Lean Six Sigma Program Name Define

Measure Analyze Improve Control

LEAN SIX SIGMA

< Last Name, First Name > Wave No: <xx> Review Date: <xx/xx/xxxx>

Lean Six Sigma Program Name Define

Measure Analyze Improve Control

LEAN SIX SIGMA

Define

Define Phase Road Map Define

Measure

Analyze

Improve

Activities

Tools

Team election and scoping • Review Project Charter • Validate High-Level Value Stream Map and Scope • Validate Voice of the Customer and Voice of the Business • Validate Problem Statement and Goals • Validate Financial Benefits • Create Communication Plan • Select and Launch Team • Develop Project Schedule • Complete Define Gate

Project Charter • Voice of the Customer and Kano Analysis • SIPOC Map • Project Valuation/ROIC Analysis Tools • RACI and Quad Charts • Stakeholder Analysis • Communication Plan • Effective Meeting Tools • Inquiry and Advocacy Skills • SWOT Analysis • Time Lines, Milestones, and Gantt Charting • Pareto Analysis



Bonacorsi Consulting

Control



3

Define

Project Description ‹

Describe the project in non-technical terms „

‹

?

Define the project’s scope and boundaries (locations, products, operations, etc) Is the scope reasonable? „ Have key constraints and key assumptions been identified? „

Where are you feeling the pain? ‹

?

Enter Key Slide Take Away (Key Point) Here Bonacorsi Consulting

4

Clarifying roles is a critical preliminary step for setting Improvement teams up for success!

Responsibility Grid

Decision

Cust o me r

Exec uti v Lead e er

Depl oym Cham ent pi on

Proj ec Spon t sor

Mas te Blac r kbel t

Blac kbel t

Responsibility Grid Gree nbel t

Define

1 = should be the only one to make this decision 2 = should have veto power over this decision 3 = should be one of those who votes

Charter

Define Execution

Measur e

A = has to execute B = has to assist in execution (provide information,…) C = not involved in execution

Analyze

Improve Responsibility P = Perform A = Approve R = Review

Control

Enter Key Slide Take Away (Key Point) Here Bonacorsi Consulting

5

Define

Team Effectiveness ‹

Ground Rules

‹

Team Roles

‹

Team Meeting Frequency

‹

Tools used by Team

‹

Team Issues (Schedule, Vacations, Availability, Communication)

‹

Other

Enter Key Slide Take Away (Key Point) Here Bonacorsi Consulting

6

Define

Strategy - Thought Map Are the team members identified?

Problem

Are my champions and Controller briefed?

Critical variables identified?

Has the CTQ’s been defined?

Is Y=F(X) established ?

Are the CTQ’s measurable ?

Do we have a measurement system?

Enter Key Slide Take Away (Key Point) Here Bonacorsi Consulting

7

Can we control X’s?

Can we have dashboards on X’s?

Define

Customer Segmentation Matrix Customer Segmentation Matrix Product / Service

Customers

Potential Segments

Enter Key Slide Take Away (Key Point) Here Bonacorsi Consulting

8

Define

Kano Analysis Chart

Ranking of Customer Needs

Enter Key Slide Take Away (Key Point) Here Bonacorsi Consulting

9

Define

VOC Plan Process Name:

Project Name:

Created By:

Date Initiated:

Location:

Current Revision Date:

Additional Information: Customers and Segments



List the various customers (external) and other key stakeholders (business partners, regulatory agencies, etc.) of your process. • Are there different types of stakeholders who may have very different needs? If so, list these as different segments.

• ? • ? • ?

What You Want to Know • Develop a list of specifically what you want to know about your customers and other stakeholders needs.



?

• Use the following list as a guide:



?



?



?



?



?



?



?



?



?



?



?

• What are the most important process outputs (products/services)? • What is the performance level of the important outputs? • What are the problems with the outputs? What is their impact? • What do you like about _______? • What can be improved about _______? • What can be done to make your job easier? • What specific recommendations would you make to us? • How do we compare relative to our competitors? • How easy is it to do business with us?

Enter Key Slide Take Away (Key Point) Here Bonacorsi Consulting

10

Define

VOC Plan (Cont.) Information Sources (Check the data sources that you think will be most useful) Reactive Data

Proactive Data

Complaints Problem or service hot lines Technical support calls Customer service calls Claims, credits Sales reporting Product return information Warranty claims Web page activity Other:

Interviews Focus groups Surveys Comment cards Sales visits/calls Direct observation Market research/monitoring Benchmarking Other:

VOC Collection Plan Summary

• • • • • • • • •

Summarize your plans to gather and use both reactive and proactive sources of VOC information. Indicate how much data you will get, how you will get it, and when. Include, for instance: What specific sources of data you plan on exploring The number of interviews or surveys you plan to use Which customers you will contact The amount of data you will collect - When you will start and end the data collection How you plan on analyzing the gathered information Etc.

• • • • • • • • •

? ? ? ? ? ? ? ? ?

Enter Key Slide Take Away (Key Point) Here Bonacorsi Consulting

11

Define

Voice of the Customer (VOC) Customer

Voice of the Customer

Key Customer Issue(s)

Critical Customer Requirement

Who is the Customer?

What does the customer want from us?

We need to identify the issue(s) that prevent us from satisfying our customers.

We should summarize key issues and translate them into specific and measurable requirements

‹

?

‹?

‹?

‹?

‹

?

‹?

‹?

‹?

‹?

‹?

‹?

‹?

‹?

‹?

‹?

‹?

‹?

‹?

‹?

‹?

‹?

‹?

‹?

‹?

‹?

‹?

‹?

‹?

‹?

‹?

‹?

‹?

Enter Key Slide Take Away (Key Point) Here Bonacorsi Consulting

12

Define

Voice of the Customer (VOC) Customer







“Voice of the Customer” Verbatim

<“…..”>

<“…..”>

<“…..”>

Categories: Delighters / OneDimensional / Must-Be’s <….>

Critical To Satisfaction



<….>



<….>



Questions Who are the customer focus groups?



What methods were used to capture customer needs?



What CTQ is the primary focus for this project?



Enter Key Slide Take Away (Key Point) Here Bonacorsi Consulting

13

Critical-to-Quality (CTQ) Tree Performance attribute (Big Y)

Level 1

Level 2 (CTQ:Y) Revenue

Gross Margin

Profitability

Operating Income

Effectiveness of return

Net Income

Share

Return on assets

Supply chain responsiveness

Delivery Performance

Supply chain Delivery reliability

Define

COGS Sales General & Admin (SG&A) Corporate Taxes

Supplier on time P.O on time

Fill rate

Warehouse on time & in full shipment

Perfect order fulfillment

3PL on time Process Requirement Defect

Text>

Unit of Measure Data Type

Text>

Text> Text>

Enter Key Slide Take Away (Key Point) Here Bonacorsi Consulting

14

Define

Quality Functional Deployment (QFD) Correlation Matrix

Importance Rating Legend

Importance Ratings Importance Ratings Strong Impact 9

#

Strong Negative

# T o tals "W h at Im p o rtan ce"

F unding Loan

Competitor Comparison: Washington Mutual Wells Fargo Countrywide Bank of America

1 Loan Approval Cycle Time 1st Call Resolution Approval to Loan Close Cycle Time

5 2 5

<= 14 days >= 75% <= 30 days

9 1 0

9 0 0

9 9 1

0 0 3

0 0 9

0 9 0

Fee (Good Faith Estimate) Accuracy Invoice Completeness Average Speed To Answer Unexpected Fees Totals "How Importance"

3 4 1 2

>= 85% 100% <= 15 sec <= $5

9 9 1 9 129

3 9 0 1 92

1 9 0 1 109

0 0 0 9 33

0 0 0 1 47

1 1 0 1 27

2

135 38 65 42 112 1 44

Enter Key Slide Take Away (Key Point) Here Bonacorsi Consulting

15

#

"Blank" for No Correlation

C los e

VOC Prioritized Comments

Negative

Loc k Loan

11

U nderw riting

Weak Weak Impact Impact

Positive

C redit A pprov al C hec k

33

F ill O ut F orm s

Moderate Moderate Impact Impact

Strong Positive

P ro cess R eq u irem en ts

99

V O C P rio ritiz atio n R atin g

Moderate Impact 3 Strong Strong Impact Weak Impact Impact 1 "Blank" for no Impact

3

4

5

Define

Project Definition - Includes/Excludes Project Scope Includes

Excludes

What: Where: When: Who: Time: Enter Key Slide Take Away (Key Point) Here Bonacorsi Consulting

16

Define

VOC - SIPOC S

I

P

O

C

Suppliers

Input

Process

Output

Customers

Providers of the required resources

Resources required by the process

(Numerical requirements on inputs) Requirements

Top level description of the activity

Deliverables from the process

(Numerical requirements on inputs) Requirements

Stakeholders



?



?



?



?



?



?



?



?



?



?



?



?



?



?



?



?



?



?

Start

Stop

Enter Key Slide Take Away (Key Point) Here Bonacorsi Consulting

17

Define

Schedule ‹

Review high-level schedule milestones here Phase Completions „ Gate Reviews „ Executive Briefing „

Tollgate TollgateReview ReviewSchedule Schedule

Phase 1: Define Phase 2: Measure Phase 3: Analyze

Tollgate

Scheduled

Revised

Complete

Define:

XX/XX/XX

-

XX/XX/XX

Measure:

XX/XX/XX

XX/XX/XX

XX/XX/XX

Analyze:

XX/XX/XX

XX/XX/XX

XX/XX/XX

Improve:

XX/XX/XX

XX/XX/XX

XX/XX/XX

Control:

XX/XX/XX

XX/XX/XX

XX/XX/XX

Phase 4: Improve Phase 5: Control

Oct 07

Nov 07

Dec 07

Jan 08

Feb 08

Mar 08

Enter Key Slide Take Away (Key Point) Here Bonacorsi Consulting

18

Apr 08

Define

Team Charter Resource Plan

Project Information

Tollgate Review Dates Date

Project Lead

Signoff

Define

Project Sponsor

Measure

Project Champion

Analyze

Coach

Improve Control

Team Members

Rolling Action Item List (RAIL) Meeting Date Meeting Frequency

Project Status Green (Done) Red (off-track) Yellow (WIP) Enter Key Slide Take Away (Key Point) Here

Bonacorsi Consulting

19

Define

Project Charter Business Case

Project Scope • Process Start: <…> • Process End: <…> • In Scope: <…> • Out of Scope: <…..> • Constraints: <…>

<Explain why did you pick up this project?> Problem Statement

Key Learning's • Impacted Process: <…> • Cultural Change:<…> • Organizational Change: <…>

<Explain the pain felt by the customer> SMART Goals CTQ

Baseline

Actua l

Recommendations • Effort Replication Areas: <…>

World Benchmark

Customer Satisfaction Benefits

<Explain the benefits for the customer>

Enter Key Slide Take Away (Key Point) Here Bonacorsi Consulting

20

Critical Path Analysis / Pert / Gantt Chart

Enter Key Slide Take Away (Key Point) Here Bonacorsi Consulting

21

Define

Define

Business Impact ‹

State financial impact of project

‹

Separate “hard or Type 1” from “soft Type 2 or 3” dollars

‹

State financial impact of future project leverage opportunities Annual Estimate

Replicated Estimate

Revenue Enhancement

• Type 1: ? • Type 2: ? • Type 3: ?

• Type 1: ? • Type 2: ? • Type 3: ?

Expenses Reduction

• Type 1: ? • Type 2: ? • Type 3: ?

• Type 1: ? • Type 2: ? • Type 3: ?

Loss Reduction

• Type 1: ? • Type 2: ? • Type 3: ?

• Type 1: ? • Type 2: ? • Type 3: ?

Cost Avoidance

• Type 1: ? • Type 2: ? • Type 3: ?

• Type 1: ? • Type 2: ? • Type 3: ?

Total Savings

• Type 1: ? • Type 2: ? • Type 3: ?

• Type 1: ? • Type 2: ? • Type 3: ?

Enter Key Slide Take Away (Key Point) Here Bonacorsi Consulting

22

Define

Business Impact Details ‹

Type 1: Describe the chain of causality that shows how you determined the Type 1 savings. (tell the story with cause–effect relationships, on how the proposed change should create the desired financial result (savings) in your project )

‹

Show the financial calculation savings and assumptions used. Assumption #1 (i.e. source of data, clear Operational Definitions?) „ Assumption #2 (i.e. hourly rate + incremental benefit cost + travel) „

‹

Type 2: Describe the chain of causality that shows how you determined the Type 2 savings. (tell the story with cause–effect relationships, on how the proposed change should create the desired financial result (savings) in your project )

‹

Show the financial calculation savings and assumptions used. Assumption #1 (i.e. Labor rate used, period of time, etc…) „ Assumption #2 (i.e. contractor hrs or FTE, source of data, etc…) „

‹

Describe the Type 3 Business Impact(s) areas and how these were measured Assumption #1 (i.e. project is driven by the Business strategy?) „ Assumption #2 (i.e. Customer service rating, employee moral, etc…) „

‹

Other Questions Stakeholders agree on the project’s impact and how it will be measured in financial terms? „ What steps were taken to ensure the integrity & accuracy of the data? „ Has the project tracking worksheet been updated? „

Enter Key Slide Take Away (Key Point) Here Bonacorsi Consulting

23

Define

SWOT Analysis Strength

Weakness

‹

?

‹

?

‹

?

‹

?

‹

?

‹

?

‹

?

‹

?

Long Term

Short Term

Opportunity

Threat

‹

?

‹

?

‹

?

‹

?

‹

?

‹

?

‹

?

‹

?

Enter Key Slide Take Away (Key Point) Here Bonacorsi Consulting

24

Define

Multi-Generational Project Plan MGPP Gen1

Gen2

Gen3

Target Date Vision

Key Functionality

Technology Requirements

Target Customers

Metrics

Dependencies

Enter Key Slide Take Away (Key Point) Here Bonacorsi Consulting

25

Process Bottleneck Identification & Workload Balancing ‹

Define

Takt Rate Analysis compares the task time of each process (or process step) to: „ Each other to determine the time trap „ Customer demand to determine if the time trap is the constraint

Task Time (seconds)

Value Add Analysis - Current State 80 70 60 50 40 30 20 10 0

Takt Time = Net Process Time Available Number of Units to Process

-Takt Tim e = 55



--



---

1

2

3

4

5 6 Task #

7

8

9

10

CVA Time

BVA Time

NVA Time

Enter Key Slide Take Away (Key Point) Here Bonacorsi Consulting

26

Define

Influence Strategy Influence Strategy Stakeholder

Issues/Concerns

Identify "Wins"

Influence Strategy

Enter Key Slide Take Away (Key Point) Here Bonacorsi Consulting

27

Define

Communication Plan Audience

Media

Purpose

Topics of Discussion/ Key Messages

Owner

Frequency

Enter Key Slide Take Away (Key Point) Here Bonacorsi Consulting

28

Notes/Status

Define

RACI Chart R = Responsible – The person who performs the action/task.

A = Accountable – The person who is held accountable that the action/task is completed. C = Consulted – The person(s) who is consulted before performing the action/task. I = Informed – The person(s) who is informed after performing the action/task. Step

Action/Task

Responsible

Accountable

Consulted

1 2 3 4 5 6 7 8 9 10

Enter Key Slide Take Away (Key Point) Here Bonacorsi Consulting

29

Informed

Define

Current Status Lean Six Sigma Project Status and Planning

‹

Key actions completed

‹

Issues

‹

Lessons learned

‹

Communications, team building, organizational activities

Deliverables/Tasks Completed last week

Upcoming Deliverables/Tasks - 2 weeks out

Due

Revised Due

Comments

For deliverables due thru: Actions Scheduled for next 2 Weeks Deliverable/Action Who Due Revised Due Comments/Resolution Need Help

Current Issues and Risks Who Due Revised Due Recommended Action Need Help

Issue/Risk

Enter Key Slide Take Away (Key Point) Here Bonacorsi Consulting

W/E:

Comments

30

Define

Next Steps ‹

Key actions

‹

Planned Lean Six Sigma Tool use

‹

Questions to answer

‹

Barrier/risk mitigation activities

Lean Six Sigma Project Issue Log No.

Description/Recommendation

Status Open/Closed/Hold

Due Date

Last Revised: Revised Due Date

Resp

1 2 3 4 5 6 7 8 9 10

Enter Key Slide Take Away (Key Point) Here Bonacorsi Consulting

31

Comments / Resolution

Define

Stop

Tollgate Checklist ‰ ‰

‰

‰ ‰ ‰ ‰ ‰ ‰ ‰

Tollgate Review

Has the team defined the opportunity from both business and customer perspectives?

Define

Is this project important, i.e. has the project been chosen because it is in alignment with <Business Unit> goals and the strategic direction of the ‘business’? What is the problem statement – detailing (what) is the problem, (when) was the problem first seen, (where) was is it seen, and what is the (magnitude or extent) of the problem. Is the problem measured in terms of Quality, Cycle Time or Cost Efficiency, not expected financial benefits? Ensure there is no mention or assumptions about causes and solutions. Does a goal statement exist that defines the results expected to be achieved by the process, with reasonable and measurable targets? Is the goal developed for the “what” in the problem statement, thus measured in terms of Quality, Cycle Time or Cost Efficiency? Does a financial business case exist, explaining the potential impact (i.e. measured in dollars) of the project on the business units, suppliers, external and business customers, etc.? Is the project scope reasonable? Have constraints and key assumptions been identified? Have IT implications been addressed and coordinated with IT managers? Who is on the team? Are they the right resources and has their required time commitment to the project been confirmed by Sponsor and Team? What is the high level work plan? What are the key milestones (i.e. dates of tollgate reviews for DMAIC projects)? Who are the customers (business units, suppliers, external and business customers) for this process? What are their requirements? Are they measurable? How were the requirements determined? Who are the key stakeholders? How will they be involved in the project? How will progress be communicated to them? Do they agree to the project? What kinds of barriers/obstacles will need assistance to be removed? Has the development of a risk mitigation plan to deal with the identified risks been developed?

Enter Key Slide Take Away (Key Point) Here Bonacorsi Consulting

32

Define

Sign Off • I concur that the Define phase was successfully completed on MM/DD/YYYY • I concur the project is ready to proceed to next phase: Measure

Enter Name Here

Enter Name Here

Green Belt/Black Belt

Enter Name Here

Deployment Champion

Enter Name Here

Sponsor / Process Owner

Enter Name Here

Financial Representative

Master Black Belt

Enter Key Slide Take Away (Key Point) Here Bonacorsi Consulting

33

Bonacorsi Consulting This Training Manual and all materials, procedures and systems herein contained or depicted (the "Manual"), are the sole and exclusive property of Bonacorsi Consulting, L.L.C. The contents hereof contain proprietary trade secrets that are the private and confidential property of Bonacorsi Consulting. Unauthorized use, disclosure, or reproduction of any kind of any material contained in this Manual is expressly prohibited. The contents hereof are to be returned immediately upon termination of any relationship or agreement giving user authorization to possess or use such information or materials. Any unauthorized or illegal use shall subject the user to all remedies, both legal and equitable, available to Bonacorsi Consulting. This Manual may be altered, amended or supplemented by Bonacorsi Consulting from time to time. In the event of any inconsistency or conflict between a provision in this Manual and any federal, provincial, state or local statute, regulation, order or other law, such law will supersede the conflicting or inconsistent provision(s) of this Manual in all properties subject to that law. © 2006 by Bonacorsi Consulting, L.L.C. All Rights Reserved.

Steven Bonacorsi is a Senior Master Black Belt instructor and coach. Steven Bonacorsi has trained hundreds of Master Black Belts, Black Belts, Green Belts, and Project Sponsors and Executive Leaders in Lean Six Sigma DMAIC and Design for Lean Six Sigma process improvement methodologies. Bonacorsi Consulting