REPORTING ON 4R KYT GROUP ACTIVITY OF MONTH JANUARY SECTION-(VRVIQC)
DAIKIN ROYALS TUSHAR MISHRA AMIT KUMAR ANKIT RAJ BHANU PRATAP LAL CHAND ASHISH SUDHIR HITESH RAJEEV AKASH
Daikin India
SUBJECT: ASSURE SAFETY WHILE WALKING TOWARDS WASHROOM (NEAR SCM OFFICE)
2
SAFETY IS GAINFUL , ACCIDENT IS PAINFUL SUBJECT : Assure Safety While Walking Towards Washroom. AREA : Ware House (Near SCM Office) HAZARD : A Chamber (inside 95mm raised earthing pit pipe) is placed in the centre of path.
HIDDEN DANGER :- Chamber is present in front of door and during walking time , people get stuck with this Chamber and fall down which meet with major injury
ROUND – 1 FIND OYT THE HAZARD WHAT KIND OF DANGER HIDDEN
ROUND-2 THIS IS DANGEROUS POINT
ROUND-3 WHAT WILL YOU DO
ROUND-4 WE WILL DO THIS WAY
Sr.No Action taken 1.
Visualization for damage by red tape marking
Resp.
Tgt Date
Status
Akash
12.01.2016
Done
Bhanu/Lalchand
13.01.2016
Done
Amit / Tushar
16.01.2016
Done
Amit
16.01.2016
Done
2.
Leveling of hole with floor surface
3.
Draft cover plate design and approval
4.
Approval from utility to cut extra length of pipe
5.
Cut extra length of pipe
Sudhir /Hitesh
18.01.2016
Done
6.
Fixing of plate on chamber
Tushar/Rajeev
20.01.2016
Done
ACTION PLAN IMPLEMENTATION 1.Proper identification and cautionary sign made near chamber.
2 . Floor Leveling
Drafting of cover plate design and take approval
BEFORE
AFTER
Chamber is present in front of door and during walking time , people get stuck with this Chamber and fall down which meet with major injury
Chamber is cover with sheet cover & surface has been leveled . No hidden danger after leveling .
THANK YOU