20190204 - Peubahan Rab Reaktivasi Jabar.pdf

  • Uploaded by: Ibnu Farhan Kathin
  • 0
  • 0
  • October 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View 20190204 - Peubahan Rab Reaktivasi Jabar.pdf as PDF for free.

More details

  • Words: 255
  • Pages: 2
STUDI KELAYAKAN DAN BASIC ENGINEERING DESAIN REAKTIVASI JALUR KERETA API DI JAWA BARAT RAB AWAL KEBUTUHAN (1)

DURASI VOLUME SATUAN (2)

(3) = (2)x(1)

(4)

ls ls ls ls ls ls

URAIAN PEKERJAAN

HARGA SATUAN (Rp)

JUMLAH (Rp)

(5)

(6)

(7) = (3)x(6)

III. SURVEI TOPOGRAFI DAN PENYELIDIKAN TANAH 3.1 Survey Pendahuluan 3.2 Survey Topografi 3.3 Survey Penyelidikan Tanah dengan Bor Mesin (interval 5.000 m) 3.4 Survey Penyelidikan Tanah dengan Sondir/CPT 25 Ton (Interval 3.000 m) 3.5 Survey Investigasi Terowongan 3.6 Survey Hidrologi JUMLAH III

75.113.400,00 2.349.413.400,00 1.571.587.400,00 175.959.400,00 252.149.375,00 676.829.700,00 5.101.052.675,00

RAB PERUBAHAN KEBUTUHAN (1)

DURASI VOLUME SATUAN (2)

(3) = (2)x(1)

(4)

ls ls ls ls ls ls

URAIAN PEKERJAAN

HARGA SATUAN (Rp)

JUMLAH (Rp)

(5)

(6)

(7) = (3)x(6)

III. SURVEI TOPOGRAFI DAN PENYELIDIKAN TANAH 3.1 Survey Pendahuluan 3.2 Survey Topografi 3.3 Survey Penyelidikan Tanah dengan Bor Mesin (interval 5.000 m) 3.4 Survey Penyelidikan Tanah dengan Sondir/CPT 25 Ton (Interval 3.000 m) 3.5 Survey Investigasi Terowongan 3.6 Survey Hidrologi JUMLAH III

Page 1 of 2

75.113.400,00 2.090.963.400,00 1.504.492.400,00 168.709.400,00 252.149.375,00 600.329.700,00 4.691.757.675,00

STUDI KELAYAKAN DAN BASIC ENGINEERING DESAIN REAKTIVASI JALUR KERETA API DI JAWA BARAT RAB AWAL JUMLAH I JUMLAH II JUMLAH III JUMLAH IV TOTAL PPN 10% TOTAL + PPN 10%

2.397.910.950,00 210.000.000,00 5.101.052.675,00 19.269.800,00 7.728.233.425,00 772.823.342,50 8.501.056.767,50

RAB PERUBAHAN JUMLAH I JUMLAH II JUMLAH III JUMLAH IV TOTAL PPN 10% TOTAL + PPN 10%

2.397.910.950,00 210.000.000,00 4.691.757.675,00 19.269.800,00 7.318.938.425,00 731.893.842,50 8.050.832.267,50

SELISIH RAB AWAL DAN PERUBAHAN SELISIH RAB AWAL DAN PERUBAHAN (TERMASUK PPN 10%)

Page 2 of 2

409.295.000,00 450.224.500,00

Related Documents


More Documents from "Raffi"