To connect 10,000 people in Chittagong Hill tracks area
(Challenge: Limited to 4 slides only) Πr2 = Area, GSM coverage is in specific terrain, lots of vegetation
Resources Need to use 24 carrier frequencies (7.5 Mhz, 900 Mhz) 2% Blocking probability Medium density (Rural, not using dense urban profile)
4/12 Cluster = 2 Carrier frequencies per cell. S2/2/2 Profile.
Submitted by: Major Md Rakibul Hassan, All calculations are based on real world scenario
Dimensioning average call duration 3
E = λh Erlang 1 Hour = 1 E A = QT/60 A
is the Erlang, Q = No of calls T = Average call duration Q = 1, T = 1.5 minutes (90 Seconds) Here A = 1 X 90/60 X 60 = 25 mE.
Submitted by: Major Md Rakibul Hassan, All calculations are based on real world scenario
Requirement of Traffic calculation 4
No of Carrier Frequencies/Cell = 24/12 = 2 RF/Cell No of Channels = 2 X 8 = 16 Channels (TS)/Cell No of TCH/Cell = 16 – 2 = 14 TCH From
Erlang B table
Submitted by: Major Md Rakibul Hassan, All calculations are based on real world scenario
Requirement of BTS 5
From Erlang B table, Traffic/Cell = 8.20 E No of users/Cell = 8.20E/25mE = 328 330 No of Cells required in Hill tracks = 10,000/330 Cells required = 30.30 Each BTS has 3 sectors/cells 30/2 = 10 BTS
Total BTS required in Chittagong Hill Tracks is 10.