STATE

HARYANA

DISTRICT

PANCHKULA

DIVISION

HUDA DIVISON NO III,PANCHKULA

NAME OF WORK

ROUGH COST ESTMATE FOR CONSTRUCTION OF SENIOR SECONDARY SCHOOL BUILDING SECTOR-25,PANCHKULA

ESTIMATE COST

RS21.945318 cr

YEAR

2018

PRILIMINARY COST EASTIMATE FRAMED BY SEVENTH SEMESTER CIVIL ENGINEERING DEPARTMENT AND STUDENTS OF SSIET DERA BASSI. FOR THE CONTRUCTION OF SENIOR SECONDARY SCHOOL BUILDING IN SECTOR 26,PANCHKULA

REPORT: The development works of sector 26 U/E ,panchkula i.e sewerage, SWD,W/supply and road have already being completed and more than 80% houses have been constructed /under construction in this sector at present there is senior secondary school in panchkula (Extn).The hon’ble chief minster Haryana has also been announced regarding construction of senior secondary school during visiting in panchkula(Extn).To meat out the requirement of residents of the sector. Therefore, it has been decided by the higher authorities to construct a senior secondary school building panchkula(Extn).keeping in view the drawing for construction of senior secondary school building as supplied by the senior architect, HUDA, Panchkula bearing job number 2750,drg. No. 1 and job no 1191 and drg. no 2 to7(main drawing) are followed for above said estimate .the necessary plan has been attach with this estimate along with layout plan of sector 26 , panchkula (Extn). Showing the proposed site for construction of senior secondary school building in sector 26, panchkula (Extn) Accordingly the rough cost estimate amounting to Rs20,71,354390/ has been framed including 3% contingency charges to cover the probable cost of senior administrative approval from the competent authority.

DESIGN AND SCOPE :- The estimate cover the provision for construction of building work on ground floor (G+1st)+part 2nd floor boundary wall including electrical ,public health services, in class rooms , office block, staff room, principal room, library and toilets.

RATES:The estimates is framed on basic of CPWD DELHI plinth area rates (2012) issued by CPWD.

SPECIFICATION:The building will be constructed as per CPWD specification 2012 with addition as applicable up to date of amendments.

CARRYING OUT THE WORK:The work shall be got carried out by letting out the work to a registered contractor inviting competitive tenders as per rules and regulations.

TIME:It will take about 24 months to complete the work from the date of its actual commencement. COST:The total cost of the estimates works out to Rs 20,71,35,430/ including 1.5 % consultancy and structural design and 3% contingency and petty establishment charges. Executive Engineer,

A PROJECT REPORT ON “ESTIMATE, ANALYSIS AND DESIGN OF MULTISTOREY (G+1st+PART 2ND FLOOR), SENIOR SECONDRY SCHOOL BUILDING IN SEC-26 PANCHKULA

Submitted in partial fulfilment of the requirement for the award of the degree Of B.tech in civil Engineering From I.K. Gujral Punjab technical University, Jalandhar

Guided by Prof.Shiv Kumar Behl HOD Civil Engg. Department Of Civil Engineering & Technology SRI SUKHMANI INSTITUTE OF ENGINEERING & & TECHNOLOGY

A PROJECT REPORT ON CONSTRUCTION OF (G+1st)+PART 2ND FLOOR STORYED RCC FRAME STRUCTURE

SUBMITTED BY

1.AMANDEEP SINGH

:-

1612644

2.GURPREET KAUR

:-

1612645

3.JATIN

:-

1612648

4.NAVNEET GUPTA

:-

1612652

5.MALIK

:-

1638317

6.SANDEEP

:-

1612658

7.SHAJAYAT ALI

:-

1638321

8.SHASHANK SHEKHAR

:-

1638322

9.SHESHRAJ CHAURASIYA

:-

1638323

10.SHUBHAM SHARMA

:-

1612660

DEPARTMENT OF CIVIL ENGINEERING

SRI SUKHMANI INSTITUTE OF ENGNIEERING AND TECHNOLOGY DERA BASSI, MOHALI

DECLARATION BY THE CANDIDATES We,student of civil department hereby declare that the project report entitled “analysis and design of multi-storey (G+1st)+part 2nd floor school building”, under the guidance of prof. SHIV KUMAR BEHL is submitted in the fulfillment of the requirement for the MAINPROJECT. This is a bonafide work carried out by use and the result embodied in the project report have not been reproduced/copied from any source. The result embodied in the project report have not been submitted to any other university or institution for the award of any other degree or diploma.

Date: Place: Civil engineering deptt SSIET,DERABASSI

1. AMANDEEP SINGH 2. GURPREET KAUR 3. JATIN 4. MALIK 5. NAVNEET GUPTA 6. SANDEEP PANWAR 7. SHAJAYAT ALI 8. SHASHANK SHEKHAR 9. SHESHRAJ CHAURASIYA 10. SHUBHAM SHARMA

ACKNOWLEDGEMENT

We would like to express our gratitude to all the people behind the screen who helped us to transform an idea into a real application.

We profoundly thank PROF.SHIV KUMAR BEHL head of department of civil engineering and other faculty member of civil department who has been an excellent guide and also a great source inspiration to our work.

We would like to thank our internal guide PROF. SHIV KUMAR BEHL for the technical guidance constant encouragement and support in carrying out our project at college.

FOLLOWING PROVISIONS HAS BEEN KEPT IN THE ESTIMATE:

1. R.C.C. framed construction of 3 storied building with total plinth area 8784m^2 and floor height 3.78 m. 2. Safe bearing capacity of soil has been taken as 20T/m^2 at depth of 1.2 m below ground level. 3. Rain water harvesting. 4. Provision Solar lighting system 5. Provision of blackboards 6. Provision for resisting earthquake forces

PRILIMINARY COST ESTIMATE FOR CONSTRUCTION OF SENIOR SECONDARY SCHOOL BUILDING IN SECTOR 26 ,PANCHKULA.

ABSTRACT OF COST

SR DESCRIPTION NO

QUANTITY UNITS

RATES

AMOUNTS

1.

8784

M^2

17000/

149328000

8784

M^2

270/

2371680

M^2

15%(149328 00+2371680 =151699680/ 4%(1516996 80/) 1140/

22754952

8500/

289000

100000/

100000

1% OF 151699680

1516996.8

7584984

400000

2.

3.

4. 5. 6.

7. 8.

9. 10.

11.

RCC FRAMED STRUCTURE UPTO 6 STOREY OF FLOOR HEIGHT 3.35m EXTRA FOR 0.3 ADD HEIGHT OF THE SCHOOL ABOVE 3.35 m(3.65-3.35=0.3) INTERNAL ELECTRIC INSTALLATON INTERNAL WATER SUPPLY SANITRY INSTALLATION RESISTING EARTHQUAKE FORCES PROVISION OF BLACKBOARDS IN CLASS ROOMS ADD PROVISION FOR SOLAR LIGHT SYSTEM COMPUTER CONDUCTING AND TELEPHONE CONDUCTING (0.5+0.5) EXTERNAL SERVICE CONNECTION OVERHEAD TANK OF WATER CLOSET INDIPENDENT SLANGING RAINWATER HARVESTING

8784 34

NO.

45000

LITRE

5% OF 151699680/ 15/

2

NO.

200000/

6067987.2 10013760

675000

TOTAL

20,1102360/

3% CONTEGENCY

6033070.8/

GRAND TOTAL

20,71,35,430/

NAME OF THE WORK:-

HISTORY:-This detail estimate amounting to Rs.137588842.24/-cr Including 3% contingency and 16% Cost index has been prepared for accord and technical sanction for construction of senior secondary school sec-26 Panchkula. In this estimate construction of ground floor + 1st floor and part 2nd floor has been considered as per architecture drawings. The preliminary estimate for this work has been prepared amounting RS-.207135430.00cr.In this P.E. there is provision of RS-.27484009.51/-. for building components considered is the building estimate.

RATE:The DSR 2012 has been considered in this estimate and items having no DSR rate has been considered as market rate.

FOUNDATION AND BEARING CAPICITY:-

The soil bearing capacity has been considered 20T/m^2 at a depth of 1.2m below ground level.

THE METHOD OF EXECUTION BY CALL OF TENDERS

Availability of land:-…………………Available. Time:-……………………………...20 month. Specification:-…………………….

COFFICEENT OF STEEL USED IN CALCULATION IN ESTIMATE (AS PER ZONE IV REGULARTIES.)

SR.NO

RCC STRUCTURE

STEE COFFICENT/UNIT

1

SLAB

100KG/M^3

2

BEAM OR LINTLE

256KG/M^3

3

FOUNDATION

100KG/M^3

4

COLUMN

272KG/M^3

5

SHED

100KG/M^3