Phosphorus India Ltd
103
Phosphorus India Ltd
PROJECT MANAGER
Mr. MODULE FICO MM PP SD
EXPERTS
: : : :
Mr. Gokul Mr. Y. M. Reddy Mr. Krishna Mohan
PROJECT CO-ORDINATOR
VERTICAL LEAD
MR.SRINIVASA REDDY
MR.MILIND RAHANGDALE
FI-CO Mrs. Meenakshi
MM Mr. Arvind Mr. Venu
SD
PP
Mr. GiriPrasad Mr. Madhav
Mr. N.Gulhane Mr. G. Ravikumar Mr. Jawar Mr. Srikanth
HR Mr. Mortin Mr. Suresh Miss. Sangeeta Miss. Bindi Priya
104
Phosphorus India Ltd
TABLE OF CONTENTS 1. INTRODUCTION 2. PURPOSE 3. SCOPE 4. BUSINESS BENEFITS a) GENERAL b) PP-RELATED
5. ORGANIZATION
I. II. III. IV.
o GENERAL EXPLANATION o NAMING CONVENTION o DEFINITION OF ORGANIZATIONAL UNITS CLIENT COMPANY CODE PLANT STORAGE LOCATION
6. BUSSINESS PROCESS OVERVIEW OF PIL 7. CROSS-APPLICATION/CENTRAL ORGANIZATIONAL UNITS a) CALENDAR b) UNITS OF MEASUREMENT
8. MATERIAL GROUPING - FINISHED PRODUCT AND SEMI-FINISHED PRODUCTS a) PRODUCT LIST B) Material Types
9. BOM 9.1 BOM TYPES o o o o o
MULTIPLE BOM VARIANT BOM BOM USAGE GROUP BOM BOM GROUP
9.2 ITEM CATEGORY a) RECURSIVE BOM b) CO PRODUCTS / BY PRODUCTS c) ALT ITEM CATEGORY GROUP
9.3 ESSENTIAL PRODUCTION SCRAP 9.4 GENERAL DATA FOR BOM a) b) c) d)
REQUIREMENTS / EXPECTATIONS GENERAL EXPLANATIONS NAMING / NUMBERING CONVENTIONS DESCRIPTIONS OF IMPROVEMENTS
105
Phosphorus India Ltd
e) DESCRIPTION OF FUNCTIONAL DEFECTS f) APPROACHES TO COVERING FUNCTINAL DEFECTS
g) AUTHORIZATION & USER ROLES 10. MASTER DATA a) b) c) d)
PRODUCTION PLANNING MATERIAL REQUIREMENT PLANNING PRODUCTION CONTROL CAPACITY PLANNING & SCHEDULING
11. WORK CENTER A) PERSON RESPONSIBLE FOR THE WORK CENTER B) CAPACITY C) SHIFT AND SHIFT SEQUENCE
d) WORK CENTERS IN PIL 12. ROUTING
INTRODUCTION
13. PRODUCTION PLANNING
SALES & OPERATIONS PLANNING
DEMAND MANAGEMENT
14. MATERIAL REQUIREMENT PLANNING- MRP a) MRP CONTROLLER b) PRODUCTION PLANNING AND PROCUREMENT PLANNING
15. PLANNED ORDERS PROCESSING 16. SHOP FLOOR CONTROL a) b) c) d) e)
PRODUCTION ORDER CREATION PRODUCTION ORDER RELASE PRODUCTION ORDER CONFRMATION PRINTOUT OF PRODUCTION ORDER REPORT
17. REPETITIVE MANUFACTURING 18. REPORTS 19. ANNEXURE I 20. ANNEXURE II 21. GAPS a) IDENTIFICATION OF GAPS b) ADDRESSING OF GAPS
106
Phosphorus India Ltd
23. Introduction Phosphorus India Ltd is a corporate giant in the Agrochemical and Industrial Chemicals sector in India and has major presence • The Specialty Chemicals (Insecticide, Fungicides, herbicides, fumigants and rodenticides) • Caustic Chlorine • White Phosphorus • Industrial Chemicals • Captive Power Generation of 48.5 MW The group has major products in the Insecticide, Herbicide, Vidicide, Fumigant, and Industrial Gases. Apart from this, the group also has manufacturing facilities in UK, USA, China and Argentina. Phosphorus India Limited today, has the widest range of generic agrochemical and other chemical intermediates. Over and above, good markets in India, these agrochemicals are exported to more than 100 countries in the world.
24.
PURPOSE
The purpose of the Business Blueprint is to document the detailed System and Business Process Requirements, and to implement the SAP R/3 System. This document summarizes the proposed decisions associated with implementation as they relate to the configuration of SAP.
25.
SCOPE
The Implementation Scope includes the following SAP R/3 Sub-Modules in Production Planning:
7.1 MASTER DATA • • • •
Material master Bill of material Work center Routing
7.2 PRODUCTION PLANNING • •
Sales & Operations Planning Demand management
7.3 MATERIAL REQUIREMENT PLANNING 7.4 CAPACITY PLANNING & SCHEDULING 7.5 PRODUCTION CONTROL • • • •
Order Control Goods movement Confirmation
107
Phosphorus India Ltd
26.
KEY BUSINESS BENEFITS
The SAP System will provide the following Key Business Benefits:
a) General
• SAP will provide Access to Real-Time, On-Line Information with timely processing. • SAP will offer stronger, more robust Reporting Tools. • SAP’s Integrated Database eliminates the need for data replication and stand-alone systems, decreasing the chance for human errors. This will reduce non-value-added work while improving overall data integrity and give broader information access. • SAP is “Packaged” Software, which is readily scalable. As such, the SAP software will serve as a facilitator of future growth.
• • • • • • • • • •
27.
b) PP-Related Entire Production Planning and Control process will be captured for the first time in a computerized SAP R/3 system. Part numbers for semi-finished product defined, so that stock valuation at various WIP stages can be done through SAP. Material requirement planning will be performed through a much accurate MRP run process in SAP. Material will be planned from the raw materials till the finished product stage. For the Material Type Production resources, consumables and tools, consumption based planning will be undertaken. Planned Scrap outcome of the production process will be accounted through the SAP system automatically and back-flushed to Scrap store. Capacity planning, Production scheduling with the PIL Shift sequence will be performed through SAP. Product Costing to be obtained through SAP. Standard SAP reports will be generated for all production processes. All the Work Centers in PP are assigned to Cost center. All the production costs will automatically get accumulated in the cost centers. All the PP master data will be loaded on to the system resulting in generation of the planned costs of the production processes. Actual production can be confirmed in the system, which will generate the actual costs. Variance in the planned and actual costs can be identified and the desired improvements can be effected in order to improve and further control the production process. This is only possible through the integration of the various modules.
ORGANIZATION
SAP an organizational structure consists of the following units: The client is the top level of the organizational level. Several company codes can be assigned to one client. In turn, several plants can be assigned to a company code, and several storage locations assigned to a plant. Plants must always be consecutively numbered for all company codes. Consequently, plants assigned to different company codes cannot have the same number. However, the numbers of storage locations can be repeated, as long as they are assigned to different plants.
108
Phosphorus India Ltd
• •
Plant: An organizational unit serving to subdivide an enterprise according to production, procurement, maintenance, and material planning aspects. It is a place where either material is produced or goods and services provided. Storage location: An organizational unit allowing differentiation between the various stocks of a material in a plant.
7.1 CORPORATE STRUCTURE Phosphorus India Ltd Group of companies comprises of two Companies
•
Company code 1: Phosphorus India Ltd Unit-1 (PIL1)
•
Company code 2: Phosphorus India Ltd Unit-2 (PIL2)
109
Phosphorus India Ltd
We will go for SAP Implementation in PIL01 Company.
PIL Group of Comp.
PIL Unit-2 Ankleshw ar
PIL Unit-1 Vapi
CPP Plant
RMS
FGS
Freon Plant
ISOPROT URON Plant with 2 Prod. Line
Con. Store
Semi-Finish Storage
Scrap Store
TCAC Plant
RMS
ZNP Plant
FGS
ALP Plant
Con. Store
Scrap Store
Semi-Finish Storage
110
Phosphorus India Ltd
Plants: 1. PIL Unit-1
Located At Vapi
Plant Name a. CPP Plant
Products CPP (Chloropyriphos)
SAP Nomenclature CPPP
CPP Plant
CPP Chloropyripho Plant Name b. Freon Plant
Products Freon-22 Freon-12
SAP Nomenclature FREP
Freon Plant
Prod. Line for Freon-22 Plant Name c. ISO Plant
Products Isoproturon
Prod. Line for Freon-12 SAP Nomenclature ISOP
ISOP Plant
ISOPROTURON
111
Phosphorus India Ltd
Storage Locations: 1. PIL Unit-1 Sl. No 01
Located At Vapi Plant
Nomenclature in sap
Raw Material storage
S110
02
Spare parts storage
S120
03
Finished Products storage
S130
04
Scrap storage
S140
05
CPPP
Description
Raw Material storage
S210
06
Spare parts storage
S220
07
Finished Products storage
S230
08
Scrap storage
S240
Raw Material storage
S310
10
Spare parts storage
S320
11
Finished Products storage
S330
12
Scrap storage
S340
09
FREP
ISOP
112
Phosphorus India Ltd
28.
Business Process Overview of PIL Group Forecast/ Demand
Planning
Procurement
Production
PIL Unit-1
PIL Unit-2
Depot-1
Sales
Depot-3
Sales & Distribution
Finance Invoicing
Collection
113
Phosphorus India Ltd
29. CROSS-APPLICATION/CENTRAL ORGANIZATIONAL UNITS a) General Explanation An organizational unit serving subdivides an enterprise according to production, procurement, maintenance, and material planning aspects. It is a place where either material is produced or goods and services provided. All data that is valid for a particular plant, as well as for the storage locations belonging to it, is stored at plant level. This includes, for example, MRP data and forecast data.
b) Naming Convention It is being proposed that the following number of plants will be created CPP Plant Code- CPPP FREON Plant Code- FREP ISOPROTURON Plant Code- ISOP
c) Definition of Organizational Unit An organizational unit serving subdivides an enterprise according to production, procurement, maintenance, and material planning aspects. It is a place where either material is produced or goods and services provided.
d) Assignment of Organizational Units All data that is valid for a particular company code, as well as for the plants and storage locations assigned to it, is stored at company code level. This includes, for example, accounting data and costing data if valuation is at company code level.
e) Changes to existing Organization It had been proposed that 3 plants be created (CPPP, FREP, and ISOP) and assigned to the company code PIL1. Various storage locations for finished goods, raw material, Semi-finish, Scrap, and Consumables will be created and assigned to each plant.
1. CALENDAR Requirements/Expectations Factory calendar needs to be maintained in the system. In this the working days are to be defined and the holidays. This information is used in various modules. Country wise calendars are already maintained in the system. The Factory Calendar needs to be updated each year based on the decided holidays. The Factory Calendar acts as the basis for Capacity Planning as it defines the working days in a year. In SAP there are two types of holidays. Holidays are to be created and then assigned to the factory calendar.
2. UNITS OF MEASUREMENT Requirements/Expectations Units of measure are required to facilitate the procurement and management of various items in multiple order units.
114
Phosphorus India Ltd
General Explanations The unit of measure is utilized to describe the unit in which items are procured or stored. There are over 220 different units of measure provided by SAP.
System Configuration Considerations Units of measure to be used must be entered in the Purchase Requisition and Purchase Order in SAP.
Special Considerations:
Units of measure that are being used will be configured in
SAP if they do not exist
30. MATERIAL GROUPING - FINISHED PRODUCT AND SEMI-FINISHED PRODUCTS The following material grouping has been defined for the finished and semi-finished products at Phosphorus India Ltd UNIT-1 in the SAP. The Material Grouping is for the Reporting purpose.
a) Product List: Company Name: PIL1 •
•
•
•
•
Finish Products: 7.1 CPP 7.2 Freon-22 7.3 Freon-12 7.4 ISOPROTURON Semi-Finish Product: 1. PNC (Sub Contracting) 2. HTCP mass 3. NaTCP Salt 4. CPP Organic Layer Trading Materials o EDC (ROH Material type) o Xylene (ROH Material type) o Methanol o White Phosphorus By-Products • 30% HCL • 90% Ammonium Sulphate • CPN in CPPP Plant • Effluent Co-Products: • Freon-11
Company Name: PIL2 •
• •
Finish Products: a. TCAC b. ZNP c. ALP By-Products • 30% HCL Co-Products: • 90% Na2SO3 • 24% Phosphoric Acid
Note: Initially we will not consider Co-Products. After successful completion of SAP, these Products will be added. CPP Product has 4 variants like ethyl CPP 97%, Ethyl CPP 98%, Methyl CPP 97% and Methyl CPP 98%. First We will go for CPP and then after successful completion of this, we will use variant configuration or Variant BOM
115
Phosphorus India Ltd
b)
MATERIALS Types
Sr. No. 1 2 3 4 5 6 7 8 9 10
31.
Material Type ROH HALB FERT ERSA HAWA VERP LEIH PIPE FHMI NLAG
Description
Raw Materials Semi Finished Products Finished Products Spare parts Trading Goods Packing Material Returnable Transport Packing Pipeline Material Production resources / Tools Non–Stock Materials
Bill of Materials
A formally structured list of the components that make up a product Or assembly. The list contains the object number of each component, together with the quantity and unit of measure.
We can create the following BOM in the SAP system: a. b. c. d. e.
Material BOMs Equipment BOMs Functional location BOMs Document structures Order BOM
a) Material BOM Types
1. Multiple BOM One product can be manufactured from alternative combinations of materials depending on the quantity to be produced (lot size). The product is represented by a number of alternative BOMs (alternatives). The differences between the alternative BOMs are only small. Usually the only difference is in the quantity of individual components. A multiple BOM groups together several BOMs that describe one object (for example, a product) with different combinations of materials for different processing methods
116
Phosphorus India Ltd
2. Variant BOM The term "variant" refers to changes to the basic model of a product. These changes occur when components are left out or added. If you are producing several similar products that have a lot of common parts, you can describe these products using a variant BOM. This is the case, for example, if you replace one material component with another to make a different product. Variants can also differ by containing different quantities of a component. You create the new BOM as a variant of an existing BOM.
Variant BOM In M/s Phosphorus India Ltd variant BOM can be created in case of ethyl CPP 97%, methyl CPP 97, Ethyl CPP 98% and methyl CPP 97% as the final products vary with only change in 2 Raw Materials. But initially we will go for one Product CPP. Later on after successful implementation we will go for variant BOM
b) BOM USAGE BOM Usage defines the area where a BOM can be used like Production, Engineering/Design, Plant maintenance, Spares, Costing relevance, sales. Different BOMs will be maintained for different areas. In the standard system for Production, you can create a BOM for all material types. You cannot create BOM for Material Type HIBE (Operating Supplies). Operating supplies are procured externally and are required for producing other products.
c) Group BOM A BOM that is not assigned to any plant is a group BOM. It is valid across the entire company. A group BOM is not exploded in material requirements planning and in the production order. Group BOMs are mainly created in the design phase and then later assigned to one or more plants for production.
d) BOM Group A collection of bills of material that lets you describes a product or a number of similar products. BOM group comprises of: • •
All the variants of a variant BOM All the alternatives of a multiple BOM
e) Use Of BOM in PP The data stored in bills of material serves as a basis for production planning activities such as: •
A material requirements planning (MRP) department explodes bills of material on a certain date to calculate cost-effective order quantities for materials.
117
Phosphorus India Ltd
•
A work-scheduling department uses bills of material as a basis for operation planning and production control.
•
A production order management department uses bills of material to plan the provision of materials.
The data stored in bills of material is also used in other activities in a company such as: •
Sales orders As an aid to data entry. You can also create and maintain a BOM specifically for a sales order (variant configuration).
•
Reservation and goods issue As an aid to data entry
•
Product costing To calculate the costs of materials required for a specific product
INTEGRATION Material Management (MM): Reservation and goods issue Finance and Controlling (FI/CO): Product costing: To calculate the costs of materials required for a specific product
Item category Categorization of the items in a BOM according to set criteria, such as whether they refer to an object (for example, material master or document info record) or whether they are kept in stock. This categorization allows you to process data that is relevant to the individual items in a BOM. The item category is used to control field selection, default values for BOM maintenance, triggering of specific system activities, and so on.
The standard R/3 System contains the following item categories: •
Item Categories for Material Items: You can use the following item categories for material items: • • • • • •
Stock Items Non-Stock Items Variable-Size Items PM Structure Elements Intra Materials
Document Items
118
Phosphorus India Ltd
• •
Class Items Text Items
9 Stock item This item category is used to manage material data that allows an item to be kept in stock.
9 Document item This item category is used to manage document data that allows you to process original application data (for example, graphics created with a graphics program). 9 Class item (for configurable BOMs) In configurable material BOMs, you can enter a class as a placeholder for selectable items. The class can contain either materials or documents. When you assign characteristic values while configuring the BOM, the system replaces the node with an object that has the same values as those assigned to the characteristic of the configuration. This makes BOMs with a larger number of variants easier to maintain, as you do not have to enter all items manually and assign a selection condition to them. Class items can be relevant to MRP.
a) Recursive BOM When a header material is a component in a BOM, it is Recursive BOM.
b) CO Products / BY products A product that is automatically produced when main product is manufactured having considerable value is Co Product and negligible value is BY Product. Co product can be considered as a finished or semi finished but this is not the case for a By Product. In Current situation, only Bi-Product terminology is being used. As per SAP procedure we have divided these products into Bi-Products and Co-Products, which are mention in above Product list.
ESSENTIAL PRODUCTION SCRAP The essential scrap generated in the production process will be included as by-products in the Bill of material. The same will be back flushed to the scrap storage location when the order is confirmed. For inclusion in the bill of material, part numbers have been defined for the different types of scrap generated in production for both the plants.
GENERAL DATA FOR BOM ¾ Requirements/Expectations To define a uniform BOM applicable to both Production, Costing and inventory management functionality of the organization. The same BOM will be used in various functionality's of Production say for example, BOM explosion during Production planning MRP run. BOM explosion during production confirmation while back flushing.
¾ General Explanations BOMs are used in their different forms in various situations where a finished product is assembled from several component parts or materials In the case of BOM, simple BOM, variant BOM, and multiple BOM will be used as applicable. Multi-level BOMs will be created for various products manufactured in plants CPPP, FREP, ISOP.
119
Phosphorus India Ltd
The first level will contain all the finished products, which are dispatched to the customer and then the second level and so on. The last level down the line will have raw materials procured from outside for the purpose of manufacturing finished or semi-finished components.
¾ Naming/Numbering Conventions Each BOM for a finished product will have the finished product code as the header.
¾ Description of Improvements Creation of consistent and uniform master data, for example bill of material, and activities across the organization for the purpose of Costing, Production and Inventory Management purpose. Putting the same data say for example the methods of production, time required for production etc for each and every material at one place.
¾ Description of Functional Deficits In some cases both Variant and multiple BOM are required for production. For example certain product will be a variant BOM with reference to a BOM which represent the most standard BOM of that product. As in SAP it is not possible to have both variant and multiple BOM for the same header material it is required to decide which functionality (Variant/ Multiple) is required to greater extent and then accordingly choose one of them and manage without other functionality.
¾ Approaches to covering Functional Deficits To make up for the limitation mentioned above it will be required to decide which is a more suitable and required functionality to decide on the BOM type to be created.
¾ Authorization and User Roles The functions of BOM creation, Change, Deletion will be available only with the designated person/group of person within each plant. Similarly display mode will be available for end-users working on the functionality.
BOM Structure for Phosphorus India Ltd, Vapi (PIL1) Finish and Semi F Products
CPP Freon-22 Freon-12 ISO PNC
Base Qty Operation Loss Selling Cost
Rs./U/M
Sr. Raw Material No 1 Chloroform 2 CTC (Carbon Tetra
Chloride)
1900
100
100
1500
2500
2%
5%
4%
1.50%
1%
400
520
600
Purchase Cost Rs.
Organic
kg
25
145
--
kg
30
--
130
Organic
120
Phosphorus India Ltd
3
Inorganic
Anhydrous HF Acid
4 Chlorine
Inorganic
5
Acid
H2SO4 Sulfuric Acid
6 Soda Ash 7 48%NaOH
Inorganic
8 TCAC
Organic
9A C N 10 CuCl
Organic
11 Rani Catalyst 12 DETC
Catalyst
13 HNO3 Nitric Acid 14 Cumin
Inorganic
15 Hydrogen
Gas
16 EDC
Solvent
17 PCU
Organic
18 Xylene
Solvent
19 Urea
Inorganic
20 DMA
Organic
21
Packing
Inorganic
Catalyst
Organic
Organic
HDPE Drum 210 lit
22 Jute Bag 23 13.6 lit Cylinder for
Packing
60
33
28
kg
18
0.5
0.5
kg
22
0.04
0.04
kg
10
kg
15
2100
kg
60
1900
kg
75
600
kg
90
9
0.012
2400
3000
25
25
0.002
kg
4
kg
80
kg
25
1800
kg
60
3500
kg
20
kg
25
kg
70
1250
kg
55
300
Kg
25
550
kg
60
450
Nos.
400
Nos.
70
Nos.
300
Nos.
1500
77
Kg
200
0.5
KW hr
5.5
kg Kg
1100
90 5000
22.5 30
Packing
Export 24 MS liner Drum 210
kg
10
8
3800
450
450
15000
0.66
13700
410
410
15000
0.007
11400
300
300
4000
Packing
Lit 25 Carbon
Inorganic
26 Power
Utility
27 Steam
Utility
28 Water
Utility
BOM Structure for Variant CPP. Finish Products
CPP
Ethyl CPP 97%
Ethyl CPP 98%
Methyl CPP 97%
Methyl CPP 98%
Base Qty Operation Loss Selling
1900
1900
1900
1900
1900
2% 400
3 450
3.5 500
3 480
3.5 520
Rs.
121
Phosphorus India Ltd
Cost
Sr .N o
1 2 3 4 5 6 7 8 9 1 0 1 1 1 2 1 3 1 4 1 5
Raw Material TCAC ACN CuCl DMTC DETC 48%NaOH EDC Methanol Carbon
/U/ M
Purchasi ng Cost
Material group Rs. Organic Organic Inorganic Organic Organic Inorganic Solvent Solvent Inorganic Inorganic
Catalyst-1
kg kg kg kg kg kg kg kg Kg
60 75 90 85 80 15 25 40 200
1900 600 9
1900 600 9
1900 600 9
1100 2100 250
1100 2100 260 300 1
1100 2100 260 300 1
0.5
Kg
0.5
1900 600 9 1110
1900 600 9 1110
2100 270 300 1
2100 270 300
0.5
Inorganic Catalyst-2 MS liner Drum 210 Lit
kg
0.5
0.5
Packing
Utility Power
No s K W hr
1500
77
77
77
77
77
5.5
3800
4600
4600
4600
4600
kg
0.66
13700
14000
14000
14000
14000
Kg
0.007
11400
11400
11400
11400
Utility Steam Utility Water
11400
BOM Structure for Phosphorus India Ltd, Ankleshwar (PIL2)
Finish and Semi F Products Base Qty Operation Loss Selling Cost
TCAC
Rs./U/M
Sr .N o.
Raw Material
ZNP
ALP
4250
1030
350
1%
0.5%
0.75%
60
950
650
Purchasing Cost
Rs.
122
Phosphorus India Ltd
1
MCAA
Organic
kg
10
2975
2
Sulfur
Inorganic
kg
8
553
3
Ferric Chloride
Catalyst
kg
40
17
4
Chlorine
Gas
kg
26
5903
5
Pyridine
Organic
kg
30
23
6
48%NaOH
Inorganic
kg
15
2835
7
TCE
Organic
kg
20
8.5
8
Aluminum Powder
Inorganic
kg
36
--
240
9
White Phosphorus White Crystalline Wax
Inorganic
kg
36
312
125
Inorganic
kg
50
--
10
Inorganic
kg
40
--
2
12
Palm Oil Ammonium Cabamate
Inorganic
kg
85
--
73
13
Bittrine
Inorganic
kg
560
--
0.2
14
Black Coal Powder
Inorganic
kg
10
--
10
15
Filler ABC
Inorganic
kg
200
--
3
16
Zinc Dust Fine
Inorganic
kg
76
600
--
17
Zinc Dust Coarse
Inorganic
kg
130
200
--
18 19
HDPE Drum 210 lit
Nos
400
17
Power
Packing Utility
KW hr
5.5
10625
43.75
125
20
Steam
Utility
kg
0.66
9000
1500
1000
21
Water
Utility
Kg
0.007
8400
0
500
LPG
Utility
kg
21
10 11
22
25
Plant wise list Of Production Resource Tools.
Sr. PRTs No 1 Fork Lift
U/M
CPPP ISOP FREP TCAC ZNP ALP
Nos
1
1
2
Nos
2
2
3
Weighing Balance Trolleys
Nos
4
4
Lift
Nos
1
1
1
2
4
1
2
2
4
6
1
2
6
1
1
1
1
2
123
Phosphorus India Ltd
5
Samplers
Nos
10
10
6
Manometer
Nos
5
5
7
Temp Indicator
Nos
40
50
15
8
Nos
5
4
9
Pressure Transmitter Chlorine Kit
10
Torch
Nos
2
2
11
Empty Drums
Nos
100
12
Shovels
Nos
5
13
Crane
Nos
32.
5
20
25
15
40
5
2
1
2
1
1
3
2
2
5
50
50
10
10
5
2
2
2
Nos
15
10 5
2
WORK CENTER
Operations are carried out at a work center. In the R/3 System work centers are business objects that can represent the following real work centers, for example: • • • •
Machines, machine groups Production lines Assembly work centers Employees, groups of employees
Use Together with bills of material, work centers belong to the most important master data in the R/3 production planning and control system. Work centers are used in task list operations and work orders. Task lists are for example routings, maintenance task lists, inspection plans and standard networks. Work orders are created for production, quality assurance, plant maintenance and for the Project System as networks. Data in work centers is used for Scheduling: Operating times and formulas are entered in the work center, so that the duration of an operation can be calculated. Costing: Formulas are entered in the work center, so that the costs of an operation can be calculated. A work center is also assigned to a cost center. Capacity plans: The available capacity and formulas for calculating capacity requirements are entered in the work center. Processing of the work centers involves the maintenance of the following data: Basic Data Capacity data
124
Phosphorus India Ltd
Scheduling data Costing data
General Explanations
• The work centers represent the different processing centers or production line responsible for the production of the finished product. • The work center master data is divided into different screens like, basic data, capacity overview, capacity header, scheduling, cost center, defaults etc. The different screens are controlled by the work center category, whereas the capacity data is differentiated according to the capacity category. • The basic data view includes the description of the work center, the task list usage and the standard value key. The usage describes the usability of the work center in routings or other task lists. • The standard value key supports the parameters, which represent the individual operational segments like machining and labor etc. • The capacity view contains all the data for the availability of the capacity and the different formulas for the capacity requirement calculation. • The scheduling view contains the scheduling data. • The cost center view contains the costing data.
Naming/Numbering Conventions Each work center/production line would be identified by their alphanumeric codes. The first two letters denotes the location of the work center/production line (plant wise), the next two letters will denote the type of the machine and number (like 1,2,3 …etc) will identify machine .
Special Organizational Considerations All the work centers in PHOSPHORUS INDIA LIMITED are in 3 plants CPPP, FREP, and ISOP. The work centers that will be created as production lines (work center category) are for FREON PLANT and as individual machines for all other operations like REACTION, SCRUBBER etc Each of these work centers will have capacity data, scheduling data and a cost center attached to it.
Changes to the existing Organization After implementation of SAP the plants have to adapt to the new work enter codes/production lines codes as proposed to be used in the system, and capacity evaluation, production scheduling and routing to be based on the defined work centers/lines.
Description of Important Maintaining the work center master data is critical for routing and scheduling production. However, this data can also be used for different analyses including capacity evaluation, rough-cut capacity planning etc. Because of the central availability of the data, different business applications can access this data and redundant data maintenance is avoided.
Authorization and User Roles Authorization of Work center creation edition or deletion will be as per the authorization matrix in Annexure.
125
Phosphorus India Ltd
10.1 INTEGRATION Human Resource (HR) A Logistics work center can be assigned to either an organizational unit or a work center in the Human Resource Management System (HRMS). Assignments to other HR-objects, for example employees or qualifications, can be maintained via the HR work center.
Finance and Controlling (FI / CO) Costing: Formulas are entered in the work center, so that the costs of an operation can be calculated. A work center is also assigned to a production cost center and the production cost center has been assigned to appropriate activity types. The prices for these activity quantities are calculated using the activity prices.
10.2
CAPACITY
Capacity planning comprises the following partial components: ¾ Capacity evaluation In the capacity evaluation, available capacity and capacity requirements are determined and compared with each other in lists or graphics.
126
Phosphorus India Ltd
¾ Capacity leveling The objectives of capacity leveling are: •
Optimal capacity commitment
•
Selection of appropriate resources In most applications, you can use two types of planning table (graphical and tabular versions) to display the capacity situation and to carry out capacity leveling.
10.3
SHIFT AND SHIFT SEQUENCE
The available capacity of a shift is defined by the following data: •
Shift start, shift end, break times
•
Capacity utilization rate
•
Number of individual capacities
Shift start, shift end and break times can be manually maintained in capacity. You can however also use shift •
Shift definition: In a shift definition you define the start, finish, break times, and validity period of a shift.
•
Shift sequence: In a shift sequence, you define how shifts follow another on a daily basis for the duration of a Cycle. You use shift definitions to do this.
If you change the working times, you only have to change the shift definition, not the available capacity in all the work centers affected. The system changes the available capacity automatically. Changes to the shift sequence only serve as an aid to entering intervals in capacity, and do not affect existing available capacity. In the case of three shifts the shift timings are as follows: Shift Start Shift End 1st Shift 2nd Shift 3rd Shift
6:00a.m. 2:00 p.m. 10:00 p.m.
Break*
2:00 p.m 10:00 p.m. 6:00 a.m.
60 Min 60 Min 60 Min
For machines which are automatic no breaks are scheduled. 30 Min break time for lunch
10.4
WORK CENTERS IN CPP Plant Work Center
Description
No. of (BCT Work in cente Hrs/bat rs ch)
W.C. Categor Activity Type y
127
Phosphorus India Ltd
8
40
Machine
Set, Mach, Lab, Pow,
2
8
Machine
Set, Mach, Lab, Pow,
CPHY
HTCP Reaction CPN Distillation Hydrolysis
3
12
Machine
Set, Mach, Lab, Pow,
CPFI
Filtration
2
8
Machine
Set, Mach, Lab, Pow,
Machine
Set, Mach, Lab, Pow,
CPHT
Stage1
CPDI
3
12
Machine
Set, Mach, Lab, Pow,
CPRE
Pressure Reaction CPP Reaction
2
10
Machine
Set, Mach, Lab, Pow,
CPWA
CPP Washing
2
4
Machine
Set, Mach, Lab, Pow,
CPLV
Low Vacuum Distillation High Vacuum Distillation HCL Scrubber
1
6
Machine
Set, Mach, Lab, Pow,
1
6
Machine
Set, Mach, Lab, Pow,
1
24 Hrs Runnin g
Machine
Set, Mach, Lab, Pow,
1
8
Machine
Set, Mach, Lab, Pow,
CPCR
CPP + MeOH Mixing Crystallization
1
12
Machine
Set, Mach, Lab, Pow,
CPAN
ANF Filtration
1
8
Machine
Set, Mach, Lab, Pow,
CPPD
CPP Distillation
1
8
Machine
Set, Mach, Lab, Pow,
CPMD
MeOH Distillation
1
8
Machine
Set, Mach, Lab, Pow,
CPPR
Stage2
CPHV
For Bi- CPHC Produ ct CPMI
Stage3 for 97% and 98% CPP
10.5 Stages
WORK CENTERS IN ISOPROTURON Plant Work Cente rs
Descriptio n
No. Of Work Cente r
BCT
W.C Category Activity Type
128
Phosphorus India Ltd
Stage-1 PNC Stage2(PCU Section)
Stage-3 (ISOPRO TURON)
This Stage is out sourced
ISHD
Hydrogena tion Reactor
2
12
Machine
Set, Mach, Lab, Pow,
ISPD
PCU Distillation
1
6
Machine
Set, Mach, Lab, Pow,
ISRE
DCU Formation
3
20
Machine
Set, Mach, Lab, Pow,
ISWA
Organic Washing
2
8
Machine
Set, Mach, Lab, Pow,
ISDE
Dehydratio n
2
12
Machine
Set, Mach, Lab, Pow,
ISDM
DMA Reaction
2
12
Machine
Set, Mach, Lab, Pow,
ISCR
Crystallizat ion
2
12
Machine
Set, Mach, Lab, Pow,
ISCN
Centrifugin g
3
13
Machine
Set, Mach, Lab, Pow,
ISRV
Vacuum Drying
1
6
Machine
Set, Mach, Lab, Pow,
1
6
Machine
Set, Mach, Lab, Pow,
1
8
Machine
Set, Mach, Lab, Pow,
ISPC
ISEV BiProduct Stage
10.6
ISO Screening and Bagging Amm. Sul. Evaporatio n
ISVD
Vacuum Drying
1
6
Machine
Set, Mach, Lab, Pow,
ISAP
Amm. Sul. Packing
1
4
Labor
Labor
WORK CENTERS IN FREON Plant ¾ Production Line-1 for Freon-22
129
Phosphorus India Ltd
¾ Production Line-2 for Freon-12 Productio n Line
Work Center
Description
Pressure Reactor for Pressure Reaction FFE-HCL Scrubber
FRRT-1
2
Machine
2
Machine
2
Machine
FRCO-1
Caustic Scrubber for removal of acidity. H2SO4 Scrubber for removal of moisture Freon Gas Compressor
4
Machine
FRD1-1
Distillation unit-1
2
Machine
FRD2-1
Distillation unit-2
2
Machine
FRFL-1
Freon Gas Filling Station
4
Machine
FRRT-2
Pressure Reactor for Pressure Reaction FFE-HCL Scrubber
2
Machine
2
Machine
2
Machine
2
Machine
FRCO-2
Caustic Scrubber for removal of acidity. H2SO4 Scrubber for removal of moisture Freon Gas Compressor
4
Machine
FRD1-2
Distillation unit-1
2
Machine
FRD2-2
Distillation unit-2
2
Machine
FRFL-2
Freon Gas Filling Station
4
Machine
FRFF-1 FRCA-1 Productio n Line for Freon-22
FRSU-1
FRFF-2 FRCA-2 Productio n Line for Freon-12
10.7 Stages
No. Of W.C. Work Category Cente r Machine 2
FRSU-2
Activity Type
Machine, Labor Machine, Labor Machine, Labor Machine, Labor Machine, Labor Machine, Labor Machine, Labor Machine, Labor Machine, Labor Machine, Labor Machine, Labor Machine, Labor Machine, Labor Machine, Labor Machine, Labor Machine, Labor
WORK CENTERS IN TCAC Plant Work Center
Description
Qty. in Nos.
Batch Cycle Time (BCT
130
Phosphorus India Ltd
Name TCDC TCHCL1
Stage-1
TCNa
TCNaRVD TCAC
Stage-2
DCAC React. Cum Dist. HCL Scrubber in DCAC Section Sodium Sulphite Evaporator Na2SO3 final Moisture removal TCAC Reactor
TCDI TCHCL2
10.8
in Hrs)
TCAC Distillation HCL Scrubber in TCAC Section
6
70
1
24 Hrs Running
2
12
2
12
6
48
2
24
1
24 Hrs Running
WORK CENTERS IN ZNPP Plant
Work Center Name
Description
Qty. in Nos.
Batch Cycle Time (BCT in Hrs)
ZNRE
Reactor.
2
6
ZNBL1
First Ball Mill
2
12
ZNSE
Sieving machine
1
3
ZNBL2
Second Ball Mill
2
12
ZNPC
Final Packing
1
2
131
Phosphorus India Ltd
10.9
WORK CENTERS IN ALPP Plant
Work Center Name
Batch Cycle Time (BCT in Hrs)
Qty. in Nos.
Description
ALFP
Firing Pots
3
0.5
ALFC
Firing Chamber
2
2
ALAD
Wax Addition
1
1
ALWM
Wax Melter
1
1
ALCM
Crushing Machine
2
1.5
ALJC
Jaw Crusher
2
1.5
ALAC
Ammonium Carbide addition Section
2
1
ALBL
Blending Machine
2
1.5
ALTR
Transferring Trolleys
8
1
ALSC
Phosphene Gas Scrubber 1
24 Hrs running
10.10 List of Q.C. Equipment. •
Following list of QC equipments where the external services are required for overhauling. • HPLC. 2 Nos. • Gas Chromatography. 2 Nos. • Lab Weighing Balance. 4 Nos. • Carl Fisher equipment. 4 Nos. • Specific Gravity meter. 4 Nos. • PH Meter. 3 Nos.
33. ROUTING INTRODUCTION: Routings enable you to plan the production of materials (products). Therefore, routings are used as a template for production orders and run schedules as well as a basis for product costing.
132
Phosphorus India Ltd
As the production scenario in CPP, ISOPROTURON Plant is of discrete manufacturing; so normal routing is considered for the above plants. Rate Routing A routing for whose operations the production quantity and a fixed duration has been defined. Thus the production rate is also defined.
Rate routing is considered for Freon Plant as it purely involves repetitive manufacturing scenario.
General Explanations A routing is assigned to a specific plant, which is defined in the routing header. However, you can assign individual operations of a routing to a different plant, if one or several operations are to be carried out in another plant. The plants specified in the individual operations and the one specified in the routing header must belong to the same company code.
Naming/Numbering Conventions Each routing will be maintained for the finished good, as the header material.
Changes to existing Organization None at present
Benefits Online and close monitoring of the production, scheduling, capacity requirement calculation and costing will be done for which at present there is no system.
Description of Functional Deficits Need to be able to use a standard routing for an entire class of items.
Approaches to covering Functional Deficits Test system to see if functionality exists.
ROUTING – MATERIAL ASSIGNMENT 133
Phosphorus India Ltd
Notes on further Improvements Online and close monitoring of the production, scheduling, capacity requirement calculation and costing will be done for which at present there is no system.
Authorization and User Roles Authorization of Routing creation edition or deletion will be as per the authorization matrix to be defined. Components are assigned to operations in routing from the Bill of Material of the Header material.
INTEGRATION Material Management (MM)
Plan the usage of materials Plan the external processing of operations
134
Phosphorus India Ltd
Finance and Controlling (FI / CO)
Prepare cost calculation according to routings
ROUTING (FLOW CHARTS) for CPP Plant Stage-1
TCAC
ACN
CuCl
HCL Gas HTCP Reaction
CPN to Scrap
HCL Scrubber System at 25 Deg.C
Water
30% HCL Acid
CPN Distillation
48% NaOH Hydrolysis
ETP1
Water
Filtration
NaTCP Cake
135
Phosphorus India Ltd
48% NaOH NaTCP Cake
Water
Stage-2 Pressure Reaction
DETC for Ethyl CPP or DMTC for Methyl CPP
Lime Effluent CPP Reaction
MEE
CPP Washing
LDO
EDC
Water EDC Storage Tank
EDC Distillation in LVD under Vacuum
Rec.EDC
Rec.EDC EDC Distillation in HVD
CPP 95% Drumming
Required Data For CPP Routing/Batch 1900kg CPP
Base Qty. in Kg Sr. No. Operation 1 HTCP Reaction
Activity Type 1900 Manpower Available in Set up time Machine Labor Time Power in Hr / KW W.C./24hr in hr time in hr in hr KWH 12 9 1 35 315 420
2 CPN Distillation
12
12
3 Hydrolysis
15
12
4 Filtration
30
48
5 Press. Reaction
15
6 CPP Reaction
0.5
12
144
144
144
180
384
240
12
12 8 12
144
180
15
12
10
120
150
7 CPP Washing
10
12
4
48
40
8 LVD
10
12
48
40
9 HVD
10
12
4 4
48
40
136
Phosphorus India Ltd
ROUTING (FLOW CHARTS) for ISOPROTURON Plant 3200kg PNC
Stage-2 PCU Section
90 Kg Hydrogen
4kg Catalyst RaniNckel
Hydrogenation
Separation PCU Distillation
Semi Finish Product 2500 kg Distilled 99% PCU
137
Phosphorus India Ltd
1250 kg PCU
Stage-3
900 kg H2SO4
300 kg Xylene
550 kg Urea
DCU Reaction
50 kg 48% NaOH De-Hydration
450 kg DMA
DMA Reaction
Crystallization
Washing at room Temp
4000 kg Water
Centrifuging
RVD Vacuum drying
4000l lit 26 % Ammo. Sulphate Evaporation
Vacuum Drying
By-Product 1200 kg 90% Amm. Sulphate/Batch
Screening, Pulverizing and Bagging
1500 kg ISOPROTURON
138
Phosphorus India Ltd
ROUTING (FLOW CHARTS) for FREON Plant
CHCL3 Or CTC
HF Acid
Chlorine Gas
Pressure Reaction
HF- HCL Separation in Distillation Column
FFE for HCL Scrubbing
Caustic Scrubber for acidity removal
H2SO4 Scrubber for Moisture removal
SbCl5 Catalyst
Rec. HF Acid 75 kg/hr
Bi-Product 30% HCL Acid 4500 kg/hr
48% NaOH 20kg/hr
98%H2SO4Acid 50 Kg/hr
Gas Compression
Co-Product Freon-11 330 kg/hr during Freon-12 Production
Distillation Unt-1
Distillation Unt-2
Freon-22 or Freon-12 to storage Tank (1660/1330 kg/hr)
Filling Station For Tuner
Filling Station for 74kg Cylinder
Filling Station for 50kg Cylinder
Filling Station for 13.6 kg cylinder
139
Phosphorus India Ltd
TCAC Plant: Process Flow Diagram (ROUTING)
Stage-1
MCAA
Sulfer FeCl3 Chlorine SO2 Gas
DCAC Reaction + Distillation BCT-70Hrs
HCL Gas
HCL Scrubbing System
30%HCL 8000lit/day
Chlorine
Na2SO3 Na2SO3 Evaporation
Pyridine Tanker loading
Stage-2
TCAC Reaction
TCAC Distillation
99% TCAC
HCL Gas
HCL Scrubbing System
RVD
Na2SO3
30%HCL 4000lit/day
Tanker loading
140
Phosphorus India Ltd
ZNP Plant: Process Flow Diagram (ROUTING)
ZNF
ZNC
WP
ZNF
Reactor - 1 (SS-316) BCT-8 hrs. Capacity - 600 kgs
ZNC
WP
Reactor - 2 (SS-316) BCT-8 hrs. Capacity - 600 kgs
Coarse Material Supper Fine Ball Mill (SS-316) , BCT-5 hrs, Cap.-1500 kgs Sieving Machine 100 mesh Capacity- 300 kgs/hrs
ZNP Tech(80%) Bulk Packing as per order i.e. drum packing
ZNP
141
Phosphorus India Ltd
ALP Plant:
Process Flow Diagram
d
Aluminum Powder White Phosphorus
Water Circulation
Firing Pot for Reaction
Crystalline Wax melter
Water
Firing Chamber
C Wax
Palm Oil
JAW CRUSHER -1 NH4COONH2
Fire
Crude ALP
S C R U B B E R
Spiral Cutter for blending / crushing NH4COONH2 Bitrrine Black powder
26% Phosphoric acid
JAW CRUSHER -2 Filler ABC
Blender -1 Phosphine gas
Phosphene Gas
Trolleys
Hopper
34. PRODUCTION PLANNING As-Is: Presently Production Planning is being done manually. This again depends on the skill of Production Manager. Some time all information regarding planning wouldn’t flow from top-level management to the shop floor person. Because of this we loose important customers who requires material in time. There are many loopholes in the existing system. Because of this transparency between top management and middle management is not maintained. While taking some important decisions Top management has to depend on the information’s given by respective dept. This can lead to wrong step in business. To-Be: The Production planning is the backbone of any growing organization. Organization needs to streamline and consolidate company’s sales and production operations. To avoid above problem SAP R/3 gives the solution in following ways.
142
Phosphorus India Ltd
Planning and Processing of Production Process Sale and Operation Planning for Material or Product Group using MC87
Sale Forecast SD
DEMAND AMANGEMENT Creation Planned Ind. Requirement using MD61
Cust. Req. Sales Order
Material Requirement Planning MD02
Planned Order
Conversion of Planned Order to Prod. Order/ Purchase Order
`
Check Availability
Components
N
Capacity
Purchase Req.
N
Purchase order
Y
Shift Dates / Provide Addl. Capacities
Y Order Settlement
Production Order
Order Release
Confirmation CO15/CO11N
Goods Movement To FG Store
143
Phosphorus India Ltd
Process Flow 1. Sales and Distribution take requirements as concrete customer requirements from the market. 2. In Demand Management, sales are planned in advance via a sales forecast. The result is the independent requirement, that is, the requirement for the finished product, tradable assemblies, trading goods and replacement parts. This result triggers material requirements planning. 3. In order to cover these requirements, MRP calculates procurement quantities and dates as well as plans the corresponding procurement elements. The procurement element in the planning run is the planned order or, for external procurement, the purchase requisition. Both procurement elements are internal planning elements that can be changed, rescheduled or deleted at any time. 4. If a material is produced in-house, the system also calculates the dependent requirements, that is, the quantity of components required to produce the finished product or the assembly, by exploding the BOM. If a material shortage exists, planned orders are created at every BOM level to cover requirements. 5. The system then converts these planned procurement elements into exact procurement elements: production orders for in-house production and purchase orders for external procurement. 6. The progress of the order for materials produced in-house is controlled by using the production order. The production order contains its own scheduling procedures, capacity planning and status management. Cost accounting is also carried out via the individual production order. 7. Materials that are procured externally trigger the purchasing procedure. In this case, you must have chosen suitable vendors or you must have drawn up outline agreements. 8. The quantities made available by production or by external procurement are placed in stock and are managed by Inventory Management.
7.1 SALES & OPERATIONS PLANNING Sales & Operations Planning (SOP) is a flexible forecasting and planning tool with which sales, production, and other supply chain targets can be set on the basis of historical, existing, and estimated future data. Rough-cut planning can also be carried out to determine the amounts of the capacities and other resources required to meet these targets. SOP is particularly suitable for long- and mediumterm planning. For planning purpose, the required sales plan can be gathered from various sources like Forecasting, Sales Information Systems and Co-PA (Cost-Profitability analysis) or can be created manually. Based on sales plan, the production plan is created and the requirements are then transferred to demand management.
a) CPPP PLANT - CPP The product group of the CPP Plant is identified as “CPP” with 100% production
share.
144
Phosphorus India Ltd
If we use 4 Variants of CPP, then Product Group of the CPP Plant is identified as “ CPP “ with sales share of 30% for ethyl CPP 97%, 40% for ethyl CPP 98%, 15% for methyl CPP 97% and 15% for Methyl CPP 98%. These variants will be used after successful implementation of SAP for plane CPP without variants.
b) FREP PLANT – FREON GAS The product group of the FREON PLANT is identified as “FREON” with a sales share of 70% for FREON-22, 30% for FREON-12.
c) ISOP PLANT The product group of the ISOP PLANT is identified as “ISOPROTURON” with 100% production share.
INTEGRATION Sales and Distribution (SD) 9 9
SOP constitutes the planning functionality of the LIS information systems. SOP plans are passed on to Demand Management in the form of independent requirements. In turn, this data is fed to Master Production Scheduling and Material Requirements Planning.
Finance and Controlling (FI/CO) 9 9
An interface with Profitability Analysis (CO-PA) allows using CO-PA data as the basis for sales planning in SOP. SOP results are passed on to Profitability Analysis (CO-PA), Cost Center Accounting and Activity-Based Costing.
7.2 DEMAND MANAGEMENT The function of Demand Management is to determine requirement quantities and delivery dates for finished products assemblies. Customer requirements are created in sales order management. • • •
The demand program is created in the form of planned independent requirements. Demand management uses planned independent requirements and customer requirements. Customer requirements are created in sales order management. To create the demand program, define the planning strategy for a product. Planning strategies represent the methods of planning for production and manufacturing or procuring a product. Using these strategies, it can be decided whether production is triggered by sales orders (make-to-order production), or it is triggered by Forecast (make-to-stock production).
145
Phosphorus India Ltd
•
Or, you may want both sales orders and stock orders in the demand program. If the production time is relatively long in relation to the standard market delivery time, you may want to produce the product or, at least, certain assemblies before any sales orders exist. In this case, the sales quantities are preplanned (for example, with the aid of the sales forecast).
Based on the Manufacturing scenario of respective Finish Products, following Planning Strategies are listed for Finish product for PIL1 as well as PIL2. We will be looking for CPPP, ISOP, and FREP Plant only.
Sr.No. 1
Finish Products TCAC
Plant
Strategy
Production Process
10 MTS
Descrit Mfg. Batch Management Descrit Mfg. Batch Management
TCAP Plant 2
95% CPP
3
7
97% ethyl CPP 98% ethyl CPP 97% methyl CPP 98% methyl CPP Freon-22
8
Freon-12
9
Isoproturon
4 5 6
40 MTS
CPPP Plant
FREP Plant
26 MTO Variant Configuration with Characteristics 1) Group and 2) Purity
Descrit Mfg. Batch Management
11 MTS
REM
10 MTS
REM
20 MTO
Descrit Mfg. Batch Management Descrit Mfg .Batch Management Descrit Mfg. Batch Management
ISOP Plant 10
11
ZNPP Plant
52 MTS without Final Assembly
ALPP Plant
50 MTO without final assembly
ZNP ALP
146
Phosphorus India Ltd
35. Material Requirement Planning As-IS: In current situation requirement planning are done in very haphazard way. Some time some raw materials or spares are procured 2-3 times which unnecessarily piling up stock of costly materials. So inventory increases. Some time Production person doesn’t get required material in time. This happens mostly in consumable material which equally important for production. This results in production loss. Monitoring stock is very difficult. This results in wrong reporting at the end of month or year. To-Be: To capture above problem and give systematic solution, in SAP R/3 system MRP gives solution in following ways.
a) MRP CONTROLLER b) PRODUCTION PLANNING AND PROCUREMENT PLANNING c) CAPACTY PLANNING What is MRP: The main function of material requirements planning is to guarantee material availability, that is, it is used to procure or produce the requirement quantities on time both for internal purposes and for sales and distribution. This process involves the monitoring of stocks and, in particular, the automatic creation of procurement proposals for purchasing and production. In doing so, MRP tries to strike the best balance possible between -
Optimizing the service level and Minimizing costs and capital lockup.
So, when MRP run is carried out using PD (normal planning) as MRP type, the PLANNED ORDERS are generated according to the demand mgmt (Planned Independent requirements). The MRP controller checks the scheduled dates of the planned orders and converts them into the production orders. Material requirements planning take current and future sales as its reference points. Depending on planning strategy, actual requirements trigger the MRP calculation. In MRP the requirements include sales orders, planned independent requirements, material reservations, the dependent requirements created by exploding the BOM and so on. In case of in-house production the system creates planned orders for planning of production quantities. When planning is complete planned orders can be converted into production orders. In case of external procurement the system creates either a planned order or directly creates a purchase requisition or a schedule line for a pre-existing scheduling agreement for planning the external purchase order quantity.
13.1
MRP Controller
General Explanation
147
Phosphorus India Ltd
MRP Controller is the person responsible for a group of components in Material Requirement Planning in a plant or company. Material that takes part in MRP must be assigned to a MRP controller. The field for MRP Controller is located in the MRP 1 view of the Material Master. The MRP controller is responsible for all activities, for specifying the type, quantity and time of the requirements and he must also calculate when and for what quantity an order proposal has to be created to cover these requirements. He needs all the information on stocks, stock reservation and stock on order to calculate quantities and he needs all the information on lead times and procurement times to calculate dates. The MRP controller determines a suitable MRP and lot-sizing procedure by material to determine procurement proposals. The most common lot-sizing procedures are available in the system and can easily integrate userdefined formulas.
Naming Convention For MRP controlling, it is proposed that there be one MRP controller in each section within the 3 plants. The proposed codes to be used in SAP are as below: Section:
Plant CPPP
MRP Controller 500
ISOP
600
FREP
700
Definition: The MRP controller is the person responsible for a group of materials in MRP in a plant or company. A material that takes part in material requirement planning must be assigned to a MRP Controller. Each of these areas will have a separate MRP controller. MRP to be run separately in the 3 areas independently.
13.2
MRP control parameters
Various control parameters are available for the total planning procedure and for single-item planning and multi-level planning, which you can set in the initial screen of the planning run. You use these parameters to determine how the planning run is to be executed and which results are to be produced. The control parameters include: •
Planning run type Choose whether all materials are to be planned or only those with MRP relevant changes. Planning run types are as fallows o
Net changing planning– NTECH
o
Net change planning in the planning horizon ---NETPL Planning horizon is maintained for 100 days
148
Phosphorus India Ltd
•
Creation indicator for procurement proposals for materials that are procured externally
Choose whether planned orders, purchase requisitions or schedule lines should be created for materials that are procured externally. •
Creation indicator for MRP lists: Define whether MRP lists are to be created.
•
Planning mode: Determine how the system is to deal with procurement proposals (planned orders, purchase requisitions, scheduling agreement lines) from the last planning run, which are not yet firmed, in the next planning run.
•
Scheduling: Choose basic date calculation or lead time scheduling
13.3
MRP RUN AT Phosphorus India LIMITED:
At PIL, for regular products MRP will be run once a week, based on the requirement by the customers. Based on this requirement for all the finished products and the Dependent requirements will get generated using transaction code MD02. In case there are changes to this requirement then MRP to be run on weekly basis. But for export orders, MRP will be only run based on the Sales orders, using the transaction code- MD50. For Regular Orders: For Export Orders:
13.4
MD02, Once a week MD50, only on receipt of sales orders.
MRP Out put
The following evaluations are available for analyzing the planning result: • • •
MRP list Stock/requirements list Planning result (corresponds to the MRP list with individual evaluation layout)
Planning situation (corresponds to the stock/requirements list with individual evaluation layout)
149
Phosphorus India Ltd
13.5
CONSUMPTION BASED PLANNING
Consumption based planning is based on consumption values and uses forecasts or statistical procedures to determine future requirements. Consumption based planning is characterized by its simplicity and is mainly used for low value items. Manual reorder point planning is a typical process in consumption based planning.
Monthly Plant wise list Of Consumables and Spare parts.
Sr. Consumable No
U/M
CPPP ISOP FREP TCAC ZNP ALP
1
Hand Gloves
Nos
150
160
80
150
180
200
2
Nose Mask
Nos
100
120
50
150
150
200
3
Safety Goggles
Nos
40
50
40
50
60
100
4
Bucket
Nos
15
10
2
5
10
15
5
Funnel
Nos
10
15
1
15
5
15
6
Filter P. Cloth
Nos
10
7
Sp.Filter Cloth
Nos
50
15
8
1” Hose pipe
Nos
50
80
50
10
50
40
9
Brooms
Nos
150
120
100
120
80
200
10
PH Paper
Nos
20
15
10
15
20
15
11
Log Sheets Books
Nos
10
15
2
10
15
15
12
Pen
Nos
40
30
30
40
50
40
13
Staplers
Nos
2
1
1
1
1
1
14
Calculators
Nos
1
1
1
1
1
1
15
Chlorine Detector
Nos
6
5
120/10 0/50/80
120/100 /50/80
250
250
120/1 00/50/ 80 250
120/1 00/50/ 80 250
Spare Parts
Nos
1
1.5”/2”/3/6/4 HDPE Valves
Nos
120/100 /50/80
2
1” Asbestos Gaskets 2” Asbestos Gaskets 4” Asbestos Gaskets 4”/2” /6”PP Gaskets
Nos
250
120/10 0/50/8 0 250
Nos
150
150
150
150
150
150
Nos
80
80
80
80
80
80
Nos
250/280 /200
250/28 0/200
250/28 0/200
250/280 /200
1”/2”/3”/4”/6” MS Flanges 1”/2”/3”/4”/6” MS Flanges ½” x 3” Nuts Bolts
Nos
100 each 100 each 50
100 each 100 each 50
100 each 100 each 50
100 each 100 each 50
250/2 80/20 0 100 each 100 each 50
250/2 80/20 0 100 each 100 each 50
3 4 5
6 7 8
Nos Kg
150
Phosphorus India Ltd
9
1”/4” Nuts bolts
Kg
50
50
50
50
50
50
10
V-Belt
Nos
10
10
10
10
10
10
13.6
Capacity Planning
The capacity planning mainly consists of two elements i.e.
¾ Capacity Evaluation ¾ Capacity Leveling
Capacity Evaluation
13.6.1
After the MRP run, the capacity requirements are created by the system. The load on the entire bottleneck work centers can be seen in the system. The system will highlight the periods when overload exists in each work center. In such a situation capacity needs to be leveled so that production plan becomes final.
13.6.2
Capacity Leveling
In capacity leveling, all the orders, which require that particular work center, will be dispatched to the committed schedule one after other as per the priority. After leveling, the load on work center will be evened out for the planning bucket. The revised scenario and schedule will be immediately reflected in the evaluation. If the capacity leveling is carried out to such an extent, that it has to be reflected in the schedule of the dependent materials, then MRP run can be carried out again. At this time the planned orders, which have undergone changes to schedule (firmed orders) will not be again changed by the system. The dependent materials will be planned as per the revised schedule.
36. PLANNED ORDER PROCESSING •
Manually The MRP controller enters a planned order manually. He determines which material is to be procured, the required quantity, the date required, and whether the material is to be procured externally or internally.
•
Automatically During the planning run, the system automatically determines the materials to be procured with the required quantity and the required date. After the planned order is created either manually or automatically a planned order profile is allocated and data is processed. The data would include: material, plant, order quantity and basic order dates. This will trigger the processing of material components, schedule the planned order, edit account assignment and process the source of supply. The system will check component and capacity availability and if needed, capacity leveling can be carried out. Saving the planned order creates a purchase requisition, planned load, creates dependent requirements and allows the processing of the planned order.
151
Phosphorus India Ltd
In case these requirements are produced in-house, the system creates planned orders that in turn can be converted to Production orders before actual production execution. Alternatively, if the requirements are procured externally, these requirements are directly converted into Purchase requisitions. It would also be possible to convert the planned orders to purchase requisitions. NUMBER RANGES FOR PLANNED ORDERS Phosphorus India Ltd:
1000
to 9999
37. SHOP FLOOR CONTROL 15.1
PRODUCTION ORDER
Production orders are a fundamental part of Production Planning and Control. PP is fully integrated in the Logistics component and has, among others, interfaces to •
Sales and Distribution
•
Materials Management
•
Controlling
¾
• •
• •
Production order specifies: •
What is to be produced
•
When production is to take place
•
Which capacity is to process the order
•
How much production costs
The work processes within a company are executed using orders. As soon as a planned order or a company-internal requirement is generated from previous planning levels (material requirements planning) shop floor control takes over the information available and adds the order-relevant data to it to guarantee complete order processing. Production orders are used to control production within a company and also to control cost accounting. The production scheduler confirms and releases the order to shop floor for actual production. After production, operation wise confirmation of the order is carried out and relevant goods are sent (GR) into the storage location.
15.2
PRODUCTION ORDER CREATION
This function supports the production of goods in-house using the production order or work
152
Phosphorus India Ltd
order concept. The different functions involved are: 1. 2. 3. 4. 5. 6. 7.
¾
Order creation Order release Inspection lot processing Goods issues Order confirmation Goods receipt Order settlement
When a production order is created the following actions are carried out: •
A routing is selected, its operations and sequences are transferred to the order
•
The bill of materials is exploded and the items in the bill of material are transferred to the order
•
Reservations are generated for bill of material items held in stock
•
The planned costs for the order are generated
•
The capacity requirements are generated for the work centers.
•
Purchase requisitions are generated for non-stock items and externally-processed operations.
PRODUCTION ORDER NUMBER RANGE PLANT
NUMBER RANGE
Phosphorus India Ltd
5000000 to 5999999
15.3
RELEASE OF PRODUCTION ORDER
Release of the production order is an important business function, which controls things like the goods issue for the order, confirmation of the order progress etc. Here either individual production operations or the order itself can be released. The production order release function is to be exercised in each production order, in the transaction menu of the order header, after the creation of the production order. This function sets the "released" status in the order header After the creation of the production order, the individual operations or the order header itself can be released as per the release date specified in the material master scheduling margin key.
153
Phosphorus India Ltd
15.4
ORDER CONFIRMATION
A confirmation documents the processing status of orders, operations, sub-operations and individual capacities. It is an instrument for controlling orders. With a confirmation you specify o The quantity in an operation that was produced as yield, scrap and the quantity to be reworked o How much work was actually done o Which work center was used for the operation o Who carried out the operation o Exact confirmation shortly after completion of an operation is essential for realistic production planning and control. The following business transactions can be executed via confirmations: o o o o o o o
Updating order data (for example, quantities, activities, dates, status) Back flushing of components Automatic goods receipt (for one operation per order max.) Capacity reduction in the work center Updating costs based on confirmed data Updating MRP-relevant excess or missing quantities in the order You can enter confirmations for An order- to be entered daily
o o o o o
An operation- to be done before period closing for inventory valuation of WIP. A sub-operation An individual capacity in an operation An individual capacity in a sub-operation For scrap, rejection, reworks, operation confirmation will be done.
15.5
PRINTOUT OF PRODUCTION ORDER
This function controls the printing of the shop papers, such as the operation confirmation slips, time tickets etc. The printing of the different shop papers is controlled by the settings made in the control key attached to the individual production operations. INTEGRATION Production orders is fully integrated in the Logistics (LO) component and has, among others, interfaces to o o o
Sales and Distribution (SD) Materials Management (MM) Controlling (CO)
154
Phosphorus India Ltd
15.6
Batch management
Definition of batch The quantity or partial quantity of a certain material or product that has been produced according to the same recipe, and represents one homogenous, non- reproducible unit with unique specifications.
Purpose of batch management •
Legal requirements (for example, the guidelines set out by GMP-Good Manufacturing Practice) or regulations on hazardous material.
•
Defect tracing, callback activities, and regression requirement.
•
The need for differentiated quantity-and value-based Inventory Management (for example, due to heterogeneous yield/result qualities or varying constituents in Production.
•
Differences in usage and the monitoring thereof in materials planning in SD and Production.
•
Production or procedural requirements (for example, settlement of material quantities on the basis of different batch specifications
Features of batch management •
Batch Number Assignment
This function used to assign a batch with a number that uniquely identifies it. •
Batch Specification
This function used to describe each batch uniquely using characteristics and characteristic values. It specifies the permitted value range in the allocated material master record. •
Batch Status Management
This function used to indicate whether a batch is usable or unusable. We can set this status o
Manually in the batch master record or at goods receipt
o
Automatically in the usage decision in quality management
155
Phosphorus India Ltd
•
Batch Determination
o
With this function, we can use various criteria to search for batches that are in stock, for example:-
o
When posting goods issues
o
When combining suitable material components for production orders and process orders
o
When creating a delivery according to particular customer requirements
•
Batch Where-Used List
o
The batch record contains all quality-relevant planned and actual data for the production of a batch and complies with the GMP guidelines (Good Manufacturing Practices) for the pharmaceutical industry and food industry.
o
The batch where-used list shows the path of the batch from its procurement to its delivery to your customer.
15.7 CLASSIFICATION The classification system allows you to use characteristics to describe all types of objects and to group similar objects in classes – to classify objects Characteristics Characteristics describe the properties of objects. The values of a characteristic specify these properties. When you create or change a characteristic, you can define the following settings: • • • • • • • • •
Format For example, numeric format is for figures, and character format is for alphanumeric characters. Units of measure for numeric values Templates for entering values Required entries for a characteristic (required characteristics) Whether intervals are allowed as values Language-dependent descriptions and texts for characteristics and characteristic values Display options for characteristics on the value assignment screen Allowed values Default values that are set automatically on the value assignment screen Class : Classes allow to group objects together according to criteria that is.
• •
Create classes for certain object types for example, material, workplace, equipment. Use the class type to determine which object types can be classified in a class.
156
Phosphorus India Ltd
•
Assign characteristics to class. These describe the objects classify in class. When assign a characteristic to a class, it can adapt (overwrite) the characteristic. Class type: The class type is a central concept in the classification system. The class type determines how classes are processed, and how objects can be classified and retrieved in these classes. Class types for a specific object type, such as materials. Then use classes of this class type to classify objects of this object type. First create a class, and then enter a class type for the class. Each class type is a closed system. There is no link between the different class types.
38. Repetitive Manufacturing In M/s Phosphorus India Limited Vapi, we have considered Repetitive manufacturing for Freon Plant, as the process is continuous. Purpose This component can be used for production planning and control in a repetitive manufacturing environment. You can use repetitive manufacturing as either make-to-stock REM or make-to-order REM such as in the automotive industry, for example. The goals of repetitive manufacturing are the following: •
Creation and revision of production quantities on a period and quantity basis (reduction in individual lot and order-specific processing).
•
Reduction in the production control effort and simpler back flushing tools(with the option of using the full scope of the PP functionality).
Implementation considerations You can implement Repetitive Manufacturing if the following is true of your production process: • • • •
You produce the same or similar products over a lengthy period of time. You do not manufacture in individually defined lots. Instead, a total quantity is produced over a certain period at a certain rate per part-period. Your products always follow the same sequence through the machines and work centers in production. Routings tend to be simple and do not vary much.
Integration Within logistics, Demand Management precedes Repetitive Manufacturing: o o o
SD Sales Operations (receipt of sales orders) PP Demand Management (creation of planned independent requirements) PP MRP
157
Phosphorus India Ltd
The following Logistics components are also relevant: o o o o
PP Work Centers PP Routings PP Bills of Materials If required, Line Design for mapping complex production lines
Features •
Master data
There is specific master data required for Repetitive Manufacturing. This includes the repetitive manufacturing profile and the product cost collector. •
Planning table
Within the framework of repetitive manufacturing, planning and control is carried out on the basis of time buckets. Starting from the existing requirements situation, you can plan production quantities based on periods. The scheduling data for products and product groups is thus broken down into a series of time buckets, the user being presented with period views for the purposes of checking and revision. •
Sequencing
You can use Sequencing to carry out takt-based scheduling which determines the sequence in which planned orders are produced on the production line. Sequencing simplifies the dispatching process, especially for high order volumes, and enables you to display them in a graphic. •
Pull list
You can use the pull list to control in-house material flow, supplying production with materials. The pull list checks the stock situation at the production line, calculates the missing parts for the components and triggers replenishment for these missing parts. •
Back flushing
Production completion confirmations are simplified and are made with reference to the material being produced. The completion confirmation usually includes the backflushing of components and the posting of production costs. •
Cost Object Controlling
In repetitive manufacturing, you ususally detemine costs per material or per production version via a product cost collector (product cost per period).
Master Data for Repetitive Manufacturing The following master data is available:
158
Phosphorus India Ltd
•
•
The repetitive manufacturing profile is set in Customizing for repetitive manufacturing and is entered in the material master record. You must also authorize the material for repetitive manufacturing in the material master record. You create the production version in the material master record. If you want to plan using a planning ID , you must define one and enter it in the material master record. If you want to use a production line for planning purposes, you must create one and enter it in the material master record. If you use repetitive manufacturing in conjunction with the component PP line Design, you can represent the production line as a line hierarchy. This makes sense if you have complex production lines, which you want to schedule using takts. If you want to plan capacity, you must create a routing and enter it in the production version.
•
You create a product cost collector for creating production costs.
• • • •
39. REPORTS Following reports will be provided 1. 2. 3. 4. 5. 6. 7.
DAILY / MONTHLY PRODUCTION REPORTS Monthly WIP Report. Batch wise SCRAP GENERATION REPORT Work Center wise Report Batch wise Quality Report Monthly Product wise RM consumption norms Operation wise important parameter per Batch
The following standard reports are to be used in the Production Planning module:
TRANSACTION CODE
PURPOSE
MMSC
This report allows a user to easily create, or view, storage location views for a material.
CRO5
This report produces a list of all work centers.
CR06
This report produces a list of all cost center assignments.
CR07
This report produces a list of all work center capacity.
CA60
This report enables you to list changes to individual routing fields in the sequence which they occurred. In the "Total Requirements Display", you can check and, if necessary, change the planning figures. With this evaluation function you can list all the planned independent requirements that exist for a particular material or a product group. From this total requirements display, you can access more detailed information or you can branch into the change mode.
MD73
159
Phosphorus India Ltd
MD04
MD05
In the stock/requirements list, the most up-to-date development of stocks and requirements is displayed. The layout of the list on the screen is the same as that of the MRP list. Once you have carried out the planning run for the material via single-item or total planning and where you have also specified that an MRP list is to be created, you can then display one of the lists with the function individual display. Proceed as follows: Starting from the menu screen of material requirements planning, select Evaluations -> MRP list ->Individual display. The initial screen for the Individual Display of MRP List appears. Enter the material number and the plant and press ENTER. The MRP List screen now appears with an overview of the Individual Lines.
MD06
With the collective display, all planned orders which correspond to the specified selection criteria are displayed; for example, all planned orders of a certain MRP controller.
MS07
The results of long-term planning are simulative planned orders at finished product level for the long-term planning version of the demand program. Simulative dependent requirements and receipts are created for the components. Simulative capacity requirements are also created for materials that are produced in-house. Separate MRP lists are also created for long-term planning. In the long-term planning menu, the stock/requirements list is also available as well as the planning situation as an individual layout.
MD09
With the evaluation, "Pegged requirements", you can retrace which requirements are the source of which order proposals and which independent requirements (especially sales orders) will be affected if an order proposal is cancelled or if its date or quantity is changed. With the function, "Pegged requirements", you can determine which requirements and order proposals caused the current stock/requirements situation. This information is particularly useful when you have to find out which independent requirements (especially sales orders) are endangered if planned orders are cancelled or if they cannot be delivered on time. This report shows a list of production orders according to the selection criteria entered. The material produced, the order schedule dates, the status of the order, and more are shown for each production order. From this list, the user can view the components and operational information for each order. This report is one that is standard delivered with the information systems, and in standard it does not include any totals listing. Using this report requires that certain info structures are active to reflect current data.
CO20
160
Phosphorus India Ltd
CO24
This report shows a list of missing parts according to the selection criteria. You can use the missing parts information system to display the missing parts list for a selection of materials, or for all materials. It is possible to restrict your selection to a specific plant, MRP group or requirements data.
CO26
The Production Order Information System offers various list types in reporting. Their layout can be adapted to suit your requirements. The information displayed in the production order information system as well as the layout of the information is controlled via an overall profile, which you can enter on the initial screen. The overall profile contains several subordinated single profiles. They contain information regarding selection criteria and layout of lists. Overall Profiles
MM60
CM01
Your company may have so many materials that you will not always know whether a specific material already exists in the material master. You can find this out with the help of the materials list. Cap. Planning Evaluation by Work Centers – Load
CM02
Cap. Planning Evaluation by Work Centers –Orders
CM05
MCP3
This report list displays all work centers and capacities with overload in the next 60 calendar days. This is a report of capacity leveling evaluation-work center view Report for Production order analysis
MCP7
Report for work center analysis
MCRE
Material usage analysis report
MCRI
Product cost analysis report
CM21
T-CODE
BOM
ROUTING WORK CENTER
MMBE CS01 CS02 CS03 CA01 CA02 CA03 CR01 CR02
Description STOCK OVERVIEW CRT BOM CHANGE BOM DISPLAY BOM CRT ROUTING CHANGE ROUTING DISPLAY ROUTING CRT WORK CENTER CHANGE WORK ENTER
161
Phosphorus India Ltd
PRODUCTION ORDER MRP
SOP
40.
CR03 CO40 CO01 CO02 MD02 MD04 MD11 COGI MC87 MC78 MC88 MC74 MC35 MB5B MB51 COOIS
DISPLAY WORK CENTER CRT CONVERT PLANNED ORDER INTO PRD ORDER INDIVIDUAL MANUAL CRT. PRODUCTION ORDER CHANGE PRODUCTION ORDER RUN MRP-SINGLE ITEM MULTI LEVEL STOCK REQUIREMENT LIST CRT. PLANNED ORDER GOODS MOVEMENT ERROR CRT. ROUGH CUT PLANNING FOR MATERIAL ACTIVE VERSION FOR MATERIAL CHANGE ROUGH CUT PLANNING FOR MATERIAL TRANSFER MATERIAL TO DEMAND MANAGEMENT ROUGH CUT PROFILE STOCK FROM POSTING DATE STOCK DOCCUMENT LIST PRODUCTION ORDER INFORMATION SYSTEM
MIGO
GOODS MOVEMENT
GAPS 17.1
IDENTIFICATION OF GAPS
The following gaps have been identified for PIL1 1. Daily Prod. Report /Month wise production report Daily/Monthly Production Report Plant
Company Code Material Date
Sr.No .
Product
1
CPP
2
ISO
3
Freon-22
4
Freon-12
5
PNC
Production Dispatch Issue to Other Dept. Opening To-Day in Cumu (B) To-Day in Cumu. To-Day in Cumu. (D) Closing Stock (A) Kg in Kg Kg (C) in Kg Kg in Kg Stock (E) In Kg = A+B-CD In kg
162
Phosphorus India Ltd
2. WIP Report for each Product at the end of Month
WIP Statement for CPP Plant
Plant
Material
Month
Date Stage
Operation W.C. Group
HTCP CPHT Reaction
Stage-1 CPN CPDI Distillation Hydrolysis CPHY Filtration CPFIL Pressure CPPR Reaction CPP CPRE Reaction Stage-2 Washing CPWA Low vacuum Drying High Vacuum drying
CPLV
Work Centers
B.No.
CPHT1 CPHT2 CPHT3 CPHT4
# 23 # 22 # 21 # 20
CPHT5
# 19
CPHT6
# 18
CPHT7
# 17
CPHT8
# 16
CPDI1
# 15
CPDI2
# 14
CPHY1
# 13
CPHY2
# 12 # 11 # 10 #9 #8 #7 #6 #5 #4 #3
CPFI1 CPFI2 CPPR1 CPPR2 CPPR3 CPRE1 CPRE2 CPWA1 CPWA2
Raw Materials charged to reactor TCAC A C N CuCl NaOH DETC EDC Cat-1 Carbon
CPLV #2
CPHV
CPLHV #1 Total Qty in Kg A
B
C
D
E
F
G
H
163
Phosphorus India Ltd
3. Monthly Product wise RM consumption Norms Report INPUT DATA Plant
Material X
Production in kg
Month
Date
OUTPUT DATA S r . N o . 1 2 3 4 5 6 7 8
Raw Material
Openi ng Stock (K)
WIP Openi ng Stock in kg (L)
Total of opening stock in kg (M)= K+L
RM Receipt Tod ay
Cumm. (N) in kg
RM Consumption Tod Cumm. ay (O) in kg
TCAC ACN CuCl NaOH DETC EDC Cat-1 Carbon
WIP Closin g in Kg (P)
Closin g Stock in Kg (Q)
Total of Closin g Stock Kg (R)
Consumpti on S=M+N-OR
Norms . = S/X
A B C D E F G H
OR INPUT DATA Plant
Material
Month
Date
OUTPUT DATA Plant
Material
Production in kg Sr. No.
Raw Materi al
1 2 3 4
TCAC ACN CuCl NaOH
Opening Stock (A) in Kg
RM Receipt Cumm. Receipt (B) in kg
Today
Month
G RM Consumption Today
Cumm. (C) in kg
Closing Stock in Kg (D)
Consumption E=A+B-C-D
Con. Norms. =
E/X
164
Phosphorus India Ltd
5 6 7 8
DETC EDC Cat-1 Carbon
4. Batch wise quality Report for each Product. Plant
Date from
Date To
Material
Purity Range from
To
Material Ethyl CPP 97%
Methyl CPP 98%
Batch No. #1 #2 #3 #1 #2 #3
Purity 97.2% 96.9% 97% 98.1% 97.9% 98.4%
Color Pale Yellow Dark Brown Brown P.Yellow P.Yellow Yellow
Clarity of Liquid Clear Slight Particle Hazy Clear Hazy Clear
5. Machine wise Batch details report Plant
Date from
Material
Work Center
Work Center Name
Descriptio n
B. No
CPHT
Start Date
#1 #5 HTCP Reaction
Date To
Time
End Date
BCT in Hrs Time
Operation Parameters Temp
Quality Details
Down Time detail s
Pres.
40 39
#8
35
#10
41
6. How to MAP Important Operation wise Parameters like Temp and other inspection Report? 7. Products, which have crossed 90% of the shelf life period, should not be shown in stock list. Once the shelf life falls on 90%, it should move into Blocked stock. 8. How to get the details about Plant wise effluent generation? 17.2 ADDRESSING OF GAPS The above gaps would be addressed by user exits/enhancements.
165
Phosphorus India Ltd
ANNEXURE I Shift Sequence for PIL1
SHIFT SEQUENCE
Shift Start
Shift End Break
Break Type
Days/Week
Shift I
6:00 AM
2:00 PM
60 MIN
BRK1
6
Shift II
2:00 PM
10:00 PM
60 MIN
BRK2
6
Shift III
10:00 PM
6:00 AM
60 MIN
BRK3
6
BREAK DETAILS Break BRK1
Break Text Breakfast Lunch Tea Breakfast Lunch Tea Breakfast Lunch Tea
BRK2
BRK2
Breaks Timings 08:00am to 08:15 am 11:30 am to 12:00 pm 01:00 pm to 01:15 pm 03:15 pm to 03:30 pm 07:00 pm to 07:30 pm 09:00 pm to 09:15 pm 11:30 pm to 11:45 pm 02:00 pm to 02:30 pm 05:00 pm to 05:15 pm
Duration Of Break 15 Mins 30 Mins 15 Mins 15 Mins 30 Mins 15 Mins 15 Mins 30 Mins 15 Mins
ANNEXURE II Work Center Formulae The execution time of an operation is defined as the sum of the set-up time and the processing time. This is expressed in the following formula. F=SET+RUN*LOT/B The meaning of the formula parameters and the origins of their values are given in the table below.
B LOT RUN
Meaning Base Quantity Lot Size Processing time for base Quantity
Origin General Operation Value General Operation Value Standard Value
166
Phosphorus India Ltd
SET
Set-up time
Standard Value
Operation wise important Parameter
Plant
CPP
1. HTCP Reaction Work center Group
CPHT
Work center
B.No.
Staring Date
CPHT1 CPHT2 CPHT3 CPHT4 CPHT5 CPHT6 CPHT7 CPHT8
End Time
Date
BCT
ACN Qty. kg
TCAC Qty. kg
Temp. C
TCAC%
Time
#1 #2 #3 #4 #5 #6 #7 #8
2. CPN Distillation Work center Group
Work center
B. No.
CPDI
CPDI1
#1
CPDI2
#2
Staring Date
End time
date
time
B Rec. C CPN T
Temp. C
Vacuum
CPN%
167
Phosphorus India Ltd
3. Hydrolysis Work center Group
Work center
B. No.
CPHY1
#1
Start time
End Time
BCT
Water qty. kg
48% NaOH qty
Temp. C
Alkali%
CPHY #2 CPHY2 #3 CPHY3
4. Filtration Work center Group
Work center
B. No.
CPFI
CPFI1
#1
CPFI2
#2
Start time
End Time
BCT
LOD %
Temp. C
Alkali% in CFML
NaTCP Qty. in Kg
CFML Gen.
5. Pressure Reaction Work center Group
Work center
B. No.
CPPR1
#1
CPPR2
#2
CPPR3
#3
Start time
End Time
BCT
NaTCP Charged
Water qty. kg
48% NaOH qty
Pre s
Temp. C
T4C P%
Efflu ent Gen erati on in Kg
CPPR
6. CPP Reaction Work center Group CPRE
Work center
B. No.
CPRE1
#1
CPRE2
#2
Start time
End Time
BCT
EDC in Kg
DETC in kg
Temp. C
NaTCP%
168
Phosphorus India Ltd
7. CPP Washing Work center Group
Work center
B. No.
CPWA1
#1
CPWA2
#2
Start time
End Time
BCT
Water charged Kg
CPP Org. received in Kg
Effluent Generation in Kg
CPWA
8. LV Distillation Work center
B. No.
CPLV
#1
Start time
End Time
BCT
CPP Org. charged in Kg
EDC Rec.
Temp.
Vacuum in mm Hg
9. HV Distillation Work center CPHV
B. No.
Start time
End Time
BCT
EDC Rec
Vacuum in mm Hg
CPP Output in Kg
Liquid Clarity Purity
Color
#1
ISOPROTURON 1. Hydrogenation
Work center Group
Work center
B.N o.
Staring
Date
Tim e
End
Dat e
Tim e
BCT in Hr
PN C Cha rged Qty. kg
Hydro gen Charg ed Qty. kg
Temp. C
PNC%
Down time if in Hrs
Down time Reasons
#1 ISHD
ISHD1 #2 ISHD2
2. PCU Distillation
169
Phosphorus India Ltd
Work center Group
Work center
B.No.
Staring
End
PCU% Date
ISPD
BCT
ISPD1
Time
Dat e
PCU purity %
Temp. C
Down time if in Hrs
Tim e
Down time Reasons
#1
3. DCU Formation Work center Group
Work center
Staring
End
B.No. Date
Time
Dat e
Tim e
BC T
Xylen e in Kg
PCU In Kg
UREA In Kg
H2SO 4 in kg
Temp. C
PCU %
#1 ISRE1 ISRE
#2 ISRE2 #3 ISRE3
4. DCU Washing Work center Group
Work center
B.No .
Staring
Dat e ISWA
ISWA1
#1
ISWA2
#2
End
Time
Date
BC T
Soda Ash in kg
Water Adde d
Temp. C Effluent Generatio n (Amm. Sul.Soluti on)
Down time if in Hrs
Down time Reasons
Tim e
5. De-Hydration Work center Group
Work center
B.No.
ISDE
ISDE1
#1
ISDE2
#2
Staring
End
BCT Temp. c
Dat e
Time
Date
Tim e
Down time if in Hrs
Down time Reasons
170
Phosphorus India Ltd
6. DMA Reaction Work center Group
Work center
B.No.
ISDM
ISDM1
#1
ISDM2
#2
Staring Dat e
End Time
BCT
Date
Tim e
DM A%
Down time if in Hrs
DMA in Kg
Tem p. C
Down time Reasons
Temp. C
Down time if in Hrs
Down time Reasons
Down time if in Hrs
Down time Reasons
Down time if in Hrs
Down time Reasons
7. Crystallization Work center Group
Work center
B.No.
ISCR
ISCR1
#1
ISCR2
#2
Staring Dat e
End Time
BCT
Date
Tim e
8. Centrifuging Work center Group
Work center
B.No .
Staring
Dat e ISCN
ISCN1
Time
End
Date
BC T
LOD %
DCU%
BC T
LOD %
Purty %
Tim e
#1
9. Rotary Vacuum Drying Work center Group
Work center
B.No .
Staring
Dat e ISRV
ISRV1
Time
End
Date
Tim e
#1
171