REKAPITULASI KEGIATAN Kegiatan Lokasi
: REHABILITASI BANGUNAN KANTOR UNIT PENYELENGGARA PELABUHAN KELAS I TANJUNG LAUT BONTANG : Kota Bontang
Tahun
: 2018
NO
URAIAN PEKERJAAN
A
PELAKSANA / FISIK
B
PENGAWASAN
JUMLAH BIAYA
1,050,000,000.00
50,000,000.00
a.
JUMLAH KEGIATAN TERMASUK PAJAK
1,100,000,000.00
b.
PEMBULATAN
1,100,000,000.00
TERBILANG : SATU MILYAR SERATUS JUTA RUPIAH
REKAPITULASI RENCANA ANGGARAN BIAYA (RAB) Kegiatan Lokasi
: REHABILITASI BANGUNAN KANTOR UNIT PENYELENGGARA PELABUHAN KELAS I TANJUNG LAUT BONTANG : Kota Bontang
Tahun
: 2018
NO
URAIAN PEKERJAAN
JUMLAH BIAYA
A
PEKERJAAN PENDAHULUAN
5,500,000.00
B
PEKERJAAN TANAH & PONDASI
C
PEKERJAAN BETON
152,738,229.06
D
PEKERJAAN DINDING
116,276,474.19
E
PEKERJAAN ATAP
F
PEKERJAAN PLAFOND
G
PEK. KUSEN, PINTU, JENDELA & PENGGANTUNG
H
PEK. PENUTUP LANTAI
I
PEKERJAAN INSTALASI LISTRIK
72,483,800.00
J
PEKERJAAN CAT-CATAN DAN ASSESORIS
47,285,891.60
K
PEKERJAAN LAIN LAIN
36,221,842.15
97,399,231.50
103,856,836.95
91,790,968.75
137,886,672.68
100,388,678.61
a.
JUMLAH PEKERJAAN FISIK TERMASUK PAJAK
961,828,625.49
b.
PPN 10%
c.
TOTAL
1,058,011,488.04
b.
PEMBULATAN
1,050,000,000.00
96,182,862.55
TERBILANG : SATU MILYAR LIMA PULUH JUTA RUPIAH
RENCANA ANGGARAN BIAYA (RAB)
NO
PEMBANGUNAN RUMAH DINAS ESELON II, III Dan PREASARANA LINGKUNGNA
Pekerjaan Lokasi
:
Tahun
: 2015
Instansi
: Kementrian Keuangan Republik Indonesia
: Kota Samarinda
URAIAN PEKERJAAN
Notasi
VOLUME/ SATUAN
HARGA SATUAN (Rp)
JUMLAH HARGA (Rp)
PENINGGIAN LAHAN KOMPLEKS, PEMB JALAN LINGKUNGAN DAN LAND SCAPING JL.A.W. SYAHRNI A
PEKERJAAN TANAH 1
Urugan Tanah
AN.01.d
860.08 M3
282,000.00
2
Memadatkan Urugan
AN.01.e
860.08 M3
282,000.00
Sub Total A B
242,542,560.00 242,542,560.00 485,085,120.00
PEKERJAAN LANTAI 1
Lantai Paving Blok segi Enam
AN.08.n
190.58 M2
307,835.00
58,667,194.30
2
Pasir Urug Bawah Paving
AN.01.b
3
7.62 M
277,800.00
2,117,724.96
3
Pasir urug Halaman Rumah T = 5cm
AN.01.b
2.08 M3
277,800.00
576,435.00
4
Cor Rabat Halaman Rumah T = 5cm
AN.04.a
2.08 M3
1,361,800.00
2,825,735.00
5
Rolag Bata (Parit) Halaman Rumah
AN.02.c
33.40 M3
180,534.63
6,029,856.53
6
Cor Rabat Jalan Taman T = 5cm
AN.04.a
1.34 M3
1,361,800.00
1,824,812.00
7
Batu Sikat Jalan Taman
AN.08.j
26.80 M2
570,000.00
15,276,000.00
Sub Total B C
87,317,757.79
PEKERJAAN BETON 1
Sloof beton 15/20
M'
Pembesian
AN.04.c1
193.05 kg
Beton 1:2:3
#N/A
#N/A
AN.04.k
3.30 M3
222,659.25
734,975.92
Begisting Sloof
AN.04.e
43.51 M2
49,570.00
2,156,889.84
Sub Total C D
#N/A
PEKERJAAN DINDING (Pot Taman) 1
Pas. Dinding bata merah 1 : 4
AN.05.b
40.18 M2
161,194.25
6,476,784.97
2
Plesteran 1 : 4
AN.05.d
28.70 M2
86,907.00
2,494,230.90
3
Acian
4
Pas batu Alam
AN.05.e
2
28.70 M
48,300.00
1,386,210.00
AN.08.f
28.70 M2
468,325.00
13,440,927.50
Sub Total D E
23,798,153.37
SANITAIR 1
BAK Kontrol Halaman Rumah
Up-LL - 11
2
Pipa Air Limbah Lingkungan rumah Ø 4'
AN.09.c
1.00 Unit 33.30 M'
900,000.00 148,902.75
Sub Total E F
900,000.00 4,958,461.58 5,858,461.58
LAIN - LAIN 1
tanaman Pisang - pisang + sampai tumbuh
AN.14.s
81.00 Polibag
61,185.00
4,955,985.00
2
Tanaman Airis + Sampai Tumbuh
AN.14.r
162.00 Polibag
31,185.00
5,051,970.00
3
Pupuk Kompos
AN.14.a
13.55 M2
18,750.00
254,141.25
4
Rumput Gajah Mini
AN.14.b
87.92 M2
68,265.00
6,001,858.80
Sub Total F
16,263,955.05
JUMLAH
#N/A
PPN 10%
#N/A
JUMLAH TOTAL
#N/A
PEMBULATAN
#N/A
RENCANA ANGGARAN BIAYA (RAB)
NO
PEMBANGUNAN RUMAH DINAS ESELON II, III Dan PREASARANA LINGKUNGNA
Pekerjaan Lokasi
:
Tahun
: 2015
Instansi
: Kementrian Keuangan Republik Indonesia
: Kota Samarinda
URAIAN PEKERJAAN
Notasi
VOLUME/ SATUAN
HARGA SATUAN (Rp)
JUMLAH HARGA (Rp)
PEMBANGUNAN PAGAR KELILING RUMAG DINAS TYPE 70 A
PEKERJAAN TANAH & PONDASI 1
Galian Tanah
AN.01.a
12.66 M3
94,500.00
1,195,992.00
2
Pancang/ Cerucuk ulin 10/10 x 3M (lokal)
AN.03.b
95.00 Ttk
213,075.00
20,242,125.00
3
Pondasi batu gunung
AN.02.b
140.24 M3
1,759,775.00
246,792,781.75
Sub Total A
268,230,898.75
B
PEK. SANITAIR 1
C
Pemasangan pipa air Ø2'
AN.09.l
28.00 m'
1,952,990.00
54,683,720.00
Sub Total B
54,683,720.00
PEKERJAAN BETON 1
2
3
4
D
Sloof beton 13/13
M'
Pembesian
AN.04.c1
222.87 kg
Beton Cam 1:2:3
#N/A
#N/A
AN.04.k
1.38 M3
222,659.25
306,717.35
Begisting Sloof
AN.04.e
21.19 M2
49,570.00
1,050,517.18
Balok Latai 13/13
M'
Pembesian
AN.04.c1
320.59 kg
#N/A
#N/A
Beton Cam 1:2:3
AN.04.k
2.00 M3
222,659.25
445,908.55
Begisting Balok
AN.04.i
30.49 M2
235,811.75
7,188,721.20
Kolom beton 25/50
M'
Pembesian
AN.04.c1
111.53 kg
Beton Cam 1:2:3
#N/A
#N/A
AN.04.k
3.50 M3
222,659.25
779,307.38
Begisting Kolom
AN.04.f
31.50 M2
#N/A
#N/A
Kolom Beton KP
M'
Pembesian
AN.04.c1
227.23 kg
#N/A
#N/A
Beton Cam 1:2:3
AN.04.k
1.09 M3
222,659.25
242,709.72
Begisting Kolom
AN.04.f
16.77 M2
#N/A
#N/A
Sub Total C
#N/A
PEKERJAAN DINDING 1
Pas. Dinding bata merah 1 : 4
AN.05.b
238.81 M2
161,194.25
38,495,475.86
2
Plesteran 1 : 4
AN.05.d
339.63 M2
86,907.00
29,516,085.36
3
Acian
AN.05.e
381.63 M2
48,300.00
18,432,651.72
4
Pas batu Alam
AN.08.f
91.15 M2
468,325.00
42,687,823.75
Sub Total D
129,132,036.69
E
PEKERJAAN CAT 1
F
Pengecatan Dinding Luar
AN.13.b
381.63 M2
51,960.00
19,829,411.66
Sub Total E
19,829,411.66
1,350,000.00
16,200,000.00
LAIN - LAIN 1
Pagar Geser
Up-LL - 13
12.00 M2
2
Hollow Galvanis
Up-LL - 14
21.24 M
2
900,000.00
19,116,000.00
Sub Total F
35,316,000.00
RENCANA ANGGARAN BIAYA (RAB)
NO
PEMBANGUNAN RUMAH DINAS ESELON II, III Dan PREASARANA LINGKUNGNA
Pekerjaan Lokasi
:
Tahun
: 2015
Instansi
: Kementrian Keuangan Republik Indonesia
: Kota Samarinda
URAIAN PEKERJAAN
G
Notasi
VOLUME/ SATUAN
HARGA SATUAN (Rp)
JUMLAH HARGA (Rp)
PEKERJAAN PAPAN NAMA 1
Pas. Dinding bata merah 1 : 4
AN.05.b
9.90 M2
161,194.25
1,595,823.08
2
Plesteran 1 : 4
AN.05.d
2
4.49 M
86,907.00
390,212.43
3
Acian
AN.05.e
4.49 M2
48,300.00
216,867.00
4
Pas batu Alam
AN.08.f
8.38 M2
468,325.00
3,924,563.50
5
Poer Plat AN.04.c1
1.07 kg
#N/A
#N/A
Beton Cam 1:2:3
AN.04.k
0.08 M3
222,659.25
16,699.44
Begisting pondasi
AN.04.f
0.15 M2
117,870.00
17,680.50
Pembesian
6
M'
Kolom beton 15/15
M'
Pembesian
AN.04.c1
103.65 kg
#N/A
#N/A
Beton Cam 1:2:3
AN.04.k
0.72 M3
222,659.25
160,314.66
Begisting Kolom
AN.04.f
21.12 M2
#N/A
#N/A
7
Plat Papan Nama + Rangka
Up-LL - 17
1.74 M2
1,200,000.00
2,088,000.00
8
Tulisan Papan Nama Plat Besi
Up-LL - 15
1.00 Unit
7,500,000.00
7,500,000.00
9
Pohon Taman dan Pagar Pohon Glodokan Tiang + Sampai Tumbuh
AN.14.p
5.00 Phn
323,685.00
1,618,425.00
Pohon Pucuk Merah + Sampai Tumbuh
AN.14.i
2.00 Phn
196,185.00
392,370.00
Pohon Ketapang kencana+ Sampai Tumbuh
AN.14.q
3.00 Phn
323,685.00
971,055.00
Bunga Lamtana + Sampai Tumbuh
AN.14.u
186.00 Polibag
81,060.00
15,077,160.00
Tanah Urug
AN.01.d
2.00 M3
282,000.00
564,000.00
Top Soil
Up-V -2
0.53 M3
180,000.00
95,400.00
Sub Total F
#N/A
JUMLAH
#N/A
PPN 10%
#N/A
JUMLAH TOTAL
#N/A
PEMBULATAN
#N/A
RENCANA ANGGARAN BIAYA (RAB)
NO
Kegiatan
: REHABILITASI BANGUNAN KANTOR UNIT PENYELENGGARA PELABUHAN KELAS I TANJUNG LAUT BONTANG
Lokasi
: Kota Bontang
Tahun
: 2018
URAIAN PEKERJAAN
Notasi
VOLUME/ SATUAN
HARGA SATUAN (Rp)
JUMLAH HARGA (Rp)
REHABILITASI BANGUNAN A
PEKERJAAN PENDAHULUAN 1
Pekerjaan persiapan Pembersihan,Pembongkaran, Pengukuran, penyiapan lahan
1.00 Ls
5,000,000.00
5,000,000.00
Papan Nama Proyek
1.00 Bh
500,000.00
500,000.00
Sub Total A B
5,500,000.00
PEKERJAAN TANAH & PONDASI 1
Pancang Ulin 10/10 + Sunduk Kalang
AN.03.b
25.00 Titik
213,075.00
5,326,875.00
2
Galian Tanah Pondasi
AN.01.a
24.59 M3
94,500.00
2,324,133.00
3
Pondasi Batu Gunung
AN.02.b
10.16 M3
1,759,775.00
17,874,738.59
4
Tanah Urug kembali
AN.01.c
14.44 M3
31,500.00
454,752.90
5
Urugan pasir bawah lantai 7 cm
AN.01.b
7.94 M3
277,800.00
2,206,969.32
6
Cor Rabat (Rabat Bawah Lantai) 5 cm
AN.04.l
5.40 M3
1,487,610.00
8,034,373.34
Sub Total B C
36,221,842.15
PEKERJAAN BETON 1
2
3
4
Sloof 15/20 Pembesian
AN.04.d'
Beton cam 1:2:3
AN.04.m
Begisting Sloof
AN.04.g
555.59 kg
25,477.50
14,155,039.13
2.55 M3
1,700,550.00
4,336,402.50
34.00 M2
96,379.50
3,276,903.00
Kolom Beton K1
###
Pembesian
AN.04.d'
25,477.50
12,265,501.62
Beton cam 1:2:3
AN.04.m
481.42 kg 1.44 M3
1,700,550.00
2,457,209.72
Begisting Kolom
AN.04.h
44.46 M2
140,650.00
6,253,299.00
RingBalk Beton
###
Pembesian
AN.04.d'
Beton cam 1:2:3
AN.04.m
Begisting RingBalk
AN.04.i
820.96 kg
25,477.50
20,915,908.02
3.38 M3
1,700,550.00
5,747,859.00
52.00 M2
235,811.75
12,262,211.00
Balok Latai Pembesian
AN.04.d'
130.68 Kg
25,477.50
3,329,355.67
Beton cam 1:2:3
AN.04.m
0.81 M3
1,700,550.00
1,379,486.16
Begisting Balok Latai
AN.04.i
12.48 M2
235,811.75
2,942,930.64
5
6
Kanopi Pembesian
AN.04.d'
Beton cam 1:2:3
AN.04.m
Begisting Kanopi
AN.04.j
38.19 kg
25,477.50
973,041.14
0.39 M3
1,700,550.00
668,231.12
5.65 M2
267,436.75
1,509,814.17
Dak Atap Beton
###
Pembesian
AN.04.d'
Beton cam 1:2:3
AN.04.m
Begisting Dak
AN.04.j
742.86 kg
25,477.50
18,926,317.69
8.83 M3
1,700,550.00
15,013,101.61
98.44 M2
267,436.75
26,325,617.87
Sub Total C D
152,738,229.06
PEKERJAAN DINDING 1
Pas. Dinding bata merah 1 : 4
AN.05.b
266.23 M2
161,194.25
42,915,325.48
2
Plesteran 1 : 4
AN.05.d
532.47 M2
86,907.00
46,275,126.95
3
Acian
AN.05.e
560.79 M2
48,300.00
Sub Total D E
27,086,021.76 116,276,474.19
PEKERJAAN ATAP 1
Pek. Penutup atap Metal
AN.06.b
475.50 M2
191,180.00
90,906,090.00
2
pek.Nok /bubungan Atap Metal
AN.06.k
23.50 M
154,815.00
3,638,152.50
3
Listplankcalciboard 2 x 30 - rangkap 20 cm AN.06.e
42.58 M
67,050.00
Sub Total E F
2,854,989.00 97,399,231.50
PEKERJAAN PLAFOND 1
Pek. Plafond Gypsum
AN.07.b
374.42 M2
87,965.00
32,935,855.30
2
Rangka Plafond metal furring
AN.07.d
374.42 M2
145,000.00
54,290,900.00
3
pek.List plafond Gipsum
AN.07.c
273.78 M
60,742.50
16,630,081.65
Sub Total F G
103,856,836.95
PEK. KUSEN, PINTU, JENDELA & PENGGANTUNG 1
Pintu PJ1
AN.11.e
1.00 Bh
7,864,540.00
7,864,540.00
2
Pintu PJ2
AN.11.f
1.00 Bh
4,550,871.25
4,550,871.25
3
Pintu PJ3
AN.11.g
1.00 Bh
10,907,175.00
10,907,175.00
4
Pintu PJ4
AN.11.h
1.00 Bh
6,749,177.50
6,749,177.50
5
Pintu D1
AN.11.i
6.00 Bh
3,451,140.00
20,706,840.00
6
Pintu D2
AN.11.j
1.00 Bh
3,337,765.00
3,337,765.00
7
Jendela W1
AN.11.k
5.00 Bh
3,495,682.50
17,478,412.50
8
Jendela W2
AN.11.l
2.00 Bh
6,364,100.00
12,728,200.00
9
Jendela W3
AN.11.m
5.00 Bh
1,493,597.50
7,467,987.50
Sub Total G H
91,790,968.75
PEK. PENUTUP LANTAI 1
Pas. Keramik Lantai uk 60/60
AN.08.k
199.91 M2
646,631.67
129,268,944.13
2
Pas. Keramik Lantai uk 40/40
AN.08.a
17.37 M2
496,270.00
8,617,728.55
Sub Total H
137,886,672.68
I
PEKERJAAN INSTALASI LISTRIK 1
OutBow Lighting PLC 15 Watt
listrik-23
15.00 Bh
225,000.00
3,375,000.00
2
Reccessed Downlight 5 Watt Lengkap
listrik-26
55.00 Bh
195,000.00
10,725,000.00
3
Saklar tunggal
listrik-05
4.00 Bh
69,300.00
277,200.00
4
Saklar ganda
listrik-06
21.00 Bh
96,150.00
2,019,150.00
5
Stop Kontak AC
listrik-17
9.00 Bh
67,500.00
607,500.00
6
Stop Kontak
listrik-04
22.00 Bh
75,225.00
1,654,950.00
7
Titik Lampu + Instalasi
listrik-14
103.00 titik
400,000.00
41,200,000.00
8
Stop Kontak + Instalasi
listrik-14
31.00 titik
400,000.00
12,400,000.00
9
Pasang Panel box + Acc
listrik-11
1.00 Bh
225,000.00
225,000.00
Garden Light 15 Watt
listrik-29
8.00 Bh
700,000.00
5,600,000.00
10
Sub Total I J
72,483,800.00
PEKERJAAN CAT-CATAN DAN ASSESORIS 1
Cat dinding baru (Dinding Luar )
AN.13.b
186.19 M2
51,960.00
9,674,328.48
2
Cat dinding baru (Dinding Dalam )
AN.13.c
406.79 M2
48,360.00
19,672,199.98
3
Cat Plafond
AN.13.d
374.42 M2
27,987.60
10,479,117.19
4
Waterproofing
AN.13.f
88.28 M2
84,503.00
7,460,245.95
Sub Total J K
47,285,891.60
PEKERJAAN LAIN LAIN Partisi Sekat R. Kasi 1
Profil Alumunium
AN.11.q
2
Pas. Kaca Bening 5 mm
AN.11.r
3
Pas. Kaca Es 3 mm
AN.11.s
4
Double Tripleks Lapis HPL
AN.11.t
160.50 m'
471,900.00
75,739,950.00
23.44 M2
531,750.00
12,464,884.69
24.03 M2
427,800.00
10,278,108.90
5.68 M2
335,629.00
Sub Total K JUMLAH
1,905,735.02 100,388,678.61 961,828,625.49
RENCANA ANGGARAN BIAYA (RAB) Kegiatan
: REHABILITASI BANGUNAN KANTOR UNIT PENYELENGGARA PELABUHAN KELAS I TANJUNG LAUT BONTANG
Lokasi
: Kota Bontang
Tahun
: 2018
###
: #REF!
URAIAN PEKERJAAN
NO
Notasi
VOLUME/ SATUAN
HARGA SATUAN (Rp)
JUMLAH HARGA (Rp)
PENINGGIAN LAHAN KOMPLEKS, PEMB JALAN LINGKUNGAN DAN LAND SCAPING JL.JUANDA
A
PEKERJAAN TANAH & PONDASI 1
Pancang/ Cerucuk ulin 10/10 x 3M (lokal)
AN.03.b
98.00 Ttk
213,075.00
20,881,350.00
2
Urugan pasir bawah lantai
AN.01.b
9.62 M3
277,800.00
2,671,715.11
3
Pondasi batu gunung
AN.02.b
3
1,759,775.00
389,345,819.31
4
Cor Rabat (Rabat Bawah Lantai)
AN.04.a
9.62 M3
1,361,800.00
13,096,982.13
5
Galian Tanah
AN.01.a
27.99 M3
94,500.00
2,645,433.00
6
Urugan Kembali
AN.01.c
4.64 M3
31,500.00
146,257.97
7
Urugan tanah
AN.01.d
#REF! M3
282,000.00
221.25 M
Sub Total A B
#REF! #REF!
PEKERJAAN BETON 1
Sloof beton 13/20
M'
Pembesian
2
AN.04.d'
Beton cam 1:3:5
AN.04.l
Begisting Sloof
AN.04.g
C
25,477.50
8,657,055.81
2.95 M3
1,487,610.00
4,384,908.99
45.35 M2
96,379.50
4,370,617.57
90.58 kg
25,477.50
2,307,846.23
2.42 M3
1,487,610.00
3,592,578.15
25.76 M2
140,650.00
3,623,144.00
Kolom beton K1
M'
Pembesian
3
339.79 kg
AN.04.d'
Beton cam 1:3:5
AN.04.l
Begisting Kolom
AN.04.h
Kolom Beton KP
M'
Pembesian
AN.04.d'
155.54 kg
25,477.50
3,962,738.23
Beton cam 1:3:5
AN.04.l
0.41 M3
1,487,610.00
603,374.62
Begisting Kolom
AN.04.h
6.24 M2
140,650.00
877,656.00
Sub Total B
32,379,919.58
PEKERJAAN DINDING 1
Pas. Dinding bata merah 1 : 4
AN.05.b
151.40 M2
161,194.25
24,404,809.45
2
Plesteran 1 : 4
AN.05.d
302.80 M2
86,907.00
26,315,439.60
3
Acian
AN.05.e
302.80 M2
48,300.00
14,625,240.00
Sub Total C
65,345,489.05
D
PEK. PENUTUP LANTAI 1
Pas Bt Alam (dinding pondasi)
AN.08.f
57.60 M2
468,325.00
26,973,646.70
2
Pas Bt Alam (Jalan masul)
AN.08.f
41.60 M2
468,325.00
19,482,320.00
3
Pas Bt Sikat
AN.08.j
93.15 M2
570,000.00
53,096,697.00
Sub Total D
99,552,663.70
E
PEK. SANITAIR 1
Pemasangan pipa air Hujan 2"
AN.09.n JUMLAH
12.00
m'
65,493.38
785,920.50
Sub Total E
785,920.50 #REF!
PPN 10%
#REF!
JUMLAH TOTAL
#REF!
PEMBULATAN
#REF!
Jenis Pekerjaan : Keramik lantai 60/60 Satuan : m2 No Panjang Lebar Titik Volume Ruang Pelayanan 1 2.97 4.09 1.00 12.15 Ruang Konsultasi 2 2.17 2.82 1.00 6.12 Ruang Tunggu 3 3.49 6.82 1.00 23.80 Ruang Staf Karyawan 4 5.51 6.43 1.00 35.42 5 4.31 6.95 1.00 29.95 6 4.27 3.27 1.00 13.96 7 1.65 4.27 1.00 7.05 8 5.69 2.53 1.00 14.40 9 5.81 3.67 1.00 21.32 10 1.41 3.03 1.00 4.27 Ruang Kepala Kantor 11 6.81 4.62 1.00 31.46 Total 199.91 Jenis Pekerjaan : Satuan : No Panjang Bagian Teras 1 3.75 2 1.50 3 1.00
Keramik lantai 40/40 m2 Lebar Titik Volume 1.00 8.08 1.50
1.00 1.00 1.00 Total
3.75 12.12 1.50 17.37
sudah ket M2 M2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m3 sudah ket M2 M2 m2 m3
Jenis Pekerjaan : Satuan : Besi Sloof Besi D
Sloof 15/20 kg,m3,m2
sudah
=
12
95.00
0.8878
Besi D
=
10
0.59
0.6165
Koefisienbesi 0.006165
a.Unit
4.00
b.Unit Total Titik
600.00 1.00
Beton 85.00
0.15 Titik
0.20 1.00
Begisting 85.00
0.40 Titik
Pembesian: Beton : Begisting : Jenis Pekerjaan : Satuan :
555.59 Kg 2.55 m3 34.00 m2 Pancang Ulin 10/10 + sunduk kalang Titik
sudah
1.00
No
Uraian Volume Ket 1 Pancang Ulin 25 Titik
Jenis Pekerjaan : Satuan : No Panjang 1 8.50 2 4.22 3 2.90 4 3.82 5 6.75 6 2.08 7 4.65 8 6.88 9 3.60 10 4.95 11 1.20
Jenis Pekerjaan : Satuan : No Uraian 2 type b 3 type c 4 type d 5 type e 6 type f 7 type g 8 type h 9 type i 10 type j 11 type k 12 type l
Galian Tanah m3 Lebar Tinggi Titik Volume 0.60 0.50 1.00 2.55 0.60 0.50 1.00 1.27 0.60 0.50 1.00 0.87 0.60 0.50 2.00 2.29 0.60 0.50 2.00 4.05 0.60 0.50 2.00 1.25 0.60 0.50 3.00 4.19 0.60 0.50 2.00 4.13 0.60 0.50 2.00 2.16 0.60 0.50 1.00 1.49 0.60 0.50 1.00 0.36 Total 24.59 18.00 Pasangan Batu Gunung m3 Panjang Lebar (atas) Lebar (bawah) Tinggi 8.50 0.20 0.40 0.60 4.22 0.20 0.40 0.60 2.90 0.20 0.40 0.60 3.82 0.20 0.40 0.60 6.75 0.20 0.40 0.60 2.08 0.20 0.40 0.60 4.65 0.20 0.40 0.60 6.88 0.20 0.40 0.60 3.60 0.20 0.40 0.60 4.95 0.20 0.40 0.60 1.20 0.20 0.40 0.60
Jenis Pekerjaan : Tanah urug kembali Satuan : m3 No Panjang 1 Galian Tanah 24.59 2 Batu Gunung 10.16
Besi D
=
10
ket m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 sudah Luas Titik Volume 1.00 0.18 1.00 0.18 1.00 0.18 1.00 0.18 1.00 0.18 1.00 0.18 1.00 0.18 2.00 0.18 1.00 0.18 1.00 0.18 1.00 0.18 Total
1.53 0.76 0.52 0.69 1.22 0.37 0.84 2.48 0.65 0.89 0.22 10.16
sudah Titik 1.00 1.00 Total
Jenis Pekerjaan : RingBalk 15/20 Satuan : kg,m3,m2 Besi Ringbalk Besi D = 12
sudah
Volume 24.59 10.16 14.44
ket m3 m3 m3 sudah
139.00
0.8878
0.59
0.6165
Koefisienbesi 0.006165
a.Unit
4.00
b.Unit Total Titik
900.00 1.00
Beton 130.00
0.13
0.20
Titik
1.00
Begisting 130.00 Pembesian: Beton : Begisting :
0.40 Titik
1.00
a.Unit
6.00
b.Unit Total Titik
52.00
820.96 Kg 3.38 m3 52.00 m2
Jenis Pekerjaan : Satuan : Dak atap 2 Besi D
Dak Atap kg,m3,m2
sudah
=
10
7.90
0.6165
Besi D
=
10
1.10
0.6165
Koefisienbesi 0.006165
1.00
Beton 0.10
0.94 Titik
7.89 1.00
Begisting 0.10
17.66 Titik
0.94
1.00 7.89
Besi D
=
10
3.62
0.6165
Besi D
=
10
1.10
0.6165
Koefisienbesi 0.006165
Titik
1.00
a.Unit
6.00
b.Unit Total Titik
24.00 1.00
Beton 0.10
3.61 Titik
0.94 1.00
Begisting 0.10
9.10 Titik
3.61 Dak atap 3 Besi D Besi D
= =
10 10
3.00 1.45
Koefisienbesi 0.006165
1.00 0.94
Titik
1.00
a.Unit
8.00
b.Unit Total Titik
20.00
0.6165 0.6165
1.00
Beton 0.10
2.95 Titik
1.30 1.00
Begisting 0.10
8.50 Titik
2.95
1.00 1.30
Titik Besi D
=
10
1.00
0.6165
Besi D
=
10
5.90
0.6165
Koefisienbesi 0.006165
1.00
a.Unit
39.00
b.Unit Total Titik
6.00 1.00
Beton 0.10
0.82 Titik
5.90 1.00
Begisting 0.10
13.44 Titik
1.00
0.82
5.90 Titik
Dak atap 4 Besi D
=
10
7.40
0.6165
Besi D
=
10
5.50
0.6165
Koefisienbesi 0.006165
1.00
a.Unit
35.00
b.Unit Total Titik
49.00 1.00
Beton 0.10
7.38 Titik
5.31 1.00
Begisting 0.10
25.38 Titik
1.00
7.38
5.31 Titik
Dak atap 5 Besi D
=
10
5.45
0.6165
Besi D
=
10
5.10
0.6165
Koefisienbesi 0.006165
1.00
a.Unit
33.00
b.Unit Total Titik
35.00 1.00
Beton 0.10
5.31 Titik
5.05 1.00
Begisting 0.10
20.72 Titik
5.31
1.00 5.05
Titik Besi D
=
10
1.50
0.6165
Besi D
=
10
2.00
0.6165
Koefisienbesi 0.006165
1.00
a.Unit
12.00
b.Unit Total Titik
10.00 1.00
Beton 0.10
1.50
1.87
Titik
1.00
Begisting 0.10
6.73 Titik
1.50 Titik Pembesian: Beton : Begisting :
742.86 Kg 8.83 m3 98.44 m2
Jenis Pekerjaan : Satuan : No Panjang 2 4.07 3 6.80 4 2.13 5 6.93 6 3.65 7 4.60
Pasir Urug Bawah Lantai m3 Lebar Tinggi Titik 2.95 0.07 3.47 0.07 2.80 0.07 4.29 0.07 1.50 0.07 6.80 0.07 Total
sudah
Jenis Pekerjaan : Satuan : No Panjang 1 4.07 2 6.80 3 2.13 4 6.93 5 3.65 6 4.60
Cor Lantai m3 Lebar Tinggi Titik Volume 2.95 0.05 1.00 0.60 3.47 0.05 1.00 1.18 2.80 0.05 1.00 0.30 4.29 0.05 1.00 1.49 1.50 0.05 1.00 0.27 6.80 0.05 1.00 1.56 Total 5.40
sudah
Jenis Pekerjaan : Satuan : No Uraian 1 type a 2 type b 3 type c 4 type d 5 e 6 f 7 g 8 h 9 i 10 j 11 k 12 l 13 m 14 n 15 o 16 p 17 q
Rangka Plafond m2 Panjang lebar 6.82 2.82 4.09 5.47 3.05 5.05 6.32 4.31 1.63 4.27 6.95 3.03 5.69 4.17 4.12 3.67 4.62
sudah
1.00 1.00 1.00 1.00 2.00 1.00
titik 3.51 2.17 2.97 4.09 1.27 3.05 5.54 2.96 4.51 3.40 4.31 1.47 2.68 2.94 4.17 5.81 6.81
Volume 0.84 1.65 0.42 2.08 0.77 2.19 7.94
luas 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
23.90 6.12 12.15 22.37 3.87 15.40 35.01 12.76 7.35 14.52 29.95 4.45 15.25 12.26 17.18 21.32 31.46
1.00 1.87
ket m3 m3 m3 m3 m3 m3 m3
ket m3 m3 m3 m3 m3 m3 m3
ket m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
1.00
18 r 19 s 20 t Calciboard 1 type a 2 type b
2.53 5.52 1.50
2.75 8.02 3.97
1.00 1.00 1.00
6.96 m2 44.27 m2 5.96 m2
1.89 2.39
1.89 5.80
1.00 1.00
3.57 m2 13.86 m2
Total Jenis Pekerjaan : Satuan : No Uraian 1 type a 2 type b 3 type c 4 type d 5 j 6 k 7 p 8 q
Plafond gypsum m2 Panjang lebar 6.82 2.82 4.09 5.47 4.27 6.95 3.67 4.62
359.96 m2 sudah
titik 3.51 2.17 2.97 4.09 3.53 4.31 5.94 6.81
luas 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Total Jenis Pekerjaan : Satuan : No Uraian 1 type a
Plafond Calciboard m2 Panjang lebar titik 1.89 1.89
23.90 6.12 12.15 22.37 15.07 29.95 21.80 31.46
162.83 m2 sudah luas 1.00
Total Jenis Pekerjaan : Satuan : No Uraian 1 type a 2 type b 3 type c 4 type d 5 j 6 k 7 p 8 q
List Plafond m Panjang 20.65 9.98 14.12 19.12 15.60 22.52 19.22 22.86
3.57 m2
titik
luas 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Jenis Pekerjaan : Balok latai 13/13 Satuan : kg,m3,m2 Besi Balok Latai Besi D = 8 =
ket 3.57 m2
sudah
Total
Besi D
ket m2 m2 m2 m2 m2 m2 m2 m2
8
20.65 9.98 14.12 19.12 15.60 22.52 19.22 22.86 144.07
ket m' m' m' m' m' m' m' m' m' sudah
50.00
0.3946
0.41
0.3946
Koefisienbesi 0.006165
a.Unit
4.00
b.Unit Total Titik
320.00 1.00
Beton 48.00
0.13 Titik
0.13 1.00
Begisting 48.00
0.26 Titik
Pembesian: Beton : Begisting : Jenis Pekerjaan : Satuan : Besi Gewel Besi D Besi D
1.00
130.68 Kg 0.81 m3 12.48 m2 Balok Gewel 11/11 kg,m3,m2
Tidak ada kerjaan
=
8
107.50
0.3946
=
8
0.33
0.3946
Koefisienbesi 0.006165
a.Unit
4.00
b.Unit Total Titik
530.00 1.00
Beton 107.50
0.11 Titik
0.11 1.00
Begisting 107.50
0.22 Titik
Pembesian: Beton : Begisting :
1.00
238.67 Kg 1.30 m3 23.65 m2
Jenis Pekerjaan : Satuan : kanopi 1 Besi D
Kanopi kg,m3,m2
sudah
=
10
1.20
0.6165
Besi D
=
10
1.70
0.6165
Koefisienbesi 0.006165
a.Unit
10.00
b.Unit Total Titik
6.00 1.00
Beton 0.10
1.00 Titik
1.50 1.00
Begisting 0.10
5.00 Titik
1.00 kanopi 2 Besi D
=
10
5.85
0.6165
Besi D
=
10
0.60
0.6165
Koefisienbesi 0.006165
1.00 1.50
Titik
1.00
a.Unit
3.00
b.Unit Total Titik
37.00 1.00
Beton 0.10
0.43 Titik
5.65 1.00
Begisting 0.10
12.16 Titik
1.00
0.43 Pembesian: Beton : Begisting :
Titik
1.00
a.Unit
4.00
b.Unit Total Titik
30.00
38.19 Kg 0.39 m3 5.65 m2
Jenis Pekerjaan : kolom Praktis 13/13 Satuan : kg,m3,m2 Besi Kolom 1 Besi D = 12 Besi D
5.65
=
sudah 5.30
10
5.00
0.8878
0.41
0.6165
Koefisienbesi 0.006165
19.00
Beton 4.50
0.13 Titik
0.13 19.00
Begisting 4.50
0.52 Titik
Pembesian: Beton : Begisting : Jenis Pekerjaan : Satuan : No Uraian Toilet Luar 1 type a Pengurangan 1 D2 2 Bouven
481.42 Kg 1.44 m3 44.46 m2 Pas. Dinding bata 1:2 m2 panjang Tinggi Unit
luas
ket
2.00
2.70
3.00 Total a
16.20 m2 16.20 m2
0.70 0.95
2.10 0.60
1.00 1.00 Total b Total a-b
1.47 0.57 2.04 14.16
M2 m2 m2 m2
Jenis Pekerjaan : Plesteran 1:2 Satuan : m2 No Uraian Luas Pas.bTitik luas ket 1 Bagian dinding 14.16 2.00 28.32 m2 Total 28.32 m2 Jenis Pekerjaan : Satuan : No Uraian Bagian Luar 1 type a 2 type b
19.00
Pas. Dinding bata 1:4 m2 panjang Tinggi Unit 6.57 1.00
4.30 4.00
luas 1.00 1.00
ket 28.25 m2 4.00 m2
56.64
3 type c 4 type d 5 type e 6 type f 7 type g 8 type h 9 type i 10 type j 11 type k 12 l 13 m 14 n Bagian Dalam 15 16 17 18 19 20 21 22 Mainan 1 o 2 p 3 q 4 r 5 s 6 t 7 8
3.49 6.82 0.54 2.15 0.87 6.95 0.87 3.67 4.62 1.25 5.44 3.64
4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00
1.00 1.00 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.00 1.00 1.00
13.94 27.28 2.14 8.60 3.48 27.80 6.96 14.68 18.48 5.00 21.74 14.54
m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
4.09 1.47 2.82 2.15 3.23 1.49 2.97 1.27
4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30
2.00 1.00 1.00 1.00 1.00 1.00 2.00 1.00
35.17 6.32 12.13 9.25 13.87 6.39 25.54 5.46
m2 m2 m2 m2 m2 m2 m2 m2
2.00 2.00 Total a
2.04 1.55 7.20 0.40 1.05 0.70 7.00 3.00 333.95
m2 m2 m2 m2 m2 m2 m2 m2 m2
3.50 1.50
130.95 51,070,500.00
35.17 6.32 12.13 9.25 13.87 6.39 25.54 5.46 Pengurangan 3.15 1.50 4.09 2.84 0.80 0.70 1.20 3.20
2.15 2.10 2.15 2.15 2.10 2.10 2.20 2.50
Pengurangan
0.54
2.66
1 PJ1
3.15
2.15
1.00
6.77 M2
2 PJ2
1.50
2.10
1.00
3.15 m2
3 PJ3
4.09
2.15
1.00
8.79 m2
4 PJ4
2.84
2.15
1.00
6.11 m2
5 D1
0.80
2.10
3.00
5.04 m2
6 D2
0.70
2.10
1.00
1.47 m2
7 W1 8 W2 9 W3
1.20 3.20 0.54
2.20 2.50 2.66
5.00 2.00 5.00 Total b Total a-b
13.20 16.00 7.19 67.72 266.23
m2 m2 m2 m2 m2
huruf 201.3
Jenis Pekerjaan : Plesteran 1:4 Satuan : m2 No Uraian Luas Pas.bTitik luas ket 1 Bagian dinding 266.23 2.00 532.47 m2 Total 532.47 m2 Jenis Pekerjaan : Satuan : No Uraian 1 1:02 2 1:04
Acian m2 titik 28.32 532.47
luas 1.00 1.00
Total Jenis Pekerjaan :
Pengecatan plafond
Satuan : No Uraian 1 Calsiboard 2 Gypsum
m2 Luas 3.57 162.83
sudah titik
Cat Luar
luas 1.00 1.00
Total Jenis Pekerjaan :
ket 28.32 m2 532.47 m2 560.79 m2
ket 3.57 m2 162.83 m2 166.40 m2
Satuan No Uraian Toilet 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Mainan 17 Mainan 18 Mainan 19 Mainan 20 Mainan 21 Mainan
:
m2 Panjang 1.92 2.16 2.00 6.57 1.13 3.75 7.08 0.66 2.15 1.00 7.21 3.67 4.88 1.34 13.50
tinggi
titik 2.70 2.70 2.70 3.50 3.50 3.50 3.50 3.50 3.50 3.50 3.50 3.50 3.50 3.50 3.50 2.04 1.55 7.20 0.40 1.05 0.70
luas 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 3.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00
5.18 5.83 5.40 23.00 3.96 13.13 24.78 2.31 7.53 10.50 25.24 12.85 17.08 4.69 47.25 4.08 3.10 14.40 0.80 2.10 1.40 234.59
m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
1.00 1.00 5.00 5.00 1.00 2.00 1.00
0.57 1.47 13.20 7.13 6.88 16.00 3.15 48.40 186.19
m2 m2 m2 m2 m2 m2 m2 m2 m2
total Pengurangan 1 Bv 2 D2 3 W1 4 W3 5 PJ1 6 W2 7 PJ2
0.95 0.70 1.20 0.54 3.20 3.20 1.50
0.60 2.10 2.20 2.64 2.15 2.50 2.10 total Total
Jenis Pekerjaan : Satuan : No Uraian 1 2 3 4 5 6 7 8 9 10 11 12 13 14
Cat dalam m2 Panjang tinggi titik 1.87 2.70 5.39 4.00 4.09 4.00 2.97 4.00 1.13 4.00 3.49 4.00 6.82 4.00 2.17 4.00 1.60 4.00 2.75 4.00 4.62 4.00 6.81 4.00 5.44 4.00 3.67 4.00
ket
luas 4.00 1.00 4.00 5.00 1.00 3.00 1.00 3.00 2.00 2.00 2.00 3.00 1.00 1.00
20.20 21.54 65.44 59.40 4.52 41.82 27.28 26.04 12.80 22.00 36.96 81.72 21.74 14.68
ket m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
15 16 17 18
1.74 6.95 2.44 4.53
4.00 4.00 4.00 4.00
1.00 1.00 1.00 1.00
6.94 4.00 4.00 4.00 475.08
m2 m2 m2 m2 m2
1.00 1.00 1.00 1.00 3.00 1.00 5.00 2.00 5.00 1.00
6.77 3.15 8.79 6.11 5.04 1.47 13.20 16.00 7.19 0.57 68.29 406.79
M2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
total Pengurangan 1 PJ1 2 PJ2 3 PJ3 4 PJ4 5 D1 6 D2 7 W1 8 W2 9 W3 10 Bouven
3.15 1.50 4.09 2.84 0.80 0.70 1.20 3.20 0.54 0.95
2.15 2.10 2.15 2.15 2.10 2.10 2.20 2.50 2.66 0.60 total Total
Partisi Kaca Kaca 5 mm no panjang 1 0.95
tinggi 1.175
luas 4 total
2
0.95
1.175
3 total jumlah
Profil alumunium 1 2.5 2 0.95
6 18
2.5 0.95
4 12
96.30 m
0.562
64.20 m 160.50 m 9
total 2
0.95
0.562
6 total Jumlah
Double triplek lapis HPL 1 0.27
4.06
1 total
2
0.27
2.95
1 total jumlah
atap
m2 m2 m2 m2 m2
10 m 11.4 m 21.4 m total jumlah
Kaca es 3 mm 1 0.95
4.47 13.40 3.35 10.05 23.44
15 m 17.1 m 32.1 m total
3 4
592.97
4.81 14.42 3.20 9.61 24.03
m2 m2 m2 m2 m2
1.10 3.29 0.80 2.39 5.68
m2 m2 m2 m2 m2
2.925 3.5 10.2375
23.48 19.44
1.318 10.642
23.48 1 2.75 15.35
1 1 1 1
2 61.89328 m2 2 413.761 m2 475.6542 m2 23.48 1 2.75 15.35 42.58
beton 337.35 218.24 555.59 Kg 555.59 Kg 2.55 M3 2.55 M3 34.00 M2 34.00 M2
besi 8.49 4.09 2.97 3.49 6.82 2.15 4.23 6.95 3.65 4.62 1.24
beton 8.69 4.29 3.17 3.69 7.02 2.35 4.43 7.15 3.85 4.82 1.44
1.00 1.00 1.00 2.00 2.00 2.00 3.00 2.00 3.00 1.00 1.00
0.00 8.49 4.09 2.97 6.97 13.64 4.30 12.68 13.90 10.95 4.62 1.24 83.84
besi 0.00 8.69 4.29 3.17 7.37 14.04 4.70 13.28 14.30 11.55 4.82 1.44 87.64
Ket m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3
beton 493.59 327.36 820.96 Kg 820.96 Kg 3.38 M3
besi
beton
besi
0.65 4.55 7.60
0.85 4.75 7.80
4.00 2.00 2.00
2.60 9.10 15.20
3.40 9.50 15.60
1.00 3.49 5.68
1.20 3.69 5.88
3.00 2.00 2.00
3.00 6.97 11.36
3.60 7.37 11.76
3.38 M3 52.00 M2 52.00 M2
4.86 7.23 3.65 4.59 4.60 6.40 1.00
5.06 7.43 3.85 4.79 4.80 6.60 1.20
2.00 4.00 3.00 3.00 1.00 2.00 2.00 total
7.4166 29.22 35.26 64.49 Kg 64.49 Kg 0.74 M3 0.74 M3 1.77 1.77 7.42 7.42
M2 M2 M2 M2 3.3934
13.39 16.28 29.67 Kg 29.67 Kg 0.34 M3 0.34 M3 0.91 0.91 3.39 3.39
M2 M2 M2 M2 3.835
14.80 17.88 32.67 Kg 32.67 Kg 0.38 M3 0.38 M3 0.85 M2 0.85 M2 3.84 M2
9.71 28.92 10.95 13.76 4.60 12.80 2.00
10.11 29.72 11.55 14.36 4.80 13.20 2.40
130.97
137.37
3.84 M2 24.04
4.838
21.82 45.87 Kg 45.87 Kg 0.48 M3 0.48 M3 1.34 1.34 4.84 4.84
M2 M2 M2 M2 39.1878
159.67 166.15 325.82 Kg 325.82 Kg 3.92 M3 3.92 M3 2.54 2.54 39.19 39.19
M2 M2 M2 M2 26.8155
110.88 110.05 220.92 Kg 220.92 Kg 2.68 M3 2.68 M3 2.07 2.07 26.82 26.82
M2 M2 M2 M2 2.7975
11.10 12.33 23.43 Kg 23.43 Kg 0.28 M3
0.28 M3 0.67 0.67 2.80 2.80
M2 M2 M2 M2 88.2838 Waterprofing
beton 78.91 51.77 130.68 Kg 130.68 Kg 0.81 M3 0.81 M3
besi 1.80 6.57 3.50 6.82 2.15 6.95 3.67 4.62 9.20
beton 2.00 6.77 3.70 7.02 2.35 7.15 3.87 4.82 9.40
2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
besi 3.60 6.57 3.50 6.82 2.15 6.95 3.67 4.62 9.20
4.00 6.77 3.70 7.02 2.35 7.15 3.87 4.82 9.40
47.08
49.08
12.48 M2 12.48 M2
169.66 69.01 238.67 Kg 238.67 Kg 1.30 M3 1.30 M3
beton besi 10.07 10.07 10.92 10.92 9.11 9.11 9.48 9.48 15.23 15.23 9.48 9.48 2.03 2.03 2.11 2.11
23.65 M2 23.65 M2
7.40 6.29 13.69 Kg 13.69 Kg 0.15 M3 0.15 M3 0.50 0.50 1.50 1.50
M2 M2 M2 M2
10.82 13.69 24.51 Kg 24.51 Kg 0.24 M3 0.24 M3
kanopi 4.145 3.35 2.08
0.5 0.5 0.75
2 1 1 2 2 1 2 2.00
beton besi 20.14 20.14 10.92 10.92 9.11 9.11 18.96 18.96 30.46 30.46 9.48 9.48 4.06 4.06 4.22 4.22 107.35 107.35
1.22 1.22 2.43 2.43
M2 M2 M2 M2
17.76 7.58 25.34 Kg 481.42 Kg 0.08 M3 1.44 M3 2.34 M2 44.46 M2
114.12
228.244
1.00 1.00 1.00 1.00 3.00 1.00 5.00 2.00
6.77 3.15 8.79 6.11 5.04 1.47 13.20 16.00
5.00
7.19
38
7649.4
15298.8
rehab Jenis Pekerjaan : Pancang Ulin 10/10 + sunduk kalang Satuan : Titik No Uraian Volume Ket 1 Pancang Ulin 15 Titik
sudah
Jenis Pekerjaan : Galian Tanah Satuan : m3 No Panjang Lebar Tinggi Titik Volume 1 2.68 0.60 0.80 1.00 1.29 2 4.40 0.60 0.80 1.00 2.11 3 3.44 0.60 0.80 2.00 3.30 4 5.19 0.60 0.80 1.00 2.49 5 4.00 0.60 0.80 4.00 7.68 6 4.75 0.60 0.80 1.00 2.28 7 8.15 0.60 0.80 1.00 3.91 8 6.35 0.60 0.80 1.00 3.05 9 1.50 0.60 0.80 1.00 0.72 10 2.25 0.60 0.80 1.00 1.08 Total 27.91
sudah
Jenis Pekerjaan Satuan No Uraian 1 type a 2 type b 3 type c 4 type d 5 type e 6 type f 7 type g 8 type h 9 type i 10 type j
: Pasangan Batu Gunung sudah : m3 Panjang Lebar (atas) Lebar (bawah) Tinggi Luas Titik Volume 2.68 0.30 0.55 0.60 0.26 1.00 0.68 4.40 0.30 0.55 0.60 0.26 1.00 1.12 3.44 0.30 0.55 0.60 0.26 2.00 1.75 5.19 0.30 0.55 0.60 0.26 1.00 1.32 4.00 0.30 0.55 0.60 0.26 4.00 4.08 4.75 0.30 0.55 0.60 0.26 1.00 1.21 8.15 0.30 0.55 0.60 0.26 1.00 2.08 6.35 0.30 0.55 0.60 0.26 1.00 1.62 1.50 0.30 0.55 0.60 0.26 1.00 0.38 2.25 0.30 0.55 0.60 0.26 1.00 0.57 Total 14.83
Jenis Pekerjaan : Tanah urug kembali Satuan : m3 No Panjang 1 Galian Tanah 27.91 2 Batu Gunung 14.83
sudah Titik 1.00 1.00 Total
Jenis Pekerjaan : Pasir Urug Bawah Lantai Satuan : m3 No Panjang Lebar Tinggi Titik 1 3.44 2.68 0.10 2 6.84 4.40 0.10 3 6.50 4.75 0.10 4 8.15 7.85 0.10 5 1.50 3.79 0.10 6 5.95 3.67 0.10 Total Jenis Pekerjaan Satuan No Panjang
ket m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3
: Cor Lantai : m3 Lebar Tinggi
Volume 27.91 14.83 13.08
ket m3 m3 m3 sudah
1.00 1.00 1.00 1.00 1.00 1.00
Volume 0.92 3.01 3.09 6.40 0.57 2.18 16.17
ket m3 m3 m3 m3 m3 m3 m3 sudah
Titik
Volume
ket
Ket m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3
1 2 3 4 5 6
3.44 6.84 6.50 8.15 1.50 5.95
2.68 4.40 4.75 7.85 3.79 3.67
0.05 0.05 0.05 0.05 0.05 0.05
1.00 1.00 1.00 1.00 1.00 1.00 Total
Jenis Pekerjaan : Sloof 15/20 Satuan : kg,m3,m2 Besi Sloof Besi D = Besi D
=
0.46 1.50 1.54 3.20 0.28 1.09 8.08
m3 m3 m3 m3 m3 m3 m3 sudah
12
55.05
0.8878
10
0.59
0.6165
Koefisienbesi 0.006165
a.Unit
4.00
b.Unit Total Titik
350.00
195.48
1.00
127.31 322.79 Kg 322.79 Kg
0.20 1.00
1.65 M3 1.65 M3
Titik
1.00
22.00 M2 22.00 M2
a.Unit
4.00
13.49
b.Unit Total Titik
23.00
Beton 55.00
0.15 Titik
Begisting 55.00 Pembesian : Beton : Begisting :
322.79 Kg 1.65 m3 22.00 m2
Jenis Pekerjaan : kolom 13/13 Satuan : kg,m3,m2 Besi Kolom Besi D = Besi D
0.40
=
sudah
12
3.80
0.8878
10
0.41
0.6165
Koefisienbesi 0.006165
12.00
5.81 19.31 Kg 231.69 Kg
0.13 12.00
0.06 M3 0.71 M3
12.00
1.82 M2 21.84 M2
Beton 3.50
0.13 Titik
Begisting 3.50
0.52 Titik
Pembesian : Beton : Begisting :
231.69 Kg 0.71 m3 21.84 m2
Jenis Pekerjaan : Ringbalk 13/20 Satuan : kg,m3,m2 Besi Ringbalk Besi D = 12 Besi D
=
10
sudah
55.05
0.8878
0.55
0.6165
Koefisienbesi 0.006165
a.Unit
4.00
b.Unit Total Titik
350.00
195.48
1.00
118.68 314.16 Kg 314.16 Kg
0.20 1.00
1.43 M3 1.43 M3
Beton 55.00
0.13 Titik
Begisting
55.00 Pembesian : Beton : Begisting :
1.00
a.Unit
4.00
b.Unit Total Titik
850.00
22.00 M2 22.00 M2
314.16 Kg 1.43 m3 22.00 m2
Jenis Pekerjaan : Balok Gewel 13/13 Satuan : kg,m3,m2 Balok Gewel Besi D = 10 Besi D
0.40 Titik
=
10
sudah
128.40
0.6165
0.41
0.6165
Koefisienbesi 0.006165
316.63
1.00
214.85 531.48 Kg 531.48 Kg
0.13 1.00
2.16 M3 2.16 M3
Titik
1.00
33.28 M2 33.28 M2
a.Unit
4.00
33.78
b.Unit Total Titik
90.00
Beton 128.00
0.13 Titik
Begisting 128.00 Pembesian : Beton : Begisting :
531.48 Kg 2.16 m3 33.28 m2
Jenis Pekerjaan : Balok Latai 11/11 Satuan : kg,m3,m2 Besi Balok latai type a Besi D = 10 Besi D
0.26
=
10
sudah
13.70
0.6165
0.33
0.6165
Koefisienbesi 0.006165
1.00
18.31 52.09 Kg 52.09 Kg
0.11 1.00
0.16 M3 0.16 M3
Titik
1.00
2.97 M2 2.97 M2
a.Unit
4.00
b.Unit Total Titik
28.00
Beton 13.50
0.11 Titik
Begisting 13.50
0.22
Besi Balok latai type b Besi D =
10
4.40
0.6165
Besi D
10
0.33
0.6165
=
Koefisienbesi 0.006165
10.85
1.00
5.70 16.55 Kg 16.55 Kg
0.11 1.00
0.05 M3 0.05 M3
1.00
0.92 M2 0.92 M2
Beton 4.20
0.11 Titik
Begisting 4.20
0.22 Titik
Pembesian : Beton : Begisting :
68.64 Kg 0.21 m3 3.89 m2
Jenis Pekerjaan : Kanopi Satuan : kg,m3,m2 Besi Kanopi Besi D = Besi D
=
sudah
10
1.50
0.6165
10
13.50
0.6165
Koefisienbesi 0.006165
a.Unit
90.00
b.Unit Total Titik
10.00
83.23
1.00
83.23 166.46 Kg 166.46 Kg
13.50 1.00
2.63 M3 2.63 M3
Beton 0.13
1.50 Titik
Begisting 0.13
30.00
1.00
3.90 3.90 20.25 20.25
a.Unit
90.00
27.74
b.Unit Total Titik
3.00
Titik 1.50
1.00 13.50
Titik Besi Kanopi Besi D
=
10
0.50
0.6165
Besi D
=
10
13.50
0.6165
Koefisienbesi 0.006165
M2 M2 M2 M2
1.00
24.97 52.71 Kg 52.71 Kg
10.70 1.00
0.70 M3 0.70 M3
Beton 0.13
0.50 Titik
Begisting 0.13
22.40
Titik
1.00
2.91 2.91 5.35 5.35
a.Unit
1.00
0.31
b.Unit Total Titik
3.00 3.00
0.37 0.68 Kg 2.03 Kg
0.20 3.00
0.01 M3 0.04 M3
3.00
0.18 M2 0.55 M2
Titik 0.50
10.70
Besi Kanopi dudukan Besi D =
10
0.50
0.6165
Besi D
10
0.20
0.6165
=
1.00
Koefisienbesi 0.006165
M2 M2 M2 M2
Beton 0.13
0.50 Titik
Begisting 0.13
1.40 Titik
Besi Kanopi Besi D
=
10
0.50
0.6165
Besi D
=
10
4.20
0.6165
Koefisienbesi 0.006165
a.Unit
28.00
b.Unit Total Titik
3.00
8.63
1.00
7.77 16.40 Kg 16.40 Kg
4.20 1.00
0.21 M3 0.21 M3
Beton 0.10
0.50 Titik
Begisting 0.10
9.40 Titik
0.50
1.00 4.20
Titik
1.00
0.94 0.94 2.10 2.10
M2 M2 M2 M2
Besi Kanopi Besi D
=
10
1.50
0.6165
Besi D
=
10
8.00
0.6165
Koefisienbesi 0.006165
a.Unit
53.00
49.01
b.Unit Total Titik
10.00 1.00
49.32 98.33 Kg 98.33 Kg
8.00 1.00
1.20 M3 1.20 M3
Beton 0.10
1.50 Titik
Begisting 0.10
19.00 Titik
1.50
8.00 Titik
Pembesian : Beton : Begisting :
335.93 Kg 4.99 m3 49.94 m2
1.00 1.00
1.90 1.90 12.00 12.00
M2 M2 M2 M2
Jenis Pekerjaan : Dak Atap Satuan : kg,m3,m2 Besi Dak Atap Besi D = Besi D
=
sudah
10
3.20
0.6165
10
5.60
0.6165
Koefisienbesi 0.006165
a.Unit
37.00
b.Unit Total Titik
21.00
72.99
1.00
72.50 145.49 Kg 145.49 Kg
5.60 1.00
1.79 M3 1.79 M3
Beton 0.10
3.20 Titik
Begisting 0.10
17.60
1.00
1.76 1.76 17.92 17.92
a.Unit
70.00
142.41
b.Unit Total Titik
22.00 1.00
145.12 287.54 Kg 287.54 Kg
10.70 1.00
3.42 M3 3.42 M3
Titik
1.00
3.20
5.60 Titik
Besi Dak Atap Besi D
=
10
3.30
0.6165
Besi D
=
10
10.70
0.6165
Koefisienbesi 0.006165
M2 M2 M2 M2
Beton 0.10
3.20 Titik
Begisting 0.10
27.80 Titik
3.20
10.70 Titik
Pembesian : Beton : Begisting :
433.03 Kg 5.22 m3 56.70 m2
Jenis Pekerjaan : Pas. Dinding bata Satuan : m2 No Uraian panjang Tinggi Unit luas ket Ruang Rapat 1 type a 3.79 4.00 2.00 30.28 m2 2 type b 8.02 4.00 1.00 32.08 m2 Bagian Toilet Ruang Rapat 3 type c 6.22 4.00 1.00 24.88 m2 4 type d 1.37 4.00 1.00 5.48 m2 5 type e 2.12 4.00 1.00 8.48 m2 Toilet Bagian depan 6 type f 2.55 4.00 3.00 30.60 m2 7 type g 1.50 4.00 4.00 24.00 m2 Ruang Pelayanan Terpadu 8 type h 4.27 4.00 2.00 34.16 m2 9 type i 0.77 4.00 1.00 3.08 m2 Ruang KA tata usaha 10 type j 1.44 4.00 1.00 5.74 m2 11 1.21 4.00 1.00 4.82 m2 12 4.62 4.00 1.00 18.48 m2 Tambahan
1.00 1.00
2.78 2.78 34.24 34.24
M2 M2 M2 M2
11 12 13 14 15 16 17 18 19 20
4.40 4.40 1.60 1.00 1.40 1.10 0.90 1.80 1.00 0.60
Pengurangan 1 J1 2 Bouven 3 4 5 6
6.50 4.00 6.00 13.00 13.00 13.50 13.50 12.30 10.70 8.20
0.90 2.70 0.78 0.98 2.10 0.90
1.60 5.00 2.10 2.10 3.50 1.60
1.00 1.00 1.00 2.00 2.00 1.00 1.00 1.00 1.00 2.00 Total a
28.60 17.60 9.60 26.00 36.40 14.85 12.15 22.14 10.70 9.84 409.96
m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
9.00 4.00 2.00 1.00 1.00 4.00 Total b Total a-b
12.96 54.00 3.28 2.06 7.35 5.76 85.40 324.55
M2 m2 m2 m2 m2 m2 m2
Jenis Pekerjaan : Plesteran Satuan : m2 No Uraian Luas Pas.bTitik luas ket 1 Bagian dinding 324.55 2.00 649.10 m2 Total 649.10 m2 Jenis Pekerjaan Satuan No Uraian 1 Plesteran
Jenis Pekerjaan Satuan No Uraian Toilet 1 2 3 4 5 6 7 8 9 10 11 12 13
: Acian : m2 titik Total
luas ket 649.10 m2 649.10 m2
titik
luas
649.10
1.00
: Cat Dalam : m2 Panjang tinggi 2.55 1.59 6.71 4.27 3.80 3.53 4.62 4.09 8.02 3.97 1.50 1.37 2.25
3.50 3.50 3.50 3.50 3.50 3.50 3.50 3.50 3.50 3.50 3.50 3.50 3.50
4.00 4.00 1.00 3.00 1.00 1.00 1.00 2.00 1.00 1.00 2.00 1.00 1.00
35.70 22.26 23.49 44.84 13.30 12.36 16.17 28.60 28.07 13.90 10.50 4.80 7.88 261.84
m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
2.00 3.00 2.00 2.00 1.00 1.00 1.00
3.28 15.30 6.36 3.20 7.00 14.70 13.21
m2 m2 m2 m2 m2 m2 m2
total Pengurangan 1 pintu 2 keramik dindin 3 keramik dindin 4 keramik dindin 5 pintu p1 6 J2 7
0.78 2.55 1.59 0.80 2.00 4.20 3.78
2.10 2.00 2.00 2.00 3.50 3.50 3.50
ket
187.88
0.90
1.60
9.00 total Total
12.96 m2 76.01 m2 185.83 m2
Jenis Pekerjaan : Cat luar Satuan : m2 No Uraian Panjang tinggi titik 1 type a 19.07 3.50 2 type b 0.55 3.50 3 type c 4.88 3.50 4 type d 1.00 3.50 5 type e 13.50 3.50 6 bagian atas 187.88 7 8.28 3.50 8 4.00 3.50 9 7.95 3.50 total Pengurangan 1 P1 2.10 3.50 2 J1 1.00 3.50 3 J2 4.20 2.80 4 J3 6.80 3.20 5 J4 1.20 3.20 6 Bouven 2.70 5.00 7 0.90 1.60 total Total Jenis Pekerjaan Satuan No Uraian 1 type a 2 type b 3 type c 4 type d 5 e 6 f 7 g 8 h 9 i 10 j 11 k 12 l 13 m 14 n 15 o 16 p 17 q 18 r 19 s 20 t Calciboard 1 type a 2 type b 3 type c
: Rangka Plafond : m2 Panjang lebar 5.49 4.09 5.03 6.33 3.75 1.37 1.50 4.40 6.71 3.67 5.53 6.36 4.12 2.54 1.50 3.50 2.00 1.78 3.36 7.72 1.59 2.37 1.37
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
luas 66.73 1.93 17.08 1.00 13.50 187.88 8.28 4.00 7.95 308.34
ket m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
1.00 1.00 1.00 1.00 5.00 4.00 9.00
7.35 3.50 11.76 21.76 19.20 54.00 12.96 130.53 177.81
m2 m2 m2 M2 m2 m2 m2 m2 m2
3 1 4.2 6.8 1.2 2.7
sudah titik
luas
ket m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
2.37 2.97 2.50 5.40 3.53 3.43 0.77 3.18 4.27 5.81 5.58 4.62 4.17 8.17 3.97 1.52 3.90 1.65 3.87 8.02
1.00 3.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
13.01 36.44 12.58 34.18 13.22 4.70 1.16 13.99 28.65 21.32 30.86 29.38 17.18 20.75 5.96 5.32 7.80 2.94 13.00 61.91
2.57 5.52 3.72
2.00 1.00 1.00
8.17 m2 13.08 m2 5.10 m2
Total Jenis Pekerjaan Satuan No Uraian 1 type a 2 type b 3 type c
Panjang Pintu P1 Jendela J1 J2 J3 J4 Bouven
: Plafond Gypsum : m2 Panjang lebar titik 5.49 2.37 4.09 2.97 5.03 2.50
400.70 m2 sudah luas 1.00 3.00 1.00
ket 13.01 m2 36.44 m2 12.58 m2
15.72 14.12 15.06
1.00 3.00 1.00
15.72 42.36 15.06
Tinggi 4 3.5 2.8 3.2 3.2 5
4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
type d e f g h i j k l m n o p q r s t
6.33 3.75 1.37 1.50 4.40 6.71 3.67 5.53 6.36 4.12 2.54 1.50 3.50 2.00 1.78 3.36 7.72
5.40 3.53 3.43 0.77 3.18 4.27 5.81 5.58 4.62 4.17 8.17 3.97 1.52 3.90 1.65 3.87 8.02
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Total
34.18 13.22 4.70 1.16 13.99 28.65 21.32 30.86 29.38 17.18 20.75 5.96 5.32 7.80 2.94 13.00 61.91
m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
374.35 m2
23.46 14.55 9.60 4.54 15.16 21.96 18.96 22.22 21.96 16.58 21.42 10.94 10.04 11.80 6.86 14.46 31.48
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
23.46 14.55 9.6 4.54 15.16 21.96 18.96 22.22 21.96 16.58 21.42 10.94 10.04 11.8 6.86 14.46 31.48 349.13
Jenis Pekerjaan Satuan No Uraian 1 type a 2 type b 3 type c
: Plafond Calciboard : m2 Panjang lebar titik 1.59 2.57 2.37 5.52 1.37 3.72
sudah luas 2.00 1.00 1.00
Total Jenis Pekerjaan
26.35 m2
: Pengecatan plafond
Satuan : m2 No Uraian 1 Calsiboard 2 Gypsum
Luas 26.35 374.35
sudah titik
luas 1.00 1.00
Total Jenis Pekerjaan Satuan No Uraian 1 type a 2 type b 3 type c 4 type d 5 type e 6 type f 7 type g
ket 8.17 m2 13.08 m2 5.10 m2
: List Plafond : m Panjang 3.52 5.37 2.87 4.52 1.37 1.37 1.87
ket 26.35 m2 374.35 m2 400.70 m2 sudah
titik
luas 2.00 2.00 8.00 2.00 2.00 2.00 2.00
7.04 10.74 22.96 9.04 2.74 2.74 3.74 59.00
Total Jenis Pekerjaan Satuan No Uraian 1 type a 2 type b 3 type c 4 type d 5 type e
: Rangka Atap Baja Ringan : m2 Panjang lebar titik 12.00 16.00 7.30 14.60 10.00 11.70 2.15 9.15 4.30 2.70 Total
Jenis Pekerjaan Satuan No Uraian 1 type a 2 type b 3 type c 4 type d 5 type e
: Atap Bitumen : m2 Panjang lebar titik 12.00 16.00 7.30 14.60 10.00 11.70 2.15 9.15 4.30 2.70 Total
Jenis Pekerjaan Satuan No Uraian 1 type a 2 type b 3 type c 4 type d 5 type e 6 type f
: List plank : m Panjang 12.00 16.00 7.30 14.60 10.00 11.70
ket m' m' m' m' m' m' m' m' sudah
1.00 1.00 1.00 1.00 1.00
luas 192.00 106.58 117.00 19.67 11.61 446.86
ket m2 m2 m2 m2 m2 m2 sudah
1.00 1.00 1.00 1.00 1.00
luas 192.00 106.58 117.00 19.67 11.61 446.86
ket m2 m2 m2 m2 m2 m2 sudah
titik
luas 2.00 2.00 2.00 2.00 2.00 2.00
24.00 32.00 14.60 29.20 20.00 23.40
ket m' m' m' m' m' m'
7 8 9 10
type g type h type i type j
2.15 9.15 4.30 2.70
2.00 2.00 2.00 2.00
4.30 18.30 8.60 5.40 179.80
Total Jenis Pekerjaan : Keramik lantai 40/40 Satuan : m2 No Panjang Lebar Titik Volume 1 6.84 4.40 1.00 30.10 2 5.49 3.67 1.00 20.15 3 6.49 4.75 1.00 30.83 4 8.02 7.72 1.00 61.91 Total 142.99
m' m' m' m' m' sudah
ket M2 M2 M2 M2 m3
Jenis Pekerjaan : Keramik lantai 30/30 Satuan : m2 No Panjang Lebar Titik Volume ket 1 1.50 4.10 1.00 6.15 M2 Total 6.15 M2
sudah
Jenis Pekerjaan : Keramik lantai wc 20/20 Satuan : m2 No Panjang Lebar Titik Volume 1 3.44 2.68 1.00 9.22 2 1.50 3.85 1.00 5.78 Total 9.22
sudah
Jenis Pekerjaan : Keramik dinding wc 20/40 Satuan : m2 No Panjang tinggi Titik Volume 1 3.72 2.00 2.00 14.88 2 1.37 2.00 2.00 5.48 3 2.55 2.00 4.00 20.40 4 1.68 2.00 4.00 13.44 Total 54.20 Pengurangan pintu 1 0.78 2.10 1.00 1.64 2 0.78 2.10 2.00 3.28 Total 4.91 Total 49.29 Jenis Pekerjaan Satuan No Uraian 1 type a 2 type b
ket M2 M2 M2 sudah ket M2 M2 M2 M2 M2 M2 M2 M2 M2
: waterprofing sudah : m2 Panjang lebar titik luas ket 3.20 5.60 1.00 17.92 m2 3.30 10.70 1.00 35.31 m2 Total 53.23 m2
53.94
Panjang Pintu P1 Jendela J1 J2 J3 J4 Bouven Alkopan 1 2 3 4
4.6 2.3 0.8 6.6
Tinggi
Unit
2 1 4.2 6.8 1.2 2.7
3.5 3.5 2.8 3.2 3.2 5
1 1 1 1 5 4
0.6 4.6 6.6 0.6
2 2 1 1
5.52 21.16 5.28 3.96 35.92
7 3.5 11.76 21.76 3.84 13.5
Rekap Analia Harga Satuan (RAHS) No Uraian A
B
C
PEKERJAAN TANAH
E
Nilai
Keterangan
AN.01
1 M³ Galian tanah biasa
AN.01.a
94,500.00
1 M³ Urugan Pasir
AN.01.b
277,800.00
1 M³ Urugan tanah kembali
AN.01.c
31,500.00
1 M³ Urugan tanah
AN.01.d
282,000.00
Memadatkan 1 m3 tanah (per 20 cm)
AN.01.e
282,000.00
1 Karung Sand bag
AN.01.f
29,780.00
PEKERJAAN PONDASI
AN.02
1 M³ Pasang batu kosong (aanstamping)
AN.02.a
1,113,555.00
1 M³ Pasang pondasi batu gunung, 1 Pc : 4 PP
AN.02.b
1,759,775.00
1 M' Pasang parit rolag bata, 1 Pc : 4 Ps
AN.02.c
180,534.63
1 M2 Pasang Non Moven Geotextile
AN.02.d
15,780.00
PEKERJAAN PANCANG
AN.03
1 M' Memancang tiang 10x10
AN.03.a
25,575.00
1 Titik Memancang Cerucuk Ulin 10x10, p = 3 m
AN.03.b
213,075.00
1m' Pengadaan tiang pancang mini pile 25/25
AN.03.c
330,604.17
Pengadaan 1 tiang pancang mini pile25/25 = 6m
AN.03.c1
1,983,625.00
1 m' Memancang Tiang Mini Pile
AN.03.d
40,364.58
AN.03.d.1
242,187.50
Memancang 1Tiang Mini Pile 25/25 = 6m D
Notasi
PEKERJAAN BETON
AN.04
1 m3 Beton lantai kerja mutu f'c = 19,3 Mpa (K 225)
AN.04.a
1,361,800.00
1 m3 Beton lantai kerja mutu f'c = 19,3 Mpa (K 225)
AN.04.b
1,548,600.00
1 m3 Beton mutu f'c = 21.7 Mpa (K 250), slump (12 ± 2) cm, w/c = 0,56
AN.04.c
1,996,250.00
Pembesian 10 kg dengan besi polos atau ulir
AN.04.d
254,775.00
Pembesian 1 kg dengan besi polos atau ulir (AN.04.c)/10
AN.04.d'
25,477.50
Pembesian 1 kg jaring kawat baja/wire mesh
AN.04.e
49,570.00
1 m2 bekisting untuk pondasi
AN.04.f
117,870.00
1 M² Pasang Bekisting untuk sloof 3x Pakai
AN.04.g
96,379.50
1 M² Pasang Bekisting untuk kolom 3x Pakai
AN.04.h
140,650.00
1 M² Pasang Bekisting untuk balok/Ring Balk 2x Pakai
AN.04.i
235,811.75
1 m2 bekisting untuk plat lantai 2x pakai
AN.04.j
267,436.75
1 m2 bekisting untuk tangga 2x Pakai
AN.04.k
222,659.25
1 m3 Beton Cor Camp. 1 : 3 : 5
AN.04.l
1,487,610.00
1 m3 Cor Camp. 1 : 2 : 3
AN.04.m
1,700,550.00
1 m3 Pembongkaran beton bertulang
AN.04.n
1,719,960.00
PEKERJAAN DINDING
AN.05
1 M² Pasangan Bata Merah tebal ½ bata , 1 Pc : 2 Ps
AN.05.a
194,647.50
1 M² Pasangan Bata Merah tebal ½ bata , 1 Pc : 4 Ps
AN.05.b
161,194.25
1 M² Plesteran 1 Pc : 2 Ps
AN.05.c
92,078.20
1 M² Plesteran 1 Pc : 4 Ps
AN.05.d
86,907.00
1 m2 Acian
AN.05.e
48,300.00
Rekap Analia Harga Satuan (RAHS) No Uraian F
G
H
PEKERJAAN ATAP
Notasi
Nilai
Keterangan
AN.06
1 M2 Pasang konstruksi kuda-kuda baja Ringan
AN.06.a
200,000.00
1 M² : Pasang atap genteng metal
AN.06.b
191,180.00
1 M' : Pasang nok genteng metal
AN.06.c
139,415.00
1 m' Pasang talang datar/ jurai seng BJLS 25 lebar 90 cm
AN.06.d
154,800.00
1 M' Pasang listplank Calsiboard ukuran 2 x.30 - rangkap 20 cm
AN.06.e
67,050.00
1 m2 Pasang aluminium foil/ Sisalation
AN.06.f
19,215.00
1 M² : Pasang atap Zincalum
AN.06.g
183,530.00
1 M² : Pasang atap genteng Keramik
AN.06.h
550,830.00
1 M' : Pasang nok Genteng keramik
AN.06.i
356,565.00
1 M² : Pasang atap bahan bitumen
AN.06.j
190,830.00
1 M : Pasang nok bahan bitumen
AN.06.k
154,815.00
PEKERJAAN PLAFOND
AN.07
1 M² Pasang langit-langit calsiboard
AN.07.a
79,735.00
1 m2 Memasang Plafondn gypsum board, uk. (120 x 240 x 0.9)cm
AN.07.b
87,965.00
1 m1 Memasang list gypsum profil
AN.07.c
60,742.50
1 M2 Pasang Rangka Plafond Metal furring
AN.07.d
145,000.00
PEKERJAAN PENUTUP LANTAI & DINDING
AN.08
1 M² : Pasang Lantai Keramik 40 x 40 cm
AN.08.a
496,270.00
1 M² : Pasang Lantai Keramik 20 x 20 cm
AN.08.b
288,265.00
1 M² : Pasang Keramik Dinding 20 x 40 cm
AN.08.c
237,012.50
1 M' : Pasang Plint Keramik artistik
AN.08.d
201,990.00
1 M' : Pasang Plint Keramik lantai
AN.08.e
151,365.00
1 M2 : Pasang Dinding Batu tempel/Alam
AN.08.f
468,325.00
1 M2 : Pasang Step nosing lantai Tangga
AN.08.g
901,365.00
1 M' : List Keramik dinding km/wc 6x20
AN.08.h
44,523.00
1 M² : Pasang Lantai Granit 60 x 60 cm
AN.08.i
1,234,711.67
1 M2 PASANGAN Batu Sikat
AN.08.j
570,000.00
1 M² : Pasang Lantai Homogenius uk. 60/60
AN.08.k
646,631.67
1 M² : Pasang Lantai Homogenius uk. 80/80
AN.08.l
363,640.00
1 M² : Pasang Lantai Homogenius uk. 100/100
AN.08.m
298,015.00
1 M² : Pasangan Paving Block Segi Enam
AN.08.n
307,835.00
1 M² : Pasang Lantai Homogenius uk. 100/100
AN.08.o
298,015.00
1 M² : Pasang Dinding Keramik Border 20 x 20 cm
AN.08.p
240,565.00
1 M² : Pasang Dinding Keramik Border 30 x 30
AN.08.q
209,015.00
Rekap Analia Harga Satuan (RAHS) No Uraian I
K
PEKERJAAN SANITAIR
Notasi
Nilai
Keterangan
AN.09
Memasang 1 m' pipa PVC type AW Ø ½"
AN.09.a
32,634.00
Memasang 1 m' pipa PVC type AW Ø 3/4"
AN.09.b
44,139.00
Memasang 1 m' pipa PVC type AW Ø 4"
AN.09.c
148,902.75
Memasang 1 m' pipa PVC type AW Ø 3"
AN.09.d
186,393.38
Memasang 1 buah kran Ø 3/4" - ½"
AN.09.e
57,337.50
Memasang 1 m' pipa PVC type AW Ø 6"
AN.09.d'
340,134.00
Memasang 1 unit Pasang floordrain
AN.09.f
56,250.00
Memasang 1 unit Pasang Kran Shower
AN.09.g
243,750.00
Memasang 1 unit Pasang Jet Washer
AN.09.h
168,750.00
Memasang 1 buah Closet jongkok
AN.09.i
627,020.00
Memasang 1 buah Closet duduk
AN.09.j
5,558,715.00
Memasang 1 buah Urinoir
AN.09.k
4,149,125.00
Memasang 1 buah Wastafel
AN.09.l
1,952,990.00
1 buah bak mandi batu bata vol. 0,3 m3
AN.09.m
935,946.43
Memasang 1 m' pipa PVC type AW Ø 2"
AN.09.n
65,493.38
PEKERJAAN BESI & ALUMINIUM
AN.11
1 m2 Pasang pintu rolling door besi
AN.11.a
778,005.00
1 m2 Pasang pintu lipat (folding gate)
AN.11.b
2,295,645.00
1 m2 Pasang rolling door aluminium
AN.11.c
595,500.00
1 m' Pasang kusen pintu/jendela aluminium
AN.11.d
51,483.75
Jendela W1
AN.11.k
3,495,682.50
Bouven
AN.11.o
1,459,282.50
1 Kusen Jendela J3
AN.11.k
3,495,682.50
1 Kusen Jendela J4
AN.11.l
6,364,100.00
1 Unit Pintu P1
AN.11.m
1,493,597.50
1 Unit Pintu P2
AN.11.n
3,220,775.00
1 Unit Pintu P3
AN.11.o
1,459,282.50
1 Kusen Jendela J5
AN.11.p
2,274,863.75
1 Kusen Jendela J6
AN.11.q
1,667,770.00
1 Kusen Jendela J7
AN.11.r
966,775.00
Kusen BV1
AN.11.s
439,900.00
1 Unit Pintu P4
AN.11.t
9,539,140.00
Rekap Analia Harga Satuan (RAHS) No Uraian L
M
PEKERJAAN KAYU, PENGGANTUNG & PENGUNCI
Notasi
Nilai
Keterangan
AN.12
Pasang 1 buah kunci tanam
AN.12.a
303,750.00
1 buah Pasang engsel pintu
AN.12.b
101,910.00
1 buah Pasang engsel jendela
AN.12.c
56,865.00
1 buah Pasang Grendel jendela
AN.12.d
56,865.00
1 buah Pasang grendel pintu
AN.12.e
65,865.00
1 buah Pasang hak angin
AN.12.f
74,550.00
1 buah Pasang kunci tanam Cilinder
AN.12.g
380,910.00
1 buah Pasang kunci (km/wc)
AN.12.h
287,160.00
1 buah Pasang Expanyolet
AN.12.i
479,400.00
1 buah Pasang Hendel Pintu
AN.12.j
389,700.00
1 M3 Pek kusen pintu/jendela kayu Bengkirai
AN.12.k
9,265,250.00
1 M3 Pek kusen pintu/jendela kayu Ulin
AN.12.l
10,465,250.00
1 Unit P1 (type 120)
AN.12.m
5,600,791.39
1 Unit P1 (type 70)
AN.12.n
3,189,783.72
1 Unit P2
AN.12.o
2,293,617.97
1 Unit PJ 1 (Type 70)
AN.12.p
6,358,206.44
1 Unit PJ(Type 120)
AN.12.q
8,691,759.47
1 Unit PJ 2 (Type 70)
AN.12.r
3,461,315.79
1 Unit J1 (Type 70)
AN.12.s
1,008,997.35
1 Unit J2 (Type 70)
AN.12.t
993,642.14
1 Unit J3 (Type 70)
AN.12.u
1,423,807.70
1 m2 Pasang kaca bening 5 mm
AN.12.v
233,160.00
1 m2 Pasang Dinding Roster
AN.12.w
1,751,710.00
1 Unit BV.1 (Type 70)
AN.12.x
73,540.24
1 Unit BV.2 (Type 70)
AN.12.y
159,870.10
1 Unit P3 (type 120)
AN.12.z
2,624,810.66
1 Unit J1 (Type 120)
AN.12.aa
1,374,057.81
1 Unit J2 (Type 120)
AN.12.ab
1,139,627.24
1 Unit J3 (Type 120)
AN.12.ac
2,563,705.82
1 Unit Pintu Garasi (Type 120)
AN.12.ad
12,886,389.45
PEKERJAAN PENGECATAN
AN.13
1 M² : pengecatan bidang kayu baru,
AN.13.a
55,105.20
1 m2 Mengecat bidang tembok baru (luar)
AN.13.b
51,960.00
1 m2 Mengecat bidang tembok baru (dalam)
AN.13.c
48,360.00
1 m2 Mengecat plafon eternit/ gypsum/Calsiboard
AN.13.d
27,987.60
1 m2 Mengecat list plank
AN.13.e
29,787.60
1 m2 Waterproofing
AN.13.f
84,503.00
Rekap Analia Harga Satuan (RAHS) No Uraian N
PEKERJAAN VEGETASI
Notasi
Nilai
Keterangan
AN.14
1 m2 Pupus Kompos Aktif
AN.14.a
18,750.00
1 m2 Rumput Gajah Mini + Pupus Kompos Aktif
AN.14.b
68,265.00
Tanaman Bayam Merah
AN.14.c
25,861.50
Tanaman bakung Bunga Putih
AN.14.d
31,111.50
Tanaman Sambang Dara
AN.14.e
44,611.50
Tanaman Ararea
AN.14.f
52,861.50
Tanaman Brokoli
AN.14.g
48,361.50
Tanaman Karambosa mini
AN.14.h
52,861.50
Tanaman Pohon Pucuk Merah 1 - 1.2 m
AN.14.i
196,185.00
Tanaman Pohon Tabe Buya Kuning 3 - 4 m
AN.14.j
413,685.00
Tanaman Pohon Palm Ekor Tupai 3 - 4 m
AN.14.k
698,685.00
Tanaman Pohon Palm Botol 1 - 1.3 m
AN.14.l
661,185.00
Tanaman Pohon Palm Ponix 1.2 - 1.8 m
AN.14.m
1,223,685.00
Tanaman Pohon Kelengkeng 1.2 - 1.8 m
AN.14.n
406,185.00
Tanaman Pohon Mangga 1.2 - 1.8 m
AN.14.o
406,185.00
Tanaman Pohon Glodokan Tiang
AN.14.p
323,685.00
Tanaman Pohon ketapang Kencana
AN.14.q
323,685.00
Tanaman Airis
AN.14.r
31,185.00
Tanaman Pisang - pisang
AN.14.s
61,185.00
Tanaman Pohon Tabe Buya Besar
AN.14.t
698,685.00
Tanaman Lamtana
AN.14.u
81,060.00
ANALISA HARGA SATUAN Kota Bontang
NO
URAIAN PEKERJAAN
AN.01 AN.01.a
HARGA SATUAN (Rp)
1 M³ Galian tanah biasa 0.750 OH Pekerja 0.025 OH Mandor
120,000.00 180,000.00
1 M³ Urugan Pasir 1.200 M³ 0.300 OH 0.010 OH
Pasir Urug Pekerja Mandor
200,000.00 120,000.00 180,000.00 Jumlah
AN.01.c
1 M³ Urugan tanah kembali dihitung 1/3 kali pekerjaan galian 0.250 OH Pekerja 0.008 OH Mandor
120,000.00 180,000.00 Jumlah
AN.01.d
1 M³ Urugan tanah 1.100 M³ 0.250 OH 0.025 OH
Tanah Urug Pekerja Mandor
225,000.00 120,000.00 180,000.00 Jumlah
AN.01.e
Memadatkan 1 m3 tanah (per 20 cm) 1.100 M³ Tanah Urug 0.250 OH Pekerja 0.025 OH Mandor
225,000.00 120,000.00 180,000.00 Jumlah
AN.01.f
AN.02 AN.02.a
1 Karung Sand bag 0.120 M³ 1.000 Bh 0.030 OH 0.001 OH
Pasir Urug Karung Pekerja Mandor
200,000.00 2,000.00 120,000.00 180,000.00 Jumlah PEKERJAAN PONDASI
1 M³ Pasang batu kosong (aanstamping) 1.200 M³ Batu gunung 0.300 M³ Pasir urug 0.780 OH Pekerja 0.390 OH Tukang 0.039 OH Kepala Tukang 0.039 OH Mandor
740,000.00 200,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah
AN.02.b
1 M³ Pasang pondasi batu gunung, 1 Pc : 4 PP 1.200 M³ Batu Gunung 163.000 Kg Semen portland 0.520 M³ Pasir pasang 1.500 OH Pekerja 0.750 OH Tukang 0.075 OH Kepala Tukang 0.075 OH Mandor
740,000.00 1,800.00 500,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah
AN.02.c
1 M' Pasang parit rolag bata, 1 Pc : 4 Ps 45.500 Bh Bata Merah 8.620 Kg Semen portland 0.018 M³ Pasir pasang 0.600 OH Pekerja 0.200 OH Tukang 0.020 OH Kepala Tukang 0.030 OH Mandor
1,000.00 1,800.00 500,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah
AN.02.d
JUMLAH HARGA UPAH (Rp)
TOTAL HARGA (Rp)
PEKERJAAN TANAH
Jumlah AN.01.b
JUMLAH HARGA BAHAN (Rp)
1 M2 Pasang Non Moven Geotextile 1.000 M2 Non Moven Gotextile 0.030 OH Pekerja 0.001 OH Mandor
12,000.00 120,000.00 180,000.00 Jumlah
SNI : 2835:2008 90,000.00 4,500.00 94,500.00 SNI : 2835:2008 240,000.00 36,000.00 1,800.00 240,000.00 37,800.00 SNI : 2835:2008 30,000.00 1,500.00 31,500.00 SNI : 2835:2008 247,500.00 30,000.00 4,500.00 247,500.00 34,500.00 SNI : 2835:2008 247,500.00 30,000.00 4,500.00 247,500.00 34,500.00 SNI : 2835:2008 24,000.00 2,000.00 3,600.00 180.00 26,000.00 3,780.00 SNI : 2836:2008 888,000.00 60,000.00 93,600.00 58,500.00 6,435.00 7,020.00 948,000.00 165,555.00 SNI : 2836:2008 888,000.00 293,400.00 260,000.00 180,000.00 112,500.00 12,375.00 13,500.00 1,441,400.00 318,375.00 SNI : 2836:2008 45,500.00 15,516.23 8,818.39 72,000.00 30,000.00 3,300.00 5,400.00 69,834.63 110,700.00
94,500.00
277,800.00
31,500.00
282,000.00
282,000.00
29,780.00
1,113,555.00
1,759,775.00
180,534.63
12,000.00
12,000.00
3,600.00 180.00 3,780.00
15,780.00
ANALISA HARGA SATUAN Kota Bontang
NO
AN.03 AN.03.a
HARGA SATUAN (Rp)
URAIAN PEKERJAAN
AN.03.c
120,000.00 150,000.00 165,000.00 180,000.00
1 Titik Memancang Cerucuk Ulin 10x10, p = 3 m 0.0300 m3 Kayu ulin balok 0.0075 m3 Kayu ulin balok 1.0000 m' Memancang tiang (AN.03.a)
5,000,000.00 5,000,000.00 25,575.00 Jumlah
150,000.00 37,500.00
325,000.00 28,125.00 120,000.00 180,000.00
325,000.00 937.50
1m' Pengadaan tiang pancang mini pile 25/25 1.0000 m' Tiang pancang mini pile 25/25 0.0333 Jam Crane Service 0.0222 Oh Pekerja 0.0111 Oh Mandor Pengadaan 1 tiang pancang mini pile25/25 = 6m 6.0000 m' Tiang pancang
330,604.17
1 m' Memancang Tiang Mini Pile 0.1944 jam Hidrolic Jack Hammer 0.1111 Oh Pekerja 0.0556 Oh Tukang 0.0278 Oh Mandor 0.0278 Oh Operator pancang
46,875.00 120,000.00 150,000.00 180,000.00 165,000.00 Jumlah
AN.03.d.1
Memancang 1Tiang Mini Pile 25/25 = 6m 6.0000 m' Tiang pancang
40,364.58
AN.04.a 1,800.00 650,000.00 550,000.00 80.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah
Kg M³ M³ liter OH OH OH OH
1,800.00 650,000.00 550,000.00 80.00 120,000.00 150,000.00 165,000.00 180,000.00
1 m3 Beton mutu f'c = 21.7 Mpa (K 250), slump (12 ± 2) cm, w/c = 0,56 1.000 0.300 0.500 0.050 0.150
M3 OH OH OH OH
Beton K-250 Redimix Pekerja Tukang Kepala Tukang Mandor
2,666.67 2,000.00 4,666.67
330,604.17
-
1,983,625.00
13,333.33 8,333.33 5,000.00 4,583.33 31,250.00
40,364.58
242,187.50 242,187.50
-
242,187.50
414,000.00 357,500.00 385,000.00 17,200.00 144,000.00 30,000.00 3,300.00 10,800.00 188,100.00
1,361,800.00
SNI : 7394:2008
Semen Portland Pasir beton Koral air Pekerja Tukang Kepala Tukang Mandor Jumlah
AN.04.c
213,075.00
9,114.58
1,173,700.00
1 m3 Beton lantai kerja mutu f'c = 19,3 Mpa (K 225) 371.00 0.43 0.72 215.00 1.200 0.200 0.020 0.060
25,575.00 25,575.00
SNI : 7394:2008
1 m3 Beton lantai kerja mutu f'c = 7,4 Mpa (K 100), slump (3-6) cm (Rabat) 230.00 Kg Semen Portland 0.55 M³ Pasir beton 0.70 M³ Koral 215.00 liter air 1.200 OH Pekerja 0.200 OH Tukang 0.020 OH Kepala Tukang 0.060 OH Mandor AN.04.b
25,575.00
1,983,625.00 1,983,625.00
9,114.58
Jumlah PEKERJAAN BETON
AN.04
187,500.00
7,500.00 825.00 2,250.00 10,575.00
325,937.50
Jumlah AN.03.d
TOTAL HARGA (Rp)
15,000.00
15,000.00
Jumlah AN.03.c1
JUMLAH HARGA UPAH (Rp)
PEKERJAAN PANCANG 1 M' Memancang tiang 10x10 0.1250 Oh Pekerja 0.0500 Oh Tukang 0.0050 Oh Kepala Tukang 0.0125 Oh mandor Jumlah
AN.03.b
JUMLAH HARGA BAHAN (Rp)
667,800.00 279,500.00 396,000.00 17,200.00
1,360,500.00
144,000.00 30,000.00 3,300.00 10,800.00 188,100.00
1,548,600.00
SNI : 7394:2008 1,850,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah
1,850,000.00
1,850,000.00
36,000.00 75,000.00 8,250.00 27,000.00 146,250.00
1,996,250.00
ANALISA HARGA SATUAN Kota Bontang
NO
AN.04.d
URAIAN PEKERJAAN
HARGA SATUAN (Rp)
Pembesian 10 kg dengan besi polos atau ulir 10.500 Kg Besi beton 0.150 Kg Kawat bendrat 0.070 OH Pekerja 0.070 OH Tukang 0.007 OH Kepala Tukang 0.004 OH Mandor
22,000.00 20,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah
AN.04.e
Pembesian 1 kg jaring kawat baja/wire mesh 1.020 Kg Kawat Wiremesh M6 0.050 Kg Kawat bendrat 0.025 OH Pekerja 0.025 OH Tukang 0.002 OH Kepala Tukang 0.001 OH Mandor
AN.04.f
1 m2 bekisting untuk pondasi 0.040 m3 Kayu Begisting 0.300 kg Paku biasa 5cm - 10cm 0.100 liter Minyak begisting 0.520 OH Pekerja 0.260 OH Tukang 0.026 OH Kepala Tukang 0.026 OH Mandor
AN.04.g
1 M² Pasang Bekisting untuk sloof 3x Pakai Kayu Begisting 0.016 m3 Paku biasa 5cm - 10cm 0.105 kg Minyak begisting 0.035 liter Pekerja 0.182 OH Tukang 0.091 OH Kepala Tukang 0.009 OH Mandor 0.009 OH
AN.04.h
1 M² Pasang Bekisting untuk kolom 3x Pakai Kayu begisting 0.014 M³ Paku biasa 5cm - 10cm 0.140 Kg Minyak begisting 0.070 Ltr Kayu meranti balok 0.005 M³ Plywood tebal 9 mm 0.123 Lbr Dolken kayu galam 0.700 Btg Pekerja 0.150 OH Tukang 0.105 OH Kepala Tukang 0.005 OH Mandor 0.005 OH
AN.04.i
1 M² Pasang Bekisting untuk balok/Ring Balk 2x Pakai Kayu begisting 0.022 M³ Paku biasa 5cm - 10cm 0.220 Kg Minyak begisting 0.110 Ltr Kayu meranti balok 0.010 M³ Plywood tebal 9 mm 0.193 Lbr Dolken kayu galam 1.100 Btg Pekerja 0.300 OH Tukang 0.150 OH Kepala Tukang 0.018 OH Mandor 0.018 OH
JUMLAH HARGA BAHAN (Rp)
JUMLAH HARGA UPAH (Rp)
TOTAL HARGA (Rp)
SNI : 7394:2008 231,000.00 3,000.00 8,400.00 10,500.00 1,155.00 720.00 20,775.00
234,000.00 1 kg -------------------> Jumlah 40,500.00 41,310.00 20,000.00 1,000.00 120,000.00 3,000.00 150,000.00 3,750.00 165,000.00 330.00 180,000.00 180.00 Jumlah 42,310.00 7,260.00 SNI : 7394:2008 3,500,000.00 140,000.00 20,000.00 6,000.00 15,000.00 1,500.00 120,000.00 62,400.00 150,000.00 39,000.00 165,000.00 4,290.00 180,000.00 4,680.00 Jumlah 7,500.00 110,370.00 SNI : 7394:2008 3,500,000.00 55,125.00 20,000.00 2,100.00 15,000.00 525.00 120,000.00 21,840.00 150,000.00 13,650.00 165,000.00 1,501.50 180,000.00 1,638.00 Jumlah 57,750.00 38,629.50 SNI : 7394:2008 3,500,000.00 49,000.00 20,000.00 2,800.00 15,000.00 1,050.00 3,500,000.00 18,375.00 180,000.00 22,050.00 17,000.00 11,900.00 120,000.00 18,000.00 150,000.00 15,750.00 165,000.00 825.00 180,000.00 900.00 Jumlah 105,175.00 35,475.00 SNI : 7394:2008 3,500,000.00 77,000.00 20,000.00 4,400.00 15,000.00 1,650.00 3,500,000.00 34,650.00 180,000.00 34,650.00 17,000.00 18,700.00 120,000.00 36,000.00 150,000.00 22,500.00 165,000.00 2,994.75 180,000.00 3,267.00 Jumlah 171,050.00 64,761.75
254,775.00 25,477.50
49,570.00
117,870.00
96,379.50
140,650.00
235,811.75
ANALISA HARGA SATUAN Kota Bontang
NO
AN.04.j
URAIAN PEKERJAAN
1 m2 bekisting untuk plat lantai 2x pakai Kayu begisting 0.022 M³ Paku biasa 5cm - 10cm 0.220 Kg Minyak begisting 0.110 Ltr Kayu meranti balok 0.008 M³ Plywood tebal 9 mm 0.193 Lbr Dolken kayu galam 3.300 Btg Pekerja 0.300 OH Tukang 0.150 OH Kepala Tukang 0.018 OH Mandor 0.018 OH
HARGA SATUAN (Rp)
3,500,000.00 20,000.00 15,000.00 3,500,000.00 180,000.00 17,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah
AN.04.k
AN.04.l
M³ Kg Ltr M³ Lbr Btg OH OH OH OH
Kayu begisting Paku biasa 5cm - 10cm Minyak begisting Kayu meranti balok Plywood tebal 9 mm Dolken kayu galam Pekerja Tukang Kepala Tukang Mandor
3,500,000.00 20,000.00 15,000.00 3,500,000.00 180,000.00 17,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah
AN.05.a
145,612.50
Semen Portland Pasir beton
1,800.00 650,000.00
444,600.00 338,000.00
0.780 215.000 1.650 0.275 0.028 0.083
Koral Air Pekerja Tukang Kepala Tukang Mandor
550,000.00 80.00 120,000.00 150,000.00 165,000.00 180,000.00
429,000.00 17,200.00
1 m3 Cor Camp. 1 : 2 : 3 371.000 Kg Semen Portland 0.520 M³ Pasir beton 0.780 M³ Koral 215.000 liter Air 1.000 OH Pekerja 0.500 OH Tukang 0.150 OH Kepala Tukang 0.160 OH Mandor
1,800.00 650,000.00 550,000.00 80.00 120,000.00 150,000.00 165,000.00 180,000.00
1 m3 Pembongkaran beton bertulang 13.334 OH Pekerja 0.666 OH Mandor
120,000.00 180,000.00 Jumlah PEKERJAAN DINDING
AN.05
64,761.75
267,436.75
57,750.00 4,400.00 1,237.50 28,875.00 34,650.00 18,700.00
247.000 Kg 0.520 M³
Jumlah AN.04.n
SNI : 7394:2008 77,000.00 4,400.00 1,650.00 28,875.00 34,650.00 56,100.00 36,000.00 22,500.00 2,994.75 3,267.00
43,560.00 27,225.00 2,994.75 3,267.00 77,046.75
222,659.25
198,000.00 41,250.00 4,620.00 14,940.00 258,810.00
1,487,610.00
120,000.00 75,000.00 24,750.00 28,800.00 248,550.00
1,700,550.00
SNI : 2002
Jumlah AN.04.m
TOTAL HARGA (Rp)
SNI : 7394:2008
1 m3 Beton Cor Camp. 1 : 3 : 5
M³ liter OH OH OH OH
JUMLAH HARGA UPAH (Rp)
202,675.00
1 m2 bekisting untuk tangga 2x Pakai 0.017 0.220 0.083 0.008 0.193 1.100 0.363 0.182 0.018 0.018
JUMLAH HARGA BAHAN (Rp)
1 M² Pasangan Bata Merah tebal ½ bata , 1 Pc : 2 Ps 45.500 Bh Bata Merah 14.138 Kg Semen portland
1,000.00 1,800.00
0.026 M³ 0.600 OH 0.200 OH
Pasir pasang Pekerja Tukang
500,000.00 120,000.00 150,000.00
0.020 OH 0.030 OH
Kepala Tukang Mandor
165,000.00 180,000.00 Jumlah
1,228,800.00 SNI : 2002 667,800.00 338,000.00 429,000.00 17,200.00
1,452,000.00 SNI : 2002 1,600,080.00 119,880.00 1,719,960.00
1,719,960.00
SNI 6897 : 2008 45,500.00 25,447.50 13,000.00 72,000.00 30,000.00 3,300.00 5,400.00 83,947.50
110,700.00
194,647.50
ANALISA HARGA SATUAN Kota Bontang
NO
AN.05.b
URAIAN PEKERJAAN
HARGA SATUAN (Rp)
1 M² Pasangan Bata Merah tebal ½ bata , 1 Pc : 4 Ps 45.500 Bh Bata Merah
1,000.00 1,800.00 500,000.00
0.500 OH 0.150 OH
Pekerja Tukang
120,000.00 150,000.00
60,000.00 22,500.00
0.010 OH 0.005 OH
Kepala Tukang Mandor
165,000.00 180,000.00
1,650.00 900.00 76,144.25
1,800.00
18,403.20
0.020 M³ 0.300 OH
Pasir pasang Pekerja
500,000.00 120,000.00
10,000.00
0.150 OH 0.015 OH
Tukang Kepala Tukang
150,000.00 165,000.00
0.015 OH
Mandor
22,500.00 2,475.00 2,700.00 63,675.00
92,078.20
SNI 2837 : 2008
6.240 Kg 0.024 M³
Semen portland Pasir pasang
1,800.00 500,000.00
0.300 OH 0.150 OH
Pekerja Tukang
120,000.00 150,000.00
36,000.00 22,500.00
0.015 OH 0.015 OH
Kepala Tukang Mandor
165,000.00 180,000.00
2,475.00 2,700.00
11,232.00 12,000.00
23,232.00
63,675.00
86,907.00
SNI 2837 : 2008
1 m2 Acian 3.250 kg 0.200 OH 0.100 OH
Semen portland Pekerja Tukang
1,800.00 120,000.00 150,000.00
0.010 OH 0.010 OH
Kepala Tukang Mandor
165,000.00 180,000.00
5,850.00 24,000.00 15,000.00 1,650.00 1,800.00 29,850.00
18,450.00
48,300.00
PEKERJAAN ATAP 1 M2 Pasang konstruksi kuda-kuda baja Ringan 1.000 M2 Pasang Kuda - Kuda Baja Ringan
200,000.00 Jumlah
SNI : 03-3436-2002 200,000.00 200,000.00 SNI : 03-3436-2002
1 M² : Pasang atap genteng metal 1.020 Lbr 0.200 Kg
Genteng metal Paku genteng metal
142,500.00 25,000.00
145,350.00 5,000.00
0.200 0.100 0.010 0.001
Pekerja Tukang Kepala Tukang Mandor
120,000.00 150,000.00 165,000.00 180,000.00
24,000.00 15,000.00 1,650.00 180.00 150,350.00 40,830.00 SNI : 03-3436-2002 80,850.00 1,250.00 30,000.00 22,500.00 2,475.00 2,340.00 82,100.00 57,315.00
OH OH OH OH
Jumlah AN.06.c
161,194.25
36,000.00
28,403.20
Jumlah
AN.06.b
85,050.00
180,000.00
1 M² Plesteran 1 Pc : 4 Ps
AN.06 AN.06.a
15,531.75 15,112.50
SNI 2837 : 2008
1 M² Plesteran 1 Pc : 2 Ps 10.224 Kg Semen portland
Jumlah AN.05.e
TOTAL HARGA (Rp)
SNI 6897 : 2008 45,500.00
Semen portland Pasir pasang
Jumlah AN.05.d
JUMLAH HARGA UPAH (Rp)
8.629 Kg 0.030 M³
Jumlah AN.05.c
JUMLAH HARGA BAHAN (Rp)
1 M' : Pasang nok genteng metal 1.100 Bh Bubungan Genteng Metal 0.050 Kg Paku genteng metal 0.250 OH Pekerja 0.150 OH Tukang 0.015 OH Kepala Tukang 0.013 OH Mandor
73,500.00 25,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah
200,000.00
191,180.00
139,415.00
ANALISA HARGA SATUAN Kota Bontang
NO
AN.06.d
AN.06.e
URAIAN PEKERJAAN
1 m' Pasang talang datar/ jurai seng BJLS 25 lebar 90 cm 1.050 m' seng BJLS 25 lebar 90 cm 0.015 kg Paku 1 cm - 2,5 cm 0.019 m3 Kayu meranti papan 0.200 OH Pekerja 0.400 OH Tukang 0.025 OH Kepala Tukang 0.010 OH Mandor
HARGA SATUAN (Rp)
61,500.00 20,000.00 6,205,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah
M2 Kg OH OH OH OH
Calsi Board 9 mm Paku 1 cm - 2,5 cm Pekerja Tukang Kepala Tukang Mandor
235,000.00 20,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah
1 m2 Pasang aluminium foil/ Sisalation 1.050 m2 Sisalation/ aluminium foil 0.150 OH Pekerja 0.050 OH Tukang 0.005 OH Kepala Tukang 0.008 OH Mandor
9,000.00 120,000.00 150,000.00 165,000.00 180,000.00
1 M² : Pasang atap Zincalum Atap Zincalume 1.020 Lbr Paku genteng metal 0.200 Kg Pekerja 0.200 OH Tukang 0.100 OH Kepala Tukang 0.010 OH Mandor 0.001 OH
135,000.00 25,000.00 120,000.00 150,000.00 165,000.00 180,000.00
1 M² : Pasang atap genteng Keramik 13.600 Bh Genteng Keramik 0.200 0.100 0.010 0.001
OH OH OH OH
37,500.00
Pekerja Tukang Kepala Tukang Mandor
120,000.00 150,000.00 165,000.00 180,000.00 Jumlah
AN.06.i
1 M' : Pasang nok Genteng keramik 3.800 Bh Bubungan Zincalume 0.250 OH Pekerja 0.150 OH Tukang 0.015 OH Kepala Tukang 0.013 OH Mandor
78,750.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah
AN.06.j
24,000.00 60,000.00 4,125.00 1,800.00 89,925.00
154,800.00
12,000.00 15,000.00 1,650.00 9,000.00 37,650.00
67,050.00
18,000.00 7,500.00 825.00 1,440.00 9,765.00
19,215.00
28,200.00 1,200.00
9,450.00
137,700.00 5,000.00 24,000.00 15,000.00 1,650.00 180.00 142,700.00 40,830.00 SNI : 03-3436-2002 510,000.00 24,000.00 15,000.00 1,650.00 180.00 510,000.00 40,830.00 SNI : 03-3436-2002 299,250.00 30,000.00 22,500.00 2,475.00 2,340.00 299,250.00 57,315.00
183,530.00
550,830.00
356,565.00
1 M² : Pasang atap bahan bitumen 1.000 0.200 0.100 0.010 0.001
Bh OH OH OH OH
Genteng Bitumen Pekerja Tukang Kepala Tukang Mandor
150,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah
AN.06.k
64,875.00
9,450.00
Jumlah AN.06.h
TOTAL HARGA (Rp)
SNI : 7393:2008 64,575.00 300.00
29,400.00
Jumlah AN.06.g
JUMLAH HARGA UPAH (Rp)
1 M' Pasang listplank Calsiboard ukuran 2 x.30 - rangkap 20 cm 0.120 0.060 0.100 0.100 0.010 0.050
AN.06.f
JUMLAH HARGA BAHAN (Rp)
150,000.00
150,000.00
24,000.00 15,000.00 1,650.00 180.00 40,830.00
190,830.00
30,000.00 22,500.00 2,475.00 2,340.00 57,315.00
154,815.00
1 M : Pasang nok bahan bitumen 1.000 0.250 0.150 0.015 0.013
Lbr OH OH OH OH
Nok Genteng Bitumen Pekerja Tukang Kepala Tukang Mandor
97,500.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah
97,500.00
97,500.00
ANALISA HARGA SATUAN Kota Bontang
NO
HARGA SATUAN (Rp)
URAIAN PEKERJAAN
AN.07 AN.07.a
JUMLAH HARGA BAHAN (Rp)
1 M² Pasang langit-langit calsiboard 0.350 Lbr Calsi Board 4 mm 0.010 Dos Paku Calsi Board 0.100 Pack Kompon 0.028 Roll Fiber Tape 0.100 Oh Pekerja 0.050 Oh Mandor 0.005 Oh Tukang 0.005 Oh Kepala Tukang
150,000.00 18,000.00 35,000.00 35,000.00 120,000.00 180,000.00 150,000.00 165,000.00
1 m2 Memasang Plafondn gypsum board, uk. (120 x 240 x 0.9)cm 0.364 lbr Gypsum board 0.110 kg Paku Gypsum 0.100 Pack Kompon 0.028 Roll Fiber Tape 0.100 OH Pekerja 0.050 OH Tukang 0.005 OH Kepala Tukang 0.005 OH Mandor
165,000.00 20,000.00 35,000.00 35,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah
AN.07.c
1 m1 Memasang list gypsum profil 1.050 m' List Plafond Gypsum 0.150 kg Tepung Gypsum 0.060 OH Pekerja 0.060 OH Tukang 0.006 OH Kepala Tukang 0.003 OH Mandor
40,000.00 6,750.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah
AN.07.d
1 M2 Pasang Rangka Plafond Metal furring Rangka Plafond Metal Furring 1.000 m'
AN.08 AN.08.a
145,000.00 Jumlah PEKERJAAN PENUTUP LANTAI & DINDING
1 M² : Pasang Lantai Keramik 40 x 40 cm 6.250 Bh Keramik lantai 40/40 14.150 Kg Semen portland 0.039 M³ Pasir pasang 2.000 Kg Semen warna 0.560 OH Pekerja 0.300 OH Tukang 0.030 OH Kepala Tukang 0.030 OH Mandor
51,000.00 1,800.00 500,000.00 5,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah
AN.08.b
1 M² : Pasang Lantai Keramik 20 x 20 cm 26.500 bh Keramik lantai 20/20 9.300 kg Semen portland 0.018 m3 Pasir pasang 1.940 kg Semen warna 0.090 OH Pekerja 0.450 OH Tukang 0.045 OH Kepala Tukang 0.045 OH Mandor
6,000.00 1,800.00 500,000.00 5,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah
AN.08.c
TOTAL HARGA (Rp)
PEKERJAAN PLAFOND
Jumlah AN.07.b
JUMLAH HARGA UPAH (Rp)
1 M² : Pasang Keramik Dinding 20 x 40 cm 12.500 Bh Keramik dinding 20/40 9.300 Kg Semen portland 0.018 M³ Pasir pasang 1.552 Kg Semen warna 0.090 OH Pekerja 0.450 OH Tukang 0.045 OH Kepala Tukang 0.045 OH Mandor
8,775.00 1,800.00 500,000.00 5,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah
52,500.00 180.00 3,500.00 980.00 12,000.00 9,000.00 750.00 825.00 57,160.00 22,575.00 SNI : 2839:2008 60,060.00 2,200.00 3,500.00 980.00 12,000.00 7,500.00 825.00 900.00 66,740.00 21,225.00 SNI : 2839:2008 42,000.00 1,012.50 7,200.00 9,000.00 990.00 540.00 43,012.50 17,730.00 SNI : 2839:2008 145,000.00 145,000.00 -
79,735.00
87,965.00
60,742.50
145,000.00
318,750.00 25,470.00 19,500.00 10,000.00 67,200.00 45,000.00 4,950.00 5,400.00 373,720.00 122,550.00 SNI : 7395:2008 159,000.00 16,740.00 9,000.00 9,700.00 10,800.00 67,500.00 7,425.00 8,100.00 194,440.00 93,825.00
496,270.00
288,265.00
109,687.50 16,740.00 9,000.00 7,760.00
143,187.50
10,800.00 67,500.00 7,425.00 8,100.00 93,825.00
237,012.50
ANALISA HARGA SATUAN Kota Bontang
NO
AN.08.d
URAIAN PEKERJAAN
HARGA SATUAN (Rp)
1 M' : Pasang Plint Keramik artistik 5.000 Bh Plint keramik artistik 1.650 Kg Semen portland 0.003 M³ Pasir pasang 0.100 Kg Semen warna 0.900 OH Pekerja 0.090 OH Tukang 0.009 OH Kepala Tukang 0.005 OH Mandor
14,625.00 1,800.00 500,000.00 5,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah
AN.08.e
1 M' : Pasang Plint Keramik lantai 2.500 Bh Plint keramik lantai 1.650 Kg Semen portland 0.003 M³ Pasir pasang 0.100 Kg Semen warna 0.900 OH Pekerja 0.090 OH Tukang 0.009 OH Kepala Tukang 0.005 OH Mandor
9,000.00 1,800.00 500,000.00 5,000.00 120,000.00 150,000.00 165,000.00 180,000.00
1 M2 : Pasang Dinding Batu tempel/Alam Batu tempel/Alam 1.100 M2 Semen portland 11.750 Kg Pasir pasang 0.003 M³ Pekerja 0.700 OH Tukang 0.350 OH Kepala Tukang 0.035 OH Mandor 0.035 OH Jumlah
AN.08.g
1 M2 : Pasang Step nosing lantai Tangga 50.000 Bh Step Nosing 1.650 Kg Semen portland 0.003 M³ Pasir pasang 0.100 Kg Semen warna 0.900 OH Pekerja 0.090 OH Tukang 0.009 OH Kepala Tukang 0.005 OH Mandor Jumlah
AN.08.h
1 M' : List Keramik dinding km/wc 6x20 5.000 Bh Keramik list dinding 6x20 0.330 Kg Semen portland 0.001 M³ Pasir pasang 0.020 Kg Semen warna 0.180 OH Pekerja 0.018 OH Tukang 0.002 OH Kepala Tukang 0.001 OH Mandor Jumlah
AN.08.i
1 M² : Pasang Lantai Granit 60 x 60 cm 2.778 Bh Granit Lantai 60/60 14.150 Kg Semen portland 0.039 M³ Pasir pasang 2.000 Kg Semen warna 0.620 OH Pekerja 0.350 OH Tukang 0.035 OH Kepala Tukang 0.030 OH Mandor Jumlah
AN.08.j
1 M2 PASANGAN Batu Sikat 1.000 m2 Pas Batu Sikat
151,365.00
84,000.00 52,500.00 5,775.00 6,300.00 148,575.00
468,325.00
108,000.00 13,500.00 1,485.00 810.00 123,795.00
901,365.00
21,600.00 2,700.00 297.00 162.00 24,759.00
44,523.00
74,400.00 52,500.00 5,775.00 5,400.00 138,075.00
1,234,711.67
1,041,666.67 25,470.00 19,500.00 10,000.00
1,096,636.67 570,000.00
Jumlah
108,000.00 13,500.00 1,485.00 810.00 123,795.00
18,750.00 594.00 320.00 100.00
19,764.00 375,000.00 1,800.00 500,000.00 5,000.00 120,000.00 150,000.00 165,000.00 180,000.00
201,990.00
772,500.00 2,970.00 1,600.00 500.00
777,570.00 3,750.00 1,800.00 500,000.00 5,000.00 120,000.00 150,000.00 165,000.00 180,000.00
108,000.00 13,500.00 1,485.00 810.00 123,795.00
297,000.00 21,150.00 1,600.00
319,750.00 15,450.00 1,800.00 500,000.00 5,000.00 120,000.00 150,000.00 165,000.00 180,000.00
TOTAL HARGA (Rp)
22,500.00 2,970.00 1,600.00 500.00
27,570.00 270,000.00 1,800.00 500,000.00 120,000.00 150,000.00 165,000.00 180,000.00
JUMLAH HARGA UPAH (Rp)
73,125.00 2,970.00 1,600.00 500.00
78,195.00
Jumlah AN.08.f
JUMLAH HARGA BAHAN (Rp)
570,000.00 570,000.00
-
570,000.00
ANALISA HARGA SATUAN Kota Bontang
NO
AN.08.k
URAIAN PEKERJAAN
HARGA SATUAN (Rp)
1 M² : Pasang Lantai Homogenius uk. 60/60 2.778 bh Keramik Homogenius 60/60 9.300 kg Semen portland 0.018 m3 Pasir pasang 1.940 kg Semen warna 0.075 OH Pekerja 0.300 OH Tukang 0.045 OH Kepala Tukang 0.045 OH Mandor
195,000.00 1,800.00 500,000.00 5,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah
AN.08.l
1 M² : Pasang Lantai Homogenius uk. 80/80 1.563 bh Keramik Homogenius 80/80 9.300 kg Semen portland 0.018 m3 Pasir pasang 1.940 kg Semen warna 0.090 OH Pekerja 0.450 OH Tukang 0.045 OH Kepala Tukang 0.045 OH Mandor
150,000.00 1,800.00 500,000.00 5,000.00 120,000.00 150,000.00 165,000.00 180,000.00
1 M² : Pasang Lantai Homogenius uk. 100/100 1.000 bh Keramik Homogenius 100/100 9.300 kg Semen portland 0.018 m3 Pasir pasang 1.940 kg Semen warna 0.090 OH Pekerja 0.450 OH Tukang 0.045 OH Kepala Tukang 0.045 OH Mandor Jumlah
AN.08.n
1 M² : Pasangan Paving Block Segi Enam 36.500 bh Paving Block 0.178 m3 Pasir Urug 0.250 OH Pekerja 0.125 OH Tukang 0.013 OH Kepala Tukang 0.013 OH Mandor Jumlah
AN.08.o
1 M² : Pasang Lantai Homogenius uk. 100/100 1.000 bh Keramik Homogenius 100/100 9.300 kg Semen portland 0.018 m3 Pasir pasang 1.940 kg Semen warna 0.090 OH Pekerja 0.450 OH Tukang 0.045 OH Kepala Tukang 0.045 OH Mandor Jumlah
AN.08.p
1 M² : Pasang Dinding Keramik Border 20 x 20 cm 26.500 bh Dinding Keramik Border 20/20 9.300 kg Semen portland 0.018 m3 Pasir pasang 1.940 kg Semen warna 0.090 OH Pekerja 0.450 OH Tukang 0.045 OH Kepala Tukang 0.045 OH Mandor
4,200.00 1,800.00 500,000.00 5,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah
646,631.67
10,800.00 67,500.00 7,425.00 8,100.00 93,825.00
363,640.00
10,800.00 67,500.00 7,425.00 8,100.00 93,825.00
298,015.00
30,000.00 18,750.00 2,145.00 2,340.00 53,235.00
307,835.00
219,000.00 35,600.00
254,600.00 168,750.00 1,800.00 500,000.00 5,000.00 120,000.00 150,000.00 165,000.00 180,000.00
9,000.00 45,000.00 7,425.00 8,100.00 69,525.00
168,750.00 16,740.00 9,000.00 9,700.00
204,190.00 6,000.00 200,000.00 120,000.00 150,000.00 165,000.00 180,000.00
TOTAL HARGA (Rp)
234,375.00 16,740.00 9,000.00 9,700.00
269,815.00 168,750.00 1,800.00 500,000.00 5,000.00 120,000.00 150,000.00 165,000.00 180,000.00
JUMLAH HARGA UPAH (Rp)
541,666.67 16,740.00 9,000.00 9,700.00
577,106.67
Jumlah AN.08.m
JUMLAH HARGA BAHAN (Rp)
168,750.00 16,740.00 9,000.00 9,700.00 10,800.00 67,500.00 7,425.00 8,100.00 204,190.00 93,825.00 SNI : 7395:2008 111,300.00 16,740.00 9,000.00 9,700.00 10,800.00 67,500.00 7,425.00 8,100.00 146,740.00 93,825.00
298,015.00
240,565.00
ANALISA HARGA SATUAN Kota Bontang
NO
AN.08.q
URAIAN PEKERJAAN
HARGA SATUAN (Rp)
1 M² : Pasang Dinding Keramik Border 30 x 30 11.000 bh Keramik lantai 30/30 9.300 kg Semen portland 0.018 m3 Pasir pasang 1.940 kg Semen warna 0.090 OH Pekerja 0.450 OH Tukang 0.045 OH Kepala Tukang 0.045 OH Mandor
7,250.00 1,800.00 500,000.00 5,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah
AN.08.r
1 M² : Pasang Lantai Vinyl OutDoor 10/90 11.000 bh Vinyl 10/90 8.000 kg Semen portland 0.018 m3 Self leveling floor 3-10 mm 1.940 kg Lem/adhesive 0.090 OH Pekerja 0.450 OH Tukang 0.045 OH Kepala Tukang 0.045 OH Mandor
Jumlah PEKERJAAN SANITAIR
AN.09 AN.09.a
33,000.00 1,800.00 287,000.00 64,600.00 120,000.00 150,000.00 165,000.00 180,000.00
Memasang 1 m' pipa PVC type AW Ø ½" 1.200 M' Pipa PVC Ø 1/2" Perlengkapan (35% Harga pipa) 0.036 OH Pekerja 0.060 OH Tukang 0.006 OH Kepala Tukang 0.002 OH Mandor
15,000.00 5,250.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah
AN.09.b
Memasang 1 m' pipa PVC type AW Ø 3/4" 1.200 M' Pipa PVC Ø 3/4" Perlengkapan (35% Harga pipa) 0.030 OH Pekerja 0.060 OH Tukang 0.006 OH Kepala Tukang 0.002 OH Mandor
19,500.00 6,825.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah
AN.09.c
Memasang 1 m' pipa PVC type AW Ø 4" 1.200 M' Pipa PVC Ø 4" Perlengkapan (35% Harga pipa) 0.036 OH Pekerja 0.060 OH Tukang 0.006 OH Kepala Tukang 0.002 OH Mandor
86,625.00 30,318.75 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah
AN.09.d
Memasang 1 m' pipa PVC type AW Ø 3" 1.200 M' Pipa PVC Ø 3" Perlengkapan (35% Harga pipa) 0.036 OH Pekerja 0.060 OH Tukang 0.006 OH Kepala Tukang 0.002 OH Mandor
110,812.50 38,784.38 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah
AN.09.d'
Memasang 1 m' pipa PVC type AW Ø 6" 1.200 M' Pipa PVC Ø 6" Perlengkapan (35% Harga pipa) 0.036 OH Pekerja 0.060 OH Tukang 0.006 OH Kepala Tukang 0.002 OH Mandor
210,000.00 73,500.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah
JUMLAH HARGA BAHAN (Rp)
JUMLAH HARGA UPAH (Rp)
SNI : 7395:2008 79,750.00 16,740.00 9,000.00 9,700.00 10,800.00 67,500.00 7,425.00 8,100.00 115,190.00 93,825.00 SNI : 7395:2008 363,000.00 14,400.00 5,166.00 125,324.00 10,800.00 67,500.00 7,425.00 8,100.00 507,890.00 93,825.00
TOTAL HARGA (Rp)
209,015.00
601,715.00
SNI : 2002 18,000.00 -
18,000.00 SNI : 2002 23,400.00 6,825.00
30,225.00 SNI : 2002 103,950.00 30,318.75
134,268.75 SNI : 2002 132,975.00 38,784.38
171,759.38 SNI : 2002 252,000.00 73,500.00
325,500.00
4,320.00 9,000.00 990.00 324.00 14,634.00
32,634.00
3,600.00 9,000.00 990.00 324.00 13,914.00
44,139.00
4,320.00 9,000.00 990.00 324.00 14,634.00
148,902.75
4,320.00 9,000.00 990.00 324.00 14,634.00
186,393.38
4,320.00 9,000.00 990.00 324.00 14,634.00
340,134.00
ANALISA HARGA SATUAN Kota Bontang
NO
AN.09.e
URAIAN PEKERJAAN
HARGA SATUAN (Rp)
Memasang 1 buah kran Ø 3/4" - ½" 1.000 Bh Kran 1/2" 0.250 Bh Seal tape 0.010 OH Pekerja 0.100 OH Tukang 0.010 OH Kepala Tukang 0.005 OH Mandor
37,500.00 4,350.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah
AN.09.f
Memasang 1 unit Pasang floordrain 1.000 Bh Floor drain 0.010 OH Pekerja 0.100 OH Tukang 0.010 OH Kepala Tukang 0.005 OH Mandor
37,500.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah
AN.09.g
Memasang 1 unit Pasang Kran Shower 1.000 Bh Kran Shower 0.010 OH Pekerja 0.100 OH Tukang 0.010 OH Kepala Tukang 0.005 OH Mandor
225,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah
AN.09.h
Memasang 1 unit Pasang Jet Washer 1.000 Bh Jet washer 0.010 OH Pekerja 0.100 OH Tukang 0.010 OH Kepala Tukang 0.005 OH Mandor
150,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah
AN.09.i
Memasang 1 buah Closet jongkok 1.000 Bh Closet Jongkok 6.000 Kg Semen portland 0.010 M³ Pasir pasang 1.000 OH Pekerja 0.500 OH Tukang 0.500 OH Kepala Tukang 0.160 OH Mandor
304,920.00 1,800.00 500,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah
AN.09.j
Memasang 1 buah Closet duduk 1.000 Bh Kloset duduk Perlengkapan (6% Harga closet) 3.300 OH Pekerja 1.100 OH Tukang batu 0.001 OH Kepala Tukang 0.160 OH Mandor
4,687,500.00
JUMLAH HARGA BAHAN (Rp)
TOTAL HARGA (Rp)
SNI : 2002 37,500.00 1,087.50
38,587.50 SNI : 2002 37,500.00
37,500.00 SNI : 2002 225,000.00
225,000.00 SNI : 2002 150,000.00
150,000.00 SNI : 2002 304,920.00 10,800.00 5,000.00
320,720.00 SNI : 2002 4,687,500.00 281,250.00
120,000.00 150,000.00 165,000.00 180,000.00 Jumlah
JUMLAH HARGA UPAH (Rp)
4,968,750.00
1,200.00 15,000.00 1,650.00 900.00 18,750.00
57,337.50
1,200.00 15,000.00 1,650.00 900.00 18,750.00
56,250.00
1,200.00 15,000.00 1,650.00 900.00 18,750.00
243,750.00
1,200.00 15,000.00 1,650.00 900.00 18,750.00
168,750.00
120,000.00 75,000.00 82,500.00 28,800.00 306,300.00
627,020.00
396,000.00 165,000.00 165.00 28,800.00 589,965.00
5,558,715.00
ANALISA HARGA SATUAN Kota Bontang
NO
AN.09.k
URAIAN PEKERJAAN
Memasang 1 buah Urinoir 1.000 Bh Urinoir Perlengkapan (30% Harga Urinoir) 6.000 kg Semen portland 0.010 m3 Pasir pasang 1.000 OH Pekerja 1.000 OH Tukang batu 0.100 OH Kepala Tukang 0.100 OH Mandor
HARGA SATUAN (Rp)
2,945,250.00 1,800.00 500,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah
AN.09.l
Memasang 1 buah Wastafel 1.000 Bh Urinoir Wastafel Perlengkapan (12% Harga wastafel) 6.000 kg Semen portland 0.010 m3 Pasir pasang 1.200 OH Pekerja 0.750 OH Tukang batu 0.070 OH Kepala Tukang 0.110 OH Mandor
1,472,625.00 1,800.00 500,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah
AN.09.m
1 buah bak mandi batu bata vol. 0,3 m3 45.000 bh bata merah 20.779 kg Semen portland 0.052 m3 Pasir pasang 84.000 bh Keramik lantai 20/20 1.039 kg Semen warna 1.500 OH Pekerja 0.750 OH Tukang 0.075 OH Kepala Tukang 0.075 OH Mandor
1,000.00 1,800.00 500,000.00 6,000.00 5,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah
AN.09.n
AN.11 AN.11.a
Memasang 1 m' pipa PVC type AW Ø 2" 1.200 M' Pipa PVC Ø 2" Perlengkapan (35% Harga pipa) 0.036 OH Pekerja 0.060 OH Tukang 0.006 OH Kepala Tukang 0.002 OH Mandor
32,812.50 11,484.38 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah PEKERJAAN BESI & ALUMINIUM
1 m2 Pasang pintu rolling door besi 1.000 m2 Pintu Rolling Door besi 1.200 OH Pekerja 1.200 OH Tukang besi konstruksi 0.120 OH Kepala Tukang 0.006 OH Mandor
433,125.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah
AN.11.b
AN.11.c
1 m2 Pasang pintu lipat (folding gate) 1.000 m2 Pintu lipat 0.440 OH Pekerja 0.440 OH Tukang 0.044 OH Kepala Tukang 0.022 OH Mandor
2,165,625.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah
1 m2 Pasang rolling door aluminium 1.000 m2 Rolling door aluminium 1.000 OH Pekerja 1.000 OH Tukang 0.100 OH Kepala Tukang 0.050 OH Mandor
300,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah
JUMLAH HARGA BAHAN (Rp)
JUMLAH HARGA UPAH (Rp)
TOTAL HARGA (Rp)
SNI : 2002 2,945,250.00 883,575.00 10,800.00 5,000.00
3,844,625.00 SNI : 2002 1,472,625.00 176,715.00 10,800.00 5,000.00
1,665,140.00 SNI : 2002 45,000.00 37,402.60 25,974.03 504,000.00 5,194.81
617,571.43 SNI : 2002 39,375.00 11,484.38
50,859.38
120,000.00 150,000.00 16,500.00 18,000.00 304,500.00
4,149,125.00
144,000.00 112,500.00 11,550.00 19,800.00 287,850.00
1,952,990.00
180,000.00 112,500.00 12,375.00 13,500.00 318,375.00
935,946.43
4,320.00 9,000.00 990.00 324.00 14,634.00
65,493.38
SNI : 7393:2008 433,125.00 144,000.00 180,000.00 19,800.00 1,080.00 433,125.00 344,880.00 SNI : 7393:2008 2,165,625.00 52,800.00 66,000.00 7,260.00 3,960.00 2,165,625.00 130,020.00 SNI : 7393:2008 300,000.00 120,000.00 150,000.00 16,500.00 9,000.00 300,000.00 295,500.00
778,005.00
2,295,645.00
595,500.00
ANALISA HARGA SATUAN Kota Bontang
NO
AN.11.e
URAIAN PEKERJAAN
Pintu PJ1 15.000 2.000 2.460 6.000 2.000 1.000 2.000 1.000 1.000 0.100 0.050
m' bh m2 bh bh bh bh OH OH OH OH
Profil aluminium Daun Pintu Kaca bening tebal 8mm Engsel pintu 4" Kunci pintu 2 slag Kunci Silinder Hendel Pintu Pekerja Tukang Kepala Tukang Mandor Acesories ( 6 % harga bahan ) Upah pembuatan profil ( 20 % bahan )
HARGA SATUAN (Rp)
140,000.00 1,425,000.00 232,500.00 75,000.00 225,000.00 354,000.00 300,000.00 120,000.00 150,000.00 165,000.00 180,000.00
Jumlah AN.11.f
Pintu PJ2 9.420 1.000 0.923 3.000 1.000 1.000 1.000 1.000 1.000 0.100 0.050
m' bh m2 bh bh bh bh OH OH OH OH
Profil aluminium Daun Pintu Kaca bening tebal 8mm Engsel pintu 4" Kunci pintu 2 slag Kunci Silinder Hendel Pintu Pekerja Tukang Kepala Tukang Mandor Acesories ( 6 % harga bahan ) Upah pembuatan profil ( 20 % bahan )
140,000.00 1,425,000.00 232,500.00 75,000.00 225,000.00 354,000.00 300,000.00 120,000.00 150,000.00 165,000.00 180,000.00
Jumlah AN.11.g
Pintu PJ3 24.600 3.360 4.510 2.000 2.000 2.000 1.000 1.000 0.100 0.050
m' m2 m2 bh bh bh OH OH OH OH
Profil aluminium Pintu Kaca 8mm Kaca bening tebal 8mm Engsel Tanam Pintu Kaca Kunci Tanam Pintu Kaca Hendel Pintu Kaca Pekerja Tukang Kepala Tukang Mandor Acesories ( 6 % harga bahan ) Upah pembuatan profil ( 20 % bahan )
140,000.00 232,500.00 232,500.00 1,500,000.00 735,000.00 325,000.00 120,000.00 150,000.00 165,000.00 180,000.00
Jumlah AN.11.h
Pintu PJ4 20.050 1.720 3.567 1.000 1.000 1.000 1.000 1.000 0.100 0.050
m' m2 m2 bh bh bh OH OH OH OH
Profil aluminium Pintu Kaca 8mm Kaca bening tebal 8mm Engsel Tanam Pintu Kaca Kunci Tanam Pintu Kaca Hendel Pintu Kaca Pekerja Tukang Kepala Tukang Mandor Acesories ( 6 % harga bahan ) Upah pembuatan profil ( 20 % bahan )
140,000.00 30,000.00 232,500.00 1,500,000.00 735,000.00 325,000.00 120,000.00 150,000.00 165,000.00 180,000.00
Jumlah
JUMLAH HARGA BAHAN (Rp)
JUMLAH HARGA UPAH (Rp)
TOTAL HARGA (Rp)
2,100,000.00 2,850,000.00 571,950.00 450,000.00 450,000.00 354,000.00 600,000.00
7,375,950.00
120,000.00 150,000.00 16,500.00 9,000.00 165,090.00 28,000.00 488,590.00
7,864,540.00
120,000.00 150,000.00 16,500.00 9,000.00 165,090.00 28,000.00 488,590.00
4,550,871.25
120,000.00 150,000.00 16,500.00 9,000.00 189,900.00 28,000.00 513,400.00
10,907,175.00
120,000.00 150,000.00 16,500.00 9,000.00 177,750.00 28,000.00 501,250.00
6,749,177.50
1,318,800.00 1,425,000.00 214,481.25 225,000.00 225,000.00 354,000.00 300,000.00
4,062,281.25 3,444,000.00 781,200.00 1,048,575.00 3,000,000.00 1,470,000.00 650,000.00
10,393,775.00 2,807,000.00 51,600.00 829,327.50 1,500,000.00 735,000.00 325,000.00
6,247,927.50
ANALISA HARGA SATUAN Kota Bontang
NO
AN.11.i
URAIAN PEKERJAAN
Pintu D1 4.900 1.000 3.000 1.000 1.000 1.000 1.000 0.100 0.050
m' bh bh bh bh OH OH OH OH
Profil aluminium Daun Pintu Engsel pintu 4" Kunci Silinder Hendel Pintu Pekerja Tukang Kepala Tukang Mandor Acesories ( 6 % harga bahan ) Upah pembuatan profil ( 20 % bahan )
HARGA SATUAN (Rp)
140,000.00 1,425,000.00 75,000.00 354,000.00 300,000.00 120,000.00 150,000.00 165,000.00 180,000.00
Jumlah AN.11.j
Pintu D2 4.800 1.000 3.000 1.000 1.000 1.000 1.000 0.100 0.050
m' bh bh bh bh OH OH OH OH
Profil aluminium Daun Pintu Engsel pintu 4" Kunci kamar mandi Hendel Pintu Pekerja Tukang Kepala Tukang Mandor Acesories ( 6 % harga bahan ) Upah pembuatan profil ( 20 % bahan )
140,000.00 1,425,000.00 75,000.00 260,250.00 300,000.00 120,000.00 150,000.00 165,000.00 180,000.00
Jendela W1 12.150 4.900 2.865 1.000 2.000 1.000 1.000 0.100 0.050
m' m' m2 bh bh OH OH OH OH
Profil aluminium Profil aluminium Daun Jendela Kaca bening tebal 8mm Rambuncis Engsel Jendela Casement Pekerja Tukang Kepala Tukang Mandor Acesories ( 6 % harga bahan ) Upah pembuatan profil ( 20 % bahan ) Jumlah
AN.11.l
Jendela W2 19.040 14.420 1.000 1.000 0.100 0.050
m' m2 OH OH OH OH
Profil aluminium Kaca bening tebal 8mm Pekerja Tukang Kepala Tukang Mandor Acesories ( 6 % harga bahan ) Upah pembuatan profil ( 20 % bahan ) Jumlah
AN.11.m
Jendela W3 6.300 1.143 1.000 1.000 0.100 0.050
m' m2 OH OH OH OH
Profil aluminium Kaca bening tebal 8mm Pekerja Tukang Kepala Tukang Mandor Acesories ( 6 % harga bahan ) Upah pembuatan profil ( 20 % bahan ) Jumlah
3,451,140.00
120,000.00 150,000.00 16,500.00 9,000.00 132,015.00 28,000.00 455,515.00
3,337,765.00
120,000.00 150,000.00 16,500.00 9,000.00 41,820.00 28,000.00 365,320.00
3,495,682.50
120,000.00 150,000.00 16,500.00 9,000.00 22,350.00 28,000.00 345,850.00
6,364,100.00
120,000.00 150,000.00 16,500.00 9,000.00 22,350.00 28,000.00 345,850.00
1,493,597.50
2,665,600.00 3,352,650.00
6,018,250.00 140,000.00 232,500.00 120,000.00 150,000.00 165,000.00 180,000.00
120,000.00 150,000.00 16,500.00 9,000.00 137,640.00 28,000.00 461,140.00
1,701,000.00 281,750.00 666,112.50 52,500.00 429,000.00
3,130,362.50 140,000.00 232,500.00 120,000.00 150,000.00 165,000.00 180,000.00
TOTAL HARGA (Rp)
672,000.00 1,425,000.00 225,000.00 260,250.00 300,000.00
2,882,250.00 140,000.00 57,500.00 232,500.00 52,500.00 214,500.00 120,000.00 150,000.00 165,000.00 180,000.00
JUMLAH HARGA UPAH (Rp)
686,000.00 1,425,000.00 225,000.00 354,000.00 300,000.00
2,990,000.00
Jumlah AN.11.k
JUMLAH HARGA BAHAN (Rp)
882,000.00 265,747.50
1,147,747.50
ANALISA HARGA SATUAN Kota Bontang
NO
AN.11.n
URAIAN PEKERJAAN
Jendela W4 16.400 2.490 1.000 1.000 0.100 0.050
m' m2 OH OH OH OH
HARGA SATUAN (Rp)
Profil aluminium Kaca bening tebal 8mm Pekerja Tukang Kepala Tukang Mandor Acesories ( 6 % harga bahan ) Upah pembuatan profil ( 20 % bahan )
140,000.00 232,500.00 120,000.00 150,000.00 165,000.00 180,000.00
Jumlah AN.11.o
m' m' m2 bh bh OH OH OH OH
Profil aluminium Profil aluminium Daun Jendela Kaca bening tebal 8mm Rambuncis Engsel Jendela Casement Pekerja Tukang Kepala Tukang Mandor Acesories ( 6 % harga bahan ) Upah pembuatan profil ( 20 % bahan ) Upah pembuatan daun jendela (20 % bahan)
140,000.00 57,500.00 232,500.00 52,500.00 214,500.00 120,000.00 150,000.00 165,000.00 180,000.00
Jendela W5 11.200 4.140 1.000 1.000 0.100 0.050
m' m2 OH OH OH OH
Profil aluminium Kaca bening tebal 8mm Pekerja Tukang Kepala Tukang Mandor Acesories ( 6 % harga bahan ) Upah pembuatan profil ( 20 % bahan )
140,000.00 232,500.00 120,000.00 150,000.00 165,000.00 180,000.00
Profil Alumunium 1.000 m' 1.000 OH 1.000 OH 0.100 OH 0.050 OH
3,220,775.00
120,000.00 150,000.00 16,500.00 9,000.00 41,820.00 28,000.00 11,500.00 376,820.00
1,459,282.50
120,000.00 150,000.00 16,500.00 9,000.00 22,350.00 28,000.00 345,850.00
2,876,400.00
Profil aluminium Pekerja Tukang Kepala Tukang Mandor Acesories ( 6 % harga bahan ) Upah pembuatan profil ( 20 % bahan )
120,000.00 150,000.00 16,500.00 9,000.00 8,400.00 28,000.00 331,900.00
140,000.00 120,000.00 150,000.00 165,000.00 180,000.00
1 m2 Kaca Bening 5 mm 1.000 m2 Kaca bening tebal 5mm 1.000 OH Pekerja 1.000 OH Tukang 0.100 OH Kepala Tukang 0.050 OH Mandor Acesories ( 6 % harga bahan ) Upah pembuatan profil ( 20 % bahan )
471,900.00
120,000.00 150,000.00 16,500.00 9,000.00 11,250.00 37,500.00 344,250.00
531,750.00
187,500.00 120,000.00 150,000.00 165,000.00 180,000.00
Kaca Es 3 mm Pekerja Tukang Kepala Tukang Mandor Acesories ( 6 % harga bahan ) Upah pembuatan profil ( 20 % bahan )
120,000.00 150,000.00 16,500.00 9,000.00 6,300.00 21,000.00 322,800.00
427,800.00
187,500.00
187,500.00 105,000.00 120,000.00 150,000.00 165,000.00 180,000.00
Jumlah
140,000.00
140,000.00
Jumlah 1 m2 Kaca Es 3mm 1.000 m2 1.000 OH 1.000 OH 0.100 OH 0.050 OH
1,568,000.00 962,550.00
2,530,550.00
Jumlah
AN.11.s
120,000.00 150,000.00 16,500.00 9,000.00 22,350.00 28,000.00 345,850.00
406,000.00 138,000.00 56,962.50 52,500.00 429,000.00
1,082,462.50
Jumlah
AN.11.r
TOTAL HARGA (Rp)
2,296,000.00 578,925.00
2,874,925.00
Jumlah
AN.11.q
JUMLAH HARGA UPAH (Rp)
Bouven 2.900 2.400 0.245 1.000 2.000 1.000 1.000 0.100 0.050
AN.11.p
JUMLAH HARGA BAHAN (Rp)
105,000.00
105,000.00
ANALISA HARGA SATUAN Kota Bontang
NO
AN.11.t
AN.12 AN.12.a
URAIAN PEKERJAAN
1 m2 Double Triplek Lapis HPL 0.364 lbr Plywood tebal 4 mm 0.110 kg Paku plywood 0.100 Pack Kompon 1.000 m2 HPL 0.028 Roll Fiber Tape 0.500 OH Pekerja 0.500 OH Tukang 0.005 OH Kepala Tukang 0.005 OH Mandor
Pasang 1 buah kunci tanam 1.000 bh Kunci Pintu 2 Slag 0.010 OH Pekerja 0.500 OH Tukang 0.010 OH Kepala Tukang 0.005 OH Mandor
AN.12.b
1 buah Pasang engsel pintu 1.000 bh Engsel pintu 4" 0.015 OH Pekerja 0.150 OH Tukang 0.015 OH Kepala Tukang 0.001 OH Mandor
AN.12.c
1 buah Pasang engsel jendela 1.000 bh Grendel jendela 0.015 OH Pekerja 0.150 OH Tukang 0.015 OH Kepala Tukang 0.001 OH Mandor
AN.12.d
1 buah Pasang Grendel jendela 1.000 bh Grendel jendela 0.015 OH Pekerja 0.150 OH Tukang 0.015 OH Kepala Tukang 0.001 OH Mandor
HARGA SATUAN (Rp)
SNI : 2839:2008 42,224.00 2,200.00 3,500.00 150,000.00 980.00 60,000.00 75,000.00 825.00 900.00 Jumlah 198,904.00 136,725.00 PEKERJAAN KAYU, PENGGANTUNG & PENGUNCI SNI : 2008 225,000.00 225,000.00 120,000.00 1,200.00 150,000.00 75,000.00 165,000.00 1,650.00 180,000.00 900.00 Jumlah 225,000.00 78,750.00 SNI : 2008 75,000.00 75,000.00 120,000.00 1,800.00 150,000.00 22,500.00 165,000.00 2,475.00 180,000.00 135.00 Jumlah 75,000.00 26,910.00 SNI : 2008 30,000.00 30,000.00 120,000.00 1,800.00 150,000.00 22,500.00 165,000.00 2,475.00 180,000.00 90.00 Jumlah 30,000.00 26,865.00 30,000.00 120,000.00 150,000.00 165,000.00 180,000.00
1 buah Pasang grendel pintu 1.000 bh Grendel Pintu 0.015 OH Pekerja 0.150 OH Tukang 0.015 OH Kepala Tukang 0.001 OH Mandor
39,000.00 120,000.00 150,000.00 165,000.00 180,000.00
1 buah Pasang hak angin 1.000 bh Hak angin 0.015 OH Pekerja 0.150 OH Tukang 0.015 OH Kepala Tukang 0.001 OH Mandor
47,640.00 120,000.00 150,000.00 165,000.00 180,000.00
1 buah Pasang kunci tanam Cilinder 1.000 bh Kunci Silinder 0.015 OH Pekerja 0.150 OH Tukang 0.015 OH Kepala Tukang 0.001 OH Mandor Jumlah
303,750.00
101,910.00
56,865.00
1,800.00 22,500.00 2,475.00 90.00 26,865.00
56,865.00
1,800.00 22,500.00 2,475.00 90.00 26,865.00
65,865.00
1,800.00 22,500.00 2,475.00 135.00 26,910.00
74,550.00
1,800.00 22,500.00 2,475.00 135.00 26,910.00
380,910.00
47,640.00
47,640.00 354,000.00 120,000.00 150,000.00 165,000.00 180,000.00
335,629.00
39,000.00
39,000.00
Jumlah AN.12.g
TOTAL HARGA (Rp)
30,000.00
30,000.00
Jumlah AN.12.f
JUMLAH HARGA UPAH (Rp)
116,000.00 20,000.00 35,000.00 150,000.00 35,000.00 120,000.00 150,000.00 165,000.00 180,000.00
Jumlah AN.12.e
JUMLAH HARGA BAHAN (Rp)
354,000.00
354,000.00
ANALISA HARGA SATUAN Kota Bontang
NO
AN.12.h
URAIAN PEKERJAAN
HARGA SATUAN (Rp)
1 buah Pasang kunci (km/wc) 1.000 bh Kunci Kamar Mandi 0.015 OH Pekerja 0.150 OH Tukang 0.015 OH Kepala Tukang 0.001 OH Mandor
260,250.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah
AN.12.i
1 buah Pasang Expanyolet 1.000 Bh Expanyolet 0.100 OH Pekerja 1.000 OH Tukang 0.100 OH Kepala Tukang 0.005 OH Mandor
300,000.00 120,000.00 150,000.00 165,000.00 180,000.00
1 buah Pasang Hendel Pintu 1.000 Bh Hendel Pintu 0.050 OH Pekerja 0.500 OH Tukang 0.050 OH Kepala Tukang 0.003 OH Mandor Jumlah
AN.12.k
AN.12.l
AN.13 AN.13.a
1 M3 Pek kusen pintu/jendela kayu Bengkirai 1.200 M3 Kayu bengkirai balok 1.000 kg Lem kayu 1.250 kg Paku Ulin 21.000 OH Tukang 2.200 OH Kepala tukang 7.000 OH Pekerja 0.350 OH Mandor 1 M3 Pek kusen pintu/jendela kayu Ulin 1.200 M3 Kayu ulin balok 1.000 kg Lem kayu 1.250 kg Paku Ulin 21.000 OH Tukang 2.200 OH Kepala tukang 7.000 OH Pekerja 0.350 OH Mandor
300,000.00 4,800,000.00 18,000.00 31,250.00
5,000,000.00 18,000.00 25,000.00 150,000.00 165,000.00 120,000.00 180,000.00 Jumlah PEKERJAAN PENGECATAN
6,000,000.00 18,000.00 31,250.00
37,500.00 30,000.00 60,000.00 83,520.00 120,000.00 150,000.00 165,000.00 180,000.00
7,500.00 4,500.00 10,200.00 21,715.20
Jumlah AN.13.b
1 m2 Mengecat bidang tembok baru (luar) (1 lapis cat dasar , 2 lapis cat penutup). Cat dasar tembok 0.100 kg Cat Tembok (Luar) 0.360 kg Pekerja 0.020 OH Tukang 0.063 OH Kepala Tukang 0.006 OH Mandor 0.003 OH Jumlah
4,849,250.00
6,049,250.00
43,915.20
68,205.00 95,000.00 120,000.00 150,000.00 165,000.00 180,000.00
1,800.00 22,500.00 2,475.00 135.00 26,910.00
287,160.00
12,000.00 150,000.00 16,500.00 900.00 179,400.00
479,400.00
6,000.00 75,000.00 8,250.00 450.00 89,700.00
389,700.00
3,150,000.00 363,000.00 840,000.00 63,000.00 4,416,000.00
9,265,250.00
3,150,000.00 363,000.00 840,000.00 63,000.00 4,416,000.00
10,465,250.00
8,400.00 1,350.00 990.00 450.00 11,190.00
55,105.20
2,400.00 9,450.00 1,039.50 450.00 10,939.50
51,960.00
300,000.00
4,000,000.00 18,000.00 25,000.00 150,000.00 165,000.00 120,000.00 180,000.00 Jumlah
1 M² : pengecatan bidang kayu baru, (1 lapis cat dasar , 2 lapis cat penutup). 0.200 kg Cat meni Plamir Kayu 0.150 kg Cat dasar kayu 0.170 kg 0.260 kg Cat minyak 0.070 OH Pekerja 0.009 OH Tukang 0.006 OH Kepala Tukang 0.003 OH Mandor
TOTAL HARGA (Rp)
300,000.00
300,000.00 300,000.00 120,000.00 150,000.00 165,000.00 180,000.00
JUMLAH HARGA UPAH (Rp)
260,250.00
260,250.00
Jumlah AN.12.j
JUMLAH HARGA BAHAN (Rp)
6,820.50 34,200.00
41,020.50
ANALISA HARGA SATUAN Kota Bontang
NO
AN.13.c
URAIAN PEKERJAAN
HARGA SATUAN (Rp)
1 m2 Mengecat bidang tembok baru (dalam) (1 lapis cat dasar , 2 lapis cat penutup). Cat dasar tembok 0.100 kg Cat tembok (dalam) 0.360 kg Pekerja 0.020 OH Tukang 0.063 OH Kepala Tukang 0.006 OH Mandor 0.003 OH
68,205.00 85,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah
AN.13.d
1 m2 Mengecat plafon eternit/ gypsum/Calsiboard Cat dasar Tembok 0.120 kg Cat tembok (dalam) 0.180 kg Pekerja 0.028 OH Tukang 0.042 OH Kepala Tukang 0.004 OH Mandor 0.003 OH
JUMLAH HARGA BAHAN (Rp)
1 m2 Mengecat list plank Cat dasar Tembok 0.120 kg Cat Tembok (Luar) 0.180 kg Pekerja 0.028 OH Tukang 0.042 OH Kepala Tukang 0.004 OH Mandor 0.003 OH
68,205.00 95,000.00 120,000.00 150,000.00 165,000.00 180,000.00
1 m2 Waterproofing 1.000 kg 0.028 OH 0.042 OH 0.004 OH 0.003 OH
Waterproofing Pekerja Tukang Kepala Tukang Mandor
80,000.00 120,000.00 150,000.00 165,000.00 180,000.00 Jumlah
48,360.00
6,300.00 693.00 450.00 1,143.00
27,987.60
6,300.00 693.00 450.00 1,143.00
29,787.60
6,300.00 693.00 450.00 1,143.00
84,503.00
8,184.60 17,100.00 3,360.00
28,644.60 AN.13.f
2,400.00 9,450.00 1,039.50 450.00 10,939.50
8,184.60 15,300.00 3,360.00
26,844.60 AN.13.e
TOTAL HARGA (Rp)
6,820.50 30,600.00
37,420.50 68,205.00 85,000.00 120,000.00 150,000.00 165,000.00 180,000.00
JUMLAH HARGA UPAH (Rp)
80,000.00 3,360.00
83,360.00
HARGA SATUAN UPAH DAN BAHAN Kota Bontang
NO
A
URAIAN
SATUAN
HARGA (Rp)
UPAH 1
Pekerja
Oh
120,000.00
2
Tukang
Oh
150,000.00
3
Kepala Tukang
Oh
165,000.00
4
Operator Pancang
Oh
165,000.00
5
Mandor
Oh
180,000.00
M3
225,000.00
M3 M3 M3 M3 M3 M3 Bh
200,000.00 500,000.00 650,000.00 550,000.00 740,000.00 225,000.00 1,000.00
Kg Kg ltr M3
1,800.00 5,000.00 80.00 1,850,000.00
B
BAHAN I 1 2 3 4 5 6 7 8 II 1 2 3 4
TANAH, PASIR & BATU Tanah urug Pasir urug Pasir pasang Pasir beton Koral Batu gunung Batu Padas bata merah SEMEN Semen portland Semen warna air Beton K-250 Redimix
III BESI 1
Besi beton
Kg
22,000.00
2
Kawat bendrat
Kg
20,000.00
3
Paku biasa 5cm - 10cm
Kg
20,000.00
4
Paku 1 cm - 2,5 cm
Kg
20,000.00
5
Paku ulin
Kg
25,000.00
6
Paku plywood
Kg
20,000.00
7
Paku Payung
Kg
20,000.00
8
Paku genteng metal
Kg
25,000.00
9
Paku Gypsum
Kg
20,000.00
Besi profil
Kg
33,000.00
10
HARGA SATUAN UPAH DAN BAHAN Kota Bontang
NO
URAIAN
SATUAN
HARGA (Rp)
IV KERAMIK 1
Keramik lantai 40/40
Bh
51,000.00
2
Keramik lantai 20/20
Bh
6,000.00
3
Keramik dinding 20/40
Bh
8,775.00
4
Plint keramik artistik
Bh
14,625.00
5
Plint keramik lantai
Bh
9,000.00
6
Batu Tempel/alam
M2
270,000.00
7
Step Nosing
Bh
15,450.00
8
Keramik list dinding 6x20
Bh
3,750.00
9
Granit Lantai 60/60
Bh
375,000.00
10
Roster Keramik
Bh
11,250.00
11
Pas Batu Sikat
M2
570,000.00
12
Keramik Homogenius 60/60
Bh
195,000.00
15
Paving Block
Bh
6,000.00
16
Dinding Keramik Border 20/20
Bh
4,200.00
17
Keramik lantai 30/30
Bh
7,250.00
V
KAYU 1
Kayu begisting
M3
3,500,000.00
2
Kayu meranti balok
M3
3,500,000.00
3
Kayu meranti papan
M
3
6,205,000.00
4
Kayu bengkirai balok
M3
4,000,000.00
5
Kayu bengkirai papan
M
3
4,000,000.00
6
Kayu ulin balok
M3
5,000,000.00
7
Kayu ulin papan
M
3
5,000,000.00
8
Dolken kayu galam
Blg
17,000.00
9
Plywood tebal 9 mm
Lbr
180,000.00
10
Plywood tebal 4 mm
Lbr
116,000.00
HARGA SATUAN UPAH DAN BAHAN Kota Bontang
NO
URAIAN
SATUAN
HARGA (Rp)
11
Gypsum board tebal 9mm
Lbr
123,000.00
12
Minyak begisting
Ltr
15,000.00
VI ATAP 1
Genteng metal
Lbr
142,500.00
2
Bubungan Genteng Metal
M'
73,500.00
seng BJLS 20 lebar 45 cm
m
25,500.00
seng BJLS 20 lebar 55 cm
m
27,000.00
seng BJLS 20 lebar 60 cm
m
30,000.00
seng BJLS 20 lebar 70 cm
m
33,000.00
seng BJLS 20 lebar 80 cm
m
34,500.00
seng BJLS 20 lebar 90 cm
m
37,500.00
seng BJLS 25 lebar 90 cm
m
61,500.00
3 Seng Plat
4
Pasang Kuda - Kuda Baja Ringan
M2
200,000.00
5
Sisalation/ aluminium foil
M2
9,000.00
6
Atap Zincalume
M'
135,000.00
7
Genteng Keramik
bh
37,500.00
8
Nok Genteng Keramik
bh
26,250.00
9
Bubungan Zincalume
M'
78,750.00
10
Genteng Bitumen
Lbr
150,000.00
11
Nok Genteng Bitumen
M
97,500.00
VII PLAPHOND 1
Calsi Board 4 mm
lembar
150,000.00 Up-1
2
Calsi Board 9 mm
lembar
235,000.00 Up-2
3
Paku Calsi Board
dos
18,000.00 Up-3
4
Kompon
pack
35,000.00 Up-4
5
Fiber Tape
roll
35,000.00 Up-5
6
List Plafond Gypsum
m1
40,000.00 Up-6
7
Paku Gypsum
kg
45,750.00 Up-7
8
Gypsum Board
Lembar
165,000.00 Up-8
9
Tepung Gypsum
kg
6,750.00 Up-9
Rangka Plafond Metal Furring
m2
145,000.00 Up-10
10
HARGA SATUAN UPAH DAN BAHAN Kota Bontang
NO
URAIAN
SATUAN
HARGA (Rp)
11
Dynabolt
bh
6,750.00 Up-11
12
Ornamen Gypsum kecil
m2
150,000.00 Up-12
13
Ornamen Gypsum Besar
bh
180,000.00 Up-13
M'
112,500.00 h-KPJ-01
VII KUSEN, PINTU & JENDELA 1
Kusen
2
Daun Pintu
Unit
1,425,000.00 h-KPJ-02
3
Daun Pintu wc ulin
Unit
1,050,000.00 h-KPJ-03
4
Daun Pintu PJ
Unit
1,200,000.00 h-KPJ-04
5
Expanyolet
bh
300,000.00 h-KPJ-05
6
Lem Kayu
kg
18,000.00 h-KPJ-06
7
Rolling Door
M2
433,125.00 h-KPJ-07
8
Pintu Lipat (folding Gate)
M2
2,165,625.00 h-KPJ-08
9
Rolling door aluminium
M2
300,000.00 h-KPJ-09
10
Profil aluminium
M'
140,000.00 h-KPJ-10
11
Profil aluminium Daun Jendela
M'
57,500.00 h-KPJ-11
12
Plat Aluminium untuk Jalusi
M'
45,000.00 h-KPJ-12
13
Prifil Kaca
m'
12,000.00 h-KPJ-13
14
Skrup fixer
Bh
1,200.00 h-KPJ-14
15
Sealant
tube
9,000.00 h-KPJ-15
16
Daun pintu uk 100 cm
Bh
1,425,000.00 h-KPJ-16
17
Daun jendela uk 60 cm t = 110 cm
Bh
487,500.00 h-KPJ-17
18
Roster
Bh
67,500.00 h-KPJ-18
19
Kaca bening tebal 5mm
M2
187,500.00 h-KPJ-19
20
Kaca Buram tebal 5mm
M2
225,000.00 h-KPJ-20
21
Kaca riben/gelap tebal 5mm
M2
195,000.00 h-KPJ-21
22
Kaca bening tebal 8mm
M
2
232,500.00 h-KPJ-22
23
Kaca riben/gelap tebal 8mm
M2
240,000.00 h-KPJ-23
24
Kaca Cermin
M
2
37,500.00 h-KPJ-24
25
Engsel pintu 4"
Bh
75,000.00 h-KPJ-25
HARGA SATUAN UPAH DAN BAHAN Kota Bontang
NO
URAIAN
SATUAN
HARGA (Rp)
26
Engsel jendela 3"
Bh
58,500.00 h-KPJ-26
27
Kunci pintu 2 slag
Bh
225,000.00 h-KPJ-27
28
Kunci kamar mandi
Bh
260,250.00 h-KPJ-28
29
Kunci Silinder
Bh
354,000.00 h-KPJ-29
30
Hendel Pintu
Bh
300,000.00 h-KPJ-30
31
Grendel pintu
Bh
39,000.00 h-KPJ-31
32
Grendel jendela
Bh
30,000.00 h-KPJ-32
33
Hak angin
Psg
47,640.00 h-KPJ-33
34
Tarikan jendela
Bh
22,500.00 h-KPJ-34
35
Sunscren Besi Hollow
M2
450,000.00 h-KPJ-35
36
Rel Bawah (pintu Garasi)
Bh
570,000.00 h-KPJ-36
37
Rel Atas (Pintu Garasi)
Bh
675,000.00 h-KPJ-37
38
Engsel Atas Tengah (pintu Garasi)
Bh
292,500.00 h-KPJ-38
39
Engsel Atas Pinggir (pintu Garasi )
bh
270,000.00 h-KPJ-39
40
Engsel Bawah Tengah (pintu Garasi)
Bh
195,000.00 h-KPJ-40
41
Engsel Bawah Pinggir (pintu Garasi )
bh
150,000.00 h-KPJ-41
42
Pintu Garasi
Bh
1,350,000.00 h-KPJ-42
43
Pintu km/wc PVC
Bh
1,125,000.00 h-KPJ-43
44
Rambuncis
Bh
52,500.00 h-KPJ-44
45
Engsel jendela casement
Bh
214,500.00 h-KPJ-45
46
Kaca Es 3 mm
M2
105,000.00 h-KPJ-46
VIII SANITAIR 1
Pipa PVC Ø 2"
M'
32,812.50 Sanitair-01
2
Pipa PVC Ø 1/2"
M'
15,000.00 Sanitair-02
3
Pipa PVC Ø 3/4"
M'
19,500.00 Sanitair-03
4
Pipa PVC Ø 4"
M'
86,625.00 Sanitair-04
5
Pipa PVC Ø 3"
M'
110,812.50 Sanitair-05
6
Kran 1/2"
Bh
37,500.00 Sanitair-06
7
Seal tape
Bh
4,350.00 Sanitair-07
8
Closed Duduk
Unit
4,687,500.00 Sanitair-08
9
Closet Jongkok
Unit
304,920.00 Sanitair-09
Urinoir
Unit
2,945,250.00 Sanitair-10
10
HARGA SATUAN UPAH DAN BAHAN Kota Bontang
NO
URAIAN
11
Wastafel
12
Floor drain
13
SATUAN
HARGA (Rp)
Unit
1,472,625.00 Sanitair-11
Bh
37,500.00 Sanitair-12
Septictank Biofil+obat kap 2-4org
Unit
6,750,000.00 Sanitair-13
14
Septictank Biofil+obat kap 4-6org
Unit
10,500,000.00 Sanitair-14
15
Tandon air 1.200 L Fiber
Unit
2,550,000.00 Sanitair-15
16
Jet washer
Unit
150,000.00 Sanitair-16
17
Kran Shower
Unit
225,000.00 Sanitair-17
18
Bak mandi Fiber
Unit
600,000.00 Sanitair-18
19
Pipa PVC Ø 6"
M'
210,000.00 Sanitair-19
IX INSTALASI LISTRIK 1
Lampu SL 8 Watt + Acc Downlight
Bh
75,000.00 listrik-01
2
Lampu SL 18 Watt
Bh
63,000.00 listrik-02
3
Lampu TL 18 Watt
Bh
75,000.00 listrik-03
4
Stop kontak
Bh
75,225.00 listrik-04
5
Saklar tunggal
Bh
69,300.00 listrik-05
6
Saklar ganda
Bh
96,150.00 listrik-06
7
Saklar Empat
Bh
102,000.00 listrik-07
8
Fiting lampu
Bh
55,440.00 listrik-08
9
Kabel NYM 3 x 2,5 mm
m'
11,250.00 listrik-09
10
Pipa pralon 5/8"
btg
16,500.00 listrik-10
11
Panel BOX + Acc
Bh
225,000.00 listrik-11
12
Reflektor + Lampu TL 2x18
Bh
450,000.00 listrik-12
13
Acc Lampu Tl 2x18w
Unit
60,000.00 listrik-13
14
Instalasi listrik
titik
400,000.00 listrik-14
15
Lampu Gantung Hias Dalam
Unit
3,000,000.00 listrik-15
16
Lampu Gantung Hias Luar
titik
1,500,000.00 listrik-16
17
Stop Kontak AC
Unit
67,500.00 listrik-17
18
MCB
Bh
375,000.00 listrik-18
19
Lampu DownLight LED 6 Watt
Bh
172,500.00 listrik-19
20
Lampu DownLight LED 3 Watt
Bh
127,500.00 listrik-20
HARGA SATUAN UPAH DAN BAHAN Kota Bontang
NO
URAIAN
SATUAN
HARGA (Rp)
21
Lampu Downlight outbow 2 warna LED 6 Watt
Bh
337,500.00 listrik-21
22
OutBow Lighting PLC 25 Watt
Bh
300,000.00 listrik-22
23
OutBow Lighting PLC 15 Watt
Bh
225,000.00 listrik-23
24
Baret Light 30 Watt
Bh
520,000.00 listrik-24
25
Reccessed Downlight 10 Watt
Bh
250,000.00 listrik-25
26
Reccessed Downlight 5 Watt
Bh
195,000.00 listrik-26
27
Exchaust Fan
Bh
325,000.00 listrik-27
28
Pasang Lighting Panel
Bh
12,300,000.00 listrik-28
29
Garden Light
Bh
700,000.00 listrik-29
X
CAT 1
Plamir Kayu
Kg
30,000.00
2
Plamir Tembok
Kg
30,000.00
3
Cat dasar Kayu
Kg
60,000.00
4
Cat dasar Tembok
Kg
68,205.00
5
Cat tembok (dalam)
Kg
85,000.00
6
Cat Tembok (Luar)
Kg
95,000.00
7
Cat minyak
Kg
83,520.00
8
Cat meni
Kg
37,500.00
9
Thiner A spesial
Ltr
30,000.00
Waterproofing
Kg
80,000.00
10 C
Lain - Lain 1
Crane Service
1Jam
28,125.00
Up-LL - 1
2
Hidrolic Jack Hammer
1 Jam
46,875.00
Up-LL - 2
3
Solar
Ltr
15,750.00
Up-LL - 3
4
Minyak Pelumas
Ltr
52,500.00
Up-LL - 4
5
Sewa Perakitan
1 Jam
15,000.00
Up-LL - 5
6
Sewa Alat Las
1 Jam
9,375.00
Up-LL - 6
7
Kawat las Listrik
Kg
37,500.00
Up-LL - 7
8
Upah Bobok kepala mini pile
titik
75,000.00
Up-LL - 8
9
Relling Stenlis pipa Ø 3"
m'
412,500.00
Up-LL - 9
10
Tulisan Plat Stenlis
7,500,000.00
Up-LL - 10
Unit
HARGA SATUAN UPAH DAN BAHAN Kota Bontang
NO
URAIAN
11
Bak Kontrol
12
Alat bantu
13
SATUAN
900,000.00
Up-LL - 11
Ls
3,000.00
Up-LL - 12
Pagar Geser 1 m2
M2
1,350,000.00
Up-LL - 13
14
Pagar Hollow Galvanis
M2
900,000.00
Up-LL - 14
15
Tulisan papan Nama Plat Besi'
Unit
7,500,000.00
Up-LL - 15
16
1 m Grill Parit
M'
300,000.00
Up-LL - 16
17
Plat Papan Nama + Rangka
M2
1,200,000.00
Up-LL - 17
18
Non Moven Gotextile
M2
12,000.00
Up-LL - 18
M2
1,137,000.00
Up-LL- 19
Bh
33,000.00
Up-LL-20
Zak
287,000.00
Up-LL-21
ltr
64,600.00
Up-LL-22
Unit
675,000.00
Up-LL-23
20
Pagar BRC Lengkap dengan Tiang, P = 2,4 M/T = 0,9/Ø 6" mm Vinyl 10/90
21
Sel Leveling floor 3-10 mm
22
Lem/adhesive
20
Zink / Tempat Cuci + Kran
19
Unit
HARGA (Rp)
PJ1 kusen alumunium daun pintu daun jendela kaca
15 m' 2 bh 2.46 m2
PJ2 Kusen alumunium daun pintu jendela kaca
9.42 m' 1 bh 0.9225 m2
PJ3 Kusen alumunium Daun Jendela jendela kaca
PJ4 Kusen alumunium Daun Jendela jendela kaca
24.6 3.36 2.05 2.46 4.51
m' m2 m2 m2 m2
20.05 1.72 1.312 2.255 3.567
m' m2 m2 m2 m2
D1 kusen alumunium daun pintu 1 bh
4.9 m' 1 bh
D2 kusen alumunium daun pintu 1 bh
4.8 m' 1 bh
W1 kusen alumunium profil jendela jendela kaca
12.15 m' 4.9 m' 2.865 m2
W2 kusen alumunium jendela kaca
19.04 m' 14.42 m2
W3 kusen alumunium jendela kaca
6.3 m' 1.143 m2
W4 kusen alumunium jendela kaca
16.4 m' 2.49 m2
Bouven kusen alumunium profil jendela jendela kaca
2.9 m' 2.4 m' 0.245 m2
1.59
W5 kusen alumunium jendela kaca
11.2 m' 4.14 m2