LQC improvements updation Sl #
Activites
Resp
1
Defining N2 flushing time & inpliment fool proof
Rahul
2
IF cost analysis and countermeasure
Madhu
3
T-shirts for Team members
Rahul
4
Jackets for MPTA and MP
Rahul
5
5 S Lay out & check sheet for monitring
Rahul
6
CTQ & CTP Identifiaction and Registration
Madhu
7
CPMM preperation
Rahul
8
OLP & CPMM file for line auditor
Madhu
9
Process audit check point review & upgrade for the below mentioned points
Madhu
10
TPQ format modification
Madhu
11
Fool proff registrations
Madhu
12
Six sigma eva leak registration
Madhu
13
PCB procuerment and analysis
Madhu
14
1 ton data to noida for QCD
Madhu
15
Logical inventory motors testing
Madhu
16
52 control boxes clearin from ELT ( power cord from noida)
Madhu
Plan/Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual
7 Start
8 End
9
Start
End
Start Start Start
End Done End
Start Done Start Done Start
End End
Start Done Start
10
11
12
13
16
19
20
23
25
7
End Done End
Done Start
End Done
End End Done Start
End
Start
Done Start Start End Done Start
End
End Done
Start
End Start
Testing automation Field condition simulation LQC Acc missing issue fool proff reg 1.5 ton brizil tool devlepment testing conducted and NCR's issued and closed CI inavation of using noida barcode for gas charging done Liquid flux for brzing implimented, with certification done from external agency Voltage code made Non SCR imlimented from january Implimenation of Fixing of instalation plate along with in door online as fool proff CM for fixing issues in field CTQ monitring started as per UCL and LCL method of xbar and R chart Capilaty routig modification to avoid cutting LQC OK stiker to avoid mixiu in OQC Ultar sonic pinch off cycle optimization