COMPUTOS METRICOS ORDEN

PROYECTO: C-FPS-LPZ-006111 CORO CORO MUNICIPIO: CORO) COMUNIDAD: JAYUMA LLALLAGU SUPERVISION: ING. CONTRATISTA: EMPRESA CONSTRU Nº

DESCRIPCIÓN

UNIDAD

128- RED DE DISTRIBUCION 2 REPLANTEO Y CONTROL DE TUBERIAS REPLANTEO TUBERIA D=2"

M Tramo Tanque a Paso de Quebrada Tramo Paso de Quebrada a Poblasion (Calle 3) Avenida "A" entre Av. B y Calle 3 Avenida "A" entre Av. C y Calle B Avenida "A" entre Calle 2 y Av. C Avenida "A" entre Calle 1 y Calle 2 Calle 1 entre Calla 4 y Av. A Calle 2 entre Calla 4 y Av. A Av. C entre Calle 4 y Av. A Av. B entre Calle 4 y Av. A Calle 3 entre Rio Jayuma y Av. A Calle 4 entre cancha y Av. D Calle 4 entre Av. D y Av. C Calle 4 entre Calle 2 y Av. C Calle 4 entre Av. C y Av. B Calle 4 entre Av. B y Rio Jayuma Av. D entre Calle 5 y Calle 4 Av. C entre Calle 5 y Calle 4 Av. B entre Calle 5 y Calle 4

REPLANTEO TUBERIA D=1 1/2" Av. D entre Calle 5 y Calle 6 Av. D entre Calle 5 y Calle 6 Av. D entre Calle 7 y Calle 6 Av. C entre Calle 7 y Calle 8 Av. B entre Calle 8 y Calle 5 Calle 5 entre Av. D y Av. C Calle 6 entre Cancha y Av. D Calle 6 entre Av. D y Av. C Calle 8 entre Av. C y Av. B Pág. 1



DESCRIPCIÓN

UNIDAD

REPLANTEO TUBERIA D=1" REPLANTEO TUBERIA D=3/4" Cancha entre Calle 1 y Cementerio Av. B entre Av. A y Cerro 951 PROV Y TEND TUBERIA PVC SDR 21 (A.G.) D=2"

M

Tramo Tanque a Paso de Quebrada Tramo Paso de Quebrada a Poblasion (Calle 3) Avenida "A" entre Av. B y Calle 3 Avenida "A" entre Av. C y Calle B Avenida "A" entre Calle 2 y Av. C Avenida "A" entre Calle 1 y Calle 2 Calle 1 entre Calla 4 y Av. A Calle 2 entre Calla 4 y Av. A Av. C entre Calle 4 y Av. A Av. B entre Calle 4 y Av. A Calle 3 entre Rio Jayuma y Av. A Calle 4 entre cancha y Av. D Calle 4 entre Av. D y Av. C Calle 4 entre Calle 2 y Av. C Calle 4 entre Av. C y Av. B Calle 4 entre Av. B y Rio Jayuma Av. D entre Calle 5 y Calle 4 Av. C entre Calle 5 y Calle 4 Av. B entre Calle 5 y Calle 4 950 PROV Y TEND TUBERIA PVC SDR 21 (A.G.) D=1.1/2"

M Av. D entre Calle 5 y Calle 6 Av. D entre Calle 5 y Calle 6 Av. D entre Calle 7 y Calle 6 Av. C entre Calle 7 y Calle 8 Av. B entre Calle 8 y Calle 5 Calle 5 entre Av. D y Av. C Calle 6 entre Cancha y Av. D Calle 6 entre Av. D y Av. C Calle 8 entre Av. C y Av. B

943 PROV. Y TENDIDO TUBERIA PVC SDR 21 (E-C) D=1 PULG

M

Pág. 2



DESCRIPCIÓN

UNIDAD

942 PROV. Y TEND. TUBERIA PVC SDR 21 (E-C) D=3/4 PULG Cancha entre Calle 1 y Cementerio Av. B entre Av. A y Cerro

M

155 RELLENO DE ZANJA CON TIERRA CERNIDA RELLENO TUBERIA D=2"

M3

Tramo Tanque a Paso de Quebrada Tramo Paso de Quebrada a Poblasion (Calle 3) Avenida "A" entre Av. B y Calle 3 Avenida "A" entre Av. C y Calle B Avenida "A" entre Calle 2 y Av. C Avenida "A" entre Calle 1 y Calle 2 Calle 1 entre Calla 4 y Av. A Calle 2 entre Calla 4 y Av. A Av. C entre Calle 4 y Av. A Av. B entre Calle 4 y Av. A Calle 3 entre Rio Jayuma y Av. A Calle 4 entre cancha y Av. D Calle 4 entre Av. D y Av. C Calle 4 entre Calle 2 y Av. C Calle 4 entre Av. C y Av. B Calle 4 entre Av. B y Rio Jayuma Av. D entre Calle 5 y Calle 4 Av. C entre Calle 5 y Calle 4 Av. B entre Calle 5 y Calle 4 RELLENO TUBERIA D=1 1/2" Av. D entre Calle 5 y Calle 6 Av. D entre Calle 5 y Calle 6 Av. D entre Calle 7 y Calle 6 Av. C entre Calle 7 y Calle 8 Av. B entre Calle 8 y Calle 5 Calle 5 entre Av. D y Av. C Calle 6 entre Cancha y Av. D Calle 6 entre Av. D y Av. C Calle 8 entre Av. C y Av. B RELLENO TUBERIA D=1" RELLENO TUBERIA D=3/4" Pág. 3



DESCRIPCIÓN

UNIDAD Cancha entre Calle 1 y Cementerio Av. B entre Av. A y Cerro

2789 PROV. E INST. ACCESORIOS RED DE DISTRIBUCION Accesorios en redes de distrubucion

GLB

2303 PRUEBA HIDRAULICA Y DESINFECCIÓN DE TUBERIAS DE AGUA POTABLE PRUEBA TUBERIA D=2" Tramo Tanque a Paso de Quebrada Tramo Paso de Quebrada a Poblasion (Calle 3) Avenida "A" entre Av. B y Calle 3 Avenida "A" entre Av. C y Calle B Avenida "A" entre Calle 2 y Av. C Avenida "A" entre Calle 1 y Calle 2 Calle 1 entre Calla 4 y Av. A Calle 2 entre Calla 4 y Av. A Av. C entre Calle 4 y Av. A Av. B entre Calle 4 y Av. A Calle 3 entre Rio Jayuma y Av. A Calle 4 entre cancha y Av. D Calle 4 entre Av. D y Av. C Calle 4 entre Calle 2 y Av. C Calle 4 entre Av. C y Av. B Calle 4 entre Av. B y Rio Jayuma Av. D entre Calle 5 y Calle 4 Av. C entre Calle 5 y Calle 4 Av. B entre Calle 5 y Calle 4

M

PRUEBA TUBERIA D=1 1/2" Av. D entre Calle 5 y Calle 6 Av. D entre Calle 5 y Calle 6 Av. D entre Calle 7 y Calle 6 Av. C entre Calle 7 y Calle 8 Av. B entre Calle 8 y Calle 5 Calle 5 entre Av. D y Av. C Calle 6 entre Cancha y Av. D Calle 6 entre Av. D y Av. C Calle 8 entre Av. C y Av. B PRUEBA TUBERIA D=1" Pág. 4



DESCRIPCIÓN

UNIDAD

Pág. 5



DESCRIPCIÓN

UNIDAD

PRUEBA TUBERIA D=3/4" Cancha entre Calle 1 y Cementerio Av. B entre Av. A y Cerro 2661 RELLENO Y COMPACTADO DE TIERRA COMUN C/COMPACTADOR MECANICO RELLENO TUBERIA D=2" Tramo Tanque a Paso de Quebrada Tramo Paso de Quebrada a Poblasion (Calle 3) Avenida "A" entre Av. B y Calle 3 Avenida "A" entre Av. C y Calle B Avenida "A" entre Calle 2 y Av. C Avenida "A" entre Calle 1 y Calle 2 Calle 1 entre Calla 4 y Av. A Calle 2 entre Calla 4 y Av. A Av. C entre Calle 4 y Av. A Av. B entre Calle 4 y Av. A Calle 3 entre Rio Jayuma y Av. A Calle 4 entre cancha y Av. D Calle 4 entre Av. D y Av. C Calle 4 entre Calle 2 y Av. C Calle 4 entre Av. C y Av. B Calle 4 entre Av. B y Rio Jayuma Av. D entre Calle 5 y Calle 4 Av. C entre Calle 5 y Calle 4 Av. B entre Calle 5 y Calle 4

M3

RELLENO TUBERIA D=1 1/2" Av. D entre Calle 5 y Calle 6 Av. D entre Calle 5 y Calle 6 Av. D entre Calle 7 y Calle 6 Av. C entre Calle 7 y Calle 8 Av. B entre Calle 8 y Calle 5 Calle 5 entre Av. D y Av. C Calle 6 entre Cancha y Av. D Calle 6 entre Av. D y Av. C Calle 8 entre Av. C y Av. B RELLENO TUBERIA D=1" RELLENO TUBERIA D=3/4" Cancha entre Calle 1 y Cementerio Av. B entre Av. A y Cerro Pág. 6



DESCRIPCIÓN

UNIDAD

2748 EXCAVACION 0-1 M S/AGOTAMIENTO TERRENO SEMIDURO EXCAVACION TUBERIA D=2" Tramo Tanque a Paso de Quebrada tramo restado por contraparte de tanque a paso de quebrada tramo restado por contraparte de tanque a paso de quebrada Tramo real excavado de tanque a paso de quebrada CONTRAPARTE DEL MUNICIPIO (Tramo Paso de Quebrada a Poblasion (Calle 3)) Avenida "A" entre Av. B y Calle 3 Avenida "A" entre Av. C y Calle B Avenida "A" entre Calle 2 y Av. C CONTRAPARTE DEL MUNICIPIO (Avenida "A" entre Calle 1 y Calle 2) Calle 1 entre Calla 4 y Av. A Calle 2 entre Calla 4 y Av. A Av. C entre Calle 4 y Av. A Av. B entre Calle 4 y Av. A Calle 3 entre Rio Jayuma y Av. A Calle 4 entre cancha y Av. D Calle 4 entre Av. D y Av. C Calle 4 entre Calle 2 y Av. C Calle 4 entre Av. C y Av. B Calle 4 entre Av. B y Rio Jayuma Av. D entre Calle 5 y Calle 4 Av. C entre Calle 5 y Calle 4 CONTRAPARTE DEL MUNICIPIO (Av. B entre Calle 5 y Calle 4)

M3

EXCAVACION TUBERIA D=1 1/2" Av. D entre Calle 5 y Calle 6 Av. D entre Calle 5 y Calle 6 Av. D entre Calle 7 y Calle 6 Av. C entre Calle 7 y Calle 8 Av. B entre Calle 8 y Calle 5 Calle 5 entre Av. D y Av. C Calle 6 entre Cancha y Av. D Calle 6 entre Av. D y Av. C Calle 8 entre Av. C y Av. B EXCAVACION TUBERIA D=1" EXCAVACION TUBERIA D=3/4" Cancha entre Calle 1 y Cementerio Av. B entre Av. A y Cerro Pág. 7



DESCRIPCIÓN

UNIDAD

Pág. 8



DESCRIPCIÓN

UNIDAD

N/I EXCAVACION EN ROCA

M3 Av. "B" entre Calle 5 y Calle 4 Av. "C" entre Calle 7 y Calle 6

165 - LINEA DE IMPULSION 2 REPLANTEO Y CONTROL DE TUBERIAS

M

Tuberia de impulsion, caseta a red de impulsion Tuberia de red de impulsion a Tanque de Almacenamiento

893 PROV. Y TENDIDO TUBERIA PVC E-40 (E-C) D=2 PULG Tuberia de impulsion, caseta a red de impulsion Tuberia de red de impulsion a Tanque de Almacenamiento

M

3424 PROV. E INST. ACCESORIOS PARA LINEA DE IMPULSION Instalacion de accesorios de linea de impulsion

GLB

155 RELLENO DE ZANJA CON TIERRA CERNIDA Relleno Tuberia de impulsion, caseta a red de impulsion Relleno Tuberia de red de impulsion a Tanque de Almacenamiento

M3

2303 PRUEBA HIDRAULICA Y DESINFECCIÓN DE TUBERIAS DE AGUA POTABLE Tuberia de impulsion, caseta a red de impulsion Tuberia de red de impulsion a Tanque de Almacenamiento

M

2661 RELLENO Y COMPACTADO DE TIERRA COMUN C/COMPACTADOR MECANICO Tuberia de impulsion, caseta a red de impulsion Tuberia de red de impulsion a Tanque de Almacenamiento

M3

2748 EXCAVACION 0-1 M S/AGOTAMIENTO TERRENO SEMIDURO Tuberia de impulsion, caseta a red de impulsion Tuberia de red de impulsion a Tanque de Almacenamiento

M3

166 - CAMARA DE VALVULAS 3 REPLANTEO DE ESTRUCTURAS Y EDIFICACIONES

M2 Pág. 9



DESCRIPCIÓN

UNIDAD

Replanteo camara de valvulas tanque de almacenamiento Replanteo camara para hipoclorador

1692 CAMARA DE VALVULAS DE HORMIGON CICLOPEO Camara de valvulas tanque de almacenamiento Camara para hipoclorador

PZA

2747 TAPA DE CAMARA DE HoAo e= 7cm Tapa camara de valvulas tanque de almacenamiento Tapa camara para hipoclorador

M2

2661 RELLENO Y COMPACTADO DE TIERRA COMUN C/COMPACTADOR MECANICO Relleno camara de valvulas tanque de almacenamiento (lado x) Relleno camara de valvulas tanque de almacenamiento (lado y)

M3

2793 PROV. E INST. ACCESORIOS CAMARA DE LLAVES Accesorios camara de valvulas tanque de almacenamiento Camara para hipoclorador

GLB

2748 EXCAVACION 0-1 M S/AGOTAMIENTO TERRENO SEMIDURO Excavacion camara de valvulas tanque de almacenamiento

M3

196 - PASOS DE QUEBRADA 3 REPLANTEO DE ESTRUCTURAS Y EDIFICACIONES

M2 Replanteo de paso de quebrada

92

EXCAVACION DE 0-2 M SUELO SEMIDURO

3824 PASO DE QUEBRADA L=10 +/-2m C/ACCESORIOS Y ANCLAJE

M3

PZA Pág. 10



DESCRIPCIÓN

UNIDAD Accesorios de tuberia PN10

Pág. 11



DESCRIPCIÓN

UNIDAD

2399 PROV. Y TENDIDO TUBERIA PEAD Ø=2" (63mm)-PN10 Tendido de tuberia enterrada, en quebrada (paso de rio)

M

I/N

M3

EXCAVACION 0-4 M C/AGOTAMIENTO SUELO SEMIDURO Excavacion de suelo p/tendido de tuberia PEAD D=2" (Paso de quebrada)

247 - MEDIDAS DE MITIGACION AMBIENTAL 1763 CINTA PLASTICA DE SEGURIDAD

M Total cinta plastica de seguridad

1773 CONTENEDOR DE RESIDUOS SOLIDOS

PZA Contenedor para residuos solidos

2660 GESTION Y DISPOSICION DE RESIDUOS SOLIDOS Gestion y disposicion de residuos solidos

GLB

3890 SEÑALIZACION FIJA

PZA Señalizacion de seguridad

3891 SEÑALIZACION MOVIL (TIPO CABALLETE)

PZA Señalizacion tipo caballete

315 - CERRAMIENTO PERIMETRAL PARA TANQUE DE ALMACENAMIENTO 3 REPLANTEO DE ESTRUCTURAS Y EDIFICACIONES REPLANTEO CERCO TANQUE Replanteo de cerco tanque (lado x) Replanteo de cerco tanque (lado y)

M2

Pág. 12



DESCRIPCIÓN

UNIDAD

2748 EXCAVACION 0-1 M S/AGOTAMIENTO TERRENO SEMIDURO Excavacion de cerco tanque (lado x) Excavacion de cerco tanque (lado y)

M3

260 CIMIENTO CORRIDO HORMIGON CICLOPEO 40% PIEDRA DESPLAZADORA Cimientos de cerco tanque (lado x) Cimientos de cerco tanque (lado y)

M3

2302 SOBRECIMIENTO DE HºCº 50% DE PIEDRA DESPLAZADORA Sobrecimientos de cerco tanque (lado x) Sobrecimientos de cerco tanque (lado y)

M3

3522 PROV. Y COLOC. MALLA OLIMPICA Y TUBOS FG 2" C/2.5m CON ALAMBRE DE PUAS Cerco con malla olimpica (lado x) Menos puerta (lado x) Cerco con malla olimpica (lado y)

M2

842 PUERTA DE MALLA OLIMPICA (2 X 1 M)

PZA Puerta de malla olimpica

708 QUINCALLERIA ALDABA, CERROJOS, CADENA Y CANDADO Quincalleria en puerta de malla olimpica

PZA

317 - SISTEMA DE BOMBEO CARCAMO 3158 PROV. E INST. DE ACCESORIOS PARA BOMBAS CENTRIFUGAS accesorios para bomba de agua

GLB

1972 TABLERO DE CONTROL PARA BOMBAS + TEMORIZADOR

PZA tablero de control+accesorios

Pág. 13



DESCRIPCIÓN

UNIDAD

Pág. 14



DESCRIPCIÓN

UNIDAD PZA

3410 PROV. E INST. BOMBA ELECTRICA CENTRIFUGA 3 HP C/ACCESORIOS bomba de agua

M3

2287 HORMIGON ARMADO H21 base losa de fondo carcamo muros de hormigon armado Carcamo de Bombeo lado A Lado B Cuello carcamo de bombeo lado A Cuello carcamo de bombeo lado A Cuello carcamo de bombeo lado B Cuello carcamo de bombeo lado B tapa losa de hormigon armado losa tapa H°A° menos tapa de ingreso

M2

385 REVOQUE CON ADITIVO IMPERMEABILIZANTE 1:3 revoque losa de fondo revoque paredes interiores (perimetro) revoque de tapa losa cara interior menos tapa de ingreso Revoque Cuello carcamo (perimetro)

M2

2619 ZAMPEADO DE PIEDRA zampeado de piedra en la base

M2

575 PINTURA EXTERIOR LATEX pintado exterior de carcamo de bombeo (perimetro)

92

EXCAVACION DE 0-2 M SUELO SEMIDURO

M3

Pág. 15



DESCRIPCIÓN

UNIDAD

840 PROVISION Y COLOCACION TAPA METALICA e=1/8" tapa metalica de ingreso Carcamo de bombeo

M2

2935 REVOQUE EXTERIOR DE CEMENTO revoque exterior carcamo de bombeo (perimetro) revoque exterior losa tapa menos tapa de ingreso Revoque Cuello carcamo (perimetro)

M2

1809 PRUEBA DE ESTANQUEIDAD Y DESINFECCION TANQUES prueba y desinfeccion carcamo de bombeo

M3

3333 BASE DE HORMIGON POBRE e=5cm base de hormigon pobre e=5cm, carcamo de bombeo

M2

762 ESCALERA METALICA

M Escalera de ingreso a Carcamo de Bombeo

3320 PROV. Y COLOC. GRAVA SELECCIONADA D=3/4" a 1" Colocado de grava seleccionado filtro 1" (lado x) Colocado de grava seleccionado filtro 1" (lado y) Colocado de grava seleccionado filtro 3/4" (lado x) Colocado de grava seleccionado filtro 3/4" (lado y)

M3

3

REPLANTEO DE ESTRUCTURAS Y EDIFICACIONES Replanteo de obra de toma Carcamo de Bombeo

M2

I/N

EXCAVACION 0-4 M C/AGOTAMIENTO SUELO SEMIDURO Excavacion de suelo para Carcamo de Bombeo

M3

44 - ACTIVIDADES COMPLEMENTARIAS 2040 LIMPIEZA Y RETIRO DE ESCOMBROS EN VOLQUETA

M3 total retiro de escombros

2050 PROVISION Y COLOCACION PLACA ENTREGA DE OBRAS compra y colocado de placa de entrega de obra

PZA

Pág. 16



DESCRIPCIÓN

UNIDAD

Pág. 17



DESCRIPCIÓN

UNIDAD

46 - ACTIVIDADES PRELIMINARES 2049 PROVISION Y COLOCACION LETRERO DE OBRA FPS

PZA colocado de letrero de obra

2312 INSTALACION DE FAENAS GENERAL

GLB intalado de almacenes

81

LIMPIEZA Y DESBROCE

M2 TOMA TANQUE

2659 ANALISIS FISICO, QUIMICO Y MICROBIOLOGICO DE AGUAS total analisis de agua en laboratorio

MTR

2514 ENSAYO DE SUELOS SPT (CAPACIDAD PORTANTE DEL SUELO)

PTO ensayo de SPT

72 - CASETA DE BOMBEO 476 CUBIERTA DE CALAMINA GALVANIZADA Nº28 INCL. MADERAMEN Cubierta de calamina mas maderamen

M2

2748 EXCAVACION 0-1 M S/AGOTAMIENTO TERRENO SEMIDURO excavacion de cimientos (eje A, eje B) excavacion de cimientos (eje 1, eje 2) excavacion de gradas ingreso a caseta excavacion para empedrado de piso

M3

190 HORMIGON ARMADO PARA VIGA DE ENCADENADO

M3 viga cadena (eje A, eje B) viga cadena (eje 1, eje 2)

303 CELOSIA DE CERAMICA (16 X 16 X 12 CM)

M2 Hilera de celosia de ceramica (eje A, eje B) Hilera de celosia de ceramica (eje 1, eje 2)

3210 EMPEDRADO Y CONTRAPISO DE CEMENTO H=5CM

M2 Pág. 18



DESCRIPCIÓN

UNIDAD empedrado para piso

177 HORMIGON SIMPLE FC=210 KG/CM2

M3

608 IMPERMEABILIZACION DE SOBRECIMIENTOS impermeabilizacion con polietileno (eje A) impermeabilizacion con polietileno (eje B) impermeabilizacion con polietileno (eje 1) impermeabilizacion con polietileno (eje 2)

M2

283 MURO DE LADRILLO GAMBOTE E=12 CM UNA CARA VISTA

M2

eje A eje B eje 1 eje 2 eje A mojinete eje B mojinete eje 1 mojinete (area triangular) eje 2 mojinete (area triangular)

3

REPLANTEO DE ESTRUCTURAS Y EDIFICACIONES

M2 replanteo de caseta

92

EXCAVACION DE 0-2 M SUELO SEMIDURO

M3

845 PUERTA METALICA DE 1/8 PULG

M2 puerta metalica p/caseta

1960 PROV.E INST. DE LUMINARIAS INCANDESCENTES DE 100 W

PZA intalacion de luminaria

Pág. 19



DESCRIPCIÓN

UNIDAD

2310 INSTALACION ELECTRICA PUNTOS DE TOMA CORRIENTE

PTO intalacion de toma corriente

714 CHAPA PARA PUERTA EXTERIOR

PZA chapa p/puerta

1162 PROVISION Y COLOCACION HIPOCLORADOR IN-LINE

PZA hipoclorador con accesorios

2935 REVOQUE EXTERIOR DE CEMENTO REVOQUE DE ZOCALO EXTERIOR

M2 eje A eje B eje B menos puerta eje 1 eje 2

REVOQUE DE VIGA CADENA eje A eje B eje 1 eje 2

220 HORMIGON CICLOPEO CON 50% PIEDRA DESPLAZADORA

M3

Cimientos (eje A, eje B) Cimientos (eje 1, eje 2) Sobrecimientos (eje A) Sobrecimientos (eje B) Sobrecimientos (eje 1) Sobrecimientos (eje 2) gradas ingreso a caseta (peldaño 1) gradas ingreso a caseta (peldaño 2)

575 PINTURA EXTERIOR LATEX PINTURA DE ZOCALO EXTERIOR

M2 eje A eje B eje B menos puerta eje 1 eje 2 Pág. 20



DESCRIPCIÓN

UNIDAD

PINTURA DE VIGA CADENA eje A eje B eje 1 eje 2 75 - CERCO DE PROTECCION CARCAMO 842 PUERTA DE MALLA OLIMPICA (2 X 1 M)

PZA Puerta de malla olimpica obra de toma

708 QUINCALLERIA ALDABA, CERROJOS, CADENA Y CANDADO Quincalleria en puerta de malla olimpica

PZA

220 HORMIGON CICLOPEO CON 50% PIEDRA DESPLAZADORA Cimiento de cerco Obra de toma (eje 1) Cimiento de cerco Obra de toma (eje 2) Cimiento de cerco Obra de toma (eje 3) Cimiento de cerco Obra de toma (eje A) Cimiento de cerco Obra de toma (eje B) Sobrecimiento de cerco Obra de toma (eje 1) Sobrecimiento de cerco Obra de toma (eje 2) Sobrecimiento de cerco Obra de toma (eje 3) Sobrecimiento de cerco Obra de toma (eje A) Sobrecimiento de cerco Obra de toma (eje B)

M3

92

M3

EXCAVACION DE 0-2 M SUELO SEMIDURO Excavacion p/cimiento (eje 1) Excavacion p/cimiento (eje 2) Excavacion p/cimiento (eje 3) Excavacion p/cimiento (eje A) Excavacion p/cimiento (eje B)

3522 PROV. Y COLOC. MALLA OLIMPICA Y TUBOS FG 2" C/2.5m CON ALAMBRE DE PUAS Malla olimpica (eje 1) Malla olimpica (eje 2) Menos puerta de malla olimpica (eje 2) Malla olimpica (eje 3) Malla olimpica (eje A) Malla olimpica (eje B)

M2

Pág. 21

Nº 3

DESCRIPCIÓN

UNIDAD

REPLANTEO DE ESTRUCTURAS Y EDIFICACIONES REPLANTEO CERCO CARCAMO Cimiento de cerco Obra de toma (eje 1) Cimiento de cerco Obra de toma (eje 2) Cimiento de cerco Obra de toma (eje 3) Cimiento de cerco Obra de toma (eje A) Cimiento de cerco Obra de toma (eje B)

M2

111 - OBRA DE TOMA 3320 PROV. Y COLOC. GRAVA SELECCIONADA D=3/4" a 1"

M3

2788 PROV. E INST. ACCESORIOS OBRA DE TOMA

GLB

3

M2

REPLANTEO DE ESTRUCTURAS Y EDIFICACIONES

220 HORMIGON CICLOPEO CON 50% PIEDRA DESPLAZADORA

M3

385 REVOQUE CON ADITIVO IMPERMEABILIZANTE 1:3

M2

92

EXCAVACION DE 0-2 M SUELO SEMIDURO

M3

81

LIMPIEZA Y DESBROCE

M2

1828 SELLO SANITARIO

M3

3009 HORMIGON ARMADO PARA LOSA TAPA

M3

840 PROVISION Y COLOCACION TAPA METALICA e=1/8"

M2

2935 REVOQUE EXTERIOR DE CEMENTO

M2

2619 ZAMPEADO DE PIEDRA

M2 Pág. 22



DESCRIPCIÓN

UNIDAD

3333 BASE DE HORMIGON POBRE e=5cm

M2

132 - TANQUE DE ALMACENAMIENTO 3333 BASE DE HORMIGON POBRE e=5cm

M2 Hormigon de limpieza tanque

575 PINTURA EXTERIOR LATEX PINTADO DE TANQUE

M2 Pintado exterior de muro (lado x) Pintado exterior de muro (lado y) Pintado exterior tapa losa menos tapa de ingreso

762 ESCALERA METALICA

M Escalera de ingreso a tanque

1809 PRUEBA DE ESTANQUEIDAD Y DESINFECCION TANQUES prueba de hermeticidad de tante de almacenamiento

M3

3

M2

REPLANTEO DE ESTRUCTURAS Y EDIFICACIONES Replanteo de tanque de almacenamiento

2287 HORMIGON ARMADO H21 HORMIGON ARMADO MURO PARA TANQUE

M3 Hormigon armado muros tanque (lado x) Hormigon armado muros tanque (lado y)

1570 PROV. E INST. ACCESORIOS PARA VENTILACION DE TANQUES Instalacion de tuberia de ventilacion con accesorios

GLB

2661 RELLENO Y COMPACTADO DE TIERRA COMUN C/COMPACTADOR MECANICO Relleno de suelo perimetral tanque (lado x) Relleno de suelo perimetral tanque (lado y)

M3

Pág. 23



DESCRIPCIÓN

UNIDAD

Pág. 24



DESCRIPCIÓN

UNIDAD

2935 REVOQUE EXTERIOR DE CEMENTO REVOQUE DE TANQUE

M2 Revoque exterior de muro (lado x) Revoque exterior de muro (lado y)

3419 PROV. E INST. ACCESORIOS DE INGRESO P/TANQUE SEMIENTERRADO Instalacion de tuberia de ingreso FG, mas accesorios de ingreso

GLB

3420 PROV. E INST. ACCESORIOS DE LIMPIEZA Y REBALSE P/TANQUE SEMIENTERRADO Instalacion de tuberia de limpieza FG, mas accesorios de ingreso

GLB

3465 PROV. E INST. ACCESORIOS DE SALIDA P/TANQUE SEMIENTERRADO Instalacion de tuberia de salida FG, mas accesorios de ingreso

GLB

92

M3

EXCAVACION DE 0-2 M SUELO SEMIDURO Excavacion para tanque de almacenamiento

220 HORMIGON CICLOPEO CON 50% PIEDRA DESPLAZADORA vaciado de acera en tapa camara de salida Cordones de proteccion en la camara de salida

M3

385 REVOQUE CON ADITIVO IMPERMEABILIZANTE 1:3

M2

Revoque interior de muro (lado x) Revoque interior de muro (lado y) Revoque interior losa base tanque Revoque interior losa tapa interior tanque menos tapa de ingreso

3009 HORMIGON ARMADO PARA LOSA TAPA

M3 Losa tapa para tanque menos tapa de ingreso

Pág. 25



DESCRIPCIÓN

UNIDAD

194 HORMIGON ARMADO PARA LOSA DE FONDO LOSA DE FONDO TANQUE

M3 Losa de fondo tanque

840 PROVISION Y COLOCACION TAPA METALICA e=1/8" Tapa metalica p/tanque de almacenamiento

M2

2635 SOLADURA DE PIEDRA E=0.15m

M2 Soladura de piedra para tanque de almacenamiento

76 - CONEXION DOMICILIARIA 2748 EXCAVACION 0-1 M S/AGOTAMIENTO TERRENO SEMIDURO Excavacion para tuberia pileta 1 (Escuela Jayuma) Excavacion camara desgrasadora pileta 1 Excavacion pozo absorvente pileta 1 Excavacion para tuberia pileta 2 (Plaza Principal) Excavacion camara desgrasadora pileta 2 Excavacion pozo absorvente pileta 2 Excavacion para tuberia pileta 3 (Avenida A entre Calle 3 y Centro de salud) Excavacion camara desgrasadora pileta 3 Excavacion pozo absorvente pileta 3 Excavacion para tuberia pileta 4 (Centro de salud) Excavacion camara desgrasadora pileta 4 Excavacion pozo absorvente pileta 4 3241 CAJA DESGRASADORA PVC C-9 8"

M3

PZA Caja desgrasadora pileta 1 Caja desgrasadora pileta 2 Caja desgrasadora pileta 3 Caja desgrasadora pileta 4

889 PROV. Y TENDIDO TUBERIA PVC E-40 (E-C) D=1/2 PULG tuberia pileta 1 (Escuela Jayuma) tuberia pileta 2 (Plaza Principal) tuberia pileta 3 (Avenida A entre Calle 3 y Centro de salud) tuberia pileta 4 (Centro de salud)

M

Pág. 26



DESCRIPCIÓN

UNIDAD

3863 PROV. E INST. ACCESORIOS CONEXION DOMICILIARIA Accesorios de conexiones de pileta 1 Accesorios de conexiones de pileta 2 Accesorios de conexiones de pileta 3 Accesorios de conexiones de pileta 4

CNX

2661 RELLENO Y COMPACTADO DE TIERRA COMUN C/COMPACTADOR MECANICO Excavacion para tuberia pileta 1 (Escuela Jayuma) Excavacion para tuberia pileta 2 (Plaza Principal) Excavacion para tuberia pileta 3 (Avenida A entre Calle 3 y Centro de salud) Excavacion para tuberia pileta 4 (Centro de salud)

M3

155 RELLENO DE ZANJA CON TIERRA CERNIDA Excavacion para tuberia pileta 1 (Escuela Jayuma) Excavacion para tuberia pileta 2 (Plaza Principal) Excavacion para tuberia pileta 3 (Avenida A entre Calle 3 y Centro de salud) Excavacion para tuberia pileta 4 (Centro de salud)

M3

2

M

REPLANTEO Y CONTROL DE TUBERIAS Excavacion para tuberia pileta 1 (Escuela Jayuma) Excavacion para tuberia pileta 2 (Plaza Principal) Excavacion para tuberia pileta 3 (Avenida A entre Calle 3 y Centro de salud) Excavacion para tuberia pileta 4 (Centro de salud)

2834 PEDESTAL DE HoAo Y BASE PARA PILETA INCLUYE ACCESORIOS Pedestal y accesorios pileta 1 Pedestal y accesorios pileta 2 Pedestal y accesorios pileta 3 Pedestal y accesorios pileta 4

PZA

2658 POZO ABSORVENTE PARA PILETA (0,60 x 0,60 x 0,60 m)

PZA Pozo absorvente Pozo absorvente Pozo absorvente Pozo absorvente

para pileta 1 para pileta 2 para pileta 3 para pileta 4

2303 PRUEBA HIDRAULICA Y DESINFECCIÓN DE TUBERIAS DE AGUA POTABLE tuberia pileta 1 (Escuela Jayuma) tuberia pileta 2 (Plaza Principal)

M

Pág. 27



DESCRIPCIÓN

UNIDAD

tuberia pileta 3 (Avenida A entre Calle 3 y Centro de salud) tuberia pileta 4 (Centro de salud) 2635 SOLADURA DE PIEDRA E=0.15m

M2 Soladura de piedra para pedestal Soladura para pozo absorvente Soladura para camara de llave de paso piletas

91 - INSTALACIONES ELECTRICAS 2009 CABLEADO FLECHADO Y LIGADO CABLE DUPLEX ACSR 2 AWG

KM

2010 INSTALACION PUESTA A TIERRA VM2-11

PZA Instalacion puesta a tierra

2444 PROV. E INSTALACION DE TABLERO DE MEDICION Y PROTECCION

PZA

3192 PROV. E INST. DE PARARRAYOS ATMOSFERICO TIPO FRANKLIN

GLB

3407 PROV. Y MONTAJE DE SISTEMA DE TIERRA C/3 JABALINAS

GLB

3990 PROV. E INST. DE PARARRAYOS DE DISTRIBUCION VM5-6

PZA Pararrayos de distribucion

3992 PROV. E INSTALACION DE RIENDA

PZA

4

KM

REPLANTEO TOPOGRAFICO DE LINEA ELECTRICA Replanteo general de linea electrica

2002 CABLEADO, FLECHADO Y LIGADO CABLE ACSR 4 AWG

KM

1976 PLANTADO, RELLENO Y COMPACTADO POSTE DE 11 M

PZA Colocado de poste

92

EXCAVACION DE 0-2 M SUELO SEMIDURO

M3 Excavacion de suelo para postes Excavacion para dados de anclaje Pág. 28



DESCRIPCIÓN

UNIDAD

Pág. 29

Nº N/I

DESCRIPCIÓN

UNIDAD

ARMADO DE ESTRUCTURA VA1

PZA Cantidad armado de estructura VA1

N/I

ARMADO DE ESTRUCTURA VA5

PZA Cantidad armado de estructura VA5

N/I

ARMADO DE ESTRUCTURA VA5-1

PZA Cantidad armado de estructura VA5-1

N/I

ARMADO DE ESTRUCTURA VA5-3

PZA Cantidad armado de estructura VA5-3

N/I

ARMADO DE SECCIONADOR VM3-4

PZA Cantidad seccionador VM3-4

N/I

SISTEMA PUESTA A TIERRA C/TRATAMIENTO

PZA Cantidad puesta a tierra con tratamiento

N/I

ARMADO DE PUESTA A TIERRA VM2-12A

PZA Cantidad puesta a tierra VM2-12A

N/I

ARMADO DE RIENDA SIMPLE VE1-1

PZA Cantidad rienda simple VE1-1

N/I

ARMADO DE ANCLA F2-1

PZA Cantidad armado de ancla F2-1

N/I

ARMADO DE ESTRUCTURA VG10

PZA Cantidad armado de estructura VG10

N/I

INSTALACION DE TRANSFORMADOR 1Ø -15 KVA

PZA Cantidad transformador 15 KVA

N/I

ARMADO DE PROTECCION BT/XFO 1Ø CB -63A

PZA Cantidad protección

N/I

TENDIDO DE CONDUCTOR ACSR N°2

KM Total tendido de conductor ACSR N°2

N/I

TENDIDO DE CONDUCTOR ACSR N°4

KM Total tendido de conductor ACSR N°4

Pág. 30

Nº N/I

DESCRIPCIÓN

UNIDAD

PRUEBAS DE ENERGIZACION

GLB pruebas de energizacion

N/I

INSTALACION ACOMETIDA MONOFASICA

PZA instalacion acometida monofasica

167 - CAMARA PURGA DE LODOS 2795 PROV. E INST. ACCESORIOS PURGA DE LODOS

GLB Total accesorios p/purga de lodos

1692 CAMARA DE VALVULAS DE HORMIGON CICLOPEO

PZA Total camars de H°C°

2661 RELLENO Y COMPACTADO DE TIERRA COMUN C/COMPACTADOR MECANICO Relleno perimetral de las camaras (lado A) Relleno perimetral de las camaras (lado B)

M3

2747 TAPA DE CAMARA DE HoAo e= 7cm

M2 Tapas de camaras purga de lodos

2748 EXCAVACION 0-1 M S/AGOTAMIENTO TERRENO SEMIDURO Excavacio de camaras de purgas de lodo (suelo accidentado) Excavacio de camaras de purgas de aire

M3

3

M2

REPLANTEO DE ESTRUCTURAS Y EDIFICACIONES Replanteo de las camaras

2935 REVOQUE EXTERIOR DE CEMENTO Revoque exterior de las camaras de lodos (perimetro) Revoque interior de las camaras de lodo y aire

M2

Pág. 31

ETRICOS ORDEN DE CAMBIO Nº 1 C-FPS-LPZ-006111 - CONST. SIST. AGUA POTABLE JAYUMA LLALLAGUA (CORO CORO) CORO CORO JAYUMA LLALLAGUA EMPRESA CONSTRUCTORA FLORCICAR JUANITO VILLA QUISPE DIMENCIONES EN (M) LARGO ANCHO ALTURA

CANT.

ÁREA

VOLUMEN

PARCIAL

TOTAL 4431.89

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1

2,783.00 453.70 76.60 23.20 38.30 48.30 46.80 43.80 48.70 50.00 33.00 31.60 14.60 37.70 25.50 31.60 37.00 36.20 40.00

-

-

2,783.00 453.70 76.60 23.20 38.30 48.30 46.80 43.80 48.70 50.00 33.00 31.60 14.60 37.70 25.50 31.60 37.00 36.20 40.00

30.50 34.20 38.00 60.50 100.00 49.00 19.00 46.59 31.50

-

-

30.50 34.20 38.00 60.50 100.00 49.00 19.00 46.59 31.50 Pág. 32

DIMENCIONES EN (M) LARGO ANCHO ALTURA

CANT.

ÁREA

VOLUMEN -

-

PARCIAL

TOTAL -

1 1

89.00 34.00

-

-

89.00 34.00

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

2,783.00 453.70 76.60 23.20 38.30 48.30 46.80 43.80 48.70 50.00 33.00 31.60 14.60 37.70 25.50 31.60 37.00 36.20 40.00

-

-

2,783.00 453.70 76.60 23.20 38.30 48.30 46.80 43.80 48.70 50.00 33.00 31.60 14.60 37.70 25.50 31.60 37.00 36.20 40.00

3899.60

409.29 1 1 1 1 1 1 1 1 1

30.50 34.20 38.00 60.50 100.00 49.00 19.00 46.59 31.50

-

-

30.50 34.20 38.00 60.50 100.00 49.00 19.00 46.59 31.50 0.00

-

-

Pág. 33

DIMENCIONES EN (M) LARGO ANCHO ALTURA

CANT.

ÁREA

VOLUMEN

PARCIAL

TOTAL 123.00

1 1

89.00 34.00

-

-

89.00 34.00 354.57

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

2,783.00 453.70 76.60 23.20 38.30 48.30 46.80 43.80 48.70 50.00 33.00 31.60 14.60 37.70 25.50 31.60 37.00 36.20 40.00

0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40

0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20

-

222.64 36.30 6.13 1.86 3.06 3.86 3.74 3.50 3.90 4.00 2.64 2.53 1.17 3.02 2.04 2.53 2.96 2.90 3.20

222.64 36.30 6.13 1.86 3.06 3.86 3.74 3.50 3.90 4.00 2.64 2.53 1.17 3.02 2.04 2.53 2.96 2.90 3.20

1 1 1 1 1 1 1 1 1

30.50 34.20 38.00 60.50 100.00 49.00 19.00 46.59 31.50

0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40

0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20

-

2.44 2.74 3.04 4.84 8.00 3.92 1.52 3.73 2.52

2.44 2.74 3.04 4.84 8.00 3.92 1.52 3.73 2.52

Pág. 34

CANT. 1 1

DIMENCIONES EN (M) LARGO ANCHO ALTURA 89.00 0.40 0.20 34.00 0.40 0.20

ÁREA

VOLUMEN -

7.12 2.72

PARCIAL

TOTAL

7.12 2.72 1.00

1

-

-

1.00 4431.89

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1

2,783.00 453.70 76.60 23.20 38.30 48.30 46.80 43.80 48.70 50.00 33.00 31.60 14.60 37.70 25.50 31.60 37.00 36.20 40.00

-

-

2,783.00 453.70 76.60 23.20 38.30 48.30 46.80 43.80 48.70 50.00 33.00 31.60 14.60 37.70 25.50 31.60 37.00 36.20 40.00

30.50 34.20 38.00 60.50 100.00 49.00 19.00 46.59 31.50

-

-

30.50 34.20 38.00 60.50 100.00 49.00 19.00 46.59 31.50

-

-

Pág. 35

CANT.

DIMENCIONES EN (M) LARGO ANCHO ALTURA

ÁREA

VOLUMEN

PARCIAL

TOTAL

Pág. 36

DIMENCIONES EN (M) LARGO ANCHO ALTURA

CANT. 1 1

89.00 34.00

ÁREA

VOLUMEN -

-

PARCIAL

TOTAL

89.00 34.00 709.11

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1

2,783.00 453.70 76.60 23.20 38.30 48.30 46.80 43.80 48.70 50.00 33.00 31.60 14.60 37.70 25.50 31.60 37.00 36.20 40.00

30.50 34.20 38.00 60.50 100.00 49.00 19.00 46.59 31.50

0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40

0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40

0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40

-

445.28 72.59 12.26 3.71 6.13 7.73 7.49 7.01 7.79 8.00 5.28 5.06 2.34 6.03 4.08 5.06 5.92 5.79 6.40

445.28 72.59 12.26 3.71 6.13 7.73 7.49 7.01 7.79 8.00 5.28 5.06 2.34 6.03 4.08 5.06 5.92 5.79 6.40

0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40

-

4.88 5.47 6.08 9.68 16.00 7.84 3.04 7.45 5.04

4.88 5.47 6.08 9.68 16.00 7.84 3.04 7.45 5.04

-

1 1

89.00 34.00

0.40 0.40

0.40 0.40

-

-

14.24 5.44

-

14.24 5.44 Pág. 37

DIMENCIONES EN (M) LARGO ANCHO ALTURA

CANT.

ÁREA

VOLUMEN

PARCIAL

TOTAL 579.92

1 -1 -1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

2,783.00 900.00 570.00 1,313.00 453.70 76.60 23.20 38.30 48.30 46.80 43.80 48.70 50.00 33.00 31.60 14.60 37.70 25.50 31.60 37.00 36.20 28.50

0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40

0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60

1 1 1 1 1 1 1 1 1

30.50 34.20 38.00 57.00 100.00 49.00 19.00 46.59 31.50

0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40

0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60

-

-

1 1

89.00 34.00

0.40 0.40

0.60 0.60

-

Contraparte Contraparte 315.12 315.12 Contraparte 18.38 18.38 5.57 5.57 9.19 9.19 Contraparte 11.23 11.23 10.51 10.51 11.69 11.69 12.00 12.00 7.92 7.92 7.58 7.58 3.50 3.50 9.05 9.05 6.12 6.12 7.58 7.58 8.88 8.88 8.69 8.69 Contraparte

7.32 8.21 9.12 13.68 24.00 11.76 4.56 11.18 7.56 -

21.36 8.16

7.32 8.21 9.12 13.68 24.00 11.76 4.56 11.18 7.56 -

21.36 8.16 Pág. 38

CANT.

DIMENCIONES EN (M) LARGO ANCHO ALTURA

ÁREA

VOLUMEN

PARCIAL

TOTAL

Pág. 39

DIMENCIONES EN (M) LARGO ANCHO ALTURA

CANT.

ÁREA

VOLUMEN

PARCIAL

TOTAL 3.60

1 1

11.50 3.50

0.40 0.40

0.60 0.60

-

2.76 0.84

2.76 0.84

1364.82 1 1

40.00 1,324.82

-

-

40.00 1,324.82 1364.82

1 1

40.00 1,324.82

-

-

40.00 1,324.82 1.00

1

-

-

1.00 109.19

1 1

40.00 1,324.82

0.40 0.40

0.20 0.20

-

3.20 105.99 -

3.20 105.99 1364.82

1 1

40.00 1,324.82

-

-

40.00 1,324.82 218.37

1 1

40.00 1,324.82

0.40 0.40

0.40 0.40

-

6.40 211.97 -

6.40 211.97 327.56

1 1

40.00 1,324.82

0.40 0.40

0.60 0.60

-

9.60 317.96 -

9.60 317.96 -

1.62 Pág. 40

CANT. 1 1

DIMENCIONES EN (M) LARGO ANCHO ALTURA 0.90 0.90 0.90 0.90

ÁREA

VOLUMEN

0.81 0.81 -

-

PARCIAL

TOTAL

0.81 0.81 2.00

1 1

-

-

1.00 1.00 1.28

1 1

0.80 0.80

0.80 0.80

0.64 0.64 -

-

0.64 0.64 0.74

2 2 0

1.15 0.90

0.18 0.18

1.00 1.00

-

0.21 0.16 -

0.42 0.32 2.00

1 1

-

-

1.00 1.00 -

1.32 1 0

1.15

1.15

1.00

-

1.32 -

1.32 -

30.32 1

75.80

0.40

30.32 -

-

30.32 0.00

-

-

0.00 Pág. 41

CANT.

DIMENCIONES EN (M) LARGO ANCHO ALTURA

ÁREA

VOLUMEN -

-

PARCIAL

TOTAL -

Pág. 42

DIMENCIONES EN (M) LARGO ANCHO ALTURA

CANT.

ÁREA

VOLUMEN -

-

PARCIAL

TOTAL 75.80

1

75.80

1

75.80

-

-

75.80 39.51

0.45

1.16

-

39.51 -

39.51 -

500.00 1

500.00

-

-

500.00 4.00

4

-

-

4.00 1.00

1

-

-

1.00 8.00

8

-

-

8.00 4.00

4

-

-

4.00 -

6.42 2 2

5.50 5.20

0.30 0.30

1.65 1.56

-

3.30 3.12 Pág. 43

DIMENCIONES EN (M) LARGO ANCHO ALTURA

CANT.

ÁREA

VOLUMEN

PARCIAL

TOTAL 1.94

2 2

5.50 5.20

0.30 0.30

0.30 0.30

-

0.50 0.47 -

1.00 0.94 -

2 2

5.50 5.20

0.30 0.30

0.30 0.30

-

0.50 0.47 -

1.00 0.94 -

1.94

0.96 2 2

5.30 5.40

0.15 0.15

0.30 0.30

-

0.24 0.24 -

0.48 0.48 48.52

2 -1 2

5.15 1.00 5.60

2.35 2.00 2.35

12.10 2.00 13.16 -

-

24.20 -2.00 26.32 1.00

1

-

-

1.00 1.00

1

-

-

1.00 -

1.00 1

-

-

1.00 1.00

1

-

-

1.00 Pág. 44

CANT.

DIMENCIONES EN (M) LARGO ANCHO ALTURA

ÁREA

VOLUMEN

PARCIAL

TOTAL

Pág. 45

DIMENCIONES EN (M) LARGO ANCHO ALTURA

CANT.

ÁREA

VOLUMEN

PARCIAL

TOTAL 1.00

1

-

-

1.00 4.73

1

2.10

2.10

0.20

-

0.88

0.88

2 2 1 1 1 1

2.10 1.70 1.05 1.05 0.70 0.70

0.20 0.20 0.20 0.15 0.20 0.15

1.80 1.80 0.85 0.85 0.85 0.85

-

0.76 0.61 0.18 0.13 0.12 0.09

1.52 1.22 0.18 0.13 0.12 0.09

1 -1

2.10 0.70

2.10 0.70

0.15 0.15

-

0.66 0.07

0.66 -0.07 20.33

1 1 1 -1 1

1.70 6.80 1.70 0.70 2.80

1.70 1.80 1.70 0.70 1.00

2.89 12.24 2.89 0.49 2.80

-

2.89 12.24 2.89 -0.49 2.80

18.80 1

4.70

4.00

18.80 -

-

18.80 0.00

0

-

-

0.00

-

-

-

Pág. 46

DIMENCIONES EN (M) LARGO ANCHO ALTURA

CANT.

ÁREA

VOLUMEN

PARCIAL

TOTAL 0.81

1

0.90

0.90

0.81 -

-

0.81 24.94

1 1 -1 1

8.40 2.10 1.05 4.20

2.15 2.10 1.05 0.85

18.06 4.41 1.10 3.57 -

-

18.06 4.41 -1.10 3.57 5.20

1

1.70

1.70

1.80

-

5.20 -

5.20 5.29

1

2.30

2.30

5.29 -

-

5.29 2.70

1

2.70

-

-

2.70 25.40

2 2 2 2

4.50 2.10 4.50 2.10

0.70 0.70 0.70 0.70

1.00 1.00 1.75 1.75

-

3.15 1.47 5.51 2.57 -

6.30 2.94 11.02 5.14 18.80

1

4.70

4.00

18.80 -

-

18.80 66.74

1

4.70

4.00

3.55

-

66.74

66.74

16.00 16

-

-

16.00 1.00

1

-

-

1.00 Pág. 47

CANT.

DIMENCIONES EN (M) LARGO ANCHO ALTURA

ÁREA

VOLUMEN -

-

PARCIAL

TOTAL -

Pág. 48

DIMENCIONES EN (M) LARGO ANCHO ALTURA

CANT.

ÁREA

VOLUMEN

PARCIAL

TOTAL 1.00

1

-

-

1.00 1.00

1

-

-

1.00 149.00

1 1

7.00 10.00

7.00 10.00

49.00 100.00 -

-

49.00 100.00 3.00

3

-

-

3.00 2.00

2

-

-

2.00 6.50

1

2.60

2.50

6.50 -

-

6.50 2.31

2 2 1 1

2.50 1.80 0.90 2.08

0.40 0.40 0.60 1.98

0.40 0.40 0.20 0.20

-

0.40 0.29 0.11 0.82 -

0.80 0.58 0.11 0.82 -

0.20 2 2

2.22 2.08

0.12 0.12

0.20 0.20

-

0.05 0.05 -

0.10 0.10 1.38

2 2

2.22 2.08

0.16 0.16

0.36 0.33

-

0.72 0.66 4.12 Pág. 49

CANT. 1

DIMENCIONES EN (M) LARGO ANCHO ALTURA 2.08 1.98

ÁREA

VOLUMEN

4.12 -

-

PARCIAL

TOTAL

4.12 0.00

-

-

0.91

1 1 1 1

2.20 1.20 2.08 2.20

0.12 0.12 0.12 0.12

0.26 0.14 0.25 0.26

-

0.26 0.14 0.25 0.26 16.69

1 1 1 1 1 1 0.5 0.5

2.22 1.20 2.08 2.20 2.22 2.22 2.08 2.08

1.70 1.70 1.70 1.70 0.76 0.15 0.76 0.76

3.77 2.04 3.54 3.74 1.69 0.33 1.58 1.58 -

-

3.77 2.04 3.54 3.74 1.69 0.33 0.79 0.79 6.50

1

2.60

2.50

6.50 -

-

6.50 0.00

-

-

1.62

1

0.90

1.80

1.62 -

-

1.62 1.00

1

-

-

1.00 Pág. 50

DIMENCIONES EN (M) LARGO ANCHO ALTURA

CANT.

ÁREA

VOLUMEN

PARCIAL

TOTAL 1.00

1

-

-

1.00 1.00

1

-

-

1.00 -

1

-

-

1.00 -

1.00

5.06 1 1 -1 1 1

2.20 2.20 0.90 2.32 2.32

0.40 0.40 0.40 0.40 0.40

0.88 0.88 0.36 0.93 0.93

-

0.88 0.88 -0.36 0.93 0.93

1 1 1 1

2.20 2.20 2.32 2.32

0.20 0.20 0.20 0.20

0.44 0.44 0.46 0.46 -

-

0.44 0.44 0.46 0.46 2.25

2 2 1 1 1 1 1 1

2.50 1.80 2.22 1.20 2.08 2.20 0.90 0.90

0.40 0.40 0.12 0.12 0.12 0.12 0.60 0.30

0.50 0.50 0.40 0.40 0.40 0.40 0.18 0.18

-

0.50 0.36 0.11 0.06 0.10 0.11 0.10 0.05 -

1.00 0.72 0.11 0.06 0.10 0.11 0.10 0.05 5.06

1 1 -1 1 1

2.20 2.20 0.90 2.32 2.32

0.40 0.40 0.40 0.40 0.40

0.88 0.88 0.36 0.93 0.93

-

0.88 0.88 -0.36 0.93 0.93 Pág. 51

DIMENCIONES EN (M) LARGO ANCHO ALTURA

CANT. 1 1 1 1

2.20 2.20 2.32 2.32

0.20 0.20 0.20 0.20

ÁREA

VOLUMEN

0.44 0.44 0.46 0.46

-

PARCIAL

TOTAL

0.44 0.44 0.46 0.46

1.00 1

-

-

1.00 1.00

1

-

-

1.00 5.81

1 1 1 1 1 1 1 1 1 1

14.30 8.70 7.65 4.78 7.53 14.15 8.60 7.57 4.89 7.67

0.30 0.30 0.30 0.30 0.30 0.15 0.15 0.15 0.15 0.15

0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30

-

1.29 0.78 0.69 0.43 0.68 0.64 0.39 0.34 0.22 0.35 -

1.29 0.78 0.69 0.43 0.68 0.64 0.39 0.34 0.22 0.35 3.87

1 1 1 1 1

14.30 8.70 7.65 4.78 7.53

0.30 0.30 0.30 0.30 0.30

0.30 0.30 0.30 0.30 0.30

-

1.29 0.78 0.69 0.43 0.68 -

1.29 0.78 0.69 0.43 0.68 98.59

1 1 -1 1 1 1

14.00 8.50 1.00 7.50 5.00 7.80

2.35 2.35 2.00 2.35 2.35 2.35

32.90 19.98 2.00 17.63 11.75 18.33 -

-

32.90 19.98 -2.00 17.63 11.75 18.33 Pág. 52

DIMENCIONES EN (M) LARGO ANCHO ALTURA

CANT.

ÁREA

VOLUMEN

PARCIAL

TOTAL 12.89

1 1 1 1 1

14.30 8.70 7.65 4.78 7.53

0.30 0.30 0.30 0.30 0.30

4.29 2.61 2.30 1.43 2.26

-

4.29 2.61 2.30 1.43 2.26

0.00 -

-

0.00

-

0.00

-

-

0.00

-

-

0.00

-

0.00

-

-

0.00

0.00 0.00 0.00 0.00 0.00 Pág. 53

DIMENCIONES EN (M) LARGO ANCHO ALTURA

CANT.

ÁREA

VOLUMEN

PARCIAL

TOTAL

0.00 11.16 1

3.60

3.10

11.16 -

-

11.16 25.60

2 2 1 -1

2.90 3.40 3.40 0.80

1.30 1.30 2.90 0.80

3.77 4.42 9.86 0.64

-

7.54 8.84 9.86 -0.64 1.80

1

1.80

1

3.00

-

-

1.80 15.00

2.50

2.00

-

15.00 -

15.00 9.86

1

3.40

2.90

9.86 -

-

9.86 4.72

2 2

2.90 3.00

0.20 0.20

2.00 2.00

-

1.16 1.20

2.32 2.40 1.00

1

-

-

1.00 7.48

2 2

4.00 4.00

0.30 0.55

1.10 1.10

-

1.32 2.42 -

2.64 4.84 Pág. 54

CANT.

DIMENCIONES EN (M) LARGO ANCHO ALTURA

ÁREA

VOLUMEN

PARCIAL

TOTAL

Pág. 55

DIMENCIONES EN (M) LARGO ANCHO ALTURA

CANT.

ÁREA

VOLUMEN

PARCIAL

TOTAL 29.62

2 2

2.90 3.40

2.35 2.35

6.82 7.99 -

-

13.64 15.98 -

-

-

1.00 -

1.00 1

1.00 1

-

-

1.00 1.00

1

-

-

1.00 17.60

1

4.00

4.00

1.10

-

17.60 -

17.60 0.21

1 2

1.77 1.22

1.22 0.15

0.05 0.30

-

0.11 0.05 -

0.11 0.10 36.64

2 2 1 1 -1

2.50 3.00 3.00 3.00 0.60

2.00 2.00 2.50 2.50 0.60

5.00 6.00 7.50 7.50 0.36 -

-

10.00 12.00 7.50 7.50 -0.36 1.12

1 -1

3.40 0.60

2.90 0.60

0.15

0.36 -

1.48 -

1.48 -0.36 Pág. 56

DIMENCIONES EN (M) LARGO ANCHO ALTURA

CANT.

ÁREA

VOLUMEN

PARCIAL

TOTAL 1.97

1

3.40

2.90

0.20

-

1.97

1.97 0.64

1

0.80

0.80

0.64 -

-

0.64 16.00

1

4.00

4.00

16.00 -

-

16.00 7.29

1 1 1 1 1 1 1 1 1 1 1 1

4.60 0.35 0.60 4.70 0.35 0.60 4.90 0.35 0.60 9.50 0.35 0.60

0.40 0.35 0.60 0.40 0.35 0.60 0.40 0.35 0.60 0.40 0.35 0.60

0.60 0.30 1.00 0.60 0.30 1.00 0.60 0.30 1.00 0.60 0.30 1.00

-

1.10 0.04 0.36 1.13 0.04 0.36 1.18 0.04 0.36 2.28 0.04 0.36

1.10 0.04 0.36 1.13 0.04 0.36 1.18 0.04 0.36 2.28 0.04 0.36 4.00

1 1 1 1

-

-

1.00 1.00 1.00 1.00 20.30

1 1 1 1

4.30 4.10 4.10 7.80

-

-

4.30 4.10 4.10 7.80

Pág. 57

DIMENCIONES EN (M) LARGO ANCHO ALTURA

CANT.

ÁREA

VOLUMEN

PARCIAL

TOTAL 4.00

1 1 1 1

-

-

1.00 1.00 1.00 1.00 3.79

1 1 1 1

4.60 4.70 4.90 9.50

0.40 0.40 0.40 0.40

0.40 0.40 0.40 0.40

-

0.74 0.75 0.78 1.52

0.74 0.75 0.78 1.52 1.90

1 1 1 1

4.60 4.70 4.90 9.50

0.40 0.40 0.40 0.40

0.20 0.20 0.20 0.20

-

0.37 0.38 0.39 0.76

0.37 0.38 0.39 0.76 23.70

1 1 1 1

4.60 4.70 4.90 9.50

-

-

4.60 4.70 4.90 9.50 4.00

1 1 1 1

-

-

1.00 1.00 1.00 1.00 4.00

1 1 1 1

-

-

1.00 1.00 1.00 1.00 20.30

1 1

4.30 4.10

-

-

4.30 4.10 Pág. 58

CANT. 1 1

DIMENCIONES EN (M) LARGO ANCHO ALTURA 4.10 7.80

ÁREA

VOLUMEN -

-

PARCIAL

TOTAL

4.10 7.80 4.00

4 4 4

0.75 0.60 0.35

0.70 0.60 0.30

0.53 0.36 0.11

-

2.12 1.44 0.44

0.00 -

-

1.00

1

-

-

1.00 0.00

-

-

0.00

-

-

-

-

-

-

0.00

2.00 2

-

-

2.00 0.00

-

-

0.80

1

0.80

-

-

0.80 0.00

-

-

-

-

-

7.00 -

7.00 7

3.30 7 4

0.50 0.40

0.50 0.40

1.50 1.00

-

0.38 0.16

2.66 0.64 Pág. 59

CANT.

DIMENCIONES EN (M) LARGO ANCHO ALTURA

ÁREA

VOLUMEN -

-

PARCIAL

TOTAL -

Pág. 60

DIMENCIONES EN (M) LARGO ANCHO ALTURA

CANT.

ÁREA

VOLUMEN

PARCIAL

TOTAL 5.00

5

-

-

5.00 2.00

2

-

-

2.00

1

-

-

1.00

1.00

1.00 1

-

-

1.00 2.00

2

-

-

2.00 2.00

2

-

-

2.00 4.00

4

-

-

4.00

4

-

-

4.00

4.00

4.00 4

-

-

4.00 1.00

1

-

-

1.00 1.00

1

-

-

1.00 1.00

1

-

-

1.00

0.80

-

-

0.80

0.80

0.80 0.80

-

-

0.80

Pág. 61

DIMENCIONES EN (M) LARGO ANCHO ALTURA

CANT.

ÁREA

VOLUMEN

PARCIAL

TOTAL 1.00

1.00

-

-

1.00 1.00

1.00

-

-

1.00

2.00 2

-

-

2.00 2.00

2

-

-

2.00 0.50

2 2

1.15 0.75

0.20 0.20

0.65 0.65

-

0.15 0.10 -

0.30 0.20 0.72

2

0.60

0.60

0.36 -

-

0.72 2.00

1 1

1.00 1.00

1.00 1.00

1.00 1.00

-

1.00 1.00 -

1.00 1.00 2.00

2

1.00

1.00

1.00 -

-

2.00 6.34

2 2

3.00 2.04

0.65 0.60

1.95 1.22 -

-

3.90 2.44 -

Pág. 62

PLANILLA ORDEN DE CAMBIO N°1 PROYECTO: C-FPS-LPZ-006111 - CONST. SIST. AGUA POTABLE JAYUMA LLALLAGUA (CORO CORO) BENEFICIARIO: JAYUMA LLALLAGUA SUPERVISION:

ITEM 128 2 951 950 943 942 155 2789 2303 2661 2748 N/I 165 2 893 3424 155 2303 2661 2748 166 3 1692 2747 2661 2793 2748 196 3 92 3824 2399 N/I 247 1763 1773 2660 3890 3891 315 3 2748 260 2302 3522 842 708 317 3158 1972 3410 2287 385 2619 575 92 840

ACTIVIDAD RED DE DISTRIBUCION REPLANTEO Y CONTROL DE TUBERIAS PROV Y TEND TUBERIA PVC SDR 21 (A.G.) D=2" PROV Y TEND TUBERIA PVC SDR 21 (A.G.) D=1.1/2" PROV. Y TENDIDO TUBERIA PVC SDR 21 (E-C) D=1 PULG PROV. Y TEND. TUBERIA PVC SDR 21 (E-C) D=3/4 PULG RELLENO DE ZANJA CON TIERRA CERNIDA PROV. E INST. ACCESORIOS RED DE DISTRIBUCION PRUEBA HIDRAULICA Y DESINFECCIÓN DE TUBERIAS DE AGUA POTABLE RELLENO Y COMPACTADO DE TIERRA COMUN C/COMPACTADOR MECANICO EXCAVACION 0-1 M S/AGOTAMIENTO TERRENO SEMIDURO EXCAVACION EN ROCA LINEA DE IMPULSION REPLANTEO Y CONTROL DE TUBERIAS PROV. Y TENDIDO TUBERIA PVC E-40 (E-C) D=2 PULG PROV. E INST. ACCESORIOS PARA LINEA DE IMPULSION RELLENO DE ZANJA CON TIERRA CERNIDA PRUEBA HIDRAULICA Y DESINFECCIÓN DE TUBERIAS DE AGUA POTABLE RELLENO Y COMPACTADO DE TIERRA COMUN C/COMPACTADOR MECANICO EXCAVACION 0-1 M S/AGOTAMIENTO TERRENO SEMIDURO CAMARA DE VALVULAS REPLANTEO DE ESTRUCTURAS Y EDIFICACIONES CAMARA DE VALVULAS DE HORMIGON CICLOPEO TAPA DE CAMARA DE HoAo e= 7cm RELLENO Y COMPACTADO DE TIERRA COMUN C/COMPACTADOR MECANICO PROV. E INST. ACCESORIOS CAMARA DE LLAVES EXCAVACION 0-1 M S/AGOTAMIENTO TERRENO SEMIDURO PASOS DE QUEBRADA REPLANTEO DE ESTRUCTURAS Y EDIFICACIONES EXCAVACION DE 0-2 M SUELO SEMIDURO PASO DE QUEBRADA L=10 +/-2m C/ACCESORIOS Y ANCLAJE PROV. Y TENDIDO TUBERIA PEAD Ø=2" (63mm)-PN10 EXCAVACION 0-4 M C/AGOTAMIENTO SUELO SEMIDURO MEDIDAS DE MITIGACION AMBIENTAL CINTA PLASTICA DE SEGURIDAD CONTENEDOR DE RESIDUOS SOLIDOS GESTION Y DISPOSICION DE RESIDUOS SOLIDOS SEÑALIZACION FIJA SEÑALIZACION MOVIL (TIPO CABALLETE) CERRAMIENTO PERIMETRAL PARA TANQUE DE ALMACENAMIENTO REPLANTEO DE ESTRUCTURAS Y EDIFICACIONES EXCAVACION 0-1 M S/AGOTAMIENTO TERRENO SEMIDURO CIMIENTO CORRIDO HORMIGON CICLOPEO 40% PIEDRA DESPLAZADORA SOBRECIMIENTO DE HºCº 50% DE PIEDRA DESPLAZADORA PROV. Y COLOC. MALLA OLIMPICA Y TUBOS FG 2" C/2.5m CON ALAMBRE DE PUAS PUERTA DE MALLA OLIMPICA (2 X 1 M) QUINCALLERIA ALDABA, CERROJOS, CADENA Y CANDADO SISTEMA DE BOMBEO CARCAMO PROV. E INST. DE ACCESORIOS PARA BOMBAS CENTRIFUGAS TABLERO DE CONTROL PARA BOMBAS + TEMORIZADOR PROV. E INST. BOMBA ELECTRICA CENTRIFUGA 3 HP C/ACCESORIOS HORMIGON ARMADO H21 REVOQUE CON ADITIVO IMPERMEABILIZANTE 1:3 ZAMPEADO DE PIEDRA PINTURA EXTERIOR LATEX EXCAVACION DE 0-2 M SUELO SEMIDURO PROVISION Y COLOCACION TAPA METALICA e=1/8"

MUNICIPIO: EMPRESA: PERIODO: FECHA:

UNIT. UNIDAD PRECIO (Bs.)

M M M M M M3 GLB M M3 M3 M3

2.47 27.01 16.54 15.15 10.10 55.56 1,641.16 3.20 58.07 50.53 137.16

M M GLB M3 M M3 M3

2.47 35.47 1,943.16 55.56 3.20 58.07 50.53

M2 PZA M2 M3 GLB M3

7.23 739.86 327.15 58.07 173.75 50.53

M2 M3 PZA M M3

7.23 55.34 2,309.80 38.92 128.41

M PZA GLB PZA PZA

3.20 413.29 848.94 141.66 574.28

M2 M3 M3 M3 M2 PZA PZA

7.23 50.53 795.71 797.82 323.14 748.03 147.51

GLB PZA PZA M3 M2 M2 M2 M3 M2

1,173.87 1,986.50 12,042.43 3,663.95 127.16 100.67 29.44 55.34 797.59

CONTRATO ORIGINAL TOTAL. CANTIDAD PRECIO (Bs.) 250,733.66 4,511.03 11,142.24 3,746.81 101,201.34 470.05 7,774.63 100.00 1,515.00 194.17 1,961.12 335.29 18,628.71 1.00 1,641.16 4,511.03 14,435.30 670.58 38,940.58 1,058.65 53,493.58 93,439.30 1,324.82 3,272.31 1,324.82 46,991.37 1.00 1,943.16 105.99 5,888.80 1,324.82 4,239.42 211.97 12,309.10 371.96 18,795.14 5,310.11 8.00 57.84 4.00 2,959.44 4.00 1,308.60 1.50 87.11 4.00 695.00 4.00 202.12 6,789.57 20.00 144.60 15.50 857.77 2.00 4,619.60 30.00 1,167.60 7,532.50 500.00 1,600.00 4.00 1,653.16 1.00 848.94 8.00 1,133.28 4.00 2,297.12 28,311.54 56.25 406.69 9.00 454.77 6.75 5,371.04 2.25 1,795.10 60.00 19,388.40 1.00 748.03 1.00 147.51 28,476.83 1.00 1,173.87 1.00 1,986.50 1.00 12,042.43 2.34 8,573.64 15.45 1,964.62 2.89 290.94 6.00 176.64 7.22 399.55 0.64 510.46 Página 63

CORO CORO EMPRESA CONSTRUCTORA FLORCICAR JUANITO VILLCA QUISPE 3/22/2019 INCREMENTO (+) CANTIDAD 152.79 19.28 38.53 3.60 40.00 40.00 3.20 40.00 6.40 10.32 45.80 39.51 2.39 4.88 15.91 0.17

DECREMENTO (-)

MONTO (Bs.) CANTIDAD 7,929.28 4,126.86 1,071.20 2,237.44 493.78 2,195.04 98.80 1,418.80 177.79 128.00 371.65 6,930.63 74.61 1,782.54 5,073.48 32,077.11 8,756.84 620.54 1,601.66 135.59

-79.14 -60.76 -71.17 -79.14 -478.73 -44.40 -6.38 -2.00 -2.72 -0.76 -2.00 -2.68 -49.83 -7.06 -4.81 -1.29 -11.48 -

TOTAL AUTORIZADO SEGÚN ODC N°1

% DE AVANCE

MONTO (Bs.) CANTIDAD MONTO (Bs) -26,362.75 -195.48 -1,004.97 -718.82 -253.25 -24,190.23 -2,243.53 -2,243.53 -2,942.75 -46.13 -1,479.72 -889.85 -44.13 -347.50 -135.42 -9,283.22 -360.27 -356.74 -3,827.37 -1,029.19 -3,709.65 -

4,431.89 3,899.60 409.29 123.00 354.57 1.00 4,431.89 709.11 579.92 3.60 1,364.82 1,364.82 1.00 109.19 1,364.82 218.37 327.56 1.62 2.00 1.28 0.74 2.00 1.32 30.32 75.80 39.51 500.00 4.00 1.00 8.00 4.00 6.42 1.94 1.94 0.96 48.52 1.00 1.00 1.00 1.00 1.00 4.73 20.33 18.80 0.81

230,785.21 10,946.77 105,328.20 6,769.66 1,242.30 19,699.91 1,641.16 14,182.05 41,178.02 29,303.36 493.78 93,390.82 3,371.11 48,410.17 1,943.16 6,066.60 4,367.42 12,680.75 16,551.61 2,367.35 11.71 1,479.72 418.75 42.97 347.50 66.70 8,242.83 219.21 2,950.14 5,073.48 7,532.50 1,600.00 1,653.16 848.94 1,133.28 2,297.12 19,028.33 46.42 98.03 1,543.68 765.91 15,678.75 748.03 147.51 59,977.75 1,173.87 1,986.50 12,042.43 17,330.48 2,585.16 1,892.60 646.05

-1.75% 4.08% -12.93% 0.00% -36.65% 5.75% 0.00% -1.75% 5.75% -45.22% 100.00% -0.05% 3.02% 3.02% 0.00% 3.02% 3.02% 3.02% -11.94% -55.42% -79.75% -50.00% -68.00% -50.67% -50.00% -67.00% 21.40% 51.60% 0.00% 0.00% 152.67% 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% -32.79% -88.59% -78.44% -71.26% -57.33% -19.13% 0.00% 0.00% 110.62% 0.00% 0.00% 0.00% 102.14% 31.59% 550.52% 0.00% 0.00% 26.56%

ITEM 2935 1809 3333 762 3320 3 I/N 44 2040 2050 46 2049 2312 81 2659 2514 72 476 2748 190 303 3210 177 608 283 3 92 845 1960 2310 714 1162 2935 220 575 75 842 708 220 92 3522 3 111 3320 2788 3 220 385 92 81 1828 3009 840 2935 2619 3333 132 3333 575 762 1809 3 2287 1570 2661

ACTIVIDAD REVOQUE EXTERIOR DE CEMENTO PRUEBA DE ESTANQUEIDAD Y DESINFECCION TANQUES BASE DE HORMIGON POBRE e=5cm ESCALERA METALICA PROV. Y COLOC. GRAVA SELECCIONADA D=3/4" a 1" REPLANTEO DE ESTRUCTURAS Y EDIFICACIONES EXCAVACION 0-4 M C/AGOTAMIENTO SUELO SEMIDURO ACTIVIDADES COMPLEMENTARIAS LIMPIEZA Y RETIRO DE ESCOMBROS EN VOLQUETA PROVISION Y COLOCACION PLACA ENTREGA DE OBRAS ACTIVIDADES PRELIMINARES PROVISION Y COLOCACION LETRERO DE OBRA FPS INSTALACION DE FAENAS GENERAL LIMPIEZA Y DESBROCE ANALISIS FISICO, QUIMICO Y MICROBIOLOGICO DE AGUAS ENSAYO DE SUELOS SPT (CAPACIDAD PORTANTE DEL SUELO) CASETA DE BOMBEO CUBIERTA DE CALAMINA GALVANIZADA Nº28 INCL. MADERAMEN EXCAVACION 0-1 M S/AGOTAMIENTO TERRENO SEMIDURO HORMIGON ARMADO PARA VIGA DE ENCADENADO CELOSIA DE CERAMICA (16 X 16 X 12 CM) EMPEDRADO Y CONTRAPISO DE CEMENTO H=5CM HORMIGON SIMPLE FC=210 KG/CM2 IMPERMEABILIZACION DE SOBRECIMIENTOS MURO DE LADRILLO GAMBOTE E=12 CM UNA CARA VISTA REPLANTEO DE ESTRUCTURAS Y EDIFICACIONES EXCAVACION DE 0-2 M SUELO SEMIDURO PUERTA METALICA DE 1/8 PULG PROV.E INST. DE LUMINARIAS INCANDESCENTES DE 100 W INSTALACION ELECTRICA PUNTOS DE TOMA CORRIENTE CHAPA PARA PUERTA EXTERIOR PROVISION Y COLOCACION HIPOCLORADOR IN-LINE REVOQUE EXTERIOR DE CEMENTO HORMIGON CICLOPEO CON 50% PIEDRA DESPLAZADORA PINTURA EXTERIOR LATEX CERCO DE PROTECCION CARCAMO PUERTA DE MALLA OLIMPICA (2 X 1 M) QUINCALLERIA ALDABA, CERROJOS, CADENA Y CANDADO HORMIGON CICLOPEO CON 50% PIEDRA DESPLAZADORA EXCAVACION DE 0-2 M SUELO SEMIDURO PROV. Y COLOC. MALLA OLIMPICA Y TUBOS FG 2" C/2.5m CON ALAMBRE DE PUAS REPLANTEO DE ESTRUCTURAS Y EDIFICACIONES OBRA DE TOMA PROV. Y COLOC. GRAVA SELECCIONADA D=3/4" a 1" PROV. E INST. ACCESORIOS OBRA DE TOMA REPLANTEO DE ESTRUCTURAS Y EDIFICACIONES HORMIGON CICLOPEO CON 50% PIEDRA DESPLAZADORA REVOQUE CON ADITIVO IMPERMEABILIZANTE 1:3 EXCAVACION DE 0-2 M SUELO SEMIDURO LIMPIEZA Y DESBROCE SELLO SANITARIO HORMIGON ARMADO PARA LOSA TAPA PROVISION Y COLOCACION TAPA METALICA e=1/8" REVOQUE EXTERIOR DE CEMENTO ZAMPEADO DE PIEDRA BASE DE HORMIGON POBRE e=5cm TANQUE DE ALMACENAMIENTO BASE DE HORMIGON POBRE e=5cm PINTURA EXTERIOR LATEX ESCALERA METALICA PRUEBA DE ESTANQUEIDAD Y DESINFECCION TANQUES REPLANTEO DE ESTRUCTURAS Y EDIFICACIONES HORMIGON ARMADO H21 PROV. E INST. ACCESORIOS PARA VENTILACION DE TANQUES RELLENO Y COMPACTADO DE TIERRA COMUN C/COMPACTADOR MECANICO

UNIT. UNIDAD PRECIO (Bs.)

TOTAL AUTORIZADO INCREMENTO (+) DECREMENTO (-) SEGÚN ODC N°1 % DE AVANCE PRECIO TOTAL. CANTIDAD MONTO (Bs.) CANTIDAD MONTO (Bs.) CANTIDAD MONTO (Bs) (Bs.) 808.14 18.94 2,551.03 24.94 3,359.17 315.67% 274.68 0.70 42.73 5.20 317.41 15.56% 275.36 2.40 228.67 5.29 504.03 83.04% 2.70 1,474.96 2.70 1,474.96 100.00% 25.40 7,959.09 25.40 7,959.09 100.00% 18.80 135.92 18.80 135.92 100.00% 66.74 8,570.08 66.74 8,570.08 100.00% 3,497.31 -1,278.40 2,218.91 -36.55% 1,880.00 -34.00 -1,278.40 16.00 601.60 -68.00% 1,617.31 1.00 1,617.31 0.00% 14,881.99 -6.56 14,875.43 -0.04% 1,936.47 1.00 1,936.47 0.00% 4,721.37 1.00 4,721.37 0.00% 984.00 -1.00 -6.56 149.00 977.44 -0.67% 4,452.63 3.00 4,452.63 0.00% 2,787.52 2.00 2,787.52 0.00% 20,445.63 77.08 -4,452.63 15,336.84 -24.99% 1,708.31 0.25 68.33 6.50 1,776.65 4.00% 131.38 -0.29 -14.65 2.31 116.72 -11.15% 1,326.30 -0.17 -609.38 0.20 716.92 -45.95% 321.60 -1.02 -136.68 1.38 184.92 -42.50% 856.56 -2.13 -291.92 4.12 564.65 -34.08% 589.37 0.00% 41.90 -1.03 -22.25 0.91 19.66 -53.09% 5,491.75 -10.81 -2,158.76 16.69 3,332.99 -39.31% 38.25 1.21 8.75 6.50 47.00 22.87% 143.88 0.00% 2,611.24 -1.20 -1,111.16 1.62 1,500.07 -42.55% 45.35 1.00 45.35 0.00% 87.74 1.00 87.74 0.00% 604.30 1.00 604.30 0.00% 3,690.85 1.00 3,690.85 0.00% 743.49 -0.46 -61.96 5.06 681.53 -8.33% 1,850.85 -0.04 -32.33 2.25 1,818.52 -1.75% 162.51 -0.46 -13.54 5.06 148.97 -8.33% 36,004.92 3,500.36 -1,748.19 37,757.09 4.87% 748.03 1.00 748.03 0.00% 147.51 1.00 147.51 0.00% 1,357.83 4.13 3,337.99 5.81 4,695.82 245.83% 144.99 1.25 69.18 3.87 214.17 47.71% 33,606.56 -5.41 -1,748.19 98.59 31,858.37 -5.20% 12.89 93.19 12.89 93.19 100.00% 19,460.61 0.00% 773.97 0.00% 1,174.36 0.00% 78.08 0.00% 2,416.61 0.00% 762.96 0.00% 229.11 0.00% 787.20 0.00% 9,136.10 0.00% 427.87 0.00% 1,052.82 0.00% 857.98 0.00% 906.03 0.00% 857.52 0.00% 54,198.63 2,942.39 -9,381.20 47,759.81 -11.88% 76.22 10.36 987.10 11.16 1,063.32 1295.00% 889.68 -4.62 -136.01 25.60 753.66 -15.29% 819.42 0.30 163.88 1.80 983.30 20.00% 915.60 15.00 915.60 0.00% 130.86 -8.24 -59.58 9.86 71.29 -45.52% 16,048.10 0.34 1,245.74 4.72 17,293.84 7.76% 313.62 1.00 313.62 0.00% 402.43 0.55 31.94 7.48 434.36 7.94%

CONTRATO ORIGINAL CANTIDAD

M2 M3 M2 M M3 M2 M3

134.69 61.04 95.28 546.28 313.35 7.23 128.41

6.00 4.50 2.89 -

M3 PZA

37.60 1,617.31

50.00 1.00

PZA GLB M2 MTR PTO

1,936.47 4,721.37 6.56 1,484.21 1,393.76

1.00 1.00 150.00 3.00 2.00

M2 M3 M3 M2 M2 M3 M2 M2 M2 M3 M2 PZA PTO PZA PZA M2 M3 M2

273.33 50.53 3,584.59 134.00 137.05 1,785.98 21.60 199.70 7.23 55.34 925.97 45.35 87.74 604.30 3,690.85 134.69 808.23 29.44

6.25 2.60 0.37 2.40 6.25 0.33 1.94 27.50 5.29 2.60 2.82 1.00 1.00 1.00 1.00 5.52 2.29 5.52

PZA PZA M3 M3 M2 M2

748.03 147.51 808.23 55.34 323.14 7.23

1.00 1.00 1.68 2.62 104.00 -

M3 GLB M2 M3 M2 M3 M2 M3 M3 M2 M2 M2 M2

313.35 1,174.36 7.23 808.23 127.16 55.34 6.56 1,691.87 3,565.56 797.59 134.69 100.67 95.28

2.47 1.00 10.80 2.99 6.00 4.14 120.00 5.40 0.12 1.32 6.37 9.00 9.00

M2 M2 M M3 M2 M3 GLB M3

95.28 29.44 546.28 61.04 7.23 3,663.95 313.62 58.07

0.80 30.22 1.50 15.00 18.10 4.38 1.00 6.93 Página 64

ITEM 2935 3419 3420 3465 92 220 385 3009 194 840 2635 76 2748 3241 889 3863 2661 155 2 2834 2658 2303 2635 91 2009 2010 2444 3192 3407 3990 3992 4 2002 1976 92 N/I N/I N/I N/I N/I N/I N/I N/I N/I N/I N/I N/I N/I N/I N/I N/I 167 2795 1692 2661 2747 2748 3 2935

ACTIVIDAD REVOQUE EXTERIOR DE CEMENTO PROV. E INST. ACCESORIOS DE INGRESO P/TANQUE SEMIENTERRADO PROV. E INST. ACCESORIOS DE LIMPIEZA Y REBALSE P/TANQUE SEMIENTERRADO PROV. E INST. ACCESORIOS DE SALIDA P/TANQUE SEMIENTERRADO EXCAVACION DE 0-2 M SUELO SEMIDURO HORMIGON CICLOPEO CON 50% PIEDRA DESPLAZADORA REVOQUE CON ADITIVO IMPERMEABILIZANTE 1:3 HORMIGON ARMADO PARA LOSA TAPA HORMIGON ARMADO PARA LOSA DE FONDO PROVISION Y COLOCACION TAPA METALICA e=1/8" SOLADURA DE PIEDRA E=0.15m CONEXION DOMICILIARIA EXCAVACION 0-1 M S/AGOTAMIENTO TERRENO SEMIDURO CAJA DESGRASADORA PVC C-9 8" PROV. Y TENDIDO TUBERIA PVC E-40 (E-C) D=1/2 PULG PROV. E INST. ACCESORIOS CONEXION DOMICILIARIA RELLENO Y COMPACTADO DE TIERRA COMUN C/COMPACTADOR MECANICO RELLENO DE ZANJA CON TIERRA CERNIDA REPLANTEO Y CONTROL DE TUBERIAS PEDESTAL DE HoAo Y BASE PARA PILETA INCLUYE ACCESORIOS POZO ABSORVENTE PARA PILETA (0,60 x 0,60 x 0,60 m) PRUEBA HIDRAULICA Y DESINFECCIÓN DE TUBERIAS DE AGUA POTABLE SOLADURA DE PIEDRA E=0.15m INSTALACIONES ELECTRICAS CABLEADO FLECHADO Y LIGADO CABLE DUPLEX ACSR 2 AWG INSTALACION PUESTA A TIERRA VM2-11 PROV. E INSTALACION DE TABLERO DE MEDICION Y PROTECCION PROV. E INST. DE PARARRAYOS ATMOSFERICO TIPO FRANKLIN PROV. Y MONTAJE DE SISTEMA DE TIERRA C/3 JABALINAS PROV. E INST. DE PARARRAYOS DE DISTRIBUCION VM5-6 PROV. E INSTALACION DE RIENDA REPLANTEO TOPOGRAFICO DE LINEA ELECTRICA CABLEADO, FLECHADO Y LIGADO CABLE ACSR 4 AWG PLANTADO, RELLENO Y COMPACTADO POSTE DE 11 M EXCAVACION DE 0-2 M SUELO SEMIDURO ARMADO DE ESTRUCTURA VA1 ARMADO DE ESTRUCTURA VA5 ARMADO DE ESTRUCTURA VA5-1 ARMADO DE ESTRUCTURA VA5-3 ARMADO DE SECCIONADOR VM3-4 SISTEMA PUESTA A TIERRA C/TRATAMIENTO ARMADO DE PUESTA A TIERRA VM2-12A ARMADO DE RIENDA SIMPLE VE1-1 ARMADO DE ANCLA F2-1 ARMADO DE ESTRUCTURA VG10 INSTALACION DE TRANSFORMADOR 1Ø -15 KVA ARMADO DE PROTECCION BT/XFO 1Ø CB -63A TENDIDO DE CONDUCTOR ACSR N°2 TENDIDO DE CONDUCTOR ACSR N°4 PRUEBAS DE ENERGIZACION INSTALACION ACOMETIDA MONOFASICA CAMARA PURGA DE LODOS PROV. E INST. ACCESORIOS PURGA DE LODOS CAMARA DE VALVULAS DE HORMIGON CICLOPEO RELLENO Y COMPACTADO DE TIERRA COMUN C/COMPACTADOR MECANICO TAPA DE CAMARA DE HoAo e= 7cm EXCAVACION 0-1 M S/AGOTAMIENTO TERRENO SEMIDURO REPLANTEO DE ESTRUCTURAS Y EDIFICACIONES REVOQUE EXTERIOR DE CEMENTO

UNIT. UNIDAD PRECIO (Bs.)

CONTRATO ORIGINAL CANTIDAD

M2 GLB GLB GLB M3 M3 M2 M3 M3 M2 M2

134.69 1,115.53 1,170.49 1,197.38 55.34 808.23 127.16 3,565.56 3,320.02 797.59 100.67

30.22 1.00 1.00 1.00 22.23 0.64 32.60 2.22 2.96 2.26 16.00

M3 PZA M CNX M3 M3 M PZA PZA M M2

50.53 189.19 7.64 258.53 58.07 55.56 2.47 523.83 53.72 3.20 100.67

11.52 4.00 48.00 4.00 7.68 3.84 48.00 4.00 4.00 48.00 4.00

KM PZA PZA GLB GLB PZA PZA KM KM PZA M3 PZA PZA PZA PZA PZA PZA PZA PZA PZA PZA PZA PZA KM KM GLB PZA

18,424.89 1,024.66 1,958.29 1,064.03 762.53 1,015.87 941.80 265.05 16,904.87 1,974.37 55.34 545.90 475.67 662.38 415.66 1,222.99 2,146.90 671.73 385.85 331.48 413.99 9,504.22 627.23 11,325.63 7,724.35 996.76 1,413.41

0.40 1.00 1.00 1.00 1.00 1.00 4.00 0.40 0.40 4.00 0.96 -

GLB PZA M3 M2 M3 M2 M2

590.84 739.86 58.07 327.15 50.53 7.23 134.69

2.00 2.00 1.00 0.98 2.50 2.00 5.48

AJUSTES POR REDONDEO MONTO TOTAL (Bs.) MONTO VARIACION (Bs.) VARIACION (%) SEGÚN ORDEN DE CAMBIO N° 1

PRECIO TOTAL. (Bs.) 4,070.33 1,115.53 1,170.49 1,197.38 1,230.21 517.27 4,145.42 7,915.54 9,827.26 1,802.55 1,610.72 6,384.08 582.11 756.76 366.72 1,034.12 445.98 213.35 118.56 2,095.32 214.88 153.60 402.68 31,781.12 7,369.96 1,024.66 1,958.29 1,064.03 762.53 1,015.87 3,767.20 106.02 6,761.95 7,897.48 53.13 3,918.97 1,181.68 1,479.72 58.07 320.61 126.33 14.46 738.10

611,166.77

Página 65

INCREMENTO (+) CANTIDAD 4.04 1.00 0.40 3.00 2.34 5.00 2.00 1.00 1.00 2.00 2.00 4.00 4.00 4.00 1.00 1.00 1.00 0.80 0.80 1.00 1.00 0.86

DECREMENTO (-)

MONTO (Bs.) CANTIDAD 513.73 52,424.99 1,015.87 106.02 5,923.11 129.50 2,729.50 951.34 662.38 415.66 2,445.98 4,293.80 2,686.92 1,543.40 1,325.92 413.99 9,504.22 627.23 9,060.50 6,179.48 996.76 1,413.41 115.83 115.83

108,192.71

-0.60 -4.63 -0.43 -1.10 -0.99 -1.62 -4.23 -27.70 -3.89 -1.94 -24.30 -27.70 -0.50 -0.26 -0.50 -

TOTAL AUTORIZADO SEGÚN ODC N°1

% DE AVANCE

MONTO (Bs.) CANTIDAD MONTO (Bs) -80.81 -256.22 -347.54 -3,922.12 -3,286.82 -1,292.10 -907.71 -213.74 -211.63 -225.89 -107.79 -60.02 -88.64 -139.37 -29.04 -85.06 -25.27 -

-58,746.31

29.62 1.00 1.00 1.00 17.60 0.21 36.64 1.12 1.97 0.64 16.00 7.29 4.00 20.30 4.00 3.79 1.90 23.70 4.00 4.00 20.30 4.00 1.00 2.00 0.80 7.00 3.30 5.00 2.00 1.00 1.00 2.00 2.00 4.00 4.00 4.00 1.00 1.00 1.00 0.80 0.80 1.00 1.00 2.00 2.00 0.50 0.72 2.00 2.00 6.34

3,989.52 1,115.53 1,170.49 1,197.38 973.98 169.73 4,659.14 3,993.43 6,540.44 510.46 1,610.72 5,476.36 368.36 756.76 155.09 1,034.12 220.09 105.56 58.54 2,095.32 214.88 64.96 402.68 62,522.14 1,024.66 2,031.74 212.04 13,820.59 182.62 2,729.50 951.34 662.38 415.66 2,445.98 4,293.80 2,686.92 1,543.40 1,325.92 413.99 9,504.22 627.23 9,060.50 6,179.48 996.76 1,413.41 3,895.44 1,181.68 1,479.72 29.04 235.55 101.06 14.46 853.93

611,166.81 0.04 0.00

-1.99% 0.00% 0.00% 0.00% -20.83% -67.19% 12.39% -49.55% -33.45% -71.68% 0.00% -14.22% -36.72% 0.00% -57.71% 0.00% -50.65% -50.52% -50.63% 0.00% 0.00% -57.71% 0.00% 96.73% 0.00% 0.00% 0.00% 0.00% 0.00% 100.00% 0.00% 100.00% 0.00% 75.00% 243.75% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% -0.60% 0.00% 0.00% -50.00% -26.53% -20.00% 0.00% 15.69%