Our Name: Adams Thermal Systems Customer Name: Behr Part Name: Part Number: Rev. Level: Rev. Date: Product Program: Key Production Date: LAST UPDATE

PPAP Customer Name: Behr Part Name: Part Number: Rev. Level: Product Program: PSO Submission Date:

PPAP

Customer Name: Behr

Product Program:

Part Name: Part Number:

Rev. Level:

0

Daimler Chrysler

Part Submission Warrant

Part Name

0

Safety and/or Government Regulation

Yes

0

Part Number

✘ No

Engineering Drawing Change Level

0

Additional Engineering Changes

Dated Dated

Shown on Drawing No.

0

Purchase Order No.

Checking Aid No.

Weight (kg)

Engineering Change Level

SUPPLIER MANUFACTURING INFORMATION

Dated

12/30/99

SUBMISSION INFORMATION

Adams Thermal Systems



Dimensional



Materials/Functional

Appearance

Supplier Code

Supplier Name & Supplier Code

Customer Name/Division

Behr

Buyer/Buyer Code

Street Address

MI

Application

State

City

Note:

12/30/99

0

Zip

Does this part contain any restricted or reportable substances.

Yes



No

Are plastic parts identified with appropriate ISO marking codes

Yes



No

REASON FOR SUBMISSION ✘

Initial Submission

Change to Optional Construction or Material

Engineering Change(s)

Sub-Supplier or Material Source Change

Tooling: Transfer, Replacement, Refurbishment, or additional

Change in Part Processing

Correction of Discrepancy

Parts Produced at Additional Location

Tooling Inactive > than 1 year

Other - please specify

REQUESTED SUBMISSION LEVEL (Check one) Level 1 - Warrant only (and for designated appearance items, an Appearance Approval Report ) submitted to customer. Level 2 - Warrant with product samples and limited supporting data submitted to customer. ✘

Level 3 - Warrant with product samples and complete supporting data submitted to customer. Level 4 - Warrant and other requirements as defined by customer. Level 5 - Warrant with product samples and complete supporting data reviewed at supplier's manufacturing location.

SUBMISSION RESULTS The results for

✘ dimensional measurements



These results meet all drawing and specification requirements:

material and functional tests ✘ Yes

appearance criteria

No



statistical process package

(if "No" - Explanation Required)

Mold / Cavity / Production Process DECLARATION I hereby affirm that the samples represented by this warrant are representative of our parts, have been made to the applicable Production Part Approval Process Manual 3rd Edition Requirements. I further warrant these samples were produced at the production rate of

/ 8 hours. I have noted any deviations from this declaration below.

EXPLANATION/COMMENTS: Print Name:

Phone No:

Title:

Supplier Authorized Signature

Fax No. Date

FOR CUSTOMER USE ONLY (IF APPLICABLE) Part Warrant Disposition:

Approved

Rejected

Part Functional Approval:

Other Customer Name July 1999

CFG-1001

Approved Waived

Customer Signature The original copy of this document shall remain at the suppliers location while the part is active (see Glossary).

Date Optional: customer tracking number: # _______________

GM

Daimler Chrysler

Production Part Approval ___ Dimensional Results Page 1 of 4

SUPPLIER

PART NUMBER

Adams Thermal Systems NAME OF INSPECTION FACILITY

0 PART NAME

0 NOT ITEM

DIMENSION / SPECIFICATION

SUPPLIER TEST RESULTS

OK

OK

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 MAY 1995

CFG-1003

SIGNATURE

TITLE

DATE

GM

Daimler Chrysler

Production Part Approval ___ Dimensional Results Page 2 of 4

SUPPLIER

PART NUMBER

Adams Thermal Systems NAME OF INSPECTION FACILITY

0 PART NAME

0 NOT ITEM

DIMENSION / SPECIFICATION

SUPPLIER TEST RESULTS

OK

OK

23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 MAY 1995

CFG-1003

SIGNATURE

TITLE

DATE

GM

Daimler Chrysler

Production Part Approval ___ Dimensional Results Page 3 of 4

SUPPLIER

PART NUMBER

Adams Thermal Systems NAME OF INSPECTION FACILITY

0 PART NAME

0 NOT ITEM

DIMENSION / SPECIFICATION

SUPPLIER TEST RESULTS

OK

OK

45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 MAY 1995

CFG-1003

SIGNATURE

TITLE

DATE

GM

Daimler Chrysler

Production Part Approval ___ Dimensional Results Page 4 of 4

SUPPLIER

PART NUMBER

Adams Thermal Systems NAME OF INSPECTION FACILITY

0 PART NAME

0 NOT ITEM

DIMENSION / SPECIFICATION

SUPPLIER TEST RESULTS

OK

OK

67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 MAY 1995

CFG-1003

SIGNATURE

TITLE

DATE

GM

Daimler Chrysler

Production Part Approval ___ Material Test Results Page 1 of 1 Pages

SUPPLIER

PART NUMBER

Adams Thermal Systems NAME OF LABORATORY

0 PART NAME

0 TYPE OF

NOT

TEST

MAY 1995

MATERIAL SPEC. NO. / DATE / SPECIFICATION

CFG-1004

SUPPLIER TEST RESULTS

SIGNATURE

TITLE

QUALITY MGR.

OK

OK

DATE

PROCESS FLOW DIAGRAM PART NUMBER: 0

MFG. ENG.:

PART NAME: 0

QUAL. ENG.:

CUSTOMER: Behr

PLANT MGR.:

E.C.L.: 0

10

Inspect

n Store

Move

Operation

Step

tl

n

20

50

60

70

l

100

Key Product / Process Characteristics

Incoming Inspection

Load on Uncioler Straighten Oil Form

n

Inspect

t

Pack

l

110

120

Tool / Gage / Fixture / Location / Operator

Move To Press

t t t t

80

90

Operation Description

Store Material

30

40

REV. DATE: 11/18/04

Move to Shipping Store in Shipping

l

Ship

OPERATOR KEY TD

TRUCK DRIVER

MO

MACHINE / PRESS OPERATOR

MH

MATERIAL HANDLER / HI-LO

AO

ASSEMBLY OPERATOR

ST

STOCK / STORAGE

RC

RECEIVING CLERK

PT

PROCESS / PRESS TECHNICIAN

QA

QUALITY INSPECTOR

Flow10/26/2009

Page 11 of 23

FAILURE MODES EFFECT ANALYSIS

/

PART NAME AND NUMBER:

PROCESS RESPONSIBILITY:

FMEA DATE (ORIG.):

Rev Level/Date

KEY PRODUCTION DATE:

FMEA DATE (REV.):

CORE TEAM MEMBERS:

MODEL YEAR(S) / VEHICLE(S):

PREPARED BY:

PART NAME: S T E P

40

MODEL VEHICLE: Potential Failure Mode

Incoming Inspection Load Coil on Uncoiler Straighten

60

Oil

70

90

Form

Pack

D E T E C T

R P N

Check at receiving

1

4

Check Material Certification Check at Press

1

8

1

4

1

10

80

2

2

8

Visual inspection

8

80

4

Die problems

1

12

4

Visual inspection

8

96

2

Visual inspection

8

96

2

Part Layout

2

24

Die shut Ht. set incorrectly Die/Worn Broken

2

Part Layout

2

24

2 Die PM System

Part Layout/

2

24

Incorrect label installed Incorrect Date samped on Container

3

8

192

3

8

192

Potential Cause(s)/ Mechanism(s) of Failure

O C C U R

S E V

Incorrect material Dimensional

Non Conforming Product

4

Wrong Material Shipped to ATS

1

Incorrect alloy

Braze Problems at Behr Non Conforming Product

8

Wrong Material Shipped to ATS Wrong Material Shipped to ATS

1

Material Clad on Wrong Side Not Set Correctly

2

6

Oiler not working/ empty Oiler not working/ empty Oiler not working/ empty Oiler set too high

6

Incorrect Progression

6

Incorrect material Dimensional Clad on Wrong Side

50

C L A S S

Potential Effect(s) of Failure

Process Function

10

1/4/2005

Braze Problems at Behr Material not Straight Die Feed Problems into die Crakcing/ Thinning of Leaks on Assembly material Parts stick in die Non conforming Product- Dimensional Burrs on part Non conforming Product- Dimensional Oily Parts Braze Problems at Behr Progression set Incorrect Part Width/ incorrectly Collar Ht. Die Shut Ht. Incorrect Incorrect Collar Ht and Part Flatness Die Worn/Broken Non conforming Product- Dimensional No Build at Behr Wrong Part # on Container Wrong "Born on Date" Braze Problems at Behr

KB Stamping

4 8 2 5 3 3

6 8 8

Current Process Controls

Prevention

1

Detection

FMEA 11/1/04

Action Results Recommended Action(s)

Responsibility & Target Completion Date

Actions Taken

S E V

O C C

D E T

R P N

Page 12 of 23

FAILURE MODES EFFECT ANALYSIS PART NAME: S T E P

10

MODEL VEHICLE: Potential Failure Mode

Process Function

Incoming Inspection

Incorrect material Dimensional

KB Stamping

Potential Effect(s) of Failure

S E V

Non Conforming Product

4

C L A S S

Potential Cause(s)/ Mechanism(s) of Failure

Wrong Material Shipped to ATS

O C C U R 1

Current Process Controls

Prevention

Detection Check at receiving

FMEA 11/1/04

D E T E C T

R P N

1

4

Action Results Recommended Action(s)

Responsibility & Target Completion Date

Actions Taken

S E V

O C C

D E T

R P N

Page 13 of 23

KB Stamping 8110 Graphic Dr.-Belmont, MI. 49306 Phone:(616) 866-5917 Fax: (616) 866-5918 SUPPLIER LOCATION:

FIRST ISSUED:

SUPPLIER PHONE:

REVISED:

PROCESS CONTROL PLAN

SUPPLIER CODE:

PART NUMBER/E.C.L.: / PART NAME: 0

SUPERCEDES:

PROTOTYPE

KB STAMPINGS REP. PLANT MGR.: _____________________ DATE: _____________

CUSTOMER REP. (IF APPLICABLE) Q.A. REP.: ___________________________

DATE: _____________

PRE-LAUNCH

MFG. ENG.: _______________________

DATE: _____________

ENG. REP.: __________________________

DATE: _____________

PRODUCTION

Q.A. MGR.: _______________________

DATE: _____________

MGMT. REP.: _________________________

DATE: _____________

Part Name

Model Vehicle Process Name/ Operation Description

Part/ Process Number

Machine, Device, Jig, Dies For Mfg.

KB NUMBER:

Characteristics

No.

Product

Methods

Process

Special Char. Class

Product/Process Specification/ Tolerance

Evaluation Measurement Technique

Sample

Reaction Plan

ACTUAL MEASUREMENT

Control Method Size

Freq.

Rec Insp

KB Stamping

Production Control Plan 11/1/04

Page 14 of 23

KB Stamping 8110 Graphic Dr.-Belmont, MI. 49306 Phone:(616) 866-5917 Fax: (616) 866-5918 Part Name

Model Vehicle Process Name/ Operation Description

Part/ Process Number

Machine, Device, Jig, Dies For Mfg.

KB NUMBER:

Characteristics

No.

Product

Methods

Process

Special Char. Class

Product/Process Specification/ Tolerance

Evaluation Measurement Technique

Sample

Reaction Plan

ACTUAL MEASUREMENT

Control Method Size

Freq.

10

20

30

KB Stamping

Production Control Plan 11/1/04

Page 15 of 23

KB Stamping 8110 Graphic Dr.-Belmont, MI. 49306 Phone:(616) 866-5917 Fax: (616) 866-5918 Part Name

Model Vehicle Process Name/ Operation Description

Part/ Process Number

KB Stamping

Machine, Device, Jig, Dies For Mfg.

KB NUMBER:

Characteristics

No.

Product

Methods

Process

Special Char. Class

Product/Process Specification/ Tolerance

Evaluation Measurement Technique

Production Control Plan 11/1/04

Sample

Reaction Plan

ACTUAL MEASUREMENT

Control Method Size

Freq.

Page 16 of 23

Production Inspection Sheet Check 1st piece at set-up or start of day and record data. Check 1 part at the start of each coil & 1 part per bin Check Last piece from Production Run, Record Data, Attach last & 1st piece part to fixture Shut down and notify Management of any non conformance Print Rev.: Rev Date: Customer: 0 12/30/99 Part Number: Part Name Lot No.: 0 0 Print Specification & Characteristic

KB Stamping

Sample No. 1

Sample No. 2

Sample No. 3

Production Inspection Sheet 01/27/03

Behr Date:

Sample No. 4

Sample No. 5

Page 17 of 23

OPERATION INSTRUCTIONS PART NAME:

0

PART NUMBER:

0

KB JOB NUMBER:

0

OPERATION(S):

WORK STATION

10 Progressive Complete

ISSUED BY:

DATE:

APPROVED BY:

DATE:

OPERATION METHOD

PACKAGING INSTRUCTIONS

OPERATOR 1) VERIFY MATERIAL THICKNESS PRIOR TO LOADING MATERIAL INTO DIE. OP. 10 PRESS DIE

2) WHEN LOADING MATERIAL INTO DIE, ASSURE THAT IT IS ALIGNED "PARALLEL" TO THE DIE.

CONVEYOR TO CARDBOARD BOX

3) WHEN THE MATERIAL IS COMPLETELY LOADED, PERFORM LEAD CHECK TO ASSURE SHUT HEIGHT. BOX

4) WHEN FIRST PIECE IS APPROVED, RUN PRESS IN FULL AUTOMATIC MODE.

FIRST PIECE AND IN PROCESS INSPECTION

5) MONITOR SCRAP REMOVAL SO THAT IT DOESN'T AFFECT DIE. GAGE TABLE

Place packaging picture here

6) WHEN THE CONTAINER IS FULLACCORDING TO PACKAGING INSTRUCTIONS.

FINISH GOODS SKID

7) APPLY COMPLETED PRODUCT INVENTORY LABEL TO SKID.

QUALITY CRITERIA

GAGE INSTRUCTIONS 7) USE FEELER GAGES TO VERIFY PROPER FORM / FORM LOCATION AS SHOWN ON FIXTURE.

Place part picture here

5. 1) PLACE CENTER HOLE OVER 12.0 - 12.2 MM GO / NOGO PIN TO VERIFY CORRECT SIZE. 2) PLACE CENTER SLOTS (2) OVER 12.2 - 12.4 X 5.30 - 5.50 MM GO / NOGO PIN TO VERIFY CORRECT SIZE.

8) USE YELLOW SCRIBE LINES TO VERIFY PROPER TRIM LOCATIONS.

7.

3) PLACE HOLES (2) OVER 4.7 - 4.9 MM GO / NOGO PIN TO VERIFY CORRECT SIZE. 4) CLAMP PART ONTO FIXTURE 5)

INSERT 11.80MM STAB PIN INTO CENTER HOLE TO VERIFY POSITION

8.

6.

6) REMOVE STAB PIN, TURN OVER AND INSERT 12.00 x 5.10 STAB PIN INTO EACH SLOT TO VERIFY POSITION FREQUENCY: FIRST PIECE, EACH COIL CHANGEOVER, BEGINNING OF EACH CONTAINER, AND AFTER ANY MACHINE OR DIE ADJUSTMENTS. RECORD ACCEPTANCE STATUS ON PRODUCTION INSPECTION SHEET.

DIE SETUP SHEET

SUBJECT PRESS SIZE STOCK (MATERIAL) SIZE COUNTER BALANCE PRESSURE SHUT HEIGHT FEED ROLLER PRESSURE MATERIAL FEED DISTANCE MATERIAL FEED RATE STRAIGHTENING PRESSURE PILOT RELEASE PRESSURE STROKES PER MINUTE OIL (LUBRICANT) AIR HOOK-UP SENSOR HOOK-UP

KB JOB NUMBER:

0

ISSUED BY:

DATE:

PART NAME:

0

APPROVED BY:

DATE:

CUSTOMER:

Behr

REQUIREMENT

Place picture of die in press here….

DIE PROTECTION SHORT FEED PART EJECT

ON

OFF

CAM SWITCH FEED ADVANCE PILOT RELEASE

ON

OFF

TONNAGE REFERENCE DIE LOCATION TONNAGE LEFT FRONT LEFT REAR RIGHT FRONT RIGHT REAR TOTAL TONNAGE

TYPE

SHAKER REFERENCE SIZE LOCATION

COMMENTS 1. ASSURE SHUT HEIGHT BY PERFORMING LEAD CHECK. 2. 3. 4. 5. 6.

Item ID 1 2 Micrometer 3 Tape Measure 4 5 6 7 8 9 10

Item Description 0-1" Mic - Material Thickness Verification Tape - Material Width Verification

SPECIAL CHARACTERISTICS LIST PART NAME:

No. 1 2 3 4

Description/Rationale

Form Revision: 11/3/04

PART NUMBER:

Specification/Tolerance Class. -

Illustration/Pictorial

Page 21 of 23

Predictive Maintenance Check List 0

Die Number:

Date:

Guidance

250,000

300,000

350,000

400,000

450,000

500,000

Weight Nitro Pressure Danger

200,000

Information Tags

150,000

Punch/Bull Ring Mounting Wear Plates Storage Cushions Balance Blocks

100,000

Cycle Frequency

50,000

Indicate cycle

x

x

x

x

x

x

x

x

x

x x

x x

x x

x x

x x

x x

x x

x x

x x

x x x x

x x x

x x x

x x x

x x x

x x x

x x x

x x x

x x x

x x x

x Check for Legibility x Check for Legibility x Check for Legibility

Guide Pins Guide Bushings

Prox. Switches Cords Boxes Surface Wear

x x x x x

x x x

x x x x x

x x x

Cavity/Pad Punch Post Plate type Pin type Punch Rubbing

x x x x x

x x x

x x x x x

x x x

x Check for leaks x Check for leaks x x x

x x x x x x

x x x

x x x

x x x

x x x

Gauging

x x x

x x x

x x x

x x x

x Check for damage x Check for damage x Check for damage x Check Nitro Log and/or replace x Replace

Wear Plates Pins & Bushings Rail Gauge Solid Gauge Bottom Blocks

x Check x Check x Check x Check for surface damage x One or x the other

Nitro Air Internal Pad

Check/tighten screws Return to original sizes Check and/or replace Check and/or replace

x Check for wear, replace x Check for wear, replace

x

Lifters Cylinders

Do all activities marked with an "x"

x Return to original sizes x Replace bushings/check pins

x x x

x x

x x

x x

x x x

x x

x x

x x

x x

x Check for tight/position/damage x Check for tight/position/damage x Check for tight/position/damage

"X"= Done. 0 = no action needed. NA = not in this die. Legend for complete column

Comments:

Actual Time Spent

Checklist Completed By:

C o m p l e t e

PREVENTIVE MAINTENANCE WORK INSTRUCTION Control Object: Reason: Responsibility:

Use of this instruction will enable the Die Preventive Maintenance Areas to warrant the tools that have been PM'd as fit for service when returned to their production line. This instruction serves as a reminder to the die maker to check critical areas on the tools and repair/replace those areas that may be a problem during a production run. The die maker will perform this maintenance before returning the tools to production and inform the supervisor of any problem that requires scheduled release time to correct.

Instructions: 1) Check punch and resurface as needed 2) Check upper and lower Steels for wear. Repair as needed. 3) Check beads and gutters for wear. Repair as needed. 4) Check nitro cylinders for leaks. Replace as needed 5) Check lifter system for damage. Repair as needed 6) Check heel and wear plates for proper clearance and wear. Tighten/replace as needed. 7) Check risers and punch mounting plates for loose and missing screws. Tighten/replace as needed. 8) Clean disassembled die. Lubricate where necessary. 9) Check and re-size / re-shim equalizer blocks. 10) Check bolster plate mounting screws. Tighten/replace as needed.

Approval:

Date:

Concurrence:

Date:

Date Revised:

Date Issued:

Related Documents

Apqp Forms
June 2020 6
Apqp
November 2019 9
Apqp
May 2020 8
Apqp Plan
November 2019 4
Curso Apqp
June 2020 4
Forms
May 2020 42