00 listrik-05

6

Saklar ganda

Bh

96,150.00 listrik-06

7

Saklar Empat

Bh

102,000.00 listrik-07

8

Fiting lampu

Bh

55,440.00 listrik-08

9

Kabel NYM 3 x 2,5 mm

m'

11,250.00 listrik-09

10

Pipa pralon 5/8"

btg

16,500.00 listrik-10

11

Panel BOX + Acc

Bh

225,000.00 listrik-11

12

Reflektor + Lampu TL 2x18

Bh

450,000.00 listrik-12

13

Acc Lampu Tl 2x18w

Unit

60,000.00 listrik-13

14

Instalasi listrik

titik

400,000.00 listrik-14

15

Lampu Gantung Hias Dalam

Unit

3,000,000.00 listrik-15

16

Lampu Gantung Hias Luar

titik

1,500,000.00 listrik-16

17

Stop Kontak AC

Unit

67,500.00 listrik-17

18

MCB

Bh

375,000.00 listrik-18

19

Lampu DownLight LED 6 Watt

Bh

172,500.00 listrik-19

20

Lampu DownLight LED 3 Watt

Bh

127,500.00 listrik-20

HARGA SATUAN UPAH DAN BAHAN Kota Bontang

NO

URAIAN

SATUAN

HARGA (Rp)

21

Lampu Downlight outbow 2 warna LED 6 Watt

Bh

337,500.00 listrik-21

22

OutBow Lighting PLC 25 Watt

Bh

300,000.00 listrik-22

23

OutBow Lighting PLC 15 Watt

Bh

225,000.00 listrik-23

24

Baret Light 30 Watt

Bh

520,000.00 listrik-24

25

Reccessed Downlight 10 Watt

Bh

250,000.00 listrik-25

26

Reccessed Downlight 5 Watt

Bh

195,000.00 listrik-26

27

Exchaust Fan

Bh

325,000.00 listrik-27

28

Pasang Lighting Panel

Bh

12,300,000.00 listrik-28

29

Garden Light

Bh

700,000.00 listrik-29

X

CAT 1

Plamir Kayu

Kg

30,000.00

2

Plamir Tembok

Kg

30,000.00

3

Cat dasar Kayu

Kg

60,000.00

4

Cat dasar Tembok

Kg

68,205.00

5

Cat tembok (dalam)

Kg

85,000.00

6

Cat Tembok (Luar)

Kg

95,000.00

7

Cat minyak

Kg

83,520.00

8

Cat meni

Kg

37,500.00

9

Thiner A spesial

Ltr

30,000.00

Waterproofing

Kg

80,000.00

10 C

Lain - Lain 1

Crane Service

1Jam

28,125.00

Up-LL - 1

2

Hidrolic Jack Hammer

1 Jam

46,875.00

Up-LL - 2

3

Solar

Ltr

15,750.00

Up-LL - 3

4

Minyak Pelumas

Ltr

52,500.00

Up-LL - 4

5

Sewa Perakitan

1 Jam

15,000.00

Up-LL - 5

6

Sewa Alat Las

1 Jam

9,375.00

Up-LL - 6

7

Kawat las Listrik

Kg

37,500.00

Up-LL - 7

8

Upah Bobok kepala mini pile

titik

75,000.00

Up-LL - 8

9

Relling Stenlis pipa Ø 3"

m'

412,500.00

Up-LL - 9

10

Tulisan Plat Stenlis

7,500,000.00

Up-LL - 10

Unit

HARGA SATUAN UPAH DAN BAHAN Kota Bontang

NO

URAIAN

11

Bak Kontrol

12

Alat bantu

13

SATUAN

900,000.00

Up-LL - 11

Ls

3,000.00

Up-LL - 12

Pagar Geser 1 m2

M2

1,350,000.00

Up-LL - 13

14

Pagar Hollow Galvanis

M2

900,000.00

Up-LL - 14

15

Tulisan papan Nama Plat Besi'

Unit

7,500,000.00

Up-LL - 15

16

1 m Grill Parit

M'

300,000.00

Up-LL - 16

17

Plat Papan Nama + Rangka

M2

1,200,000.00

Up-LL - 17

18

Non Moven Gotextile

M2

12,000.00

Up-LL - 18

M2

1,137,000.00

Up-LL- 19

Bh

33,000.00

Up-LL-20

Zak

287,000.00

Up-LL-21

ltr

64,600.00

Up-LL-22

Unit

675,000.00

Up-LL-23

20

Pagar BRC Lengkap dengan Tiang, P = 2,4 M/T = 0,9/Ø 6" mm Vinyl 10/90

21

Sel Leveling floor 3-10 mm

22

Lem/adhesive

20

Zink / Tempat Cuci + Kran

19

Unit

HARGA (Rp)

PJ1 kusen alumunium daun pintu daun jendela kaca

15 m' 2 bh 2.46 m2

PJ2 Kusen alumunium daun pintu jendela kaca

9.42 m' 1 bh 0.9225 m2

PJ3 Kusen alumunium Daun Jendela jendela kaca

PJ4 Kusen alumunium Daun Jendela jendela kaca

24.6 3.36 2.05 2.46 4.51

m' m2 m2 m2 m2

20.05 1.72 1.312 2.255 3.567

m' m2 m2 m2 m2

D1 kusen alumunium daun pintu 1 bh

4.9 m' 1 bh

D2 kusen alumunium daun pintu 1 bh

4.8 m' 1 bh

W1 kusen alumunium profil jendela jendela kaca

12.15 m' 4.9 m' 2.865 m2

W2 kusen alumunium jendela kaca

19.04 m' 14.42 m2

W3 kusen alumunium jendela kaca

6.3 m' 1.143 m2

W4 kusen alumunium jendela kaca

16.4 m' 2.49 m2

Bouven kusen alumunium profil jendela jendela kaca

2.9 m' 2.4 m' 0.245 m2

1.59

W5 kusen alumunium jendela kaca

11.2 m' 4.14 m2