HEALTH, SAFETY AND ENVIRONMENT MANUAL

KSDR-L2-05A-HSE

Job Safety Analysis

Form Name

KSDR-L2-05A-02-03-FOR-002

Form No 2

Manual Level

Issue Date 01-Nov-04

Rev. Date 26-Apr-18

Rig: JS-2

Supervisor: Click

Job: Testing standpipe manifold

Number of Personnel Required To Do The Job:

Date: 4-Jun-18

Date Reviewed/Revised: 4-Jun-18

Hard Hats Chemical Barriers Signs / Barriers

X X

Safety Glasses Safety Shields Safety Goggles

Permit To Work Required: Yes / No

Rev. No 4

X

Life Vests Gloves MSDS

COO

JSA I.D.#: JS2-JSA-DR-035

here to enter text.

REQUIRED CONTROL MEASURES: X Boots Respiratory Protection Fire Fighting Equipment

Approved by QHSE

SOP I.D.#: JS2-SOP-DR-035

X

Rig Announcement Communications Hearing Protection Fall Protection

X

HAZARDS Simultaneous Operations Hazards Well Control Hazards Weather Hazard Environmental Hazard

X

If Yes, Type and Number:

Tools Required: Test pump or cement unit with chart recorder, flanged 1502 union, HP hose, barrier tape Sequence of Basic Job Steps Prior to job commencing Raise permit, prepare HP test pump or cement unit and chart recorder Rigging up and testing standpipe and choke manifolds as per programme

Uncontrolled when printed| FORM

Potential Accidents/Hazards (PPE; Body Position; Procedure; Environmental; Tools/Equip) Lack of communications affecting ongoing operations Equipment not suitable for the operation, damaged equipment

Use of hand tools, high pressure test pump or cment unit, blown hoses, spillage and personal injury

Recommended SAFE Job Procedure or Controls Hold pre job safety meeting and discuss the full workscope. Ensure the proposed job will not have any adverse effect on ongoing operations. Raise permit. Check all equipment to be used is in good working condition. Check all hoses and connections, install R clips and whip checks on air hoses. Prior to test starting, barrier off surrounding area, post warning signs, make PA announcement, only competent personnel to run test pump and chart recorder. Complete pressure testing manifold as per procedure and programme dictates. Ensure upon completion of testing the manifolds are lined up correctly, test charts are completed correctly and the relevant post test paperwork and logs are filled in. Clear work areas of equipment, remove barriers and warning signs, make PA announcement and sign off permit.

1 of 3

Manual

HEALTH, SAFETY AND ENVIRONMENT MANUAL

KSDR-L2-05A-HSE

Job Safety Analysis

Form Name

KSDR-L2-05A-02-03-FOR-002

Form No Manual Level

2

Issue Date 01-Nov-04

Rev. Date 26-Apr-18

Rev. No 4

Approved by QHSE

COO

Additional Risk Assessment: The above steps stay basically the same . Additional risk that change every time need assessing. Do risk assessment on following during pre-job JSA meeting: Weather conditions (Rain, dry, wind, temperature, visability); Time of day (Day Time/Night Time) ; Number of persons doing this job for first time: Any other additional Conditions. PERSONNEL INVOLVED: Name

Position

Company

Signature

Name

Position

Company

Signature

O.I. Line Supervisor

Uncontrolled when printed| FORM

2 of 3

Manual

HEALTH, SAFETY AND ENVIRONMENT MANUAL

KSDR-L2-05A-HSE

Job Safety Analysis

Form Name

KSDR-L2-05A-02-03-FOR-002

Form No Manual Level

2

Issue Date 01-Nov-04

Rev. Date 26-Apr-18

Rev. No 4

Approved by QHSE

COO

De- Brief At the end of the job/task, all persons involved to discuss the job/task and fill in below De-Briefing section.

List what went well

List What did not go well

List Revisions/changes to be made

JSA Has been revised per De-Brief:

Uncontrolled when printed| FORM

Name/Title____________________________ Signature ____________________________ Date _________________

3 of 3

Related Documents

Testing
July 2020 14
Testing
May 2020 16
Testing
June 2020 24
Testing
October 2019 41
Testing
April 2020 12

More Documents from ""

6575js2 Jsa
October 2019 24
Renstra Rs.docx
December 2019 46
Mutasi
May 2020 43
3g Checlist After Co.xlsx
December 2019 31