001 Basement

  • June 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View 001 Basement as PDF for free.

More details

  • Words: 570
  • Pages: 1
DO NOT SCALE THIS DRAWING . USE FIGURED DIMENSIONS THIS DRAWING IS COPYRIGHT. DO NOT REPRODUCE IT WITHOUT WRITTEN PERMISSION VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING ANY WORK OR SHOP DRAWINGS

N

INFORM THE ARCHITECTS BEFORE ANY WORK STARTS IF THIS DRAWING EXCEEDS THE QUANTITIES IN ANY WAY

The Mall

Key: Demolished element

C

No.14

No.15

113

B

No.16

112

A

111

F

116

New stud partitions New masonry wall

No.13

Notes: (plant) Demolished elements described in brackets

Lightwell

Lightwell

C.1

Subject to further design development in conjuction with M&E & structural engineers

C.2

Subject to further design development in conjuction with M&E & structural engineers

Lightwell up

Corridor B5 Staff Bedroom B3

Staff Bedroom B7

Pool Base Household Stores/Plant B1

E 115

E 115

Kitchen/Prep + Wash-Up B2

Corridor B6

Staff Bathroom B4 riser 1c

Cupboard

Cupboard

Cupboard

Cupboard

Corridor B35

Linen B43 Storage

Corridor B34

ramp up

Storage

Staff Bathroom B8

Kitchen B9

Storage

Pantry B24

Store B17

Corridor B25

Storage

Store B10 Corridor B16

19 18 17 1615 14 13 12 Store below

riser 2a

Lift 2

Stair 2

Staff Lift 1

riser 1b

2

3 4

5 6

10

riser 1a

Staff Bathroom B41

114

Store B11

riser 3b

Staff Change (male) B32

WC B31

Family Lift

Staff Bathroom B38

Main Lift 3

Corridor B19

Corridor B26

Staff Change (female) B30

WC B29 Staff Bedroom B39

Staff Bedroom B40

Staff Bathroom B12 Store

Lobby B27

Porter B21

Refuse B46

Corridor B47

up

Corridor B14

up

Delivery

up

C.1

Porters Entrance

up

B60

B59

(plant)

up

B61

E

241007

Stair 3 terminated at lower ground floor level and staff dayroom added with link through to No.14. Main lift 3 doors repositioned to open into new lobby.

D

221007

Pre-application submission for listed building consent

C

121007

Core 13 & 15 ammended to client requirements

B

101007

Revisions following recent client changes and interior designers comments up to 031007

A

011007

Revisions following recent client changes and interior designers comments up to 260907

Rev.No.

Date

D 114

up up

C.2 vertical datum A

service riser 4 up

Secretary B28

(plant)

Stair 7 Hall

Lift 4

Staff Bedroom B13

Bathroom B20

Staff dayroom B22

(shower)

up

Store

Corridor B15

riser 3a

Laundry B45

D

Store B18

Store B37

Lift 1

Corridor B42

Lobby B23

Kitchen Stores B33

7 8 9

Corridor B36 Laundry B44

riser 2b

11

By

Amendment

Service Entrance

WELDON WALSHE

B48

ARCHITECTURE . INTERIOR DESIGN . HISTORIC BUILDING CONSERVATION 20 GROSVENOR PLACE LONDON SW1X 7HN t:0044 207 235 4100 f:0044 207 235 6678

Plant B58

Refuse & Recycling V5

Bedroom1 B49

E.D.F V1

Bedroom 2 B50

Corridor B55 Plant B57

Meters V8

Pump Room V13

Corridor V11

Refuse & Recycling V22

Boilers V16

PRELIMINARY

Corridor V19 Corridor V3 Water Tank V6

Bathroom B51

Water Tank V14

Water Tank V9

Water Tank V23

Pump Room V17

Corridor V12 Corridor B54

Plant B56

Fire Doors Plant B53

Plant B52

up

shower

Corridor V20

London Electricity Board V2

Water Tank V7

Chillers V15

Water Tank V10

Chillers V18

V4

Water Tank V24

13-16 Carlton House Terrace London SW1Y 5AH

Corridor V21

Basement Plan

C

113

B

112

A

111

F 3 2 1 0.5

scale:

1:100@a1

date:

24/08/07

1:200@a3

Carlton House Terrace

dwg no:

Scale @1:100 metres

0

116

4

5

as proposed

0

0.5

metres

1

2

3

4

5

CR866 101

drawn by: pm rev:

E

Related Documents

001 Basement
June 2020 6
Basement
May 2020 8
Basement
June 2020 8