Base De La Triangulacion Calculos.docx

  • Uploaded by: Luis Arcangel Rv
  • 0
  • 0
  • December 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Base De La Triangulacion Calculos.docx as PDF for free.

More details

  • Words: 420
  • Pages: 6
TRIANGULACION

Brigada:     

Pineda Escobedo, José Miguel (Operador) Rosario Valentín, Luis Ángel (Libretista) Sipra Ramos, Joel Steven (Portador) Urcia Peláez, Manuel (Exceso) Chuyes León, José Adrián (Exceso)

Equipos:  Instrumentos: -Teodolito OMNI -Wincha YAMAYO

 Accesorios: -Trípode -Mira

 Otros: -Corrector -Lapicero -Borrador PRESUPUESTO Brigada Cargo

Cantidad

Costos

Días trabajados

Total

Operador

1

S/ 50.00

1

S/ 50.00

Libretista

1

S/ 20.00

1

S/ 20.00

Portamira

1

S/ 20.00

1

S/ 20.00

INSTRUMENTOS Instrumentos

Cantidad

Costos

Días trabajados

Total

Teodolito

1

S/ 50.00

1

S/ 50.00

Wincha

1

S/ 15.00

1

S/ 15.00

Accesorios

Cantidad

Costos

Días trabajados

Total

Trípode

1

S/ 15.00

1

S/ 15.00

Mira

1

S/ 15.00

1

S/ 15.00

Otros

Cantidad

Costos

Días trabajados

Total

Corrector

1

S/ 2.50

1

S/ 2.50

Lapicero

1

S/ 2.50

1

S/ 2.50

Borrador

1

S/ 1.00

1

S/ 1.00

Costos Directos

S/ 191.00

Costos Indirectos

S/ 34.38

Sub total

S/ 225.38

I.G.V

S/ 34.38

Trabajo de Campo

Reconocimiento Hemos recorrido la zona a trabajar la cual se encuentra ubicada en el primer cuadrante de la Universidad Privada Antenor Orrego

Toma de datos:

CALCULOS ANALITICOS

TRAMO A-2



Corrección por Temperatura (CT) CT= KL ( T – To) CT= (0.000012) x (14.201)(22-20) CT=0.00034



Corrección por catenaria (Cc) Cc = -L/24 (WL/P)² Cc= -14.201/24 x (0.015 x 14.201/5)² Cc= -0.00107



Corrección por horizontalidad (Ch)

APOYO A-1 Ch= -dh²/2L Ch= -0.046²/2 x 14.201 Ch= -0.0000745

APOYO 1-2 Ch = -dh²/ 2L Ch= -(-0.005)²/2 x 14.201 Ch= -0.00000088



Corrección por tensión (CP) CP = L (P-Po)/S x E

Lm = 42.55

CP =14.201 (4 – 5)/0.02 x 21000

Cs = Ct + Cc + Ch +CP

CP = 0.00034

Cs = 0.0015



Lmc1 = Lm + Cs Lmc1 = 42.5485

42.5485 ------------- 30.008 X1------------------30.000 X1 = 42.537



Lmc2 = Lm + Cs Lmc2 = 45.5455

42.5455 -------------- 30.008 X2 ---------------30.000 X2 = 42.534



Lmc3 = Lm + Cs Lmc3= 42.5461

42.5461 -------------- 30.008 X3--------------- 30.000 X3= 42.535



Lmc4 = Lm + Cs Lmc4 = 42.54

42.54------------------30.008 X4------------------ 30.000 X4= 42.529

ERRORES:

𝑀=

42.55 + 42.547 + 42. 549 + 42.544 = 42.548 4

Media de Error 𝑇=

2+1+1+4 = 2𝑚𝑚 4

Error medio cuadrático de una medición 𝑒𝑚 = √

22 = 2.708 3

Error medio cuadrático de la media aritmética 𝑒𝑀 = √

22 = 1.354 3(4)

Error Máximo Emax = 2.5 (2.708) = 6.770 mm

Error Real

𝑒𝑟 =

0.002708 𝑚 42.548

Error Probable

Ep=

1 23000

=

1 15000

Related Documents


More Documents from "Sabela Soriano"

Caratula-jeje.docx
December 2019 15
Triangulacion Final.docx
December 2019 17
Volumetria.docx
December 2019 10
Hidrologiaa.pptx
December 2019 10