TUGAS PENGANTAR REKAYASA DAN DESAIN PROGRAM STUDI TEKNIK PERMINYAKAN

KELAS PRD ( Kode 40 ) Anggota

:

M. Fikri Lazuardi ( 16418242 ) Alfi Nur Khodijah ( 16418262 ) Fitri Milenia (16418252 ) Abil (16418247 ) Jhon Arlanto S ( 16418257 ) Ivan ( 16418267 ) Julius Reinard ( 16418272 )

INSTITUT TEKNOLOGI BANDUNG KOTA BANDUNG 2018

Tabel Data yang diperlukan dalam evaluasi IOIP/IGIP Kontur

Area (Acre)

h (ft)

1500

210

10

1510

420

10

Nilai max : 0,26 Nilai min : 0,09 Nilai rata-rata : 0,173

10

Nilai max : 0,29 Nilai min : 0,05 Nilai rata-rata : 0,166

1520

490

1530

650

10

Nilai max : 0,27 Nilai min : 0,09 Nilai rata-rata : 0,175

1540

1050

10

Nilai max : 0,25 Nilai min : 0,25 Nilai rata-rata : 0,25

Data perhitungan IOIP 

Por (fraksi) Nilai max : 0,26 Nilai min : 0,05 Nilai rata-rata : 0,182

Sw fraksi

Bo rb/st b

0,379

1,2

0,333

1,2

Nilai max : 2354436,63 Nilai min : 814997,295 Nilairata-rata : 1566605,912

1,2

Nilai max : 3256051,995 Nilai min : 561388,275 Nilairata-rata : 1863809,073

0,191

1,2

Nilai max : 2965514,895 Nilai min : 988504,965 Nilairata-rata : 1922092,988

0,197

1,2

Nilai max : 2725482,375 Nilai min : 2725482,375 Nilairata-rata : 2725482,375

0,173

:

Kedalaman 1500 ft IOIP max

=

7758 𝑥 210 𝑥 10 𝑥 0,26 𝑥 ( 1−0,379) 1,2

= 2192061,69 stb IOIP min

=

7758 𝑥 210 𝑥 10 𝑥 0,05 𝑥 ( 1−0,379) 1,2

= 421550,325 stb IOIP rata-rata

=

7758 𝑥 210 𝑥 10 𝑥 0,182 𝑥 ( 1−0,379) 1,2

= 1534443,183 stb 

Kedalaman 1510 ft IOIP max

=

7758 𝑥 210 𝑥 10 𝑥 0,26 𝑥 ( 1−0,333) 1,2

= 2354436,63 stb IOIP min

=

7758 𝑥 210 𝑥 10 𝑥 0,09 𝑥 ( 1−0,333)

= 814997,295 stb

1,2

IOIP stb Nilai max : 2192061,69 Nilai min : 421550,325 Nilairata-rata : 1534443,183

IOIP rata-rata

=

7758 𝑥 210 𝑥 10 𝑥 0,173 𝑥 ( 1−0,333) 1,2

= 1566605,912 stb 

Kedalaman 1520 ft IOIP max

=

7758 𝑥 210 𝑥 10 𝑥 0,29 𝑥 ( 1−0,173) 1,2

= 3256051,995 stb IOIP min

=

7758 𝑥 210 𝑥 10 𝑥 0,05 𝑥 ( 1−0,173) 1,2

= 561388,275 stb IOIP rata-rata

=

7758 𝑥 210 𝑥 10 𝑥 0,166 𝑥 ( 1−0,173) 1,2

= 1863809,073 stb 

Kedalaman 1530 ft IOIP max

=

7758 𝑥 210 𝑥 10 𝑥 0,27 𝑥 ( 1−0,191) 1,2

= 2965514,895 stb IOIP min

=

7758 𝑥 210 𝑥 10 𝑥 0,09 𝑥 ( 1−0,191) 1,2

= 988504,965 stb IOIP rata-rata

=

7758 𝑥 210 𝑥 10 𝑥 0,175 𝑥 ( 1−0,191) 1,2

= 1922092,988 stb 

Kedalaman 1540 ft IOIP max

=

7758 𝑥 210 𝑥 10 𝑥 0,25 𝑥 ( 1−0,197) 1,2

= 2725482,375 stb IOIP min

=

7758 𝑥 210 𝑥 10 𝑥 0,25 𝑥 ( 1−0,197) 1,2

= 2725482,375 stb IOIP rata-rata

=

7758 𝑥 210 𝑥 10 𝑥 0,25 𝑥 ( 1−0,197)

= 2725482,375 stb

1,2

Perhitungan Keekomomian Volume tangki yang dibutuhkn untuk 10 hari Volume Maksimuum miyak perhari = 3000 BBL/hari Volume tangki yang dibutuhkan = 3000BBL/hari x 10 hari = 30000 BBL Volume minimum miyak perhari = 200 BBL/hari Volume tangki yang dibutuhkan = 200BBL/hari x 10 hari = 2000 BBL Biaya pemboran seluruh bor Jumlah sumur biaya pengeboran biaya total pengeboran

= 15 Sumur = 3MM USD/sumur = (3MM USD/sumur)*15 Sumur = 45MM USD

Biaya Fasilitas Produksi Produksi minyak selama 20 tahun Total biaya fasilitas produksi

= 500 M USD/ 1000 BBL = 11665400 BBL = (500 M USD/1000 BBL ) * 11665400 BBL = 5832700 M USD

Biaya pembangunan jaringan pipa = 500 M USD/km Panjang jaringan pipa = 20 km Total biaya pembangunan jaringan pipa = (500 M USD/km) * 20 km = 1 MM USD NO

Komponen

Jumlah

Satuan

1

Pemboran

15

Sumur

2

Fasprod

11665400

BBL

3

Pipa

20

km

Total

Biaya/unit 3 MM USD / sumur 500 M USD/1000 BBL 500 M USD / km

Subtotal 45 MM USD 5832,7 MM USD 1 MM USD 5878.7 USD

Perhitungan Ekonomi

Tahun

BOPD

BOPY

Pendapatan Gross (USD)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

200 600 1400 2200 3000 3000 3000 3000 3000 2900 2700 2200 1700 1200 900 600 200 100 50 10

73000 219000 511000 803000 1095000 1095000 1095000 1095000 1095000 1058500 985500 803000 620500 438000 328500 219000 73000 36500 18250 3650

5110000 15330000 35770000 56210000 76650000 76650000 76650000 76650000 76650000 74095000 68985000 56210000 43435000 30660000 22995000 15330000 5110000 2555000 1277500 255500

Bagian Pemerintah Indonesia (53%) (USD)

Bagian Kontraktor (47%) (USD)

Pajak Kontraktor (40%) (USD)

Total Bagian Pemerintah Indoensia (USD)

Total Bagian Kontraktor (USD)

Operating Cost (USD)

Pendapatan Bersih Kontraktor (USD)

Cumulative Cash In Kontraktor (USD)

2912700 8738100 20388900 32039700 43690500 43690500 43690500 43690500 43690500 42234150 39321450 32039700 24757950 17476200 13107150 8738100 2912700 1456350 728175 145635

2197300 6591900 15381100 24170300 32959500 32959500 32959500 32959500 32959500 31860850 29663550 24170300 18677050 13183800 9887850 6591900 2197300 1098650 549325 109865

878920 2636760 6152440 9668120 13183800 13183800 13183800 13183800 13183800 12744340 11865420 9668120 7470820 5273520 3955140 2636760 878920 439460 219730 43946

2912700 8738100 20388900 32039700 43690500 43690500 43690500 43690500 43690500 42234150 39321450 32039700 24757950 17476200 13107150 8738100 2912700 1456350 728175 145635

2033780 6101340 14236460 22371580 30506700 30506700 30506700 30506700 30506700 29489810 27456030 22371580 17287130 12202680 9152010 6101340 2033780 1016890 508445 101689

876000 2628000 6132000 9636000 13140000 13140000 13140000 13140000 13140000 12702000 11826000 9636000 7446000 5256000 3942000 2628000 876000 438000 219000 43800

1157780 3473340 8104460 12735580 17366700 17366700 17366700 17366700 17366700 16787810 15630030 12735580 9841130 6946680 5210010 3473340 1157780 578890 289445 57889

1157780 4631120 12735580 25471160 42837860 60204560 77571260 94937960 112304660 129092470 144722500 157458080 167299210 174245890 179455900 182929240 184087020 184665910 184955355 185013244

Related Documents

Dis-prd
November 2019 33
Prd-geo3
November 2019 27
Prd-geo4
November 2019 28
Prd-geo2
November 2019 20
Prodi Arsitek
December 2019 20

More Documents from ""

Kecepatan Raka.docx
December 2019 11
Bab 2.docx
August 2019 56
Pt Adaro Energy Tbk.
August 2019 82
Exercise_1.docx
December 2019 3