Perancangan Struktur Baja Gedung Perkantoran 4 Lantai BAB V PERENCANAAN BALOK ANAK
Gambar 5.1 Denah Rencana Balok Anak
5.1 Data Perencanaan Lx
=
3.00
m
(Bentang pendek balok)
Ly
=
6.00
m
(Bentang panjang balok)
Mutu Baja
=
BJTD 40
fy
=
400
MPa
fu
=
520
Mpa
fr
=
70
Mpa
E Baja
=
2.100.000 Kg/cm2
υ Baja
=
0,3
ϕb
=
0,9
(SNI 1729-2015 Hal. 28 Kekuatan Tarik)
ϕf
=
0,75
(SNI 1729-2015 Hal. 28 Kekuatan Tarik)
Perencanaan Balok Anak
(LRFD BAJA SNI 1729-2002 Hal. 27)
36
Perancangan Struktur Baja Gedung Perkantoran 4 Lantai 5.2 Perencanaan Profil Baja WF Balok Direncanakan menggunakan profil sebagai berikut : WF
=
250 x 125 x 6 x 9
Ht
=
250
mm
b
=
125
mm
tw
=
6
mm
tf
=
9
mm
r
=
12
mm
A
=
37,66 cm2
Q
=
29,56 kg/m
Ix
=
4.050
cm4
Iy
=
294
cm4
ix
=
10,37 cm
iy
=
2,79
cm
Zx
=
352
cm3
Zy
=
72
cm3
(LRFD BAJA SNI 1729-2002 Hal. 27)
5.3 Pembebanan Balok Beban Mati (DL)
(PPIUG 1983 Tabel 2.1 hal. 11-12)
Berat Beton Bertulang
=
2400
Kg/m3
Spesi Tebal 1 cm
=
21
Kg/m2/cm
Tegel Tebal 1 cm
=
24
Kg/m2/cm
Plafond + Penggantung =
18
Kg/m2
Instalasi ME
=
10
Kg/m2
Floordeck
=
10.1
Kg/m2
Dinding ½ Batu Bata
=
250
Kg/m2
Beban Hidup (LL)
(SNI 1727 – 2013 Tabel 4-1 hal. 27)
Perkantoran
=
479
Kg/m2
Beban Yang Dipikul Balok Tinggi segitiga
=
1.5
m
Tinggi dinding
=
4,35
m
Perencanaan Balok Anak
37
Perancangan Struktur Baja Gedung Perkantoran 4 Lantai
Beban Merata Segitiga Berat Beton Bertulang
2400
Kg/m3 x 0.12 m
=
288
Kg/m2
Spesi Tebal 3 cm
21
Kg/m2/cm x 3 cm
=
63
Kg/m2
Tegel Tebal 1 cm
24
Kg/m2/cm x 1 cm
=
24
Kg/m2
Plafond + Penggantung 18
Kg/m2
=
18
Kg/m2
Instalasi ME
10
Kg/m2
=
10
Kg/m2
Floordeck
10.1
Kg/m2
=
10,1
Kg/m2
Profil (q)
29.56 Kg/m2
=
29,56 Kg/m2 +
=
442,66 Kg/m2
Total Beban Merata Dinding Dinding
=
250 x 4,35
=
1087,5
Kg/m
Perkantoran
=
479
Beban Terfaktor =
1,2 DL + 1,6 LL
Wu
=
1,2 DL + 1,6 LL
=
1,2 ( 442,66 Kg/m2 + 1087,5 Kg/m2) + 1,6 ( 479 Kg/m2 )
=
2385,092 Kg/m
Beban Hidup (LL) Kg/m2 (SNI 1727 – 2013 hal.27 tabel 4-1)
5.4 Momen dan Gaya Geser Mu
=
1/8 ql2
=
1/8 x 2.385,092 Kg/m x 3 m x 3 m
=
2.683,23 Kg.m
Ra = Vu =
1/2 ql
=
1/2 x 2.385,092 Kg/m x 3 m
=
3.577,64 Kg
5.5 Bagian Penampang G
=
E / (2 x (1 + υ))
=
2.100.000 Kg/cm2 / (2 x (1 + 0.3))
=
807.692
Kg/m2
=
80.769
Mpa
Perencanaan Balok Anak
38
Perancangan Struktur Baja Gedung Perkantoran 4 Lantai h1
h2
h
Iw
J
X1
=
tf + r
=
9 mm + 12 mm
=
21 mm
=
ht – (2 x h1)
=
250 mm – ( 2 x 21 mm )
=
208 mm
=
ht – tf
=
250 mm – 9 mm
=
241 mm
=
Iy x ( h2 / 4)
=
2.940.000 x ( 241 mm )2 / 4
=
4,269 x 1010 mm6
=
Ʃ( b x t3 / 3)
=
2 x ( 1/3 x 125 x 93 ) + ( 1/3 x (250-2 x 9 ) x 63 )
=
77.454 mm4
= (π / Sx) x √(E x G x J x A / 2) = ( 3,14 / 352.000 )x √(2.100.000 Kg/cm2 x 80.769 MPa x 77.454 mm4 x 37,66 cm2 / 2)
= 14.037 Mpa
X2
= 4 x (Sx / (G x J)2 x Iw / Iy = 4 x ( 352.000 / ( 80.769 MPa x 77.454 mm4 ) 2 x ( 4,269 x 1010 mm6 / 2.940.000 ) = 0,000184 mm2/N2
Zx
= (tw x ht2 / 4) + (bf - tw) x (ht - tf) x tf = (6 x 2502 / 4) + (125 – 6) x (250 – 9) x 9 = 351.861 mm3
Zy =
(tf x bf2 / 2) + (ht - 2 x tf) x (tw2 / 4) = (9 x 1252 / 2) + (250 – 2 x 9) x (62 / 2) = 72.401 mm3
Perencanaan Balok Anak
39
Perancangan Struktur Baja Gedung Perkantoran 4 Lantai 5.6 Kontrol Lendutan F (ijin)
F
F
=
L / 360
=
300 cm / 360
=
0,83 cm
=
5/384 x
qL4 / E x Ix
=
5/48
(( 1/8 qL2 ) x L2 ) / 2.100.000 Kg/cm2 x 4.050 cm4
=
5/48x(( 1/8x2683,23x32 ) x 32 ) / 2.100.000 Kg/cm2 x 4.050 cm4
=
5/48
=
0,1042 x
=
0,30 cm
x
x
( 2,4 x 1010 / 8,5 x 109 ) 2,8394 cm <
ymax =
0,83 cm ............ (OK)
5.7 Momen Nominal Pengaruh / Local Buckling Kelangsingan Sayap Kontrol Batas Penampang Kompak bf / 2 tf
<
172 / √ fy
125 / 18 <
172 / √ 400 Mpa
6,944
8,6
<
.............. ( Kompak )
Kontrol Batas Penampang Non Kompak bf / tf
<
625 / √ fy
125 / 9
<
625 / √ 400 Mpa
13,89
<
31,25
.............. ( Kompak )
Jadi Momen Nominal = Momen Plastis Mn
= Mp
=
fy x Zx
=
400 MPa x 351.861 mm3
=
140.744.400 Nmm
=
14.074,44 Kg.m
5.8 Kelangsingan Badan Kontrol Batas Penampang Kompak h / tw
<
1680 / √ fy
250 / 6
<
1680 / √ 400 Mpa
42
<
84
Perencanaan Balok Anak
.............. ( Kompak )
40
Perancangan Struktur Baja Gedung Perkantoran 4 Lantai Kontrol Batas Penampang Non Kompak h / tw
<
2550 / √ fy
250 / 6
<
2550 / √ 400 Mpa
42
<
127,50
.............. ( Kompak )
Jadi Momen Nominal = Momen Plastis Mn
= Mp
=
fy x Zx
=
400 MPa x 351.861 mm3
=
140.744.400 Nmm
=
14.074,44 Kg.m
5.9 Momen Nominal Pengaruh Lateral Buckling Jarak geser connector Lb
= 19
cm
Lp
= 1,76 x iy x 10 x √( E / 100 / fy ) = 1,76 x 27,9 cm x √( 2.100.000 Kg/cm2 / 100 / 400 Mpa ) = 355,79 mm = 35,58 cm
>
Lb
=
19
cm
Jadi Momen Nominal = Momen Plastis Mp
= Mn
=
8.444,66 Kg.m
Φb
x Mn
=
0.9
=
12.667 Kg.m > Mu
x
14.074,44 Kg.m =
2.683,23 Kg.m ...... (OK)
5.10 Kontrol Rencana Kuat Geser h / tw
<
1.110 / √ fy
250 / 6
<
1.110 / √ 400 Mpa
42
<
55
Vn
=
0,6 x fy x 10 x (tw / 10)
=
0,6 x 400 MPa x 10 x ( 6 mm / 10 )
=
36.000 Kg
Perencanaan Balok Anak
.............. ( Plastis )
41
Perancangan Struktur Baja Gedung Perkantoran 4 Lantai ϕf x Vn
Vu
=
0,75 x 36.000 Kg
=
27.000 Kg
=
3.577,64 Kg
< ϕf x Vn
= 27.000 Kg ...... (OK)
5.11 Interaksi Geser Dan Lentur Mu
=
2.683,23 Kg.m
Vu
=
3.577,64 Kg
Φb
x Mn
=
12.667 Kg.m
ϕf
x Vn
=
27.000 Kg
Mu / (Φb x Mn) Vu / ϕf x Vn
=
2683,23 Kg.m / 12.667 Kg.m
=
0,21
=
3.577,638 Kg / 27.000 Kg
=
0,13
<
1,00
........
(OK)
Syarat : [Mu / (ϕb x Mn)] + [0,625 x Vu / (ϕf x Vn)] = 0,212 + (0,625 x 0,133) = 0,295 < 1,375 ..... (OK)
Perencanaan Balok Anak
42