Abastecimiento Practica.docx

  • Uploaded by: Cesar Rodriguez Rodriguez
  • 0
  • 0
  • May 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Abastecimiento Practica.docx as PDF for free.

More details

  • Words: 2,227
  • Pages: 16
ALUMNOS: INGENIERIA CIVILPEDRO” “UNIVERSIDAD 2018 SAN 

ALVA FAJARDO, HENRY.



RODRIGUEZ RODRIGUEZ, CESAR.

“UNIVERSIDAD SAN PEDRO” DOCENTE:



RUBEN LOPEZ CARRANZA

CURSO:  ABASTECIMIENTO Y TRATAMIENTO DE INGENIERÍA CIVIL AGUA POTABLE CICLO: 

VII

ABASTECIMIENTO Y TRATAMIENTO DE AGUA POTABLE

ALUMNO

: RODRIGUEZ RODRIGUEZ, Cesar Augusto

DOCENTE

: LOPEZ CARRANZA, Rubén

CICLO

: VII

TEMA

: TRABAJO DOMICILIARIO

AÑO - 2018

UNIVERSIDAD SAN PEDRO INGENIERIA CIVIL

PROBLEMA Nº 01: (05 puntos) En el siguiente sistema a) Determinar la distribución de caudales b) Verificar si la red proporciona las presiones requeridas. c) Considerar CH=140.

Tramo

Largo (m)

Diámetro (Pulg)

AB BC AF FE BE ED CD

600 600 900 600 900 600 900

10” 8” 10” 6” 6” 8” 6”

NUDO A B C D E F

Rodríguez Rodriguez César

COTA 50 48 46 45 43 40

1Abastecimiento y Tratamiento de Agua Potable

UNIVERSIDAD SAN PEDRO INGENIERIA CIVIL

CIRCUITO INICIAL 90 lt/s

40 lt/s A

30 lt/s

25 lt/s

I

50 lt/s F

20 lt/s

15 lt/s

B

E

C

II 45 lt/s

15 lt/s

D

60 lt/s

FORMULAS QUE SE UTILIZARON PARA EL DESARROLLO

Rodríguez Rodriguez César

2Abastecimiento y Tratamiento de Agua Potable

UNIVERSIDAD SAN PEDRO INGENIERIA CIVIL

HALLANDO:

HALLANDO K AB AF FE BE

CIRCUITO 1 0.00149055 0.002235825 0.017937007 0.02690551

CIRCUITO 2 0.004418739 0.02690551 0.004418739 0.02690551

BC BE ED CD

HALLANDO Hf (Hf = K*Q´1.85)

CIRCUITO 1 AB AF FE BE

CIRCUITO 2

1.371379145 -3.108367244 -4.577785712 10.37600667

BC BE ED CD

0.662318901 -10.37600667 -5.055236412 4.032831304

4.061232862

-10.73609288

HALLANDO hf/Q AB AF FE BE ∑hf/Q

CIRCUITO 1 0.034284479 0.062167345 0.228889286 0.415040267

BC BE ED CD 0.740381376 ∑hf/Q

CIRCUITO 2 0.044154593 0.415040267 0.112338587 0.26885542

0.840388868

∆Q= -∑Hf/1.85∑hf/Q CIRCUITO 1 -3

CIRCUITO 2 7

TANTEO N°01

Rodríguez Rodriguez César

3Abastecimiento y Tratamiento de Agua Potable

UNIVERSIDAD SAN PEDRO INGENIERIA CIVIL

CIRCUITO I TRAMO

AB AF FE BE

CIRCUITO II

CAUDAL 37 -53 -23 15

HF 1.19 -3.11 -4.58 4.03

∑hf

-2.47

TRAMO

BC BE

ED CD

CAUDAL 22 -15 -38 22

HF 1.35 -8.19 -4.45 8.19

∑hf

-3.1

HALLANDO hf/Q CIRCUITO 1

CIRCUITO 2

AB AF FE BE

0.032162162 0.058679245 0.199130435 0.268666667

BC BE ED CD

0.061363636 0.546 0.117105263 0.372272727

∑hf/Q

0.56

∑hf/Q

1.1

∆Q= -∑Hf/1.85∑hf/Q CIRCUITO 1

CIRCUITO 2

2

2

TANTEO N°02

CIRCUITO I TRAMO

AB AF FE BE

CIRCUITO II

CAUDAL 39 -51 -21 15

HF 1.31 -3.22 -5.01 4.03

∑hf

-2.89

TRAMO

BC BE

ED CD

CAUDAL 24 -15 -36 24

HF 1.58 -8.19 -4.45 9.62

∑hf

-1.44

HALLANDO hf/Q CIRCUITO 1 AB

Rodríguez Rodriguez César

0.033589744

CIRCUITO 2 BC

0.065833333

4Abastecimiento y Tratamiento de Agua Potable

UNIVERSIDAD SAN PEDRO INGENIERIA CIVIL

AF FE BE

0.063137255 0.238571429 0.268666667

BE ED CD

0.546 0.123611111 0.400833333

∑hf/Q

0.6

∑hf/Q

1.14

∆Q= -∑Hf/1.85∑hf/Q CIRCUITO 1

CIRCUITO 2

3

1

TANTEO N°03

CIRCUITO I

CIRCUITO II

TRAMO

CAUDAL

HF

TRAMO

CAUDAL

HF

AB AF FE

42

1.5

BC

25

1.7

-48

-2.99

BE

-17

-5.08

-18

-4.16

-35

-3.35

BE

17

5.08

ED CD

25

10.38

∑hf

-0.57

∑hf

3.65

HALLANDO hf/Q CIRCUITO 1 AB 0.04 AF 0.06 FE 0.23 BE 0.3 0.63 ∑hf/Q

CIRCUITO 2 BC 0.07 BE 0.3 ED 0.1 CD 0.42 0.89 ∑hf/Q

∆Q= -∑Hf/1.85∑hf/Q CIRCUITO 1

CIRCUITO 2

0

-2

TANTEO N°04

CIRCUITO I

CIRCUITO II

TRAMO

CAUDAL

HF

TRAMO

CAUDAL

HF

AB

42

1.5

BC

23

1.46

AF

-48

-2.88

BE

-19

-6.87

FE

-18

-3.77

ED

-37

-3.7

BE

19

6.25

CD

23

8.89

Rodríguez Rodriguez César

5Abastecimiento y Tratamiento de Agua Potable

UNIVERSIDAD SAN PEDRO INGENIERIA CIVIL

1.1

∑hf

∑hf

-0.22

HALLANDO hf/Q CIRCUITO 1 AB 0.04 AF 0.06 FE 0.21 BE 0.33 0.64 ∑hf/Q

CIRCUITO 2 BC 0.06 BE 0.36 ED 0.1 CD 0.39 0.91 ∑hf/Q

∆Q= -∑Hf/1.85∑hf/Q CIRCUITO 1

CIRCUITO 2

-1

0

TANTEO N°05

CIRCUITO I

CIRCUITO II

TRAMO

CAUDAL

HF

TRAMO

CAUDAL

HF

AB

41

1.44

BC

23

1.46

AF

-49

-2.99

BE

-18

-5.65

FE

-19

-4.16

ED

-37

-3.52

BE

18

5.65

CD

23

8.89

∑hf

-0.06

∑hf

1.18

HALLANDO hf/Q CIRCUITO 1 AB 0.04 AF 0.06 FE 0.22 BE 0.31 0.63 ∑hf/Q

CIRCUITO 2 BC 0.06 BE 0.31 ED 0.1 CD 0.39 0.86 ∑hf/Q

∆Q= -∑Hf/1.85∑hf/Q

Rodríguez Rodriguez César

CIRCUITO 1

CIRCUITO 2

0

-1

6Abastecimiento y Tratamiento de Agua Potable

UNIVERSIDAD SAN PEDRO INGENIERIA CIVIL

TANTEO N°06

CIRCUITO I

CIRCUITO II

TRAMO

CAUDAL

HF

TRAMO

CAUDAL

HF

AB AF FE

41

1.44

BC

22

1.35

-49

-2.99

BE

-19

-6.25

-19

-4.16

ED

-38

-3.7

BE

19

6.25

CD

22

8.19

∑hf

0.54

∑hf

-0.41

HALLANDO hf/Q CIRCUITO 1 AB 0.04 AF 0.06 FE 0.22 BE 0.33 0.65 ∑hf/Q

CIRCUITO 2 BC 0.06 BE 0.33 ED 0.1 CD 0.37 0.86 ∑hf/Q

∆Q= -∑Hf/1.85∑hf/Q CIRCUITO 1 0

CIRCUITO 2 0

CIRCUITO FINAL 90 lt/s

41 lt/s

I

49 lt/s

30 lt/s

F

Rodríguez Rodriguez César

19 lt/s

22 lt/s

B

A

19 lt/s

19 lt/s

E

C

II 38 lt/s

22 lt/s

D

60 lt/s

7Abastecimiento y Tratamiento de Agua Potable

UNIVERSIDAD SAN PEDRO INGENIERIA CIVIL

PROBLEMA Nº 02: (05 puntos) Encontrar la distribución de los caudales en el siguiente sistema: Tramo 2-3 2-9 4-10 8-10 5-6 6-7 3-4 4-5 2-10 10-6 9-8 8-7

Largo (m) 400 600 400 600 400 600 500 500 500 500 500 500

400 l/s

Diámetro (Pulg) 6” 10” 6” 10” 6” 10” 8” 8” 8” 8” 8” 8”

400 l/s

FORMULAS QUE SE UTILIZARON PARA EL DESARROLLO Rodríguez Rodriguez César

8Abastecimiento y Tratamiento de Agua Potable

UNIVERSIDAD SAN PEDRO INGENIERIA CIVIL

CIRCUITO INICIAL 400 lt/s 150 lt/s

2

3

I

150 lt/s

4 130 lt/s

5

III

10

40 lt/s

200 lt/s

8

IV

30 lt/s

130 lt/s

9

II

50 lt/s

20 lt/s

200 lt/s

6

240 lt/s

240 lt/s

7

400 lt/s

Rodríguez Rodriguez César

9Abastecimiento y Tratamiento de Agua Potable

UNIVERSIDAD SAN PEDRO INGENIERIA CIVIL

HALLANDO: CIRCUITO I 2-3 3-4 4-10 2-10

0.0119580 0.0036823 0.0119580 0.0036823

HALLANDO K CIRCUITO II CIRCUITO III 2-9 4-10 0.0014906 0.0119580 2-10 10-6 0.0036823 0.0036823 9-8 5-6 0.0036823 0.0119580 8-10 4-5 0.0014906 0.0036823

CIRCUITO IV 8-10 0.0014906 10-6 0.0036823 8-7 0.0036823 6-7 0.0014906

HALLANDO Hf (Hf = K*Q´1.85)

CIRCUITO I

CIRCUITO II

CIRCUITO III CIRCUITO IV 2-3 126.890040938 2-9 -26.93097326 4-10 -3.0518571 8-10 -1.3713791 3-4 39.073822852 2-10 5.119311803 10-6 -1.9897174 10-6 1.9897174 4-10 3.051857141 9-8 -66.53077247 5-6 8-7 97.3764438 -93.2197365 2-10 -5.119311803 8-10 1.371379145 4-5 6-7 29.9855677 -37.7343917 163.8964091 -86.97105478 122.3204370 -130.3357900 HALLANDO hf/Q CIRCUITO I

2-3 3-4 4-10 2-10 ∑hf/ Q

CIRCUITO II

0.8459336 0.2604922 0.1525929 0.1023862

2-9 2-10 9-8 8-10

1.361404852

CIRCUITO III

0.0342845

4-10 10-6 5-6 4-5

0.603979443

∑hf/ Q

0.1346549 0.1023862 0.3326539

∑hf/ Q

0.1525929 0.0663239 0.7490496 0.2306582

1.198624551

CIRCUITO IV

8-10 10-6 8-7 6-7 ∑hf/ Q

0.0342845 0.0663239 0.3884156 0.1572266

0.646250593

∆Q= -∑Hf/1.85∑hf/Q CIRCUITO I

CIRCUITO II

CIRCUITO III

CIRCUITO IV

-65

78

-55

109

TANTEO N° 01 CIRCUITO I TRAMO CAUDAL

2-3 3-4 4-10

CIRCUITO II HF

TRAMO CAUDAL

85

44.37

85

13.66

2-9 2-10

10

0.85

9-8

Rodríguez Rodriguez César

-122 193 -122

CIRCUITO III

CIRCUITO IV

HF TRAMO CAUDAL HF TRAMO CAUDAL HF -10 -0.85 8-10 -9 -0.09 10.79 4-10 62.29 10-6 -194 -62.9 10-6 194 62.89 5-6 75 8-7 -131 -30.41 26.66 35.2

10Abastecimiento y Tratamiento de Agua Potable

UNIVERSIDAD SAN PEDRO INGENIERIA CIVIL

2-10

-193 ∑hf

2-3 3-4 4-10 2-10

62.29

8-10

3.41

9 ∑hf

0.09

4-5

24.93

75

10.8 4

∑hf

17.7

6-7

349

75.44

∑hf

107.83

HALLANDO hf/Q CIRCUITO II CIRCUITO III CIRCUITO IV 2-9 4-10 8-10 0.0884426 0.0850000 0.0100000 2-10 10-6 10-6 0.3227461 0.3241753 0.3241753 9-8 5-6 8-7 0.2185246 0.4693333 0.2321374 8-10 4-5 6-7 0.0100000 0.1445333 0.2161605 1.090451996 ∑hf/Q 0.639713327 ∑hf/Q 1.023041924 ∑hf/Q 0.782473121

CIRCUITO I 0.5220000 0.1607059 0.0850000 0.3227461

∑hf/Q

∆Q= -∑Hf/1.85∑hf/Q CIRCUITO II CIRCUITO III -21 9

CIRCUITO I 2

CIRCUITO IV -74

TANTEO N° 02 CIRCUITO I TRAM O

2-3 3-4 4-10 2-10

CIRCUITO II

CAUDA L

HF

87

46.32

87

14.26

3

0.09

-170

49.25

∑hf

TRAMO CAUDAL

11.4 2

2-9 2-10 9-8 8-10

CIRCUITO III HF

-143

14.48

170

49.25

-143

35.77

62

3.09

∑hf

CIRCUITO IV

TRAM O

CAUDA L

4-10

-3

10-6

-111

5-6

84

4-5

84

-0.09 22.3 9 43.4 1 13.3 7

∑hf

34.3

2.09

HF

TRAM O

CAUDA L

HF

8-10

-62

-3.09

10-6

111

8-7

-205

22.39 69.64

6-7

275

48.54

∑hf

-1.8

HALLANDO hf/Q CIRCUITO I CIRCUITO II CIRCUITO III CIRCUITO IV 2-3 2-9 4-10 8-10 0.5324138 0.1012587 0.0300000 0.0498387 3-4 2-10 10-6 10-6 0.1639080 0.2897059 0.2017117 0.2017117 4-10 9-8 5-6 8-7 0.0300000 0.2501399 0.5167857 0.3397073 2-10 8-10 4-5 6-7 0.2897059 0.0498387 0.1591667 0.1765091 ∑hf/Q 1.016027721 ∑hf/Q 0.690943193 ∑hf/Q 0.907664093 ∑hf/Q 0.767766829 ∆Q= -∑Hf/1.85∑hf/Q

Rodríguez Rodriguez César

11Abastecimiento y Tratamiento de Agua Potable

UNIVERSIDAD SAN PEDRO INGENIERIA CIVIL CIRCUITO I -6

CIRCUITO II -2

CIRCUITO III -20

CIRCUITO IV 1

TANTEO N° 03 CIRCUITO I

CIRCUITO II

CIRCUITO III

CIRCUITO IV

TRAMO CAUDAL HF TRAMO CAUDAL HF TRAMO CAUDAL HF TRAMO CAUDAL HF 81 40.58 -145 -14.86 4-10 2-3 2-9 -17 -59 -2.26 8-10 -2.81 81 12.5 174 51.42 3-4 2-10 10-6 -132 30.84 10-6 132 30.84 17 2.26 -145 -36.7 4-10 9-8 5-6 64 8-7 -204 69.01 26.25 -174 59 2.81 2-10 4-5 64 6-7 276 48.87 51.42 8-10 8.08 ∑hf 3.92 2.67 1.23 7.89 ∑hf ∑hf ∑hf HALLANDO hf/Q CIRCUITO I CIRCUITO II CIRCUITO III CIRCUITO IV 2-3 2-9 4-10 8-10 0.5009877 0.1024828 0.1329412 0.0476271 3-4 2-10 10-6 10-6 0.1543210 0.2955172 0.2336364 0.2336364 4-10 9-8 5-6 8-7 0.1329412 0.2531034 0.4101563 0.3382843 2-10 8-10 4-5 6-7 0.2955172 0.0476271 0.1262500 0.1770652 1.08376706 ∑hf/Q 0.698730567 ∑hf/Q 0.90298379 ∑hf/Q 0.796613013 ∑hf/Q CIRCUITO I -2

∆Q= -∑Hf/1.85∑hf/Q CIRCUITO II CIRCUITO III -2 -1

CIRCUITO IV -5

TANTEO N° 04 CIRCUITO I

CIRCUITO II

CIRCUITO III

CIRCUITO IV

TRAMO CAUDAL HF TRAMO CAUDAL HF TRAMO CAUDAL HF TRAMO CAUDAL HF 79 38.75 -147 -15.24 4-10 2-3 2-9 -16 -62 -2.02 8-10 -3.09 79 11.93 174 51.42 3-4 2-10 10-6 -128 29.14 10-6 128 29.14 16 2.02 -147 -37.64 4-10 9-8 5-6 63 8-7 -209 72.18 25.49 -174 62 3.09 2-10 4-5 63 6-7 271 47.24 51.42 8-10 7.85 ∑hf 1.28 1.63 2.18 1.11 ∑hf ∑hf ∑hf HALLANDO hf/Q

Rodríguez Rodriguez César

12Abastecimiento y Tratamiento de Agua Potable

UNIVERSIDAD SAN PEDRO INGENIERIA CIVIL

2-3 3-4 4-10 2-10 ∑hf/Q

CIRCUITO I 0.4905063 0.1510127 0.1262500 0.2955172

CIRCUITO II 2-9 0.1036735 2-10 0.2955172 9-8 0.2560544 8-10 0.0498387 1.063286229 ∑hf/Q 0.705083842

CIRCUITO III CIRCUITO IV 4-10 8-10 0.1262500 0.0498387 10-6 10-6 0.2276563 0.2276563 5-6 8-7 0.4046032 0.3453589 4-5 6-7 0.1246032 0.1743173 ∑hf/Q 0.883112599 ∑hf/Q 0.797171155

∆Q= -∑Hf/1.85∑hf/Q CIRCUITO II CIRCUITO III -1 -1

CIRCUITO I -1

CIRCUITO IV -1

TANTEO N° 05 CIRCUITO I TRAM CAUDAL O

2-3 3-4 4-10 2-10

2-3 3-4 4-10 2-10 ∑hf/Q

CIRCUITO II HF

78

37.8 5

78

11.6 5

16

2.02

-174

51.4 2

∑hf

0.1

TRAMO CAUDAL

2-9 2-10 9-8 8-10

CIRCUITO III HF

-148

-15.43

174

51.42

-148

-38.12

62

3.09

∑hf

0.96

TRAM CAUDAL O

4-10

-16

10-6

-128

5-6 4-5

CIRCUITO IV HF

TRAM CAUDAL O

8-10

-62

-3.09

10-6

128

62

-2.02 29.1 4 24.7 5

8-7

-210

29.14 72.82

62

7.62

6-7

270

46.92

∑hf

1.21

∑hf

0.15

HALLANDO hf/Q CIRCUITO II CIRCUITO III CIRCUITO IV 2-9 4-10 8-10 0.1042568 0.1262500 0.0498387 2-10 10-6 10-6 0.2955172 0.2276563 0.2276563 9-8 5-6 8-7 0.2575676 0.3991935 0.3467619 8-10 4-5 6-7 0.0498387 0.1229032 0.1737778 1.056382626 ∑hf/Q 0.707180275 ∑hf/Q 0.876003024 ∑hf/Q 0.798034642

CIRCUITO I 0.4852564 0.1493590 0.1262500 0.2955172

CIRCUITO I 0

∆Q= -∑Hf/1.85∑hf/Q CIRCUITO II CIRCUITO III -1 -1

CIRCUITO IV 0

TANTEO N° 06

Rodríguez Rodriguez César

HF

13Abastecimiento y Tratamiento de Agua Potable

UNIVERSIDAD SAN PEDRO INGENIERIA CIVIL

CIRCUITO I TRAM O

2-3 3-4 4-10 2-10

CIRCUITO II

CAUDA L

HF

78

37.8 5

78

11.6 5

17

2.26

-173

50.8 7

TRAMO CAUDAL

2-9

-15.62

173

50.87

-149

-38.59

61

2.99

2-10 9-8

HF

-149

8-10

0.89

∑hf

CIRCUITO III

∑hf

TRAM O

CAUDA L

4-10

-17

10-6

-129

5-6 4-5

-0.35

CIRCUITO IV TRAM O

CAUDA L

HF

8-10

-61

-2.99

10-6

129

61

-2.26 29.5 6 24.0 2

8-7

-210

29.56 72.82

61

7.4

6-7

210

46.92

∑hf

-0.4

∑hf

0.67

HF

HALLANDO hf/Q CIRCUITO I CIRCUITO II CIRCUITO III CIRCUITO IV 2-3 2-9 4-10 8-10 0.4852564 0.1048322 0.1329412 0.0490164 3-4 2-10 10-6 10-6 0.1493590 0.2940462 0.2291473 0.2291473 4-10 9-8 5-6 8-7 0.1329412 0.2589933 0.3937705 0.3467619 2-10 8-10 4-5 6-7 0.2940462 0.0490164 0.1213115 0.1737778 1.061602804 ∑hf/Q 0.70688814 ∑hf/Q 0.877170431 ∑hf/Q 0.798703363 ∑hf/Q ∆Q= -∑Hf/1.85∑hf/Q CIRCUITO II CIRCUITO III 0 0

CIRCUITO I 0

CIRCUITO IV 0

CIRCUITO FINAL 400 lt/s 78 lt/s

3

I

78 lt/s

4 61 lt/s

Rodríguez Rodriguez César

17 lt/s

III

2 173 lt/s

10 129 lt/s

149 lt/s

9

II 61 lt/s

IV

149 lt/s

8 210 lt/s

14Abastecimiento y Tratamiento de Agua Potable

UNIVERSIDAD SAN PEDRO INGENIERIA CIVIL

5

61 lt/s

6

210 lt/s

7

400 lt/s

PROBLEMA Nº 03: (05 puntos) TRAMO A-B B-C B-D D-E D-F F-G

LONGITUD (KM) 0.11 0.1 0.16 0.18 0.12 0.08 NUDO A B C D E F G

DIÁMETRO (PULG) 6 4 6 4 4 4 COTA (msnm) 2095 2083 2080 2068 2068 2070 2070

Diseñar la red abierta considerando a) Caudal = 15 l/s b) CH= 150 c) Presión mínima (10 mca), Presión máxima (50 mca) Sea el caudal 15 l/s, diseñar la red abierta, además comprobar la presión mínima (10 mca), considerando que es una tubería con CH=100

Rodríguez Rodriguez César

15Abastecimiento y Tratamiento de Agua Potable

Related Documents


More Documents from ""

Cementos.docx
May 2020 23
October 2019 15
December 2019 21