BAB IV PEMBAHASAN

4.1.

Pengukuran Debit Untuk mengetahui apakah debit di model sudah sesuai dengan kondisi

Prototype, perlu dilakukan uji pendahuluan (running test). Elevasi di hulu bendung dicapai hingga konstan kemudian akan diperoleh debit di alat ukur debit Rechbox, hasil debit tersebut akan dibandingkan dengan kondisi debit di Prototype. Debit aliran yang masuk ke model diukur dengan ambang lebar tipe Rechbox dengan dimensi sebagai berikut:

Gambar 4.1. Alat Ukur Rechbox

Contoh Perhitungan untuk Percobaan 1 Debit 1: D

= 1,110 m

B

= 0,720 m

b

= 0,500 m

Debit aliran teoritik yang melalui Rechbox dapat dihitung dengan rumus: Q = k.b.h3/2 Dengan: Q

= debit (m3/dt)

k

= koefisien debit (m1/2/menit) = 107,1 +

b

B (25,7( B ο€­ b)h) 0,177 14,2 xh + + + 2,04 D D h DB

= lebar mercu (m)

h

= kedalaman air diatas mercu (m)

B

= lebar saluran (m)

D

= tinggi dari dasar saluran ke mercu (m)

Harga k dimasukkan dalam rumus alat ukur debit, maka dihitung besarnya debit percobaan. Langkah Pengukuran: a. Tentukan Indek Point Gauge (IPG) dengan menyentuhkan ujung jarum point gauge pada crest alat ukur debit. b. Setel nonius sehingga angka nol tepat pada angka meteran taraf pada angka 117,2 sehingga IPG = Elevasi 747 = 117,2 c. Ukur tinggi muka air pada alat ukur dengan menyentuhkan ujung jarum point gauge pada muka air, meteran taraf (point gauge) dibaca dan dicatat. Dari data yang tercatat diketahui: IPG Rechbox hulu = Elevasi 747 = 117,2 Percobaan: Bacaan hulu: 51 Dengan h = 0,020 m k

= 107,1 +

=107,1+

( B ο€­ b)h 1,42 xh 0.177 + - 25,7 + 2,04 D h DB

B D

0,177 1,420 x0,060 (0,720 ο€­ 0,500)0,020 + + 25,7 +2,04 1,110 x0,720 0,020 1,110

= 115,942

Sehingga: Qm

= k . b . h3/2 = 115,942 . 0,500 . (0,020)3/2 = 0,164 m3/mnt β‰ˆ 0,003 m3/dtk

Rasio debit (𝑸𝒓 )

= 𝑳𝒓 (𝑯𝒓 )πŸ‘/𝟐 = 25(25)3/2 = 3125

0, 720 1,110

Q Prototype

= (Rasio debit) x Q model = 3125 x 0,003 = 8,540 m3/det

Perhitungan selanjutnya dihitung secara tabulasi pada tabel berikut. Tabel 4.1. Alat Ukur Debit Rechbox Hulu

m0.5/dt

Q Model m3/mnt

Q Model m3/det

Q Prototipe m3/det

115,942

0,164

0,003

8,540

h

B

b

D

K

(m)

(m)

(m)

(m)

0,020

0,720

0,500

1,110

Sumber: Hasil Pengukuran dan Perhitungan

Tabel 4.2. Alat Ukur Debit Rechbox Hilir

m0.5/dt

Q Model m3/mnt

Q Model m3/det

Q Prototipe m3/det

115,901

0,131

0,002

6,830

h

B

b

D

K

(m)

(m)

(m)

(m)

0,020

0,565

0,400

0,515

Sumber: Hasil Pengukuran dan Perhitungan

4.2.

Perhitungan Tinggi Muka Air Perhitungan tinggi muka air menggunakan alat ukur Point Gauge yang

dipasang di alat ukur debit dan pada titik-titik pengukuran yang akan ditinjau. Elevasi muka air dapat dihitung dengan menggunakan persamaan berikut: Dengan skala model V = 1 : 25, maka: E

= EPG + [(𝐼𝑃𝐺 βˆ’ π‘Ž)π‘₯ (

π‘†π‘˜π‘Žπ‘™π‘Ž π‘€π‘œπ‘‘π‘’π‘™ 100

)]

Dengan: E

= Elevasi Muka Air Prototype (m)

EPG = Elevasi yang dipakai sebagai indeks alat ukur (m) IPG

= Bacaan Point Gauge pada elevasi indeks

b

= Bacaan Point Gauge pada titik yang ditinjau

Contoh perhitungan Elevasi Air di Prototype: ( Percobaan 1 di Section hulu VIII - As ) Diketahui

: BM 0 = Elevasi 747 = IPG 117,2

Hasil Pembacaan

: (Section hulu VIII - As)

Dasar Saluran

: 141,200

Muka Air

: 131,500

Penyelesaian: Elevasi Dasar As di Prototype

=

(117,200 ο€­ 141,200) x 25 + 747 100

= + 741,000 m Elevasi Dasar rata-rata As di Prototype

=

(741,225  741,000  740,675) 3

= + 740,967 m Elevasi Muka Air As di Prototype

=

(117,200 ο€­ 131,500) x 25 + 747 100

= + 743,425 m Elevasi Muka Air rata-rata As di Prototype =

(743,400  743,425  743,400) 3

= + 743,408 m Tinggi Muka Air As

= El. Muka Air – El. Dasar saluran = +743,408 - +740,967 = 2,442 m

Perhitungan selanjutnya dihitung secara tabulasi pada tabel di bawah ini.

PERCOBAAN I Tabel 4.3. Pembacaan Elevasi Dasar Sungai Sebelum Dialiri (Sebelum Ada Bangunan) BM 0 = Elevasi 747 = 117,2 Model

Prototipe

No. Sec.

Kanan

As

Kiri

Kanan

As

Kiri

Elevasi Rerata

X

134,800

138,300

139,400

742,600

741,725

741,450

741,925

IX

139,100

139,100

140,400

741,525

741,525

741,200

741,417

VIII

140,300

141,200

142,500

741,225

741,000

740,675

740,967

VII

146,000

145,900

146,000

740,000

740,025

740,000

740,000

VI

146,100

146,000

146,600

740,000

740,000

739,850

740,000

V

146,200

146,200

146,000

739,950

739,950

740,000

740,000

IV

146,100

146,000

145,900

739,975

740,000

740,025

740,000

III

146,500

146,000

146,000

739,875

740,000

740,000

740,000

II

146,000

145,900

146,100

740,000

740,025

739,975

740,000

I

145,800

145,500

146,000

740,050

740,125

740,000

740,000

0

134,000

134,100

134,000

743,000

742,975

743,000

743,000

1

135,000

135,000

135,000

742,750

742,750

742,750

742,750

2

140,000

140,000

140,000

741,500

741,500

741,500

741,500

3

144,000

144,400

144,500

740,500

740,400

740,375

740,425

4

148,400

148,500

148,500

739,400

739,375

739,375

739,383

5

150,600

150,600

150,600

738,850

738,850

738,850

738,970

6

150,000

150,000

150,000

739,000

739,000

739,000

739,000

7

145,000

145,500

145,500

740,250

740,125

740,125

740,167

8

144,200

143,800

143,500

740,250

740,350

740,425

740,342

9

144,100

144,100

143,500

740,275

740,275

740,425

740,325

10

145,700

145,000

144,500

739,875

740,050

740,175

740,033

11

147,100

146,500

146,000

739,525

739,675

739,800

739,667

12

148,700

147,600

147,800

739,125

739,400

739,350

739,292

13

149,900

149,200

149,300

738,825

739,000

738,975

738,933

14

150,500

150,000

150,500

738,675

738,800

738,675

738,717

15

151,700

151,800

152,300

738,375

738,350

738,225

738,317

16

153,200

153,200

153,000

738,000

738,000

738,050

738,017

D

138,700

137,500

137,300

741,625

741,925

741,975

741,842

C

135,100

134,700

134,500

742,525

742,625

742,675

742,608

B

132,000

131,700

131,300

743,300

743,375

743,475

743,383

127,700 127,500 127,000 A Sumber: Hasil Pengukuran dan Perhitungan

744,375

744,425

744,550

744,450

BELOKAN

HILIR

HULU

Section

Keterangan: [1] = No.Section [2] = Hasil pengukuran [3] = Hasil pengukuran [4] = Hasil pengukuran

[5] = (IPG - [2])* 0,25+ El.Datum [6] = (IPG - [3])* 0,25+ El.Datum [7] = (IPG - [4])* 0,25+ El.Datum [8] = ([5]+[6]+[7])/3

Tabel 4.4. Pembacaan Elevasi Muka Air Sungai (Sebelum Ada Bangunan) IPG = Elevasi 747 = 117,2

HULU

Section

Model

Prototipe

No. Sec.

Kanan

As

Kiri

Kanan

As

Kiri

Elevasi Rerata

X

131,600

131,800

131,500

743,400

743,350

743,425

743,392

IX

131,500

131,500

131,600

743,425

743,425

743,400

743,417

VIII

131,600

131,500

131,600

743,400

743,425

743,400

743,408

VII

131,800

131,800

131,800

743,350

743,350

743,350

743,350

VI

131,800

131,700

131,600

743,350

743,375

743,400

743,375

V

131,800

131,800

131,800

743,350

743,350

743,350

743,350

131,800

131,600

131,700

743,350

743,400

743,375

743,375

131,600

131,600

131,600

743,400

743,400

743,400

743,400

II

131,600

131,600

131,600

743,400

743,400

743,400

743,400

I

131,900

131,900

131,800

743,325

743,325

743,350

743,333

0

131,900

132,000

132,000

743,325

743,300

743,300

743,308

1

133,200

133,500

133,600

743,000

742,925

742,900

742,942

2

137,900

137,900

137,900

741,825

741,825

741,825

741,825

3

142,300

142,400

142,000

740,725

740,700

740,800

740,742

4

143,500

143,500

143,500

740,425

740,425

740,425

740,425

5

143,700

143,700

143,700

740,375

740,375

740,375

740,375

6

144,000

143,800

144,000

740,300

740,350

740,300

740,317

7

141,700

142,000

141,900

740,875

740,800

740,825

740,833

8

146,900

146,800

145,800

739,575

739,600

739,850

740,675

9

147,300

146,800

145,800

739,475

739,600

739,850

740,642

10

148,000

0,000

147,900

739,300

776,300

739,325

751,642

11

149,500

0,000

149,000

738,925

776,300

739,050

751,425

12

150,200

150,200

150,500

738,750

738,750

738,675

739,725

13

150,800

151,000

150,900

738,600

738,550

738,575

739,575

14

150,900

151,900

0,000

738,575

738,325

776,300

751,067

15

151,500

152,700

0,000

738,425

738,125

776,300

750,950

16

152,500

153,000

0,000

738,175

738,050

776,300

750,842

D

129,600

131,000

131,000

743,900

743,550

743,550

743,667

C

131,500

131,400

131,300

743,425

743,450

743,475

743,450

B

131,500

131,500

131,600

743,425

743,425

743,400

743,417

131,600 131,600 131,700 A Sumber: Hasil Pengukuran dan Perhitungan

743,400

743,400

743,375

744,892

BELOKAN

HILIR

IV III

Keterangan: [1] = No.Section [2] = Hasil pengukuran [3] = Hasil pengukuran [4] = Hasil pengukuran

[5] = (IPG - [2])* 0,25+ El.Datum [6] = (IPG - [3])* 0,25+ El.Datum [7] = (IPG - [4])* 0,25+ El.Datum [8] = ([5]+[6]+[7])/3

Tabel 4.5. Pembacaan Elevasi Dasar Sungai Setelah Dialiri (Sebelum Ada Bangunan) IPG = Elevasi 747 = 117,2 Model No. Sec. Kanan As Kiri 137,000 138,300 139,300 X IX 140,100 140,100 140,500 VIII 142,600 142,500 142,300 VII 144,600 143,800 143,900 VI 144,900 144,000 143,800 145,100 144,300 144,500 V IV 145,200 144,300 144,300 III 145,000 144,400 144,800 145,000 145,000 145,000 II 144,300 149,500 144,200 8 144,600 149,300 145,100 9 151,600 147,400 145,800 10 147,600 148,300 146,700 11 150,800 151,300 148,000 12 151,400 151,000 150,000 13 152,700 153,200 151,000 14 154,000 153,700 152,000 15 154,400 154,400 153,300 16 128,500 131,500 135,000 D 128,000 132,000 133,700 C 130,300 130,300 133,400 B 137,900 137,900 136,200 A Sumber: Hasil Pengukuran dan Perhitungan

BELOKAN

HILIR

HULU

Section

Keterangan: [1] = No.Section [2] = Hasil pengukuran [3] = Hasil pengukuran [4] = Hasil pengukuran

Kanan 742,050 741,275 740,650 740,150 740,075 740,025 740,000 740,050 740,050 740,225 740,150 738,400 739,400 738,600 738,450 738,125 737,800 737,700 744,175 744,300 743,725 741,825

Prototipe As 741,725 741,275 740,675 740,350 740,300 740,225 740,225 740,200 740,050 738,925 738,975 739,450 739,225 738,475 738,550 738,000 737,875 737,700 743,425 743,300 743,725 741,825

Kiri 741,475 741,175 740,725 740,325 740,350 740,175 740,225 740,100 740,050 740,250 740,025 739,850 739,625 739,300 738,800 738,550 738,300 737,975 742,550 742,875 742,950 742,250

Elevasi Rerata 741,750 741,242 740,683 740,275 740,242 740,142 740,150 740,117 740,050 739,800 739,717 739,233 739,417 738,792 738,600 738,225 737,992 737,792 743,383 743,492 743,467 741,967

[5] = (IPG - [2])* 0,25+ El.Datum [6] = (IPG - [3])* 0,25+ El.Datum [7] = (IPG - [4])* 0,25+ El.Datum [8] = ([5]+[6]+[7])/3

Tabel 4.6. Tinggi Muka Air (Sebelum Ada Bangunan)

BELOKA N

HILIR

HULU

Section

No. Section X IX VIII VII VI V IV III II I 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 D C B A

Elevasi Dasar Rerata 741,925 741,417 740,967 740,000 740,000 740,000 740,000 740,000 740,000 740,000 743,000 742,750 741,500 740,425 739,383 738,970 739,000 740,167 740,342 740,325 740,033 739,667 739,292 738,933 738,717 738,317 738,017 741,842 742,608 743,383 744,450

Sumber: Hasil Pengukuran dan Perhitungan

Elevasi Tinggi Muka Air Rerata 743,392 743,417 743,408 743,350 743,375 743,350 743,375 743,400 743,400 743,333 743,308 742,942 741,825 740,742 740,425 740,375 740,317 740,833 740,675 740,642 751,642 751,425 739,725 739,575 751,067 750,950 750,842 743,667 743,450 743,417 744,892

h Air 1,467 2,000 2,442 3,350 3,375 3,350 3,375 3,400 3,400 3,333 0,308 0,192 0,325 0,317 1,042 1,405 1,317 0,667 0,333 0,317 11,608 11,758 0,433 0,642 12,350 12,633 12,825 1,825 0,842 0,033 0,442

PERCOBAAN II Tabel 4.7. Pembacaan Elevasi Dasar Sungai Sebelum Dialiri (Setelah Ada Bangunan) IPG = Elevasi 747 = 117,2 Model No. Sec. Kanan As Kiri 137,000 138,300 139,300 X IX 140,100 140,100 140,500 VIII 142,600 142,500 142,300 VII 144,600 143,800 143,900 VI 144,900 144,000 143,800 145,100 144,300 144,500 V IV 145,200 144,300 144,300 III 145,000 144,400 144,800 145,000 145,000 145,000 II 144,300 149,500 144,200 8 144,600 149,300 145,100 9 151,600 147,400 145,800 10 147,600 148,300 146,700 11 150,800 151,300 148,000 12 151,400 151,000 150,000 13 152,700 153,200 151,000 14 154,000 153,700 152,000 15 154,400 154,400 153,300 16 128,500 131,500 135,000 D 128,000 132,000 133,700 C 130,300 130,300 133,400 B 137,900 137,900 136,200 A Sumber: Hasil Pengukuran dan Perhitungan

BELOKAN

HILIR

HULU

Section

Keterangan: [1] = No.Section [2] = Hasil pengukuran [3] = Hasil pengukuran [4] = Hasil pengukuran

Kanan 742,050 741,275 740,650 740,150 740,075 740,025 740,000 740,050 740,050 740,225 740,150 738,400 739,400 738,600 738,450 738,125 737,800 737,700 744,175 744,300 743,725 741,825

Prototipe As 741,725 741,275 740,675 740,350 740,300 740,225 740,225 740,200 740,050 738,925 738,975 739,450 739,225 738,475 738,550 738,000 737,875 737,700 743,425 743,300 743,725 741,825

Kiri 741,475 741,175 740,725 740,325 740,350 740,175 740,225 740,100 740,050 740,250 740,025 739,850 739,625 739,300 738,800 738,550 738,300 737,975 742,550 742,875 742,950 742,250

Elevasi Rerata 741,750 741,242 740,683 740,275 740,242 740,142 740,150 740,117 740,050 739,800 739,717 739,233 739,417 738,792 738,600 738,225 737,992 737,792 743,383 743,492 743,467 741,967

[5] = (IPG - [2])* 0,25+ El.Datum [6] = (IPG - [3])* 0,25+ El.Datum [7] = (IPG - [4])* 0,25+ El.Datum [8] = ([5]+[6]+[7])/3

Tabel 4.8 Pembacaan Elevasi Muka Air Sungai (Setelah Ada Bangunan) IPG = Elevasi 747 = 118 Model No. Sec. Kanan As Kiri 132,200 132,100 131,800 X IX 132,100 132,100 132,100 VIII 132,100 132,100 132,000 VII 131,800 131,800 131,800 VI 131,800 131,700 131,600 131,800 131,800 131,800 V IV 131,800 131,600 131,700 III 131,600 131,600 131,600 131,600 131,600 131,600 II 131,900 131,900 131,800 I 131,900 132,000 132,000 0 133,200 133,500 133,600 1 137,900 137,900 137,900 2 142,800 142,700 141,500 3 143,800 143,900 144,100 4 143,800 143,800 143,800 5 143,900 143,900 143,900 6 143,200 142,500 142,400 7 144,000 143,400 143,300 8 144,100 143,200 143,200 9 148,900 0,000 0,000 10 150,500 0,000 0,000 11 151,400 151,500 0,000 12 151,800 151,800 151,900 13 152,200 152,400 152,400 14 152,600 153,200 0,000 15 152,900 153,100 0,000 16 131,500 131,600 131,800 D 131,900 132,100 131,800 C 132,100 132,100 132,000 B 132,300 131,400 131,800 A Sumber: Hasil Pengukuran dan Perhitungan

BELOKAN

HILIR

HULU

Section

Keterangan: [1] = No.Section [2] = Hasil pengukuran [3] = Hasil pengukuran [4] = Hasil pengukuran

Kanan 743,450 743,475 743,475 743,550 743,550 743,550 743,550 743,600 743,600 743,525 743,525 743,200 742,025 740,800 740,550 740,550 740,525 740,700 740,500 740,475 739,275 738,875 738,650 738,550 738,450 738,350 738,275 743,625 743,525 743,475 743,425

Prototipe As 743,475 743,475 743,475 743,550 743,575 743,550 743,600 743,600 743,600 743,525 743,500 743,125 742,025 740,825 740,525 740,550 740,525 740,875 740,650 740,700 776,500 776,500 738,625 738,550 738,400 738,200 738,225 743,600 743,475 743,475 743,650

Kiri 743,550 743,475 743,500 743,550 743,600 743,550 743,575 743,600 743,600 743,550 743,500 743,100 742,025 741,125 740,475 740,550 740,525 740,900 740,675 740,700 776,500 776,500 776,500 738,525 738,400 776,500 776,500 743,550 743,550 743,500 743,550

Elevasi Rerata 743,492 743,475 743,483 743,550 743,575 743,550 743,575 743,600 743,600 743,533 743,508 743,142 742,025 740,917 740,517 740,550 740,525 740,825 740,608 740,625 749,092 749,958 743,256 738,754 738,417 751,017 751,000 743,592 743,517 743,483 743,542

[5] = (IPG - [2])* 0,25+ El.Datum [6] = (IPG - [3])* 0,25+ El.Datum [7] = (IPG - [4])* 0,25+ El.Datum [8] = ([5]+[6]+[7])/3

Tabel 4.9. Pembacaan Elevasi Dasar Sungai Setelah Dialiri (Setelah Ada Bangunan) IPG = Elevasi 747 = 118

BELOKAN

HILIR

HULU

Section

Model

Prototipe

Elevasi

No. Sec.

Kanan

As

Kiri

Kanan

As

Kiri

Rerata

X

140,100

138,700

139,900

741,475

741,825

741,525

741,608

IX

140,600

140,000

139,100

741,350

741,500

741,725

741,525

VIII

142,300

141,900

141,300

740,925

741,025

741,175

741,042

VII

144,300

144,100

144,400

740,425

740,475

740,400

740,433

VI

144,900

143,900

143,800

740,275

740,525

740,550

740,450

V

144,900

144,000

143,300

740,275

740,500

740,675

740,483

10

151,700

153,300

145,800

738,575

738,175

740,050

738,933

11

147,700

148,300

147,000

739,575

739,425

739,750

739,583

12

151,700

150,600

148,300

738,575

738,850

739,425

738,950

13

152,400

151,700

148,900

738,400

738,575

739,275

738,750

14

152,700

153,600

151,100

738,325

738,100

738,725

738,383

15

153,600

154,200

152,300

738,100

737,950

738,425

738,158

16

154,000

154,400

153,100

738,000

737,900

738,225

738,042

D

128,500

135,000

127,700

744,375

742,750

744,575

743,900

C

132,100

132,600

132,700

743,475

743,350

743,325

743,383

B

135,300

134,700

135,000

742,675

742,825

742,750

742,750

A

138,400

136,600

137,700

741,900

742,350

742,075

742,108

Sumber: Hasil Pengukuran dan Perhitungan

Keterangan: [1] = No.Section [2] = Hasil pengukuran [3] = Hasil pengukuran [4] = Hasil pengukuran

[5] = (IPG - [2])*0,25+ El.Datum [6] = (IPG - [3])* 0,25+ El.Datum [7] = (IPG - [4])* 0,25+ El.Datum [8] = ([5]+[6]+[7])/3

Tabel 4.10. Tinggi Muka Air (Sebelum Ada Bangunan)

BELOKAN

HILIR

HULU

Section

No. Section X IX VIII VII VI V IV III II 8 9 10 11 12 13 14 15 16 D C B A

Elevasi Dasar Rerata 741,750 741,242 740,683 740,275 740,242 740,142 740,150 740,117 740,050 739,800 739,717 739,233 739,417 738,792 738,600 738,225 737,992 737,792 743,383 743,492 743,467 741,967

Sumber: Hasil Pengukuran dan Perhitungan

Elevasi Tinggi Muka Air Rerata 743,492 743,475 743,483 743,550 743,575 743,550 743,575 743,600 743,600 740,608 740,625 749,092 749,958 743,256 738,754 738,417 751,017 751,000 743,592 743,517 743,483 743,542

h Air 1,742 2,233 2,800 3,275 3,333 3,408 3,425 3,483 3,550 0,808 0,908 9,859 10,541 4,464 0,154 0,192 13,025 13,208 0,208 0,025 0,017 1,575

4.3.

Perhitungan Kecepatan Pengukuran distribusi kecepatan menggunakan Pitot.

4.3.1 Kecepatan Air Contoh Perhitungan Pada Percobaan 1: Pengukuran kecepatan menggunakan pitot. Pengukuran di Section Hulu VIII As. 1. vm

As

= n = 0,200 = vm

= 0,0948 n + 0,0642 = 0,0948 (0,200) + 0,0642 = 0,083 cm/dt

Rasio kecepatan

= Lr0,5 = (25)0,5 =5

v Prototype

= (Rasio kecepatan). vm = 5 x 0,083 = 0,416 m/det

v rata-rata

=

0,416  0,416  0,416 3

= 0,416 m/ dt Perhitungan selanjutnya dihitung secara tabulasi pada tabel di bawah ini.

Tabel 4.11. Data Kecepatan (Sebelum Ada Bangunan) IPG = Elevasi 747 = 117,2

BELOKAN

HILIR

HULU

Sec.

Data

No. Sec.

Ket.

Kanan

As

Kiri

X

0,100

0,300

0,300

Pitot

IX

0,100

0,100

0,100

Pitot

VIII

0,200

0,200

0,200

Pitot

VII

0,100

0,200

0,500

Pitot

VI

0,100

0,100

0,300

Pitot

V

0,100

0,100

0,100

Pitot

IV

0,100

0,300

0,200

Pitot

III

0,100

0,100

0,200

Pitot

II

0,100

0,200

0,200

Pitot

I

0,100

0,200

0,300

Pitot

0

1,000

0,700

0,500

Pitot

1

1,400

1,400

1,600

Pitot

2

9,100

5,600

8,600

Pitot

3

9,000

10,500

10,000

Pitot

4

4,900

6,800

7,900

Pitot

5

1,500

1,100

0,700

Pitot

6

0,200

0,300

0,400

Pitot

7

0,200

0,300

0,300

Pitot

8

2,500

2,000

1,800

Pitot

9

0,000

2,300

1,600

Pitot

10

1,600

1,100

0,000

Pitot

11

0,400

0,700

0,000

Pitot

12

1,000

0,700

0,000

Pitot

13

0,700

0,700

0,000

Pitot

14

0,300

0,000

0,000

Pitot

15

1,000

0,300

0,000

Pitot

16

8,900

1,100

0,000

Pitot

D

0,000

0,500

0,000

Pitot

C

0,100

0,300

0,500

Pitot

B

0,100

0,500

0,500

Pitot

A

0,100

0,300

0,300

Pitot

Sumber: Hasil Pengukuran dan Perhitungan

Tabel 4.12. Data Awal Kecepatan (Setelah Ada Bangunan) IPG = Elevasi 747 = 118

BELOKAN

HILIR

HULU

Sec.

Data

No. Sec.

Ket.

Kanan

As

Kiri

X

0,100

0,300

0,300

Pitot

IX

0,100

0,100

0,100

Pitot

VIII

0,200

0,200

0,200

Pitot

VII

0,100

0,200

0,500

Pitot

VI

0,100

0,100

0,300

Pitot

V

0,100

0,100

0,100

Pitot

IV

0,100

0,300

0,200

Pitot

III

13,000

13,000

12,000

Pitot

II

0,100

0,200

0,200

Pitot

I

0,300

0,200

0,200

Pitot

0

1,700

1,900

1,100

Pitot

1

1,400

1,400

1,600

Pitot

2

9,100

5,600

8,600

Pitot

3

8,000

10,300

11,200

Pitot

4

7,200

7,600

7,000

Pitot

5

0,700

1,000

1,600

Pitot

6

0,300

0,300

0,300

Pitot

7

0,300

0,300

0,300

Pitot

8

0,300

0,300

0,500

Pitot

9

0,500

0,700

0,400

Pitot

10

0,700

1,700

0,000

Pitot

11

0,400

0,600

0,000

Pitot

12

0,700

0,300

0,000

Pitot

13

1,000

1,200

0,600

Pitot

14

2,700

2,700

0,000

Pitot

15

3,600

4,300

0,000

Pitot

16

2,700

1,300

0,000

Pitot

D

0,000

0,500

0,000

Pitot

C

0,100

0,300

0,500

Pitot

B

0,100

0,500

0,500

Pitot

A

0,100

0,300

0,300

Pitot

Sumber: Hasil Pengukuran dan Perhitungan

PERCOBAAN I Tabel 4.13. Data Kecepatan pada Prototipe (Sebelum Ada Bangunan) IPG = Elevasi 747 = 117,2

BELOKAN

HILIR

HULU

Sec.

No. Sec. X IX VIII VII VI V IV III II I 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 D C B A

Data put/det Kanan As 0,100 0,300 0,100 0,100 0,200 0,200 0,100 0,200 0,100 0,100 0,100 0,100 0,100 0,300 0,100 0,100 0,100 0,200 0,100 0,200 1,000 0,700 1,400 1,400 9,100 5,600 9,000 10,500 4,900 6,800 1,500 1,100 0,200 0,300 0,200 0,300 2,500 2,000 0,000 2,300 1,600 1,100 0,400 0,700 1,000 0,700 0,700 0,700 0,300 0,000 1,000 0,300 8,900 1,100 0,000 0,500 0,100 0,300 0,100 0,500 0,100 0,300

Kiri 0,300 0,100 0,200 0,500 0,300 0,100 0,200 0,200 0,200 0,300 0,500 1,600 8,600 10,000 7,900 0,700 0,400 0,300 1,800 1,600 0,000 0,000 0,000 0,000 0,000 0,000 0,000 0,000 0,500 0,500 0,300

Kecepatan Model (Vm) cm/det Kanan As Kiri 0,074 0,093 0,093 0,074 0,074 0,074 0,083 0,083 0,083 0,074 0,083 0,112 0,074 0,074 0,093 0,074 0,074 0,074 0,074 0,093 0,083 0,074 0,074 0,083 0,074 0,083 0,083 0,074 0,083 0,093 0,159 0,131 0,112 0,197 0,197 0,216 0,927 0,595 0,879 0,917 1,060 1,012 0,529 0,709 0,813 0,206 0,168 0,131 0,083 0,093 0,102 0,083 0,093 0,093 0,301 0,254 0,235 0,064 0,282 0,216 0,216 0,168 0,064 0,102 0,131 0,064 0,159 0,131 0,064 0,131 0,131 0,064 0,093 0,064 0,064 0,159 0,093 0,064 0,908 0,168 0,064 0,064 0,112 0,064 0,074 0,093 0,112 0,074 0,112 0,112 0,074 0,093 0,093

Kecepatan prototipe (Vp) m/det Kanan As Kiri 0,368 0,463 0,463 0,368 0,368 0,368 0,416 0,416 0,416 0,368 0,416 0,558 0,368 0,368 0,463 0,368 0,368 0,368 0,368 0,463 0,416 0,368 0,368 0,416 0,368 0,416 0,416 0,368 0,416 0,463 0,795 0,653 0,558 0,985 0,985 1,079 4,634 2,975 4,397 4,587 5,298 5,061 2,644 3,544 4,066 1,032 0,842 0,653 0,416 0,463 0,511 0,416 0,463 0,463 1,506 1,269 1,174 0,321 1,411 1,079 1,079 0,842 0,321 0,511 0,653 0,321 0,795 0,653 0,321 0,653 0,653 0,321 0,463 0,321 0,321 0,795 0,463 0,321 4,540 0,842 0,321 0,321 0,558 0,321 0,368 0,463 0,558 0,368 0,558 0,558 0,368 0,463 0,463

Sumber: Hasil Pengukuran dan Perhitungan

Keterangan: [1] = Section [2] = No. Section [3] = Hasil pengukuran/5 [4] = Hasil pengukuran/5 [5] = Hasil pengukuran/5 [6] = [0,0948x(3)]+0,0642 [7] = [0,0948x(4)]+0,0642

[8] = [0,0948x(5)]+0,0642 [9] = [(6)x250,5] [10] = [(7)x250,5] [11] = [(8)x250,5] [12] =[(9)+(10)+(11)]/3 [13] = Keterangan Alat Ukur

Vrerata Ket. m/det 0,432 0,368 0,416 0,447 0,400 0,368 0,416 0,384 0,400 0,416 0,669 1,016 4,002 4,982 3,418 0,842 0,463 0,447 1,316 0,937 0,748 0,495 0,590 0,542 0,368 0,526 1,901 0,400 0,463 0,495 0,432

Pitot Pitot Pitot Pitot Pitot Pitot Pitot Pitot Pitot Pitot Pitot Pitot Pitot Pitot Pitot Pitot Pitot Pitot Pitot Pitot Pitot Pitot Pitot Pitot Pitot Pitot Pitot Pitot Pitot Pitot Pitot

PERCOBAAN II Tabel 4.14. Data Kecepatan pada Prototipe (Setelah Ada Bangunan) IPG = Elevasi 747 = 118

BELOKAN

HILIR

HULU

Sec.

No. Sec. X IX VIII VII VI V IV III II I 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 D C B A

Data put/det Kanan As 0,100 0,300 0,100 0,100 0,200 0,200 0,100 0,200 0,100 0,100 0,100 0,100 0,100 0,300 13,000 13,000 0,100 0,200 0,300 0,200 1,700 1,900 1,400 1,400 9,100 5,600 8,000 10,300 7,200 7,600 0,700 1,000 0,300 0,300 0,300 0,300 0,300 0,300 0,500 0,700 0,700 1,700 0,400 0,600 0,700 0,300 1,000 1,200 2,700 2,700 3,600 4,300 2,700 1,300 0,000 0,500 0,100 0,300 0,100 0,500 0,100 0,300

Kiri 0,300 0,100 0,200 0,500 0,300 0,100 0,200 12,000 0,200 0,200 1,100 1,600 8,600 11,200 7,000 1,600 0,300 0,300 0,500 0,400 0,000 0,000 0,000 0,600 0,000 0,000 0,000 0,000 0,500 0,500 0,300

Kecepatan Model (Vm) cm/det Kanan As Kiri 0,074 0,093 0,093 0,074 0,074 0,074 0,083 0,083 0,083 0,074 0,083 0,112 0,074 0,074 0,093 0,074 0,074 0,074 0,074 0,093 0,083 1,297 1,297 1,202 0,074 0,083 0,083 0,093 0,083 0,083 0,225 0,244 0,168 0,197 0,197 0,216 0,927 0,595 0,879 0,823 1,041 1,126 0,747 0,785 0,728 0,131 0,159 0,216 0,093 0,093 0,093 0,093 0,093 0,093 0,093 0,093 0,112 0,112 0,131 0,102 0,131 0,225 0,064 0,102 0,121 0,064 0,131 0,093 0,064 0,159 0,178 0,121 0,320 0,320 0,064 0,405 0,472 0,064 0,320 0,187 0,064 0,064 0,112 0,064 0,074 0,093 0,112 0,074 0,112 0,112 0,074 0,093 0,093

Kecepatan prototipe (Vp) m/det Kanan As Kiri 0,368 0,463 0,463 0,368 0,368 0,368 0,416 0,416 0,416 0,368 0,416 0,558 0,368 0,368 0,463 0,368 0,368 0,368 0,368 0,463 0,416 6,483 6,483 6,009 0,368 0,416 0,416 0,463 0,416 0,416 1,127 1,222 0,842 0,985 0,985 1,079 4,634 2,975 4,397 4,113 5,203 5,630 3,734 3,923 3,639 0,653 0,795 1,079 0,463 0,463 0,463 0,463 0,463 0,463 0,463 0,463 0,558 0,558 0,653 0,511 0,653 1,127 0,321 0,511 0,605 0,321 0,653 0,463 0,321 0,795 0,890 0,605 1,601 1,601 0,321 2,027 2,359 0,321 1,601 0,937 0,321 0,321 0,558 0,321 0,368 0,463 0,558 0,368 0,558 0,558 0,368 0,463 0,463

Sumber: Hasil Pengukuran dan Perhitungan

Keterangan: [1] = Section [2] = No. Section [3] = Hasil pengukuran/5 [4] = Hasil pengukuran/5 [5] = Hasil pengukuran/5 [6] = [0,0948x(3)]+0,0642 [7] = [0,0948x(4)]+0,0642

[8] = [0,0948x(5)]+0,0642 [9] = [(6)x250,5] [10] = [(7)x250,5] [11] = [(8)x250,5] [12] =[(9)+(10)+(11)]/3 [13] = Keterangan Alat Ukur

Vrerata Ket. m/det 0,432 0,368 0,416 0,447 0,400 0,368 0,416 6,325 0,400 0,432 1,064 1,016 4,002 4,982 3,765 0,842 0,463 0,463 0,495 0,574 0,700 0,479 0,479 0,763 1,174 1,569 0,953 0,400 0,463 0,495 0,432

Pitot Pitot Pitot Pitot Pitot Pitot Pitot Pitot Pitot Pitot Pitot Pitot Pitot Pitot Pitot Pitot Pitot Pitot Pitot Pitot Pitot Pitot Pitot Pitot Pitot Pitot Pitot Pitot Pitot Pitot Pitot

4.3.2 Kecepatan Belokan Kecepatan Belokan ( Percobaan 1 ) a. Pengukuran Menggunakan Pitot Tabel 4.15 Kecepatan pada Belokan dengan Menggunakan Pitot Percobaan I Section V max (m/dt) 0.56 D 0.56 C 0.56 B 0.46 A Sumber : Hasil Perhitungan b. Pengukuran Menggunakan Rumus dan Diagram Karaki Tabel 4.16 Perhitungan Parameter Pembantu Karaki Percobaan 1 H max B (m) (m) 1.83 19.3 D 0.84 19.5 C 0.03 19.5 B 0.44 22.0 A Sumber : Hasil Perhitungan 2014 Section

g0,5

C

3.132 3.132 3.132 3.132

87.608 82.268 57.647 77.572

Hmax/B (m) 0.095 0.043 0.002 0.020

g0,5/C

Ξ±

Ξ”

0.036 0.038 0.054 0.040

15 30 30 45

0.021 0.021 0.001 0.015

Dari Diagram Karaki didapatkan : Section Ξ”x102 Ξ” Vmax.102 2Vmax/B 2.135 1.2 0.06 D 2.071 1.2 0.06 C 0.105 0.1 0.06 B 1.533 0.7 0.04 A Sumber : Hasil Perhitungan 2014 Kemudian dari grafik hubungan Ξ”x102 dengan 2x/B didapatkan : Section Vb/Vo Vo (m/dt) 0.36 1.53 D 0.36 1.53 C 0.36 1.53 B 0.30 1.53 A Sumber : Hasil Perhitungan 2014 Keterangan : V0 : kecepatan sebelum belokan Vb : kecepatan maksimum pada belokan

Vb (m/dt) 0.56 0.56 0.56 0.46

Kecepatan Belokan ( Percobaan 1I ) a. Pengukuran Menggunakan Pitot Tabel 4.17 Kecepatan pada Belokan dengan Menggunakan Pitot Percobaan II Section

V max (m/dt)

D

0.56

C

0.56

B

0.56

0.46 A Sumber : Hasil Perhitungan

b. Pengukuran Menggunakan Rumus dan Diagram Karaki

Tabel 4.18 Perhitungan Parameter Pembantu Karaki Percobaan II

D

H max (m) 0.21

C

0.03

19.5

3.132

55.405

0.001

0.057

30

0.001

B

0.02

19.5

3.132

52.242

0.001

0.060

30

0.001

1.57 22.0 3.132 A Sumber : Hasil Perhitungan 2014

86.767

0.072

0.036

45

0.049

Section

B (m)

g0,5

C

Hmax/B (m)

g0,5/C

Ξ±

Ξ”

19.3

3.132

71.833

0.011

0.044

15

0.003

Dari Diagram Karaki didapatkan : Section

Ξ”x102

Ξ” Vmax.102 2Vmax/B

D

0.297

0.166

0.058

C

0.091

0.051

0.057

B

0.065

0.036

0.057

4.884 2.261 A Sumber : Hasil Perhitungan 2014

0.042

Kemudian dari grafik hubungan Ξ”x102 dengan 2x/B didapatkan : Section

Vb/Vo

Vo (m/dt)

Vb (m/dt)

D

0.407

1.370

0.558

C

0.407

1.370

0.558

B

0.407

1.370

0.558

0.338 1.370 A Sumber : Hasil Perhitungan 2014

0.463

Keterangan : V0 : kecepatan sebelum belokan Vb : kecepatan maksimum pada belokan

Related Documents

4. Bab 4 Perc. 1.docx
December 2019 33
Laprak Perc 4.docx
July 2020 13
Bab 4
May 2020 52
Bab 4
December 2019 75
Bab 4
November 2019 71

More Documents from ""