2 Relacion De Insumos.xlsx

  • Uploaded by: Ana Dorcas Nhoqui
  • 0
  • 0
  • June 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View 2 Relacion De Insumos.xlsx as PDF for free.

More details

  • Words: 168
  • Pages: 2
RELACION DE INSUMOS ACTIVIDAD

: TECHADO EN DUCTO PARA LA PROTECCION DE ESCALERA DE ACCESO A LA GERENCIA DE INFRAESTRUCTURA OBRAS Y CATASTRO

PROPIETARIO : MUNICIPALIDAD DISTRITAL DE NESHUYA UBICACION : DPTO:UCAYALI PROV:PADRE ABAD DIST:NESHUYA LOC:MONTE ALEGRE FECHA : 21/03/2019 Ind Unid DescripciĆ³n Cantidad Costo . . MANO DE OBRA 47 OPERARIO hh 8.00 10.00 47 OFICIAL hh 16.00 8.75 47 PEON hh 24.00 6.25 MATERIALES 65 TUBO DE NEGRO RECTANGULAR 1 1/2" x 6.4m x 3mm m 24.00 14.00 65 TUBO DE NEGRO RECTANGULAR 1" x 6.4m x 3mm m 33.00 12.50 30 SOLDADURA SELLO CORD kg 2.00 25.00 56 CALAMINA GALVANIZADA 0.80m X 1.80m E=0.22mm pln 21.00 20.00 54 PINTURA ZINCROMATO (BASE) gln 1.00 70.40 2 CLAVO CALAMINERO ESPIRALADO 2 1/2" kg 1.00 10.00 EQUIPO 49 GRUPO DE SOLDADURA he 8.00 15.00 37 HERRAMIENTAS MANUALES %mo 3.00 370.00 TOTAL: Gra cias por su co mpr a

CCESO A LA

LEGRE Total 370.00 80.00 140.00 150.00 1,298.90 336.00 412.50 50.00 420.00 70.40 10.00 131.10 120.00 11.10 1,800.00

Related Documents


More Documents from ""

Informe Quimica.docx
June 2020 5
June 2020 4
June 2020 2